CN205421614U - Housing construction wall body of being under construction fast - Google Patents

Housing construction wall body of being under construction fast Download PDF

Info

Publication number
CN205421614U
CN205421614U CN201620204328.XU CN201620204328U CN205421614U CN 205421614 U CN205421614 U CN 205421614U CN 201620204328 U CN201620204328 U CN 201620204328U CN 205421614 U CN205421614 U CN 205421614U
Authority
CN
China
Prior art keywords
groove
preformed bricks
wall
prefabricated brick
wall body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620204328.XU
Other languages
Chinese (zh)
Inventor
徐炳建
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wenzhou Dong Lian Municipal Engineering Co Ltd
Original Assignee
Wenzhou Dong Lian Municipal Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wenzhou Dong Lian Municipal Engineering Co Ltd filed Critical Wenzhou Dong Lian Municipal Engineering Co Ltd
Priority to CN201620204328.XU priority Critical patent/CN205421614U/en
Application granted granted Critical
Publication of CN205421614U publication Critical patent/CN205421614U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a housing construction wall body of being under construction fast, its technical scheme main points include the wall body, including prefabricated brick, the wall body is piled up by prefabricated brick and is formed, the middle part of prefabricated brick is equipped with the logical groove of lining up from top to bottom, four ends of lower surface of prefabricated brick all are equipped with first arch, four ends of upper surface of prefabricated brick be equipped with with the first recess of first protruding complex, first bellied height is greater than the degree of depth of first recess, the right side terminal surface of prefabricated brick is equipped with the second arch, the left side terminal surface of prefabricated brick be equipped with with the protruding complex second recess of second, the bellied length of second is greater than the degree of depth of second recess, the wall body outside is connected with the template, and the clearance of adjacent prefabricated brick and the logical inslot of prefabricated brick all are equipped with concrete layer. The utility model discloses the structural strength height has, stable performance, convenient positive effect of being under construction, and can effectively shorten construction period for the project progress.

