CN205259430U - Install special building block - Google Patents
Install special building block Download PDFInfo
- Publication number
- CN205259430U CN205259430U CN201520656394.6U CN201520656394U CN205259430U CN 205259430 U CN205259430 U CN 205259430U CN 201520656394 U CN201520656394 U CN 201520656394U CN 205259430 U CN205259430 U CN 205259430U
- Authority
- CN
- China
- Prior art keywords
- building block
- recess
- utility
- pipeline
- model
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 239000011449 brick Substances 0.000 abstract description 6
- 238000010276 construction Methods 0.000 abstract description 5
- 239000000463 material Substances 0.000 abstract description 4
- 238000009434 installation Methods 0.000 abstract description 3
- 238000006073 displacement reaction Methods 0.000 abstract description 2
- 239000002699 waste material Substances 0.000 description 5
- 238000010586 diagram Methods 0.000 description 3
- 239000007787 solid Substances 0.000 description 2
- 229910000831 Steel Inorganic materials 0.000 description 1
- 230000015572 biosynthetic process Effects 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 230000005611 electricity Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 238000003908 quality control method Methods 0.000 description 1
- 239000010959 steel Substances 0.000 description 1
- 230000009466 transformation Effects 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Landscapes
- Retaining Walls (AREA)
Abstract
The utility model discloses an install special building block, it includes building block (1) be equipped with recess (2) in building block (1), recess (2) are uncovered towards building block (1) one side embedding installation pipeline (3) in recess (2). The position of recess (2) is located the position of building block (1) horizontal face third. The utility model discloses a there is a recess in three / position at building block middle part department, and purpose that the recess is located this position is the fissure of displacement when being convenient for build by laying bricks or stones. The walling unit is built by laying bricks or stones and is accomplished the back, will install this recess of pipeline embedding, accomplishes and installs the pre -buried of pipeline. The construction quality who builds the engineering by laying bricks or stones has effectively been improved. And take the notched building block, the wall body of avoiding fluting has reduced the production of building rubbish, and the material obtains effectual saving.
Description
Technical field
The utility model relates to a kind of installing engineering dedicated building block, belongs to construction brick setting and water and electricity installation project field.
Background technology
Building block is the filling materials for wall body of commonly using in architectural engineering, and the building block of using in construction at present is mainly shaped as cuboid. In use Construction of Brick Wall is first carried out in employing conventionally, then carries out body of wall fluting by cutting machine, then will install in pipeline embedding groove, completes the pre-buried of pipeline is installed. Adopt the body of wall of common concrete block masonry, for completing, the pre-buried of pipeline is installed, difficult quality control in grooving process, also can produce a large amount of building wastes simultaneously, causes the unnecessary waste of material.
Utility model content
The purpose of this utility model is as overcoming the deficiencies in the prior art, and a kind of building block that steel pipe buried in advance is installed that can complete without fluting is provided, and avoids producing more building waste, effectively ensures masonry project quality simultaneously.
For realizing the purpose of this utility model, the utility model adopts such technical scheme:
In building block, be provided with groove, groove is uncovered towards building block one side, embeds pipeline is installed in groove. The position of groove is positioned at the position of building block athwartship plane 1/3rd.
There is a groove/3rd positions, building block of the present utility model middle part, and the object that groove is positioned at this position is the fissure of displacement while being convenient to build by laying bricks or stones. After walling unit has been built by laying bricks or stones, pipeline will be installed and embed in this groove, and complete the pre-buried of pipeline is installed. Effectively improve the construction quality of masonry project. And be with reeded building block, the body of wall fluting of avoiding, has reduced the generation of building waste, and material is effectively saved.
Brief description of the drawings
Fig. 1 is 3-D solid structure schematic diagram of the present utility model;
Fig. 2 is positive elevational schematic view of the present utility model;
Fig. 3 is side elevation schematic diagram of the present utility model.
Being labeled as in accompanying drawing: 1-building block, 2-groove, 3-installs pipeline.
Detailed description of the invention
Below in conjunction with drawings and Examples, the utility model is described in further detail.
