CN205242299U CN201520998984.7U CN201520998984U CN205242299U CN 205242299 U CN205242299 U CN 205242299U CN 201520998984 U CN201520998984 U CN 201520998984U CN 205242299 U CN205242299 U CN 205242299U
Authority
CN
China
Prior art keywords
coaster
safe
auxiliary pole
assembly
intelligent
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201520998984.7U
Other languages
Chinese (zh)
Inventor
李映辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201520998984.7U priority Critical patent/CN205242299U/en
Application granted granted Critical
Publication of CN205242299U publication Critical patent/CN205242299U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

The utility model discloses an intelligent security banister, the main pole setting and the auxiliary pole that set up including the interval, set up safe shield between main pole setting and the auxiliary pole, set up the motor of being connected with control system in the main pole setting, synchronous motors control follow respectively at the both ends of safe shield main pole setting and auxiliary pole upwards perhaps move down perpendicularly. The utility model discloses a motor can synchro control safety shield both ends along main pole setting and auxiliary pole upwards or move down, realize opening and shutting the floodgate, to compare the structure as the drive simpler with two motors of adoption among the prior art, the cost is cheaper moreover.

Description

Intelligent and safe banister and safety island assembly
Technical field
The utility model relates to a kind of urban road traffic safety safeguard, is specifically related to a kind of intelligent and safeBanister and safety island assembly.
Background technology
At present, rely on merely traffic lights and zebra stripes to be difficult to the control of the traffic that meets existing complexity,Especially the in the situation that of monitoring not and traffic police, pedestrian ignores the phenomenon that traffic lights collective makes a dash across the red light and gets overCome more serious. In the case of Urban Road Traffic Accidents, the traffic accident that pedestrian running red light causes accounts for wholeThe large percentage of traffic accident, its main cause is that zebra-striped crosswalk's mouth is not installed safety gate. OrderBefore have the disclosed zebra-striped crosswalk's mouth of technical data to use safety gate, due to complex structure, useThe reason such as inconvenient and involve great expense causes popularizing use.
Utility model content
The purpose of this utility model is to provide a kind of intelligent and safe banister simple in structure, this intelligent and safe roadLock can be realized the safe guard strip of Synchronization Control by a motor and move up and down.
Another object of the present utility model is to provide a kind of safety island assembly, and this safety island assembly is arranged atZebra-striped crosswalk central authorities, stop for the pedestrian of road central authorities, avoid pedestrian running red light.
For reaching this object, the utility model by the following technical solutions:
On the one hand, provide a kind of intelligent and safe banister, comprise spaced main vertical rod and auxiliary pole, described inSafe guard strip is set between main vertical rod and auxiliary pole, the electricity being electrically connected with control system is set in described main vertical rodMachine, described in described motor Synchronization Control the two ends of safe guard strip respectively along described main vertical rod vertical with auxiliary pole toGo up or move down.
As the preferred version of intelligent and safe banister, in described main vertical rod, setting can be along gliding in described main vertical rodThe first moving coaster, the second coaster that in described auxiliary pole, setting can slide up and down along described auxiliary pole, described inSafe guard strip two ends are connected with described the first coaster, described the second coaster respectively, in described auxiliary pole, steel are setRope stretching device, described motor is connected with described the first coaster by steel wire, and described the first coaster is by firstPulley assembly is connected with described the second coaster, and described the second coaster draws by the second pulley assembly and described cable wireStretching device connects.
As the preferred version of intelligent and safe banister, on described the first coaster, be provided with emergency circuit and be electrically connectedUnhook assembly, described unhook assembly comprises and being fixedly installed on described the first coaster and near described motorMagnetic apparatus, is provided with the axle locking bar parallel with described safe guard strip in described magnetic apparatus, described axle locking bar one endBe convexly set in outside described magnetic apparatus, and be connected with the axle bumper plate that is arranged on described magnetic apparatus one side, described steel wireOne end arranges snap close, and described steel wire one end is by described snap close and the socket of axle locking bar, the other end and described motorConnect;
Described unhook assembly is connected with the fault detection module in control system, in the time of described electrical fault, and instituteState axle locking bar and retract in described magnetic apparatus, the described snap close of described steel wire and described axle locking bar depart from, and described theOne coaster and described the second coaster drive on described safe guard strip and move under the effect of described cable wire stretching device.
