CN205444235U - Prefabricated retaining wall with prop up and keep off rib - Google Patents

Prefabricated retaining wall with prop up and keep off rib Download PDF

Info

Publication number
CN205444235U
CN205444235U CN201620260927.3U CN201620260927U CN205444235U CN 205444235 U CN205444235 U CN 205444235U CN 201620260927 U CN201620260927 U CN 201620260927U CN 205444235 U CN205444235 U CN 205444235U
Authority
CN
China
Prior art keywords
retaining
wall
rib
hole
backplate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620260927.3U
Other languages
Chinese (zh)
Inventor
王斌
牛冰艳
刘庆松
周原
田茂霖
任艳云
郝佳莹
邱雪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong University of Science and Technology
Original Assignee
Shandong University of Science and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong University of Science and Technology filed Critical Shandong University of Science and Technology
Priority to CN201620260927.3U priority Critical patent/CN205444235U/en
Application granted granted Critical
Publication of CN205444235U publication Critical patent/CN205444235U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Cultivation Receptacles Or Flower-Pots, Or Pots For Seedlings (AREA)

Abstract

The utility model discloses a prefabricated retaining wall with prop up and keep off rib, prop up backplate, bottom suspension backplate on, keep off the hole, the connecting hole, keep off rib and connection rib including afforestation canal, outer wall, afforestation hole. Outer wall slope or perpendicular, outer wall wall is equipped with connecting hole and afforestation hole. The beneficial effects are that, afforest the flourishing ornamental bush plant of downthehole planting root system, plant roots pricks and goes into to be strutted the soil body, plays the effect of stock or anchor rope. The rainwater that flows down along the wall face is collected or by the rivers area soil body down to the afforestation canal, the building of protection retaining wall below, the greening area of improvement retaining wall. Go up a backplate and bottom suspension backplate and link to each other through keeping off a rib, improve the support system wholeness prop up backplate and bottom suspension backplate on, on the cover strut the soil body, the gravity of the make full use of soil body is strutted, improvement supporting construction's economic nature. When the atress is too big or when receiving the impact force, the connection rib atress is crooked, the retaining wall can directly not destroy, leaves the enough time for handling danger.

