CN203452335U - Water and electricity installation structure for constructional engineering - Google Patents

Water and electricity installation structure for constructional engineering Download PDF

Info

Publication number
CN203452335U
CN203452335U CN201320539389.8U CN201320539389U CN203452335U CN 203452335 U CN203452335 U CN 203452335U CN 201320539389 U CN201320539389 U CN 201320539389U CN 203452335 U CN203452335 U CN 203452335U
Authority
CN
China
Prior art keywords
groove
wall
brick
building
fragment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201320539389.8U
Other languages
Chinese (zh)
Inventor
李海蓉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Biomedy Ltd
Original Assignee
Zhenjiang Prestige Guangsha Module Construction Co Ltd (joint Venture)
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhenjiang Prestige Guangsha Module Construction Co Ltd (joint Venture) filed Critical Zhenjiang Prestige Guangsha Module Construction Co Ltd (joint Venture)
Priority to CN201320539389.8U priority Critical patent/CN203452335U/en
Application granted granted Critical
Publication of CN203452335U publication Critical patent/CN203452335U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Installation Of Indoor Wiring (AREA)

Abstract

The utility model discloses an installation structure for constructional engineering, and particularly relates to a water and electricity installation structure for constructional engineering. The water and electricity installation structure for constructional engineering comprises a line groove used for laying lines, and a tube groove used for laying pipelines, wherein the line groove is composed of a groove which is formed in a walling brick, the section of the groove of the line groove is rectangular, the tube groove is composed of a groove which is formed in the walling brick, the section of the groove of the tube groove is semicircular, and a through hole which is formed in the walling brick serves as the tail end of the tube groove. According to the structure, due to the fact that in the process of building a wall, the walling bricks with the line grooves and the tube grooves are laid according to the actual construction requirements of laying of water and electricity pipelines, line embedding grooves and tube grooves do not need to be manually formed in the wall any longer when water and electricity installation construction is carried out, manpower and materials can be greatly saved in the process of water and electricity installation, damage to the wall can be reduced, and the amount of produced construction waste can be reduced.