As the preferred version of intelligent and safe banister, described cable wire stretching device is balance weight assembly, described counterweightAssembly comprises the counterweight iron block that is arranged in described auxiliary pole and can moves up and down along described auxiliary pole, described in joinThe upper end of heavy iron block is connected with described the second pulley assembly, and the weight of described counterweight iron block is greater than described first and slidesThe weight sum of car, described the second coaster, described unhook assembly and described safe guard strip.
As the preferred version of intelligent and safe banister, the 3rd slide rail is set in described auxiliary pole along its length,The both sides of described counterweight iron block arrange groove, and described groove two ends are symmetrically installed with roller, described counterweight iron blockRolled and be connected with described the 3rd slide rail by described roller, described the 3rd slide rail has two spaced railsRoad, described at least one, track is provided with to slow down the deceleration assembly of described balance weight assembly sliding speed;
Described deceleration assembly comprises flaps and resistance shell fragment, and described flaps is arranged in described track, andLength direction along described track extends, and described flaps is positioned at pulley and the described track of described balance weight assemblyBetween, on the described track sidewall relative with the pulley of described balance weight assembly, be arranged at intervals with some and described resistanceThe installing hole that power shell fragment matches, described resistance shell fragment one end is fixed on sidewall by described installing hole, anotherOne end and described flaps butt, along the descent direction of described balance weight assembly, the elastic force of described resistance shell fragment byCumulative large.
As the preferred version of intelligent and safe banister, described cable wire stretching device is cable wire stretcher, described steelRope stretcher is fixedly connected with described auxiliary pole, is provided with spring and with described in described cable wire stretcherThe connecting axle that spring connects, described connecting axle is connected with the cable wire in described the second pulley assembly; Or,
Described cable wire stretching device is extension spring, and described extension spring is fixedly connected with described auxiliary pole, andLength direction along described auxiliary pole extends.
As the preferred version of intelligent and safe banister, on described main vertical rod or described auxiliary pole, be provided with describedHuman body infrared inductor and the voice broadcasting system of control system electrical connection.
As the preferred version of intelligent and safe banister, the control circuit of described motor and the traffic light signal at crossingControl circuit connects, described in being provided with in described main vertical rod the pulse current of described traffic light signal being converted toThe Switching Power Supply device of the power supply of control system.
Automatically control the unlatching of emergency gate lock or close by traffic light signal. For traffic lights are not setPeople's Bank of China road junction, intelligent and safe banister also comprises the timer of time opening emergency gate lock, makes intelligent and safe roadLock time opening or close arranges and is subject to banister unlatching or closes control simultaneously main vertical rod or auxiliary pole outsideThe signal traffic lights of system, to point out vehicle to give way. When banister is closed, when red, when banister is opened, green lightBright, prompting walk.
As the preferred version of intelligent and safe banister, the upper end of described main vertical rod and described auxiliary pole is provided withThe All-weather shed of PVC structural membrane material;
On described the first coaster and/or described the second coaster, be provided with and protecting that the end of described safe guard strip is connectedBar expansion bend; And/or,
On described safe guard strip, be provided with elastic cord; Or,
Described safe guard strip is elastic cord.
On the other hand, provide a kind of safety island assembly, comprise two groups of above-mentioned intelligent and safe banisters, described two groupsIntelligent and safe banister is disposed on the position of crossing in road central authorities, and vertical with zebra stripes.
Two groups of intelligent and safe banisters of above-mentioned safety island assembly are arranged on the central authorities of crossing, and safety island is becomeFor relay station, can carry out and point be sidelong row according to the variation of signal lamp the pedestrian of safety island assembly both sides, jointMake an appointment with pedestrian to pass by one's way the time, improve crossing traffic order, improve the pass by one's way frequency and frequency, traffic efficiency increases by 25%Above.
Compared with prior art, the beneficial effects of the utility model: the utility model provides a kind of intelligence peaceFull banister, comprises spaced main vertical rod and auxiliary pole, between described main vertical rod and auxiliary pole, safety is setGuard strip, arranges the motor being connected with control system in described main vertical rod, safety described in described motor Synchronization ControlThe two ends of guard strip respectively along described main vertical rod and auxiliary pole vertically upward or move down. The utility model is logicalCross two ends that a motor can the safe guard strip of Synchronization Control along main vertical rod and auxiliary pole upwards or to moving downMoving, simpler as driving structure compared with two motors of available technology adopting, and also cost is lowerHonest and clean.
