CN107023013A - A kind of green precipitation method for making full use of hydrogeological characteristic - Google Patents

A kind of green precipitation method for making full use of hydrogeological characteristic Download PDF

Info

Publication number
CN107023013A
CN107023013A CN201710410969.XA CN201710410969A CN107023013A CN 107023013 A CN107023013 A CN 107023013A CN 201710410969 A CN201710410969 A CN 201710410969A CN 107023013 A CN107023013 A CN 107023013A
Authority
CN
China
Prior art keywords
water
draw
well
full use
precipitation method
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710410969.XA
Other languages
Chinese (zh)
Inventor
张伟
黄金召
田云飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Seventh Engineering Division Corp Ltd
Original Assignee
China Construction Seventh Engineering Division Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Seventh Engineering Division Corp Ltd filed Critical China Construction Seventh Engineering Division Corp Ltd
Priority to CN201710410969.XA priority Critical patent/CN107023013A/en
Publication of CN107023013A publication Critical patent/CN107023013A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D19/00Keeping dry foundation sites or other areas in the ground
    • E02D19/06Restraining of underground water
    • E02D19/10Restraining of underground water by lowering level of ground water

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Hydrology & Water Resources (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Environmental & Geological Engineering (AREA)
  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Abstract

A kind of green precipitation method for making full use of hydrogeological characteristic, comprises the following steps:1), foundation ditch draw the determination of water percolating capacity;2), calculate and single draw seepage well capacity of outlet water:3), determine to draw infiltration to the water level value influence value in bottom water-bearing layer;4), determine precipitation form and pipe well spacing.Present invention process is simple; the abundant water regime of soil layer itself; a number of draw seepage well by setting; drainage top backwater and top water-bearing layer; not only reduce the consumption of energy; water resource is protected, and reduces a large amount of sedimentations drawn water and cause surrounding buildingses to consolidate, is a kind of safety, economic, environmental protection new precipitation method.In work progress, it can simultaneously set and draw seepage well progress reduction Water Level in Foundation Pit, it is to avoid the geological disaster such as piping, drift sand, allow pattern foundation pit supporting structure to be carried out, so as to shorten the foundation pit support construction duration.In addition, setting appropriate position drawing seepage well, it is not necessary to when backfilling sandstone and being shunt in a well, be conducive to the antiseepage of hypogee and the drying of guarantee basement.

