CN205293923U - Material transfer chain belt quick replacement structure - Google Patents
Material transfer chain belt quick replacement structure Download PDFInfo
- Publication number
- CN205293923U CN205293923U CN201521038949.7U CN201521038949U CN205293923U CN 205293923 U CN205293923 U CN 205293923U CN 201521038949 U CN201521038949 U CN 201521038949U CN 205293923 U CN205293923 U CN 205293923U
- Authority
- CN
- China
- Prior art keywords
- outsourcing
- bend
- belt
- wheel
- power drum
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Structure Of Belt Conveyors (AREA)
Abstract
The utility model discloses a material transfer chain belt quick replacement structure, the frame top is located at a plurality of tow boat intervals of going up of this structure, the tip wheel is located in the frame and be located a plurality of both ends of going up tow boats, power roller is located a plurality of tow boat belows of going up, this structure still includes two endocyst bend wheels and two outsourcing bend wheels, two outsourcing bend wheels are located in the frame and be located the power roller both sides respectively, two endocyst bend wheels are located in the frame and be located between power roller lower part and power roller and the outsourcing bend wheel, the belt embolias a plurality of tow boats of going up in proper order, tip wheel and two endocyst bend wheels are and outsourcing power roller and two outsourcing bend wheels. Traditional endocyst form belt mounting structure's defect has been overcome to this structure, and the belt damages to need not to shut down and carries out the dismouting operation, has ensured the normal transport of material.
Description
Technical field
This utility model relates to a kind of material pipeline belt fast replacing structure.
Background technology
Material pipeline is widely used in the conveying of the automated material such as warehouse logistics, manufacturing industry, makes material be delivered to the other end from one end; But under some operating mode, when on pipeline, material moves to sorting mouth, some materials need to remove main conveyor line and make vertical transport to branch's pipeline. Usual material vertical transport adopts vertical conveyor mostly, as shown in Figure 1, the belt of conventional vertical conveyor adopts interior packet form, namely the some upper tugboat 6 that parallel interval is arranged, the end wheel 5 being positioned at some upper tugboat 6 both ends and power drum 2 are respectively positioned on the inner ring of belt 7, two outsourcing bend wheels 3 are located at the both sides of power drum 2 for changing the rotation direction of belt 7, so that belt 7 and power drum 2 have enough contact surfaces, belt 7 is driven rotation by power drum 2, it is achieved the transmission of material. When the belt of conveying occurs that damage needs to change, power drum need to be made after shutting down to stop operating, interrupt the conveying of logistics; then carrying out dismounting operation, this process often wastes time and energy very much, and working performance is low; have a strong impact on the normal conveying of material, cause certain economic loss.
Summary of the invention
Technical problem to be solved in the utility model is to provide a kind of material pipeline belt fast replacing structure, and this structure overcomes the defect of packet form belt mounting structure in tradition, and belt damages carries out dismounting operation without shutting down, it is ensured that the normal conveying of material.
For solving above-mentioned technical problem, this utility model material pipeline belt fast replacing structure includes frame, power drum, some upper tugboats, end is taken turns, two outsourcing bend wheels and belt, described frame top is located at described some upper tugboat intervals, the both ends of described some upper tugboats are located in described frame and are positioned to described end wheel, described power drum is located on the driving arm of material pipeline and is positioned at below described some upper tugboats, said two outsourcing bend wheel is located in frame and lays respectively at described power drum both sides, this structure also includes two interior bag bend wheels, in said two, bag bend wheel is located in described frame and between described power drum bottom and power drum and outsourcing bend wheel, described belt is inserted in described some upper tugboats successively, end wheel and power drum and two outsourcing bend wheels described in two interior bag bend wheels and outsourcing.
Further, in said two, the wheel rim of bag bend wheel is tangent with the edge of described power drum.
Further, the wheel rim of said two outsourcing bend wheel is tangent with the wheel rim of bag bend wheel in said two respectively.