As shown in Figure 1, Fig. 1 has shown 3-D solid structure of the present utility model, and as can be seen from the figure, the utility model is provided with groove 2 in building block 1, and groove 2 is uncovered towards building block 1 one side, embeds pipeline 3 is installed in groove 2. Groove 2 is arranged in 1/3rd places of athwartship plane (i.e. the positive facade of the figure) position of building block 1, be positive facade 1/3rd positions from right to left in Fig. 1, groove 2 up/down perforation building blocks 1, pipeline 3 is installed to be embedded in groove 2, after the degree of depth of groove 2 should ensure to install pipeline 3 and embeds wherein, completely in building block 1, and its outer surface should be reserved certain distance apart from the opening part of groove 2.
See Fig. 2 and Fig. 3, positive elevational schematic view of the present utility model and side elevation schematic diagram are shown respectively, can see that main body of the present utility model is building block 1, building block 1 is rectangular shape structure, the utility model arranges a groove 2 by three points of parts in the middle, pipeline 3 will be installed after building wall completes and embed in groove 2, and this groove 2 can avoid installing 3 two flutings of pipeline, reduce the generation of building waste, ensure masonry and installation engineering quality.
Certainly, be more than concrete exemplary applications of the present utility model, the utility model also has other embodiment, and all employings are equal to the technical scheme of replacement or equivalent transformation formation, within all dropping on the desired protection domain of the utility model.
Claims (1)
1. a dedicated building block is installed, and it comprises building block (1), it is characterized in that: in described building block (1), be provided with groove (2), groove (2) is uncovered towards building block (1) one side, embeds pipeline (3) is installed in described groove (2); The position of described groove (2) is positioned at the position of building block (1) athwartship plane 1/3rd.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520656394.6U CN205259430U (en) | 2015-08-28 | 2015-08-28 | Install special building block |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520656394.6U CN205259430U (en) | 2015-08-28 | 2015-08-28 | Install special building block |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205259430U true CN205259430U (en) | 2016-05-25 |
Family
ID=56000966
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520656394.6U Expired - Fee Related CN205259430U (en) | 2015-08-28 | 2015-08-28 | Install special building block |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205259430U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112343242A (en) * | 2020-12-03 | 2021-02-09 | 中建一局集团建设发展有限公司 | Pipe wrapping device for wrapping electromechanical wire pipes by using masonry structure and construction method of pipe wrapping device |
-
2015
- 2015-08-28 CN CN201520656394.6U patent/CN205259430U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112343242A (en) * | 2020-12-03 | 2021-02-09 | 中建一局集团建设发展有限公司 | Pipe wrapping device for wrapping electromechanical wire pipes by using masonry structure and construction method of pipe wrapping device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103321436B (en) | Pre-installation construction method for wire box on building bricked body and pre-installation supporting frame thereof | |
CN103061515B (en) | Concrete hollow block infilled wall pre-buried PVC conduit poling mounting method | |
CN204040078U (en) | A kind of alter-pouring strips mould plate installs structure | |
CN204898715U (en) | Assembled precast concrete child mould of basis cushion cap | |
CN104806025A (en) | Direct-burial complete-set constructing process for electromechanical pipelines and wire boxes of masonry engineering | |
CN105019651A (en) | High efficient installation construction method for rowed cable boxes in hollow brick filled wall | |
CN205259430U (en) | Install special building block | |
CN103266629A (en) | Basement external wall post-poured band construction process | |
CN204235676U (en) | L-shaped door buttress prefabricated section sizing punching block | |
CN203096762U (en) | Anti-frost ground beam | |
CN104153451A (en) | Construction method for installing concrete pipeline through prefabricated supporting block | |
CN204983356U (en) | Compound interior wall building block of pre -buried threading pipe | |
CN204212181U (en) | A kind of plugging structure of open caisson reserved opening | |
CN203654317U (en) | Guide wall structure of basement exterior wall | |
CN204728562U (en) | A kind of building brick, the wall at band turning built up by this brick | |
CN203452335U (en) | Water and electricity installation structure for constructional engineering | |
CN204239900U (en) | A kind of water power spool fixes suspension member fast | |
CN206542144U (en) | A kind of prefabricated integrated line box building element | |
CN205863837U (en) | A kind of dark wire terminal box | |
CN203284813U (en) | Waterproof processing structure of basement outer wall post-cast strip | |
CN205278570U (en) | Wall mounting structure is worn to pipeline | |
CN205025098U (en) | Stagnant water can be dismantled to drawing screw rod to basement | |
CN204781428U (en) | Xin qiang and old wall connecting piece | |
CN204647576U (en) | Concrete floor pre-arranged hole mouth water sealing structure | |
CN204098051U (en) | Novel porous precast concrete is forming moulding bed |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20160525 |