Description

A kind of building construction rapid construction body of wall
Technical field
This utility model relates to field of house buildings, in particular it relate to a kind of can the building construction body of wall of rapid construction.
Background technology
In housing construction, traditional body of wall uses lightweight bricks stack and connected by cement mortar, and every piece of lightweight bricks of this kind of wall construction is required for spreading cement mortar and is connected with a upper lightweight bricks, and construction more bothers, and the construction period is long.
Utility model content
The deficiency existed for prior art, the purpose of this utility model is to provide a kind of building construction rapid construction body of wall, the problem long in time limit to solve conventional house wall construction.
For achieving the above object, this utility model provides following technical scheme: a kind of building construction rapid construction body of wall, including wall body, including preformed bricks, described wall body is piled up by preformed bricks and is formed, and the middle part of described preformed bricks is provided with the groove of up/down perforation, and it is protruding that lower surface four end of described preformed bricks is equipped with first, upper surface four end of described preformed bricks is provided with the first groove with the first male cooperation, and the height of described first projection is more than the degree of depth of the first groove;Its right end face of described preformed bricks is provided with the second projection, and the left end face of described preformed bricks is provided with the second groove with the second male cooperation, and the length of described second projection is more than the degree of depth of the second groove;The connection of described wall outer body is equipped with concrete layer in having template, the gap of contiguous prefabricated brick and the groove of preformed bricks.
Good effect of the present utility model is, the body of wall described in this programme is constructed without using traditional mode;It is embodied in, this wall body forms for being piled up by preformed bricks, it is protruding that the lower surface of preformed bricks is provided with first, and its upper surface is provided with the first groove, upper and lower two pieces of preformed bricks can carry out location and installation by the first projection with the first groove, and first the height of projection more than the first groove, after this makes upper and lower two pieces of preformed bricks heaps puzzle, gap can be left between two pieces of preformed bricks;In like manner the preformed bricks of left and right directions is then by second protruding and the second groove fit location and installation, equally can retention gap;Additionally have template, template to can be used for the preformed bricks that location and installation is good in the connection of wall outer body to be fixed and seal;And in preformed bricks, all offer the groove of up/down perforation, and can be wall body heap puzzles or is stacked to certain altitude when, penetration concrete at the groove of top preformed bricks, until concrete overflows, thus groove and gap location are all filled;Template is dismantled after concrete setting.By using above-mentioned wall body structure, owing to it is without connecting brick body one by one, therefore enormously simplify construction technology, shorten the construction period, improve construction speed, and concrete parts is connected in groove, substantially increase the contact area of concrete and preformed bricks, add bonding strength.
This utility model is further arranged to: the concrete layer in described groove is connected with steel bar framework.
By using technique scheme, steel bar framework is set in groove and is connected with mixed pure land layer one, further increase the structural strength of body of wall.
This utility model is further arranged to: described steel bar framework is in " well " font, and including longitudinal reinforcement and transverse steel, transverse steel is positioned at groove, and longitudinal reinforcement is through the preformed bricks of stacked on top.
By using technique scheme, steel bar framework is described further, steel bar framework has transverse steel and longitudinal reinforcement, longitudinal reinforcement can be used for running through the preformed bricks that connection is upper and lower, improving the type that is completely embedded between upper and lower preformed bricks, transverse steel plays fixing longitudinal reinforcement and improves and the effect of the raising of concrete layer contact area with concrete layer bonding strength.
This utility model is further arranged to: described groove is circle.
By using technique scheme, the preferably circular structure of groove has more preferable comprcssive strength, improves the stability of structure.
In sum, this utility model provide a kind of can rapid construction, reduction of erection time, the building construction body of wall of raising construction speed.
Accompanying drawing explanation
Fig. 1 is the structural representation of this utility model embodiment;
Fig. 2 is the internal structural map of this utility model embodiment;
Fig. 3 is enlarged drawing at the A of Fig. 2;
Fig. 4 is the exploded perspective view of this utility model another kind wall body structure;
Fig. 5 is enlarged drawing at the B of Fig. 4.
Description of reference numerals: 1, preformed bricks;2, first is protruding;3, the first groove;4, second is protruding;5, the second groove;6, concrete layer;7, template;8, steel bar framework;9, groove;10, half slot.
Detailed description of the invention
Below in conjunction with accompanying drawing, this utility model is described in further detail.
Present embodiment discloses a kind of building construction rapid construction body of wall, as Figure 1-3, including wall body, wall body is piled up by preformed bricks 1 and is formed, the middle part of preformed bricks 1 is provided with the groove 9 of up/down perforation, and described groove 9 is circular, and lower surface four end of preformed bricks 1 is equipped with the first projection 2, upper surface four end of preformed bricks 1 is provided with and the first protruding 2 the first groove 3 coordinated, and the height of the first projection 2 is more than the degree of depth of the first groove 3;Its right end face of preformed bricks 1 is provided with the second projection 4, and the left end face of preformed bricks 1 is provided with and the second protruding 4 the second groove 5 coordinated, and the length of described second projection 4 is more than the degree of depth of the second groove 5;The connection of described wall outer body is equipped with concrete layer 6 in having template 7, the gap of contiguous prefabricated brick 1 and the groove 9 of preformed bricks 1.
Good effect of the present utility model is, the body of wall described in this programme is constructed without using traditional mode;It is embodied in, this wall body forms for being piled up by preformed bricks 1, the lower surface of preformed bricks 1 is provided with the first projection 2, and its upper surface is provided with the first groove 3, upper and lower two pieces of preformed bricks 1 can carry out location and installation by the first protruding 2 and first groove 3, and first the height of projection 2 more than the first groove 3, after this makes upper and lower two pieces of preformed bricks 1 heaps puzzle, gap can be left between two pieces of preformed bricks 1;In like manner the preformed bricks 1 of left and right directions then coordinates location and installation by second protruding 4 with the second groove 5, equally can retention gap;Additionally connect, at wall outer body, the preformed bricks 1 having template 7, template 7 to can be used for location and installation is good to be fixed and seal;And in preformed bricks 1, all offer the groove 9 of up/down perforation, and can be wall body heap puzzles or is stacked to certain altitude when, penetration concrete at the groove 9 of top preformed bricks 1, until concrete overflows, thus groove 9 and gap location are all filled;Template 7 is dismantled after concrete setting.By using above-mentioned wall body structure, owing to it is without connecting brick body one by one, therefore enormously simplify construction technology, shorten the construction period, improve construction speed, and concrete parts is connected in groove 9, substantially increase the contact area of concrete and preformed bricks 1, add bonding strength.
It addition, as it is shown on figure 3, the concrete layer 6 in groove 9 is connected with steel bar framework 8, described steel bar framework 8 is in " well " font, and including longitudinal reinforcement and transverse steel, transverse steel is positioned at groove 9, and longitudinal reinforcement is through the preformed bricks 1 of stacked on top.Steel bar framework 8 has transverse steel and longitudinal reinforcement, longitudinal reinforcement can be used for running through the preformed bricks 1 that connection is upper and lower, improving the type that is completely embedded between upper and lower preformed bricks 1, transverse steel plays fixing longitudinal reinforcement and improves and the effect of the raising of concrete layer 6 contact area with concrete layer 6 bonding strength.
Additionally, as illustrated in figures 4-5, this utility model additionally provides another rapid construction wall body structure, can realize the staggered of preformed bricks to pile up, it includes two kinds of preformed bricks structures, and the first preformed bricks structure is identical with the preformed bricks of scheme before, first projection 2 of another kind of preformed bricks is arranged at the middle part of preformed bricks, first groove 3 is also disposed on the middle part opposite side relative to the first projection 2 of preformed bricks, and the two ends of preformed bricks offer half slot 10, and two half slot 10 docking constitute the structure of groove 9.As shown in Figure 4, ground floor is the first preformed bricks to its packing structure, and the second layer, just for the second preformed bricks, replaces successively.The groove 9 of two half slot 10 compositions is equally applicable to install steel bar framework 8.Realize the staggered of preformed bricks by the program to pile up so that the structure of body of wall is more stable.
In sum, this utility model provide a kind of can rapid construction, reduction of erection time, the building construction body of wall of raising construction speed.
The foregoing is only preferred embodiment of the present utility model, be not limited to this utility model, all within design concept of the present utility model, any modification, equivalent substitution and improvement etc. made, within should be included in protection domain of the present utility model.