Description

Construction work hydropower installation structure
Technical field
The utility model relates to a kind of construction work mounting structure, specifically a kind of construction work hydropower installation structure.
Background technology
At building engineering field, particularly building construction, fragment of brick is the main material for construction wall.At present, in the architectural process in house, conventionally not for laying the application specific architecture of water power, thereby when hydropower installation, must first to body of wall, manually dig pipe laying groove in construction wall, then could landfill hydroelectric line, contactor mounting box etc.This not only wastes a large amount of man power and materials, and can damage body of wall, also can produce a large amount of building wastes simultaneously.
Summary of the invention
The technical problems to be solved in the utility model is to provide a kind of construction work hydropower installation structure that not only can save in a large number the human and material resources in hydropower installation process but also can guarantee body of wall integrality.
In order to solve the problems of the technologies described above, construction work hydropower installation structure of the present utility model, comprise for the wire casing of laying-out with for laying the tube seat of pipeline, wire casing forms by being arranged on the groove that the cross sectional shape of building a wall on fragment of brick is rectangle, tube seat is that semicircular groove forms by being arranged on the cross sectional shape of building a wall on fragment of brick, and the end of tube seat is for being arranged on through hole on the fragment of brick of building a wall.
The horizontal segment of described wire casing is the groove that is rectangle along the cross sectional shape of the fragment of brick horizontal direction setting of building a wall, and vertical section of wire casing is the groove that is rectangle of the cross sectional shape along the fragment of brick longitudinal direction setting of building a wall.
The end of described tube seat is the through hole for poling that arranges from front to back along the fragment of brick of building a wall, vertical section of described tube seat for the cross sectional shape along the fragment of brick longitudinal direction setting of building a wall be semicircular groove.
On described wire casing, be provided with the slot cover plate for capping wire casing.
On described tube seat, be provided with the tube seat cover plate for capping tube seat.
Adopt after above-mentioned structure, in the architectural process of body of wall, according to the practice of construction needs of water power pipe laying, the fragment of brick of building a wall that is provided with wire casing and tube seat is laid, therefore when constructing, hydropower installation no longer needs body of wall to carry out artificial sunken cord groove and the tube seat dug, the human and material resources in hydropower installation process can be saved in a large number, destruction that body of wall is caused and the generation of building waste can be reduced simultaneously.
Accompanying drawing explanation
Fig. 1 is that the master of the utility model construction work hydropower installation structure looks schematic diagram;
Fig. 2 is the schematic top plan view of the utility model construction work hydropower installation structure.
The specific embodiment
Below in conjunction with the drawings and specific embodiments, construction work hydropower installation structure of the present utility model is described in further detail.
As shown in the figure, construction work hydropower installation structure of the present utility model, comprise for the wire casing 1 of laying-out with for laying the tube seat 2 of pipeline, wire casing 1 forms by being arranged on the groove that the cross sectional shape of building a wall on fragment of brick 3 is rectangle, in the architectural process of body of wall, the fragment of brick of building a wall each piece to the groove of rectangle need to be laid according to the practice of construction of track laying, that is to say that the fragment of brick of building a wall that each piece is had to a groove of rectangle requires to build a wall according to circuit, the groove part of the fragment of brick of building a wall that makes each piece have the groove of rectangle forms wire casing, tube seat 2 is that semicircular groove forms by being arranged on the cross sectional shape of building a wall on fragment of brick 3, in the architectural process of body of wall, the fragment of brick of building a wall each piece to semicircular groove need to be laid according to the practice of construction of pipe laying, that is to say that the fragment of brick of building a wall that each piece is had to a semicircular groove requires to build a wall according to pipeline, the groove part that makes each piece have the fragment of brick of building a wall of semicircular groove forms tube seat, the end of tube seat 2 is for being arranged on through hole 4 on the fragment of brick 3 of building a wall.
Wherein, the horizontal segment of wire casing 1 is the groove that is rectangle along the cross sectional shape of the fragment of brick 3 horizontal direction settings of building a wall, and vertical section of wire casing 1 is the groove that is rectangle of the cross sectional shape along the fragment of brick longitudinal direction setting of building a wall; The end of tube seat 2 is the through hole for poling that arranges from front to back along the fragment of brick 3 of building a wall, and vertical section of tube seat 2 is that the cross sectional shape along the fragment of brick 3 longitudinal direction settings of building a wall is semicircular groove.
Further can also on wire casing 1, be provided with the slot cover plate for capping wire casing, the cross sectional shape of slot cover plate and the cross sectional shape of wire casing adapt, on tube seat 2, be provided with the tube seat cover plate for capping tube seat, the cross sectional shape of tube seat cover plate and the cross sectional shape of tube seat adapt.

Claims (5)

1. a construction work hydropower installation structure, it is characterized in that: comprise wire casing (1) for laying-out and for laying the tube seat (2) of pipeline, the groove that described wire casing (1) is rectangle by the cross sectional shape being arranged on the fragment of brick of building a wall (3) forms, described tube seat (2) is that semicircular groove forms by the cross sectional shape being arranged on the fragment of brick of building a wall (3), and the end of described tube seat (2) is for being arranged on the upper through hole (4) of the fragment of brick of building a wall (3).
2. according to construction work hydropower installation structure claimed in claim 1, it is characterized in that: the horizontal segment of described wire casing (1) is the groove that is rectangle along the cross sectional shape of the fragment of brick of building a wall (3) horizontal direction setting, vertical section of wire casing (1) is the groove that is rectangle of the cross sectional shape along the fragment of brick longitudinal direction setting of building a wall.
3. according to construction work hydropower installation structure claimed in claim 1, it is characterized in that: the end of described tube seat (2) is the through hole for poling that arranges from front to back along the fragment of brick of building a wall (3), vertical section of described tube seat (2) is that the cross sectional shape along the fragment of brick of building a wall (3) longitudinal direction setting is semicircular groove.
4. according to the construction work hydropower installation structure described in claim 1 or 2, it is characterized in that: described wire casing is provided with the slot cover plate for capping wire casing on (1).
5. according to the construction work hydropower installation structure described in claim 1 or 3, it is characterized in that: on described tube seat (2), be provided with the tube seat cover plate for capping tube seat.
CN201320539389.8U 2013-08-30 2013-08-30 Water and electricity installation structure for constructional engineering Expired - Lifetime CN203452335U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320539389.8U CN203452335U (en) 2013-08-30 2013-08-30 Water and electricity installation structure for constructional engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320539389.8U CN203452335U (en) 2013-08-30 2013-08-30 Water and electricity installation structure for constructional engineering

Publications (1)