Owing to this utility model material pipeline belt fast replacing structure have employed technique scheme, namely frame top is located at the some upper tugboat interval of this structure, end wheel is located in frame and is positioned at the both ends of some upper tugboats, power drum is positioned at below some upper tugboats, this structure also includes two interior bag bend wheels and two outsourcing bend wheels, two outsourcing bend wheels are located in frame and lay respectively at power drum both sides, two interior bag bend wheels are located in frame and between power drum bottom and power drum and outsourcing bend wheel, belt is inserted in some upper tugboats successively, end wheel and two interior bag bend wheels and outsourcing power drum and two outsourcing bend wheels. this structure overcomes the defect of packet form belt mounting structure in tradition, and belt damages carries out dismounting operation without shutting down, it is ensured that the normal conveying of material.
Accompanying drawing explanation
Below in conjunction with drawings and embodiments, the utility model is described in further detail:
Fig. 1 is the structural representation of packet form in conventional materials pipeline belt;
Fig. 2 is this utility model material pipeline belt fast replacing structure schematic diagram;
Fig. 3 is the schematic diagram that in this structure, belt departs from power drum.
Detailed description of the invention
Embodiment is as shown in Figure 2, this utility model material pipeline belt fast replacing structure includes frame 1, power drum 2, some upper tugboats 6, end wheel 5, two outsourcing bend wheels 3 and belt 7, described frame 1 top is located at described some upper tugboat 6 intervals, described end wheel 5 is located in described frame 1 and is positioned at the both ends of described some upper tugboats 6, described power drum 2 is located on the driving arm of material pipeline and is positioned at below described some upper tugboats 6, described power drum 2 both sides are located in frame 1 and are laid respectively to said two outsourcing bend wheel 3, this structure also includes two interior bag bend wheels 4, in said two, bag bend wheel 4 is located in described frame 1 and between described power drum 2 bottom and power drum 2 and outsourcing bend wheel 3, described belt 7 is inserted in described some upper tugboats 6 successively, power drum 2 and two outsourcing bend wheels 3 described in end wheel 5 and two interior bag bend wheels 4 and outsourcing.
Preferably, in said two, the wheel rim of bag bend wheel 4 is tangent with the edge of described power drum 2.
Preferably, the wheel rim of said two outsourcing bend wheel 3 is tangent with the wheel rim of bag bend wheel 4 in said two respectively.
This simple in construction, practicality, two outsourcing bend wheels and power drum are positioned at belt outer ring, and the belt that material is carried is ridden on power drum by two interior bag bend wheels and two outsourcing bend wheels, when material is normally carried, the driving force that belt is provided is rotated by power drum, the path rotation that belt is constituted by end wheel, two interior bag bend wheels and two outsourcing bend wheels, it is achieved material is carried; As shown in Figure 3, occur that the faults such as damage need to be changed once belt 7, material pipeline is without shutting down, namely power drum 2 still rotates, now, by lift carriage 1, by some upper tugboats 6, end 5, two interior bag bend wheels 4 of wheel and two outsourcing bend wheels 3 and the overall lifting of belt 7, so that belt 7 departs from power drum 2, belt 7 driving that runs out of steam stops operating, and can carry out the replacing operation of belt 7;Belt 7 is changed after operation completes, and only need to put down frame 1, make belt 7 outsourcing power drum 2, can recover the power drum 2 driving to belt 7. Therefore this structure greatly improves the efficiency of belt replacing operation, accelerates material pipeline failture evacuation speed, to guarantee the normal conveying of material.
Claims (3)
1. a material pipeline belt fast replacing structure, including frame, power drum, some upper tugboats, end is taken turns, two outsourcing bend wheels and belt, described frame top is located at described some upper tugboat intervals, the both ends of described some upper tugboats are located in described frame and are positioned to described end wheel, described power drum is located on the driving arm of material pipeline and is positioned at below described some upper tugboats, said two outsourcing bend wheel is located in frame and lays respectively at described power drum both sides, it is characterized in that: this structure also includes two interior bag bend wheels, in said two, bag bend wheel is located in described frame and between described power drum bottom and power drum and outsourcing bend wheel, described belt is inserted in described some upper tugboats successively, end wheel and power drum and two outsourcing bend wheels described in two interior bag bend wheels and outsourcing.
