CN205444162U - Horizontal floral tube precipitation system - Google Patents

Horizontal floral tube precipitation system Download PDF

Info

Publication number
CN205444162U
CN205444162U CN201620234455.4U CN201620234455U CN205444162U CN 205444162 U CN205444162 U CN 205444162U CN 201620234455 U CN201620234455 U CN 201620234455U CN 205444162 U CN205444162 U CN 205444162U
Authority
CN
China
Prior art keywords
precipitation
floral tube
tube
horizontal
sand bed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620234455.4U
Other languages
Chinese (zh)
Inventor
张永伟
丁同岭
孔维龙
李云宁
张瑞艳
贾峰
牛鹏举
周锋
陈爱霞
冯素君
代虎
李维岭
于仰垒
韩兆振
高超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Henan Zhongyuan Water Resources And Hydropower Engineering Group Co Ltd
Original Assignee
Henan Zhongyuan Water Resources And Hydropower Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Henan Zhongyuan Water Resources And Hydropower Engineering Group Co Ltd filed Critical Henan Zhongyuan Water Resources And Hydropower Engineering Group Co Ltd
Priority to CN201620234455.4U priority Critical patent/CN205444162U/en
Application granted granted Critical
Publication of CN205444162U publication Critical patent/CN205444162U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Abstract

The utility model belongs to the technical field of the building foundation construction, specifically disclose a horizontal floral tube precipitation system, including the water catch bowl, the soil layer of holding one's breath is laid to sand bed among the water catch bowl underfill on the well sand bed, and the precipitation floral tube has been laid at well sand bed center, precipitation floral tube level sets up, precipitation floral tube one end is sealed, and the other end passes through the lateral conduit and communicates on the trunk line, and the trunk line is connected with real airborne wetting system. The utility model discloses simple structure, precipitation is effectual and with low costs.