Description

A kind of prefabricated retaining wall with a retaining rib
Technical field
This utility model belongs to retaining support structure technical field, particularly relates to a kind of prefabricated retaining wall with a retaining rib.
Background technology
The common construction method of existing reinforced concrete retaining wall is typically site operation, and the major defect of this construction method is longer in the construction site time spent, needs more site operation personnel, physical work amount relatively big, and construction manpower is relatively costly.Prefabricated retaining wall is prefabricated in the factory, Assembling, constructs convenient, Environmental Safety.
Utility model content
Technical problem: the purpose of this utility model is to overcome the weak point in prior art, it is provided that a kind of prefabricated retaining wall with retaining rib, its simple in construction, uses safety, dependable performance, is the supporting scheme carrying out supporting for slope soil.
Technical scheme: for reaching above-mentioned purpose, this utility model provides a kind of prefabricated retaining wall with a retaining rib, including greening canal, exterior wall, greening hole, upper retaining-plate, lower retaining-plate, gear hole, connecting hole, retaining rib and connection rib.Described exterior wall tilts or vertical, and exterior wall wall body is provided with connecting hole and greening hole.Exterior wall wall body is provided with greening hole, plants the ornamental shrub plant of well developed root system in greening hole, and root system of plant penetrates by the supporting soil body, plays the effect of anchor pole or anchor cable, increases the globality of supporting construction, and fixing by the supporting soil body.Exterior wall wall body has greening canal, collects the rainwater flowed down along wall face or by the soil body of current leukorrhagia, the building below protection retaining wall, in greening canal, plantation ornamental plant, improves the green coverage of retaining wall, increases aesthetic function.Exterior wall and soil body joining part are respectively equipped with retaining-plate and lower retaining-plate, upper retaining-plate and lower retaining-plate and are provided with a gear hole, are connected by a retaining rib.Covering the supporting soil body on upper retaining-plate and lower retaining-plate, the gravity making full use of the soil body carries out supporting, improves the economy of supporting construction.Upper retaining-plate and lower retaining-plate and the soil body connect one entirety of formation by a retaining rib, improve the stability of supporting construction.Connection rib connects adjacent two prefabricated retaining wall bodies of wall, injects concrete after inserting connection rib in connecting hole.When stress is excessive or receives impulsive force, connection rib stress bends, and adjacent two prefabricated retaining wall body of wall junction deformation, retaining wall will not directly destroy, and leaves enough time for processing danger.The greening hole of exterior wall wall body can make retaining wall stress concentrate, and causes retaining wall shearing resistance tensile property to reduce, and in order to ensure the stability of retaining support structure, to configure appropriate number of stirrup and principal rod in retaining wall.
Retaining rib and connection rib can be reinforcing bar, steel pipe can also be discarded I-steel, a retaining rib can be extracted out after supporting completes or supporting construction is stable, recycle.
It provides the benefit that: exterior wall wall body is provided with greening hole, plants the ornamental shrub plant of well developed root system in greening hole, and root system of plant penetrates by the supporting soil body, plays the effect of anchor pole or anchor cable, increases the globality of supporting construction, and fixing by the supporting soil body.Exterior wall wall body has greening canal, collects the rainwater flowed down along wall face or by the soil body of current leukorrhagia, the building below protection retaining wall, in greening canal, plantation ornamental plant, improves the green coverage of retaining wall, increases aesthetic function.Exterior wall and soil body joining part are respectively equipped with retaining-plate and lower retaining-plate, upper retaining-plate and lower retaining-plate and are provided with a gear hole, are connected by a retaining rib.Covering the supporting soil body on upper retaining-plate and lower retaining-plate, the gravity making full use of the soil body carries out supporting, improves the economy of supporting construction.Upper retaining-plate and lower retaining-plate and the soil body connect one entirety of formation by a retaining rib, improve the stability of supporting construction.Connection rib connects adjacent two prefabricated retaining wall bodies of wall, injects concrete after inserting connection rib in connecting hole.When stress is excessive or receives impulsive force, connection rib stress bends, and adjacent two prefabricated retaining wall body of wall junction deformation, retaining wall will not directly destroy, and leaves enough time for processing danger.Retaining rib and connection rib can be reinforcing bar, steel pipe can also be discarded I-steel, a retaining rib can be extracted out after supporting completes or supporting construction is stable, recycle.
Accompanying drawing explanation
Fig. 1 is a kind of prefabricated retaining wall structure schematic diagram with a retaining rib of this utility model;
Fig. 2 is a kind of prefabricated retaining wall profile with a retaining rib;
Fig. 3 is exterior wall greening hole schematic diagram.
In figure: 1 greening canal;2 exterior walls;3 greening holes;Retaining-plate on 4;5 times retaining-plates;6 gear holes;7 connecting holes;8 retaining ribs;9 connection ribs.
Detailed description of the invention
A kind of prefabricated retaining wall with a retaining rib, including greening canal 1, exterior wall 2, greening hole 3, upper retaining-plate 4, lower retaining-plate 5, gear hole 6, connecting hole 7, retaining rib 8 and connection rib 9.Described exterior wall 2 tilts or vertically, exterior wall 2 wall body is provided with connecting hole 7 and greening hole 3.Exterior wall 2 wall body is provided with greening hole 3, and in greening hole 3, the property shrub plant of well developed root system is viewed and admired in plantation, and root system of plant penetrates by the supporting soil body, plays the effect of anchor pole or anchor cable, increases the globality of supporting construction, and fixing by the supporting soil body.Exterior wall 2 wall body has greening canal 1, collects the rainwater flowed down along wall face or by the soil body of current leukorrhagia, the building below protection retaining wall, in greening canal 1, plantation ornamental plant, improves the green coverage of retaining wall, increases aesthetic function.Exterior wall 2 and soil body joining part are respectively equipped with retaining-plate 4 and lower retaining-plate 5, upper retaining-plate 4 and lower retaining-plate 5 and are provided with a gear hole 6, and upper retaining-plate 4 is connected by a retaining rib 8 with lower retaining-plate 5.Covering the supporting soil body on upper retaining-plate 4 and lower retaining-plate 5, the gravity making full use of the soil body carries out supporting, improves the economy of supporting construction.Upper retaining-plate 4 and lower retaining-plate 5 and the soil body connect one entirety of formation by a retaining rib 8, improve the stability of supporting construction.Connection rib 9 connects adjacent two prefabricated retaining wall bodies of wall, injects concrete after inserting connection rib 9 in connecting hole 7.When stress is excessive or receives impulsive force, connection rib 9 stress bends, and adjacent two prefabricated retaining wall body of wall junction deformation, retaining wall will not directly destroy, and leaves enough time for processing danger.The greening hole 3 of retaining wall exterior wall 2 can make retaining wall stress concentrate, and causes retaining wall shearing resistance tensile property to reduce, and in order to ensure the stability of retaining support structure, to configure appropriate number of stirrup and principal rod in retaining wall.Retaining rib 8 and connection rib 9 can be reinforcing bar, steel pipe can also be discarded I-steel, a retaining rib 8 can be extracted out after supporting completes or supporting construction is stable, recycle.