Description

A kind of green precipitation method for making full use of hydrogeological characteristic
Technical field
The present invention relates to building foundation pit precipitation method, specially a kind of green precipitation for making full use of hydrogeological characteristic Method.
Background technology
For being water barrier between water-bearing layer in the range of base pit dewatering, upper aqueous layer penetrating power is less than bottom aqueous layer Penetrating power, bottom aqueous layer water level is less than precipitation depth and with certain thickness and dissolving more than or equal in precipitation depth Pit Discharge, when the water quality of upper strata underground water is not comtaminated can introduce underlying earth water, this kind of earth formation can lead to Cross set depth different draw seepage well and will connect in water-bearing layer up and down, upper aqueous layer will be made in head difference and self gravitation With lower inflow bottom aqueous layer, so as to reach drainage top water-bearing layer, part pumping equipment is this method save, energy is reduced Consumption, protect water resource.
Therefore it provides one kind makes full use of above-mentioned hydrogeology to carry out dewatering design, it is thus necessary to determine that setting is drawn seepage well and caused The relation of water level and design water level after the change of bottom water-bearing layer, and then the method for determining precipitation, being one is worth research The problem of.
The content of the invention
In order to overcome above-mentioned deficiency of the prior art, dropped the invention provides one kind point using above-mentioned hydrogeology Water, by set it is a number of draw seepage well, drainage top backwater and top water-bearing layer not only reduce the consumption of energy, Water resource is protected, and reduces the green precipitation method of a large amount of sedimentations drawn water and cause surrounding buildingses to consolidate.
The object of the present invention is achieved like this:
A kind of green precipitation method for making full use of hydrogeological characteristic, comprises the following steps:1), foundation ditch draws water percolating capacity It is determined that;2), calculating is single draws seepage well capacity of outlet water:3), determine to draw water level value influence value of the infiltration to bottom water-bearing layer;4), really Determine precipitation form and pipe well spacing.
Described foundation ditch draws the determination of water percolating capacity, concretely comprises the following steps the water burst for determining to need to draw according to stratum soil property situation and oozing Amount, the water yield can be that perched water and needs draw the multi-layered aquifer oozed, according to homogeneous aquifer diving complete penetration of well formula, Each layer water-bearing layer water yield is calculated respectively, and is overlapped and is collected:
In formula:Total yield (the m of Q --- base pit dewatering3/d);
K --- infiltration coefficient (m/d);
H0--- phreatic aquifer (m);
s0--- Water Level in Foundation Pit drawdown;
R --- Rainfall Influence radius;
r0--- the precipitation gang of wells being evenly arranged along foundation ditch periphery encloses the radius (m) of area equivalent circle.
It is described it is single draw seepage well capacity of outlet water calculation formula be:
In formula:q0--- individual well capacity of outlet water;
rs--- filter radius (m);
L --- filter water inlet portion length (m);
K --- AQUIFER HYDRAULIC.
Described determination precipitation form and pipe well spacing:
If bottom aqueous layer head subtracts design water level much larger than Δ h, it can take and all draw seepage well from scheme is oozed, it, which draws, oozes Well number isDraw seepage well spacing for D=P/ (n-1), and enter according to water-bearing layer water inlet and water outlet position and the radius of influence Row arrangement.
Described determination precipitation form and pipe well spacing:If bottom aqueous layer head subtracts design water level and is comparable to Δ h, can Take ooze to take out well spacing form more.
Described determination precipitation form and pipe well spacing:If bottom aqueous layer head subtracts design water level less than Δ h, Ying Gen According to artesian water complete penetration of well calculation formula, the water yield for needing to extract is calculated, and considers that completely determining for surrounding environment may be caused Precipitation scheme.
Positive beneficial effect:Construction technology of the present invention is simple, the abundant water regime of soil layer itself, certain by setting Quantity draws seepage well, drainage top backwater and top water-bearing layer, not only reduces the consumption of energy, protects water resource, and A large amount of sedimentations drawn water and cause surrounding buildingses to consolidate are reduced, are a kind of safety, economic, environmental protection new precipitation method.Construction During, it can simultaneously set and draw seepage well and carry out reduction Water Level in Foundation Pit, it is to avoid the geological disaster such as piping, drift sand, allow pattern foundation pit supporting structure Carried out, so as to shorten the foundation pit support construction duration.In addition, setting appropriate position drawing seepage well, it is not necessary to Cast-in-situ Piles in Sand-filling When stone is shunt in a well, be conducive to the antiseepage of hypogee and ensure the drying of basement.
Embodiment
With reference to overall plan, the present invention is described further:
A kind of green precipitation method for making full use of hydrogeological characteristic, comprises the following steps:1), foundation ditch draws water percolating capacity It is determined that;2), calculating is single draws seepage well capacity of outlet water:3), determine to draw water level value influence value of the infiltration to bottom water-bearing layer;4), really Determine precipitation form and pipe well spacing.
1) foundation ditch draws the determination of water percolating capacity
Determine to need to draw the water yield oozed according to stratum soil property situation, the water yield can be perched water and need to draw to ooze Multi-layered aquifer, according to homogeneous aquifer dive under water complete penetration of well formula, each layer water-bearing layer water yield is calculated respectively, and folded Plus collect.
In formula:Total yield (the m of Q --- base pit dewatering3/d);
K --- infiltration coefficient (m/d);
H0--- phreatic aquifer (m);
s0--- Water Level in Foundation Pit drawdown;
R --- Rainfall Influence radius;
r0--- the precipitation gang of wells being evenly arranged along foundation ditch periphery encloses the radius (m) of area equivalent circle;
2) it is single to draw seepage well capacity of outlet water:
In formula:q0--- individual well capacity of outlet water;
rs--- filter radius (m);
L --- filter water inlet portion length (m);
K --- AQUIFER HYDRAULIC;
3) water level value influence value of the infiltration to bottom water-bearing layer is drawn
Upper soil horizon draws the water oozed through drawing seepage well inflow bottom water-bearing layer in the range of precipitation, will cause the water in bottom water-bearing layer The rising of place value, its numerical value can be calculated using pressure-bearing whole well water yield calculation formula.
In formula:Q --- draw infiltration total amount;
R --- draw and ooze the radius of influence after underground water;
r0--- draw seepage well radius;
K --- artesian water draws infiltration layer infiltration coefficient;
M --- artesian aquifer thickness;
4) precipitation form and pipe well spacing are determined
If bottom aqueous layer head subtracts design water level much larger than Δ h, it can take and all draw seepage well from scheme is oozed, it, which draws, oozes Well number isDraw seepage well spacing for D=P/ (n-1), and enter according to water-bearing layer water inlet and water outlet position and the radius of influence Row arrangement.
If bottom aqueous layer head subtracts design water level and be comparable to Δ h, " ooze more and take out " well spacing form can be taken;
If bottom aqueous layer head subtracts design water level less than Δ h, should be according to artesian water complete penetration of well calculation formula, calculating needs The water yield to be extracted, and consider that the precipitation scheme that completely determines of surrounding environment may be caused, the program may be for " one oozes one Take out ", the precipitation form of " two ooze take out ".
Present invention process is simple, the abundant water regime of soil layer itself, a number of draws seepage well, drainage by setting Top backwater and top water-bearing layer, not only reduce the consumption of energy, protect water resource, and reduce a large amount of draw water and cause The sedimentation of surrounding buildingses consolidation, is a kind of safety, economic, environmental protection new precipitation method.In work progress, it can set simultaneously Draw seepage well and carry out reduction Water Level in Foundation Pit, it is to avoid the geological disaster such as piping, drift sand, allow pattern foundation pit supporting structure to be carried out, so as to shorten The foundation pit support construction duration.In addition, setting appropriate position drawing seepage well, it is not necessary to when backfilling sandstone and being shunt in a well, be conducive to The antiseepage of hypogee and the drying for ensureing basement.
It is merely illustrative of the technical solution of the present invention and unrestricted, the knowledge possessed in the those of ordinary skill above In the range of, technical scheme is modified or equivalent substitution, without departing from the objective and scope of the technical program, It all should cover among scope of the presently claimed invention.