Claims (4)

1. a building construction rapid construction body of wall, including wall body, it is characterized in that: include preformed bricks (1), described wall body is piled up by preformed bricks (1) and is formed, the middle part of described preformed bricks (1) is provided with the groove (9) of up/down perforation, lower surface four end of described preformed bricks (1) is equipped with first protruding (2), upper surface four end of described preformed bricks (1) is provided with the first groove (3) coordinated with first protruding (2), and the height of described first protruding (2) is more than the degree of depth of the first groove (3);Its right end face of described preformed bricks (1) is provided with second protruding (4), and the left end face of described preformed bricks (1) is provided with the second groove (5) coordinated with second protruding (4), and the length of described second protruding (4) is more than the degree of depth of the second groove (5);Described wall outer body connects template (7), is equipped with concrete layer (6) in the gap of contiguous prefabricated brick (1) and the groove (9) of preformed bricks (1).
A kind of building construction rapid construction body of wall the most according to claim 1, it is characterised in that: the concrete layer (6) in described groove (9) is connected with steel bar framework (8).
A kind of building construction rapid construction body of wall the most according to claim 2, it is characterized in that: described steel bar framework (8) is in " well " font, including longitudinal reinforcement and transverse steel, transverse steel is positioned at groove (9), and longitudinal reinforcement is through the preformed bricks (1) of stacked on top.
4. according to a kind of building construction rapid construction body of wall described in claim 1 or 2 or 3, it is characterised in that: described groove (9) is circular.
CN201620204328.XU 2016-03-16 2016-03-16 Housing construction wall body of being under construction fast Expired - Fee Related CN205421614U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620204328.XU CN205421614U (en) 2016-03-16 2016-03-16 Housing construction wall body of being under construction fast