Brief description of the drawings
Fig. 1 is the structural representation of the intelligent and safe banister described in the utility model embodiment.
Fig. 2 is the enlarged diagram of A part in Fig. 1.
Fig. 3 is the enlarged diagram of B part in Fig. 1.
Fig. 4 is the first supratrochlear unhook assembly described in the utility model embodiment and the knot of guard strip expansion bendStructure schematic diagram.
Fig. 5 is the structural representation of the balance weight assembly described in the utility model embodiment.
Fig. 6 is the structural representation of the track matching with deceleration assembly described in the utility model embodiment
Fig. 7 is the structural representation of the flaps described in the utility model embodiment.
Fig. 8 is the perspective view of the resistance shell fragment described in the utility model embodiment.
Fig. 9 is the schematic side view of the resistance shell fragment described in the utility model embodiment.
In Fig. 1~9:
1, main vertical rod; 11, the first coaster; 111, magnetic apparatus; 112, axle locking bar; 113, axle bumper plate; 12,The first slide rail;
2, auxiliary pole; 21, the second coaster; 22, balance weight assembly; 221, counterweight iron block; 23, deceleration groupPart; 231, flaps; 2311, the first roundabout portion; 2312, protuberance; 232, resistance shell fragment; 2321,The second roundabout portion; 2322, the first straight portion; 2323, arc sections; 2324, the second straight portion; 24, second is slidingRail; 25, the 3rd slide rail; 251, installing hole;
3, safe guard strip; 31, guard strip expansion bend;
4, motor;
5, All-weather shed.
Detailed description of the invention
Below in conjunction with accompanying drawing 1~9 and further illustrate the technical solution of the utility model by specific embodiment.
Fig. 1 is the structural representation of the intelligent and safe banister of the utility model one embodiment. As shown in Figure 1,A kind of intelligent and safe banister, comprises spaced main vertical rod 1 and auxiliary pole 2, main vertical rod 1 and auxiliary pole 2Between safe guard strip 3 is set, the motor 4 that the interior setting of main vertical rod 1 is electrically connected with control system, motor 4 is synchronousThe two ends of controlling safe guard strip 3 respectively along main vertical rod 1 and auxiliary pole 2 upwards or move down. This enforcementExample can the safe guard strip 3 of Synchronization Control by motor 4 two ends along main vertical rod 1 and auxiliary pole 2 upwardsOr move down, simpler as driving structure compared with two motors of available technology adopting, andCost is cheaper.
The first coaster 11 that the interior setting of main vertical rod 1 can slide up and down along main vertical rod 1, the interior setting of auxiliary pole 2 canThe second coaster 21 sliding up and down along auxiliary pole 2, safe guard strip 3 two ends respectively with the first coaster 11, secondCoaster 21 connects, the interior cable wire stretching device that arranges of auxiliary pole 2, and motor 4 is by steel wire and the first coaster 11Connect, the first coaster 11 is connected with the second coaster 21 by the first pulley assembly, and the second coaster 21 passes through theTwo pulley assemblies are connected with cable wire stretching device. In the present embodiment, the first pulley assembly comprise some pulleys andBe enclosed within the cable wire on these some pulleys, the second pulley assembly also comprises some pulleys and is enclosed within on these some pulleysCable wire. Particularly, as shown in Figures 1 to 3, the first pulley assembly comprises four pulleys, and wherein first is slidingWheel is arranged on top in main vertical rod 1, and the second pulley is arranged on the top of auxiliary pole 2, the 3rd pulley and theIt is interior near lower end that four pulleys are disposed on auxiliary pole 2, the line of centres and the peace of the 3rd pulley and the 4th pulleyFull guard strip 3 is parallel, and the cable wire one end in the first pulley assembly connects the upper end of the first coaster 11, then successivelyWalk around from the upper end of the first pulley and the upper end of the second pulley, and through the lower end of the 3rd pulley and the 4th pulleyLower end is connected with the lower end of the second coaster; The second pulley assembly comprises two pulleys, is the 5th pulley and the 6thPulley, two pulleys are arranged on the upper end in auxiliary pole 2, the line of centres of the 5th pulley and the 6th pulley withSafe guard strip 3 