Claims (6)

1. a kind of green precipitation method for making full use of hydrogeological characteristic, it is characterised in that:Comprise the following steps:1), foundation ditch Draw the determination of water percolating capacity;2), calculating is single draws seepage well capacity of outlet water:3), determine to draw water level value shadow of the infiltration to bottom water-bearing layer Ring value;4) precipitation form and pipe well spacing, are determined.
2. a kind of green precipitation method for making full use of hydrogeological characteristic according to claim 1, it is characterised in that:Institute The foundation ditch stated draws the determination of water percolating capacity, concretely comprises the following steps the water yield for determining to need to draw according to stratum soil property situation and oozing, the water burst Amount can be that perched water and needs draw the multi-layered aquifer oozed, according to homogeneous aquifer diving complete penetration of well formula, calculate respectively Go out each layer water-bearing layer water yield, and be overlapped and collect:
In formula:Total yield (the m of Q --- base pit dewatering3/d);
K --- infiltration coefficient (m/d);
H0--- phreatic aquifer (m);
s0--- Water Level in Foundation Pit drawdown;
R --- Rainfall Influence radius;
r0--- the precipitation gang of wells being evenly arranged along foundation ditch periphery encloses the radius (m) of area equivalent circle.
3. a kind of green precipitation method for making full use of hydrogeological characteristic according to claim 1, it is characterised in that:Institute State it is single draw seepage well capacity of outlet water calculation formula be:
In formula:q0--- individual well capacity of outlet water;
rs--- filter radius (m);
L --- filter water inlet portion length (m);
K --- AQUIFER HYDRAULIC.
4. a kind of green precipitation method for making full use of hydrogeological characteristic according to claim 1, it is characterised in that:Institute The determination precipitation form stated and pipe well spacing, if bottom aqueous layer head subtracts design water level much larger than Δ h, can take and all draw Seepage well is from oozing scheme, and it draws seepage well number and isDraw seepage well spacing for D=P/ (n-1), and according to water-bearing layer water inlet and Water outlet position and the radius of influence are arranged.
5. a kind of green precipitation method for making full use of hydrogeological characteristic according to claim 1, it is characterised in that:Institute The determination precipitation form stated and pipe well spacing, if bottom aqueous layer head subtracts design water level and be comparable to Δ h, can take and ooze one more Take out well spacing form.
6. a kind of green precipitation method for making full use of hydrogeological characteristic according to claim 1, it is characterised in that:Institute The determination precipitation form stated and pipe well spacing, should be complete according to artesian water if bottom aqueous layer head subtracts design water level less than Δ h Whole well calculation formula, calculates the water yield for needing to extract, and consider that may cause surrounding environment completely determines precipitation scheme.
CN201710410969.XA 2017-06-04 2017-06-04 A kind of green precipitation method for making full use of hydrogeological characteristic Pending CN107023013A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710410969.XA CN107023013A (en) 2017-06-04 2017-06-04 A kind of green precipitation method for making full use of hydrogeological characteristic

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710410969.XA CN107023013A (en) 2017-06-04 2017-06-04 A kind of green precipitation method for making full use of hydrogeological characteristic

Publications (1)

Publication Number Publication Date
CN107023013A true CN107023013A (en) 2017-08-08

Family

ID=59530089

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710410969.XA Pending CN107023013A (en) 2017-06-04 2017-06-04 A kind of green precipitation method for making full use of hydrogeological characteristic

Country Status (1)