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620204328.XU CN205421614U (en) 2016-03-16 2016-03-16 Housing construction wall body of being under construction fast

Publications (1)

Publication Number Publication Date
CN205421614U true CN205421614U (en) 2016-08-03

Family

ID=56546286

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620204328.XU Expired - Fee Related CN205421614U (en) 2016-03-16 2016-03-16 Housing construction wall body of being under construction fast

Country Status (1)

Country Link
CN (1) CN205421614U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106760146A (en) * 2017-01-18 2017-05-31 郑招伟 A kind of assembled porcelain earthenware brick for building and the construction process using the porcelain earthenware brick
CN110306716A (en) * 2019-04-12 2019-10-08 深圳全景空间工业有限公司 A kind of brick and brick wall for assembled-type house
CN110453812A (en) * 2019-08-28 2019-11-15 郭春来 A kind of novel building assembling structure
CN114775514A (en) * 2022-04-13 2022-07-22 中交第四航务工程勘察设计院有限公司 Building block type gravity block wharf

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106760146A (en) * 2017-01-18 2017-05-31 郑招伟 A kind of assembled porcelain earthenware brick for building and the construction process using the porcelain earthenware brick
CN110306716A (en) * 2019-04-12 2019-10-08 深圳全景空间工业有限公司 A kind of brick and brick wall for assembled-type house
CN110453812A (en) * 2019-08-28 2019-11-15 郭春来 A kind of novel building assembling structure
CN114775514A (en) * 2022-04-13 2022-07-22 中交第四航务工程勘察设计院有限公司 Building block type gravity block wharf

Similar Documents

Publication Publication Date Title
CN205421614U (en) Housing construction wall body of being under construction fast
CN205224363U (en) Connection structure of floor and girder steel
US20110247289A1 (en) Building Block Having The Appearance of Wood Shake
CN208379891U (en) A kind of precast concrete elements of block for against vibrations with joinery and its construction
CN105926824A (en) Light hollow building block
CN104652456B (en) A kind of modularity can pin lock fixed pattern permeable building block constitute body of wall
CN210827824U (en) Connecting structure of prefabricated wall
CN206873979U (en) One kind is used to newly build a wall and old wall contact surface processing structure
CN202989727U (en) Cement square brick
CN108086552A (en) A kind of band groove arch reinforced concrete prefabricated board
CN201236408Y (en) Hollow bricks
CN206512852U (en) A kind of multi-layer construction structure of use preformed material
CN207499212U (en) New ruggedized construction of building a wall
CN207003788U (en) A kind of assembled horizontal hole building block
CN106088445A (en) A kind of without mortar raw-soil masonry structure system and building
CN208650098U (en) The external wall structure of more absolute altitude complexity basements
CN204098334U (en) The building block of wedge-type interpenetrating structure
CN206245493U (en) Floor and floor structure
CN210636668U (en) Assembled building brick
CN205875490U (en) Prefabricated reinforced concrete antiskid leak protection water roof boarding floor crossbeam combination that falls
CN110847401B (en) Shock insulation structure based on masonry structure building
CN203429673U (en) Shear wall structure
CN205591415U (en) Non - standard building block
CN204983175U (en) Erect dress formula ALC board based on wall body
CN213741760U (en) Energy-saving lime-sand brick

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160803

Termination date: 20190316