Description

Horizontal floral tube precipitation system
Technical field
This utility model belongs to building foundation pit technical field of construction, is specifically related to a kind of horizontal floral tube precipitation system.
Background technology
In hydraulic structures construction period, owing to geological condition is different, some engineering project levels of ground water are higher, when conventional relevant deep foundation base excavation construction, have a large amount of subsoil water and ooze out, and will be unable to construction as got rid of not in time.In order to solve seepage in foundation seepage problem, we used well-points dewatering and tube well dewatering method in the past, well-points dewatering and tube well dewatering are to use lower peupendicular hole pipe to carry out precipitation, it is all the soil property of sandy loam to underground, there is positive effect, but when level of ground water appears above impermeable stratum or the surface more serious geology of infiltration (such as foundry loam layer), upper strata dewatering effect is inconspicuous.Well-points dewatering and tube well dewatering are more without positive effect.In order to thoroughly solve the infiltration of foundation ditch top layer and the problem of foundation ditch side infiltration, engineers and technicians, according to conventional construction experience, consult relevant information, have developed horizontal floral tube precipitation method.Trying out in drawing yellow lock reconstruction project natural literary composition rock canal inverted-siphon engineering in Puyang canal village, obtained positive effect, indices all can reach construction requirement.This equipment use material price buying cheap, easy, low cost, construction technology is simple, dewatering effect is obvious.Improve site construction condition, striven for the engineering time, accelerate construction speed, improve economic benefit.
Utility model content
The purpose of this utility model is to provide that a kind of simple in construction, dewatering effect be good and the horizontal floral tube precipitation system of low cost.
For achieving the above object, this utility model by the following technical solutions: horizontal floral tube precipitation system, including water leg, sand bed in water leg underfill, middle sand bed is laid soil layer of holding one's breath, middle sand bed center is equipped with precipitation floral tube;Precipitation floral tube is horizontally disposed with;Precipitation floral tube one end seals, and the other end is connected on main pipeline by lateral, and main pipeline connects vacuum-dewatering equipment.
Precipitation floral tube includes plastic tube, and plastic tube is evenly equipped with through hole, is fixed with palm fibre lamella, is fixed with filter mesh layer outside palm fibre lamella outside plastic tube.
Plastic tube internal diameter is 4-5cm;Through-hole aperture is 6-10mm, and pitch of holes is 10-20cm.
Middle burial depth is 30-40cm;Described the thickness of the layer of holding one's breath is 15-30cm.
Vacuum-dewatering equipment includes the vacuum tank being connected with main pipeline, and vacuum tank connects has vacuum pump, vacuum pump to be provided with motor.
Main pipeline is arranged below pipeline support.
The processing method of horizontal floral tube precipitation system, comprises the following steps:
(1) precipitation floral tube is made;
(2) water leg is excavated at needs precipitation position;
(3) in laying bottom water leg, sand, is placed on precipitation floral tube on Shamian Island, then fills middle sand, and sand bed in formation fills, at middle sand bed top, soil layer of holding one's breath;
(4) by lateral, precipitation floral tube is connected with main pipeline;
(5) start vacuum-dewatering equipment and carry out precipitation.
Selecting internal diameter in step (1) is the plastic tube of 4-5cm, plastic tube surface drilling formed aperture be 6-10mm, pitch of holes be the through hole of 10-20cm, include that plastic tube forms palm fibre lamella with palm fibre sheet, after palm fibre lamella periphery uses tied silk colligation fixing, it is wrapped in outside palm fibre lamella with filter screen again and colligation is fixed, prepare precipitation floral tube.
One end of precipitation floral tube uses stopper to seal, and the other end connects main pipeline by lateral.
Compared with prior art, the beneficial effects of the utility model are as follows: utilize horizontally disposed precipitation floral tube to carry out precipitation, and precipitation speed is fast, efficiently solve top layer infiltration.It is horizontally disposed with precipitation floral tube the infiltration of foundation ditch side is dammed and also had the biggest effect, lateral seepage stream can be prevented;Precipitation used unit quantity is few, easy to operate;Preparing precipitation floral tube after selecting plastic tube processed, material is easy to get and expense is low;The plastic tube boring machine that internal diameter is 4-5cm is drilled to aperture be 6-10mm, pitch of holes be the precipitation floral tube of 10-20cm, simple for production;Owing to well-point dewatering method is vertical pumping, belong to deep layer precipitation, precipitation scope scalp is big, take effect slow, and be not suitable for the foundation ditch of big cross section, if dewatering effect is more inconspicuous when having foundry loam interlayer in foundation ditch, and horizontal floral tube precipitation system is applicable to variously-shaped big light-gauge foundation ditch, horizontal floral tube precipitation belongs to shallow-layer precipitation, the simple small investment of operation, instant effect;Precipitation system of the present utility model can carry out precipitation to big cross section foundation ditch with local and foundation ditch lateral seepage position according to job site situation, more inconspicuous than more serious position such as dewatering effect to infiltration, with increasing and adjust horizontal precipitation pipeline, applied widely;It is vertical pumping that well-points dewatering carries out precipitation to big cross section foundation ditch, it is typically all and uses both sides precipitation simultaneously to can be only achieved dewatering effect, if with side precipitation, opposite side dewatering effect is likely to inconspicuous, and horizontal precipitation pipeline can be horizontal-extending to opposite side from side, foundation ditch both sides dewatering effect can be made equally to compare balance, use this utility model to save the material of more than 1/2nd than well-points dewatering;Precipitation system of the present utility model runs 1-2 hour, soil body surface in foundation ditch is it can be seen that there is dry and cracked contraction gap, and after running 24 hours, water content fully achieves test water content and execution conditions, solve top layer infiltration and lateral seepage, save 7-15 days than conventional well point dewatering.
Accompanying drawing explanation
Fig. 1 is the structural representation of this utility model horizontal floral tube precipitation system;
Fig. 2 is this utility model precipitation floral tube precipitation schematic diagram.
Detailed description of the invention
Embodiment 1
Horizontal floral tube precipitation system, as it is shown in figure 1, include water leg 7, sand bed 9 in water leg 7 underfill, middle sand bed 9 is laid soil layer 10 of holding one's breath, middle sand bed 9 center is equipped with precipitation floral tube 8;Precipitation floral tube 8 is horizontally disposed with;Precipitation floral tube 8 one end seals, and uses stopper to seal, and the other end connects on main pipeline 4 by lateral 5, and main pipeline 4 connects vacuum-dewatering equipment.Precipitation floral tube 8 includes plastic tube, and plastic tube is evenly equipped with through hole, is fixed with palm fibre lamella, is fixed with filter mesh layer outside palm fibre lamella outside plastic tube, and palm fibre lamella and filter mesh layer are all fixed by binding.Plastic tube internal diameter is 4-5cm;Through-hole aperture is 6-10mm, and pitch of holes is 10-20cm.Middle sand bed 9 thickness is 30-40cm;The thickness of soil layer 10 of holding one's breath is 15-30cm.Vacuum-dewatering equipment includes the vacuum tank 3 being connected with main pipeline 4, and vacuum tank 3 connects has vacuum pump 1, vacuum pump 1 to be provided with motor 2.Main pipeline 4 is arranged below pipeline support 11.
Embodiment 2
The processing method of horizontal floral tube precipitation system, comprises the following steps:
(1) precipitation floral tube is made;
(2) water leg is excavated at needs precipitation position;
(3) in laying bottom water leg, sand, is placed on precipitation floral tube on Shamian Island, then fills middle sand, and sand bed in formation fills, at middle sand bed top, soil layer of holding one's breath;
(4) by lateral, precipitation floral tube is connected with main pipeline;
(5) start vacuum-dewatering equipment and carry out precipitation.
Selecting internal diameter in step (1) is the plastic tube of 4-5cm, plastic tube surface drilling formed aperture be 6-10mm, pitch of holes be the through hole of 10-20cm, through hole becomes blossom type, include that plastic tube forms palm fibre lamella with palm fibre sheet, after palm fibre lamella periphery uses tied silk colligation fixing, it is wrapped in outside palm fibre lamella with filter screen again and colligation is fixed, prepare precipitation floral tube.One end of precipitation floral tube uses stopper to seal, and the other end connects main pipeline by lateral.