Country Link
CN (1) CN107023013A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110309520A (en) * 2018-03-27 2019-10-08 北京交通大学 A kind of calculation method and its application of stratum partially-penetrated well effective reinforcing depth of diving under water
CN110777830A (en) * 2019-08-30 2020-02-11 中电建十一局工程有限公司 Foundation pit dewatering control method under geological condition of water-rich thick gravel layer
CN113236359A (en) * 2021-05-28 2021-08-10 中煤科工集团西安研究院有限公司 Separation layer water drainage method, separation layer water drainage roadway system and construction method

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08246780A (en) * 1995-03-10 1996-09-24 Shimabukuro Naoya Saltwater cultivating well and method for sinking the well
CN102778260A (en) * 2012-05-17 2012-11-14 中南大学 Calculation method for water drainage and water drainage time in dynamic precipitation process of submersible fully penetrating well or well group
AU2013252230B2 (en) * 2012-04-28 2016-05-12 China Shenhua Energy Company Limited Method for distributed storage and use of underground water in mine

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08246780A (en) * 1995-03-10 1996-09-24 Shimabukuro Naoya Saltwater cultivating well and method for sinking the well
AU2013252230B2 (en) * 2012-04-28 2016-05-12 China Shenhua Energy Company Limited Method for distributed storage and use of underground water in mine
CN102778260A (en) * 2012-05-17 2012-11-14 中南大学 Calculation method for water drainage and water drainage time in dynamic precipitation process of submersible fully penetrating well or well group

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
任海香,张廷会: "《管井与引渗井相结合在某基坑降水中的应用》", 《地下水》 *
周景星,李广信,张建红编著: "《基础工程 第3版=FOUNDATION ENGINEERING THIRD EDITION》", 31 January 2015 *
彭泽瑞主编: "《北京地铁复一八线土建工程施工技术》", 31 August 2003 *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110309520A (en) * 2018-03-27 2019-10-08 北京交通大学 A kind of calculation method and its application of stratum partially-penetrated well effective reinforcing depth of diving under water
CN110777830A (en) * 2019-08-30 2020-02-11 中电建十一局工程有限公司 Foundation pit dewatering control method under geological condition of water-rich thick gravel layer
CN113236359A (en) * 2021-05-28 2021-08-10 中煤科工集团西安研究院有限公司 Separation layer water drainage method, separation layer water drainage roadway system and construction method
CN113236359B (en) * 2021-05-28 2022-06-28 中煤科工集团西安研究院有限公司 Separation layer water drainage method, separation layer water drainage roadway system and construction method

Similar Documents

Publication Publication Date Title
CN104032760A (en) Foundation pit construction tube well dewatering method
Hanson et al. Ground‐water dams for rural‐water supplies in developing countries
CN108457285B (en) Ultra-deep pit-in-pit open type dewatering construction method
CN102425421B (en) Novel water control method suitable for mine shafts
CN107587516A (en) A kind of efficient sealing of Follow-up type hinders sand precipitation hybrid system and its construction method
CN104314090A (en) Deep foundation pit bedrock drainage culvert and drainage system and drainage construction method thereof
CN105544576A (en) Foundation ditch dewatering and drainage excavation structure and application method
CN113175005B (en) Anti-floating design and construction method for waterproof bottom plate of underground garage in rainstorm period
CN107023013A (en) A kind of green precipitation method for making full use of hydrogeological characteristic
CN106592756A (en) Karst region step-type basement water drainage structure and construction method thereof
CN207143981U (en) 3rd is rich water half diagenesis Sandstone Section Metro station excavation discharge structure
CN101413277B (en) Method for correcting incline of deep layer drill silt squeezing and soil discharging
CN110984200B (en) Method for draining water of foundation pit of binary geological structure layer
CN108867673A (en) A kind of underwater prevention method in the foundation pit based on the curtain that draws water
CN205999897U (en) A kind of seepage proof curtain using dewatering well borders on the river foundation ditch
CN205152969U (en) A precipitation tubular well structure for foundation ditch precipitation
CN205662938U (en) Drainage excavation structure falls in foundation ditch
CN204940314U (en) A kind of bellend pressure reduction well and deep foundation ditch structure thereof
CN110670613B (en) Foundation pit elevator shaft water seepage prevention structure and construction method thereof
CN204311464U (en) A kind of foundation pit dewatering constructing structure
CN203320576U (en) Waterproof and drainage system for basement external wall of super high-rise buildings
CN104975610A (en) Expanded-end decompression well, deep foundation pit structure and construction method for expanded-end decompression well
CN207121911U (en) A kind of foundation ditch horizontal tube precipitation system
CN204899930U (en) Secretly dig leading dry out well in subway hole
CN103306299A (en) Comprehensive waterproof and drainage construction method of basement exterior wall of super-high-rise building

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20170808