is parallel, and cable wire one end of the second pulley assembly connects the upper end of the second coaster 21, then successivelyWalk around from the upper end of the 5th pulley and the 6th pulley, and be connected with the upper end of cable wire stretching device. In motor 4Be provided with machine shaft, machine shaft is connected with one end of steel wire, and the motor of control system control motor 4 turnsAxle clockwise rotates, and the steel wire length between the first coaster 11 and motor 4 increases gradually, cable wire stretching deviceDriven on the second coaster 21 and moved by the second pulley assembly, the second coaster drives by the first pulley assembly simultaneouslyOn the first coaster, move, realization is opened a sluice gate; While needing barrier gate, the machine shaft inverse time of control system control motor 4Pin rotates, and the steel wire length between the first coaster 11 and motor 4 reduces gradually, and the first coaster 11 moves down,Drive the second coaster 21 to move down by the first pulley assembly, the second coaster 21 is by the second pulley assembly simultaneouslyOn band running wire stretching device, move, complete barrier gate. The structure of the intelligent and safe banister of the present embodiment is very simple,By control system can link control two coasters simultaneously, move or move down, thereby drive safe guard strip 3Simultaneously, move or move down.
In above-described embodiment, the first pulley in the first pulley assembly is to be fixedly mounted in main vertical rod 1, theTwo pulleys, the 3rd pulley and the 4th pulley are fixedly mounted in auxiliary pole 2; Cunning in the second pulley assemblyWheel is all fixedly mounted in auxiliary pole 2.
As the preferred embodiment of the utility model, as shown in Figure 4, on the first coaster 11, be provided with and answerThe unhook assembly of urgent telegram road electrical connection, unhook assembly comprises and being fixedly installed on the first coaster 11 and near motor4 magnetic apparatus 111, is provided with the axle locking bar 112 parallel with safe guard strip 3, axle locking bar in magnetic apparatus 111112 one end are convexly set in outside magnetic apparatus 111, and are connected with the axle bumper plate 113 that is arranged on magnetic apparatus 111 1 sides,One end of steel wire arranges snap close, and steel wire one end is socketed by snap close and axle locking bar 112, the other end and motor 4Connect, more specifically, the steel wire other end is to be connected with the machine shaft of motor 4; Unhook assembly also with controlFault detection module electrical connection in system, when fault detection module detects that motor 4 is stuck or it occursWhen his fault, in emergency circuit commander axle locking bar 112 retraction magnetic apparatus 111, the snap close of steel wire and axle locking bar112 depart from, and the first coaster 11 and the second coaster 21 drive safe guard strip 3 under the effect of cable wire stretching deviceOn move. The present embodiment, by unhook assembly is set, can be avoided causing intelligent and safe banister because of motor 4 faultsCannot use.
As shown in Figure 5, cable wire stretching device is balance weight assembly 22, and balance weight assembly 22 comprises and is arranged at auxiliary poleIn 2 and counterweight iron block 221, the upper end of counterweight iron block 221 and second pulley that can move up and down along auxiliary pole 2Assembly connects, and the weight of counterweight iron block 221 is greater than the first coaster 11, the second coaster 21, unhook assembly and peaceThe weight sum of full guard strip 3. By selecting the counterweight iron block 221 of approrpiate wts, can make balance weight assembly 22Utilize the gravity of himself to drive on safe guard strip 3 and move by the first coaster 11 and the second coaster 21 smoothly.
Above-mentioned cable wire stretching device can be also extension spring, and extension spring one end is fixedly connected with auxiliary pole 2,The other end is connected with the second coaster 21 by the second pulley assembly. While opening a sluice gate, can by the elastic force of extension springTo drive on safe guard strip 3 and to move by the first coaster 11 and the second coaster 21.
Above-mentioned cable wire stretching device is cable wire stretcher, and cable wire stretcher is fixedly connected with auxiliary pole 2. Open a sluice gateTime, in the cable wire retraction cable wire stretcher in cable wire stretcher, drive on safe guard strip 3 and move.