Claims (6)

  1. The most horizontal floral tube precipitation system, it is characterised in that: including water leg, sand bed in water leg underfill, middle sand bed is laid soil layer of holding one's breath, middle sand bed center is equipped with precipitation floral tube;Precipitation floral tube is horizontally disposed with;Precipitation floral tube one end seals, and the other end is connected on main pipeline by lateral, and main pipeline connects vacuum-dewatering equipment.
  2. Horizontal floral tube precipitation system the most as claimed in claim 1, it is characterised in that: described precipitation floral tube includes plastic tube, and plastic tube is evenly equipped with through hole, is fixed with palm fibre lamella, is fixed with filter mesh layer outside palm fibre lamella outside plastic tube.
  3. Horizontal floral tube precipitation system the most as claimed in claim 2, it is characterised in that: described plastic tube internal diameter is 4-5cm;Through-hole aperture is 6-10mm, and pitch of holes is 10-20cm.
  4. Horizontal floral tube precipitation system the most as claimed in claim 3, it is characterised in that: described middle burial depth is 30-40cm;Described the thickness of the layer of holding one's breath is 15-30cm.
  5. Horizontal floral tube precipitation system the most as claimed in claim 4, it is characterised in that: described vacuum-dewatering equipment includes the vacuum tank being connected with main pipeline, and vacuum tank connects has vacuum pump, vacuum pump to be provided with motor.
  6. Horizontal floral tube precipitation system the most as claimed in claim 5, it is characterised in that: described main pipeline is arranged below pipeline support.
CN201620234455.4U 2016-03-25 2016-03-25 Horizontal floral tube precipitation system Expired - Fee Related CN205444162U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620234455.4U CN205444162U (en) 2016-03-25 2016-03-25 Horizontal floral tube precipitation system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620234455.4U CN205444162U (en) 2016-03-25 2016-03-25 Horizontal floral tube precipitation system

Publications (1)

Publication Number Publication Date
CN205444162U true CN205444162U (en) 2016-08-10

Family

ID=56575064

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620234455.4U Expired - Fee Related CN205444162U (en) 2016-03-25 2016-03-25 Horizontal floral tube precipitation system

Country Status (1)

Country Link
CN (1) CN205444162U (en)

Similar Documents

Publication Publication Date Title
CN205677631U (en) It is combined arch tunnel lining structure at the bottom of the box tunnel with hydrophobic function
CN204023501U (en) A remove dangerous and consolidate prevention of seepage processing structure for earth and rockfill dam
CN105544576B (en) A kind of foundation pit Yield rainfall relation excavation method
CN207143981U (en) 3rd is rich water half diagenesis Sandstone Section Metro station excavation discharge structure
CN102383408B (en) Greening method for high water level impermeable saline and alkaline lands and greening system
CN102787608B (en) Gravity type foundation pit supporting system under vacuum effect and construction method
CN103215945B (en) The three-dimensional assembly power drain consolidation system of heterogeneous body place soft soil foundation and method
CN203939036U (en) A kind of steel sheet pile cofferdam structure that is applicable to river course
CN105821892A (en) Horizontal screen pipe dewatering system and treatment method
CN105155472A (en) Dam foundation anti-seepage structure of deep overlying layer earth-rock dam and construction method of dam foundation anti-seepage structure
CN205839779U (en) A kind of sandy soil stratum base pit dewatering water level following catch pit structure
CN205662938U (en) Drainage excavation structure falls in foundation ditch
CN107023013A (en) A kind of green precipitation method for making full use of hydrogeological characteristic
CN204252148U (en) High artesian thick sand-pebble layer deep foundation ditch slip casting back cover structure
CN203320576U (en) Waterproof and drainage system for basement external wall of super high-rise buildings
CN205444162U (en) Horizontal floral tube precipitation system
CN206034603U (en) Airport height fill construction three -dimensional drainage system
CN206173944U (en) Lowland dredger fill drainage system
CN205000346U (en) Slope frame for slope reinforcement and water drainage
CN204644998U (en) A kind of light and shade double-decker gutter
CN204825916U (en) Highly permeable stratum deep basal pit back cover stagnant water structure
CN104775444B (en) A kind of method for wet environment protection archeological site earthen ruins Yield rainfall relation
CN210946854U (en) Anti-seepage structure of foundation pit elevator shaft
CN203846479U (en) Saturated loose sand compacting system
CN208633235U (en) A kind of sandstone seepage well suitable for sponge urban construction

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160810

Termination date: 20190325

CF01 Termination of patent right due to non-payment of annual fee