2. material pipeline belt fast replacing structure according to claim 1, it is characterised in that: in said two, the wheel rim of bag bend wheel is tangent with the edge of described power drum.
3. material pipeline belt fast replacing structure according to claim 1 and 2, it is characterised in that: the wheel rim of said two outsourcing bend wheel is tangent with the wheel rim of bag bend wheel in said two respectively.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201521038949.7U CN205293923U (en) | 2015-12-15 | 2015-12-15 | Material transfer chain belt quick replacement structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201521038949.7U CN205293923U (en) | 2015-12-15 | 2015-12-15 | Material transfer chain belt quick replacement structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205293923U true CN205293923U (en) | 2016-06-08 |
Family
ID=56431796
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201521038949.7U Active CN205293923U (en) | 2015-12-15 | 2015-12-15 | Material transfer chain belt quick replacement structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205293923U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108529133A (en) * | 2018-05-03 | 2018-09-14 | 合肥工业大学 | A kind of conveyer of fast changeable belt |
CN112193794A (en) * | 2020-10-28 | 2021-01-08 | 科捷智能装备有限公司 | High-speed jacking transfer control method |
-
2015
- 2015-12-15 CN CN201521038949.7U patent/CN205293923U/en active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108529133A (en) * | 2018-05-03 | 2018-09-14 | 合肥工业大学 | A kind of conveyer of fast changeable belt |
CN112193794A (en) * | 2020-10-28 | 2021-01-08 | 科捷智能装备有限公司 | High-speed jacking transfer control method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107187915A (en) | A kind of cloth reel captures hoisting mechanism automatically | |
CN203959291U (en) | One-to-two load transfer device | |
CN205293923U (en) | Material transfer chain belt quick replacement structure | |
CN206665686U (en) | A kind of pipe cutting agency | |
CN206511621U (en) | A kind of automatic lifting feeding line | |
CN106986184A (en) | A kind of pipe cutting agency | |
CN104444116A (en) | Shaft machining conveyer | |
CN204453596U (en) | A kind of rotating shaft processing feedway | |
CN201670579U (en) | Diagonal lifting wheel diversion mechanism | |
CN101704445A (en) | Shaft capable of automatically rectifying deviation and cleaning | |
CN105000236A (en) | Planet disc rotary labeling machine | |
CN204896510U (en) | Conveyer belt | |
CN204341847U (en) | The scalable Bidirectional conveying device of a kind of chain-belt type | |
CN204896754U (en) | A novel letter sorting machine of keeping to side for roller transfer chain | |
CN203283757U (en) | Conveying chain for packaging | |
CN205187139U (en) | Prevent lou feeder of material | |
CN204355626U (en) | A kind of roller cage bagged cement connects bag conveyer | |
CN207434347U (en) | The assist in synchronization device of synchronous conveyer band | |
CN202186523U (en) | Double-row capping conveyer belt for barreled instant noodle | |
CN207107820U (en) | It is a kind of to push away barrel for drum production | |
CN205294178U (en) | Spherical reposition of redundant personnel machine in plain noodles | |
CN205187248U (en) | Feeder convenient to feeding | |
CN204584100U (en) | One is put the oil material loading conveying mechanism | |
CN203845073U (en) | Circular pipe automatic stacker crane | |
CN104370099A (en) | Automatic turning device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20180716 Address after: 201409 588, room 5, No. 748, er Qiao village, Fengcheng, Fengxian District, Shanghai Patentee after: Bao Kai (Shanghai) Intelligent Logistics Technology Co., Ltd. Address before: 201411 115, room 8, No. 2313, Xin Feng Road, Fengcheng, Fengxian District, Shanghai. Patentee before: SHANGHAI BAOKAI LOGISTICS SYSTEM CO., LTD. |