The interior length direction along auxiliary pole of auxiliary pole 2 arranges the 3rd slide rail 25, and establish the both sides of counterweight iron block 221Put groove, groove two ends are symmetrically installed with roller, and counterweight iron block 221 rolls by this roller and the 3rd slide rail 25Be dynamically connected. Particularly, as shown in Figure 5, four rolling is fixedly connected with counterweight iron block 221, four rollingSome is placed in two tracks of the 3rd slide rail 25, and counterweight iron block 221 is by roller and the 3rd slide rail 25Two tracks roll and connect. Roll and connect the friction that can reduce between counterweight iron block 221 and the 3rd slide rail 25Power, makes to close a floodgate more smooth and easy.
Meanwhile, cause too soon counterweight iron block 221 derail or damage for fear of counterweight iron block 221 gliding speedsBad track, the 3rd slide rail 25 has two spaced tracks, and at least one track is provided with to slow downThe deceleration assembly 23 of balance weight assembly 22 sliding speeds; Deceleration assembly 23 comprises flaps 231 and resistance shell fragment232, flaps 231 is arranged in track, and extends along the length direction of track, and flaps 231 is positioned at joinsBetween the pulley and track of restructuring part 22, on the track sidewall relative with the pulley of balance weight assembly 22, establish at intervalBe equipped with some installing holes 251 that match with resistance shell fragment 232, installing hole is passed through in resistance shell fragment 232 one end251 are fixed on sidewall, the other end and flaps 231 butts, and along the descent direction of balance weight assembly 22, resistanceThe elastic force of power shell fragment 232 increases gradually. As shown in Figs. 5 to 7, the flaps 231 in the present embodiment is embedded inIn one siding track of the 3rd slide rail 25, and under the elastic force effect of resistance shell fragment 232 this siding track court relativelyWay roller or be moved away from roller, the width by increasing or reduce this siding track is to change counterweightThe rolling speed of iron block 221. Due to the descent direction along balance weight assembly 22, the elastic force of resistance shell fragment 232 byCumulative large, therefore, the resistance that balance weight assembly 22 is subject to when moving down increases gradually, to reach the order of deceleration, the resistance being subject to when moving on balance weight assembly 22 reduces gradually, to reduce the energy consumption of barrier gate.
As shown in Figure 7, one end of the flaps 231 in above-described embodiment is provided with the first roundabout portion 2311,The other end is provided with protuberance 2312, is installed in track protuberance 2312 use by this first roundabout portion 2311With the distance between restriction flaps 231 and this orbit sidewall. Wherein, this first roundabout portion 2311 and trackAn installing hole 251 near its end on sidewall coordinates.
As shown in Figure 8, Figure 9, resistance shell fragment 232 comprises one second roundabout portion 2321 and arc sections 2323,One end of arc sections 2323 is provided with the first straight portion 2322 of extending along its tangential direction, and the other end is provided with edgeThe second roundabout portion 2321 of straight portion 2324, the second, the first straight portion 2322, arc sections that its tangential direction is extended2323 and second straight portion 2324 connect successively. When resistance shell fragment 232 is installed in track, adjacent two resistancesThe installation direction of power shell fragment 232 is contrary, i.e. second of a resistance shell fragment 232 the roundabout portion 2321 and a peaceDress hole 251 coordinates, the second straight portion 2324 and aforementioned installing hole of another resistance shell fragment 232 being adjacent251 another adjacent installing holes 251 coordinate, and the assembly that makes to slow down has better deceleration effect. Adjacent tracksThe radian of the arc sections 2323 of the resistance shell fragment 232 of side wall lower ends is slightly larger than the resistance of adjacent tracks sidewall upperThe radian of the arc sections 2323 of shell fragment 232.
In main vertical rod 1, be provided with along its length the first slide rail 12 matching with the first coaster 11, secondary verticalIn bar 21, be provided with along its length the second slide rail 24, the first slide rails 12 that match with the second coaster 21On be arranged at intervals with two in order to limit the first postive stop baffle of the first coaster 11 sliding distances, the first coaster 11Between two the first postive stop baffles; On the second slide rail 24, be arranged at intervals with two in order to limit the second coasterThe second postive stop baffle of 21 sliding distances, the second coaster 21 is between two the second postive stop baffles; The first limitOn position baffle plate, the second postive stop baffle, be respectively arranged with stopper slot or spacing hole (not shown).