Claims (1)

1. the prefabricated retaining wall with a retaining rib, it is characterised in that: it includes afforesting canal, exterior wall, greening hole, upper retaining-plate, lower retaining-plate, gear hole, connecting hole, retaining rib and connection rib;Described exterior wall tilts or vertical, and exterior wall wall body is provided with connecting hole and greening hole, plants the ornamental shrub plant of well developed root system in greening hole;Exterior wall has greening canal, exterior wall and soil body joining part and is respectively equipped with retaining-plate and lower retaining-plate, upper retaining-plate and lower retaining-plate and is provided with a gear hole, is connected by a retaining rib;Connection rib connects adjacent two prefabricated retaining wall bodies of wall, injects concrete after inserting connection rib in connecting hole.
CN201620260927.3U 2016-03-31 2016-03-31 Prefabricated retaining wall with prop up and keep off rib Expired - Fee Related CN205444235U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620260927.3U CN205444235U (en) 2016-03-31 2016-03-31 Prefabricated retaining wall with prop up and keep off rib

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620260927.3U CN205444235U (en) 2016-03-31 2016-03-31 Prefabricated retaining wall with prop up and keep off rib

Publications (1)

Publication Number Publication Date
CN205444235U true CN205444235U (en) 2016-08-10

Family

ID=56608977

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620260927.3U Expired - Fee Related CN205444235U (en) 2016-03-31 2016-03-31 Prefabricated retaining wall with prop up and keep off rib

Country Status (1)

Country Link
CN (1) CN205444235U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106522164A (en) * 2017-01-04 2017-03-22 广州华隧威预制件有限公司 Shrub planting type ecological concrete component and preparing method thereof
CN107268530A (en) * 2017-06-28 2017-10-20 防城港市长歧水利管理所 A kind of reservoir slope water and soil fixing device
CN111472321A (en) * 2020-04-21 2020-07-31 周力 Industrialized assembly type revetment construction method
CN112049073A (en) * 2020-08-08 2020-12-08 浙江水利水电学院 River bank protection structure and construction method thereof

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106522164A (en) * 2017-01-04 2017-03-22 广州华隧威预制件有限公司 Shrub planting type ecological concrete component and preparing method thereof
CN107268530A (en) * 2017-06-28 2017-10-20 防城港市长歧水利管理所 A kind of reservoir slope water and soil fixing device
CN111472321A (en) * 2020-04-21 2020-07-31 周力 Industrialized assembly type revetment construction method
CN112049073A (en) * 2020-08-08 2020-12-08 浙江水利水电学院 River bank protection structure and construction method thereof
CN112049073B (en) * 2020-08-08 2022-03-22 浙江水利水电学院 River bank protection structure and construction method thereof

Similar Documents

Publication Publication Date Title
CN205444235U (en) Prefabricated retaining wall with prop up and keep off rib
CN104584969B (en) The roof greening arbor windproof solid method for root of planting
CN104213717B (en) Multi-storey building integration transformation method of construction
CN108999281A (en) A kind of novel precast concrete bean column node and its construction method
CN206607602U (en) A kind of new prefabricated section and new type of retaining system
CN203080510U (en) Pin-sleeved type pile joint
CN208430425U (en) A kind of high-speed railway pier top protective device of installation easy to disassemble
CN207677356U (en) Reinforced steel pipe suspension cable scaffolding
CN211472510U (en) GFRP reinforcing bar combination is strutted
CN206423275U (en) A kind of landscape trees typhoon protection bracing means
CN208844608U (en) A kind of assembled ecological anchor rod retaining wall structure
CN211080088U (en) Ecological protection stock barricade suitable for hydro-fluctuation belt and ordinary side slope
CN204370442U (en) A kind of nursing structure for heavy grade rock side-slope
CN205875876U (en) Triangle angle steel communication steel tower mast prevent wind fixing base
CN206237929U (en) A kind of Anti-Typhoon single shed
CN106760897B (en) A kind of cement or steel pipe electric pole means for correcting
CN205172029U (en) False hillstone in gardens connects reinforced structure
CN205475220U (en) Prestressed anchorage hitch constructs
CN203891361U (en) End gutter safety measure connecting piece system
CN204393003U (en) The tree crown wind-proof device of roof planting arbor
CN109989394A (en) A kind of cast-in-place concrete pile section stake partition and its construction method
CN201588210U (en) Filling pile with ground source heat pump PE pipe
CN104770245A (en) Spliced structure for typhoon-resistant greenhouse base
CN104563141B (en) Protecting structure for big-gradient stone slope
CN204370449U (en) A kind of nursing structure for heavy grade rock side-slope

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160810

Termination date: 20170331