Publication Number Publication Date
CN203452335U true CN203452335U (en) 2014-02-26

Family

ID=50132222

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320539389.8U Expired - Lifetime CN203452335U (en) 2013-08-30 2013-08-30 Water and electricity installation structure for constructional engineering

Country Status (1)

Country Link
CN (1) CN203452335U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105908829A (en) * 2016-04-07 2016-08-31 中国十七冶集团有限公司 Residential house water supply pipeline air-entrapping concrete block partition wall and pipe trench reservation method
CN117027422A (en) * 2023-08-24 2023-11-10 滕州市工程建设服务中心 Construction method of modularized assembly type green integrated building and wall module prefabricated member

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105908829A (en) * 2016-04-07 2016-08-31 中国十七冶集团有限公司 Residential house water supply pipeline air-entrapping concrete block partition wall and pipe trench reservation method
CN117027422A (en) * 2023-08-24 2023-11-10 滕州市工程建设服务中心 Construction method of modularized assembly type green integrated building and wall module prefabricated member

Similar Documents

Publication Publication Date Title
CN103061515A (en) Method for perforating and pre-burying polyvinyl chloride (PVC) wiring tubes in concrete hollow block filled walls
CN103215946A (en) Electroosmosis electrode and electroosmosis draining system thereof
CN203229965U (en) 10 kV box-type substation basic standard module
CN104410031B (en) A kind of pre-fabricated electric cables comb
CN204040062U (en) Prefabricated wedge shape flexible interface assembling piping lane
CN203452335U (en) Water and electricity installation structure for constructional engineering
CN204151824U (en) A kind of glass reinforced plastic underground comprehensive pipe network common trench
CN204212180U (en) A kind of reinforcing cage for basement plugging dewatering well
CN205296347U (en) Arrangement structure that utility tunnel internal drain pipe said
CN203339577U (en) Cable duct construction device
CN204387499U (en) The water power piping network installation device of indoor integrated finishing
CN206220351U (en) A kind of assembled grid wallboard
CN204424846U (en) Pre-fabricated electric cables ditch
CN104963507A (en) Method used for manufacturing intelligent energy-saving building
CN206542144U (en) A kind of prefabricated integrated line box building element
CN204083521U (en) A kind of platoon cable waterproof clutch through walls
CN204205525U (en) A kind of pre-fabricated electric cables comb
CN202866106U (en) Pre-buried brick for water and electricity installation of constructional engineering
CN204530624U (en) A kind of power station bank protection cement pre-fabricated panel with diversion function
CN205259430U (en) Install special building block
CN207775931U (en) A kind of suspension and support fastener inserts
CN202325541U (en) Tunnel structure with improved structure
CN203768945U (en) Daylight illumination device pier base
CN204151812U (en) Direct burial pole and tower foundation
CN103485502A (en) Embedded brick for indoor installation of water pipelines and electricity pipelines

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: ZHENJIANG WEIXIN GUANGSHA MODULE HOUSE INDUSTRY CO

Free format text: FORMER NAME: ZHENJIANG WEIXIN GUANGSHA MODULE CONSTRUCTION CO., LTD. (JOINT VENTURE)

CP03 Change of name, title or address

Address after: 212009 Jiangsu province Zhenjiang new Dingmao Road No. 36 latitude four

Patentee after: Zhenjiang prestige Guangsha modular housing industry Co.,Ltd. (Sino foreign joint venture)

Address before: 212009 Zhenjiang province Jiangsu city Zhenjiang district four South Dingmao Road No. 36

Patentee before: ATLANTIC MODULAR SYSTEM LTD.

CP03 Change of name, title or address

Address after: No.46, Angang Road, Zhenjiang New District, Zhenjiang City, Jiangsu Province

Patentee after: BIOMEDY LTD.

Address before: No. 36, Nanwei 4th Road, Dingmao, Zhenjiang New District, Jiangsu Province, 212009

Patentee before: Zhenjiang prestige Guangsha modular housing industry Co.,Ltd. (Sino foreign joint venture)

CP03 Change of name, title or address
PP01 Preservation of patent right

Effective date of registration: 20230807

Granted publication date: 20140226

PP01 Preservation of patent right
CX01 Expiry of patent term

Granted publication date: 20140226

CX01 Expiry of patent term
PD01 Discharge of preservation of patent

Date of cancellation: 20230830

Granted publication date: 20140226

PD01 Discharge of preservation of patent