As the concrete scheme of another kind, above-mentioned cable wire stretching device can also be cable wire stretcher, and cable wire drawsStretch device and be fixedly connected with auxiliary pole 2, in cable wire stretcher, be provided with spring and connecting axle, springBe connected with the cable wire in the second pulley assembly by connecting axle; Or cable wire stretching device is extension spring, drawsStretch spring and be fixedly connected with auxiliary pole 2, and extend along the length direction of auxiliary pole 2. Adopt cable wire stretcherCan realize equally and only adopt a motor can drive the two ends of safe guard strip 3 along main vertical rod 1 with extension springSynchronously move up and down with auxiliary pole 2.
Main vertical rod 1 lower end is provided with the human body infrared inductor (not shown) being connected with control system. PeopleBody infrared inductor is responded to the pedestrian of crossing, controls decrease speed and the hovering of safe guard strip 3,Guarantee that the pedestrains safety on crossing goes out lock.
In main vertical rod 1, be provided with the voice broadcasting system (not shown) being connected with control system. Voice are broadcastReporting system and mechanical movement interaction, point out pedestrian to observe traffic rules and regulations, note traffic safety in time.
Control system comprises the communication that detects the detection module of electrical fault and fault-signal is launchedModule. Wherein, communication module is global hawk communication SIM900A module, when detection module detects fault,Program circuit in control system, by global hawk communication SIM900A module transmitting note, is notified maintenance personalOn-call maintenance.
The control circuit of motor 4 is connected with the traffic light signal control circuit at crossing, in main vertical rod 1, is provided withThe pulse current of traffic light signal is converted to the Switching Power Supply device (not shown) of the power supply of control system.Automatically control the unlatching of emergency gate lock or close by traffic light signal. For the people that traffic lights are not setTrade mouth, intelligent and safe banister also comprises the timer of time opening emergency gate lock, makes intelligent and safe banister fixedShi Kaiqi or close is subject to banister to open or close control in main vertical rod 1 or the outer setting of auxiliary pole 2 simultaneouslyThe signal traffic lights of system, to point out vehicle to give way. When banister is closed, when red, when banister is opened, green lightBright, prompting walk.
The upper end of main vertical rod 1 and auxiliary pole 2 is provided with the All-weather shed 5 of PVC structural membrane material. All-weather shed 5Can keep out wind and rain for pedestrian, avoid pedestrian to shine violating the regulations scrambling for roads because taking shelter from the rain, keeping away, be conducive to improve traffic order,Ensure pedestrains safety, improve the current rate of automobile.
On the first coaster 11 and/or the second coaster 21, being provided with the guard strip being connected with the end of safe guard strip 3 stretchesContracting device 31; And/or, on safe guard strip 3, be provided with elastic cord or safe guard strip 3 for elastic cord (in figure notIllustrate), make safe guard strip 3 there is elasticity, further to prevent that pedestrian from injuring unexpectedly because encountering safe guard strip.
Main vertical rod 1 and auxiliary pole 2 are respectively arranged with advertising lamp box, make intelligent and safe road brake system have economyAnd public welfare.
The main vertical rod 1 of above-mentioned intelligent and safe banister and auxiliary pole 2 bottom be also provided with four screws, useSo that intelligent and safe banister is fixed on the ground. Concrete installation steps are as follows:
Step 1, position, hole installing plate is put and needed on the ground fixing position, design four hole bit positions;
Step 2, with electric drill (Drill bit) accomplish fluently four screw positions (about degree of depth 80mm) and be about toFixing position;
Step 3, respectively main vertical rod 1, auxiliary pole 2 are placed on to the position of position, hole installing plate, tighten four expansionsScrew can fix main vertical rod 1, auxiliary pole 2 on the ground, then taking main vertical rod 1, auxiliary pole 2 as propping upFrame, is fixed on All-weather shed on main vertical rod 1, auxiliary pole 2.
The installation of above-mentioned intelligent and safe banister is very convenient, quick.
Cable wire in the first pulley assembly and second pulley assembly of above-described embodiment also can be arranged on ground withUnder, at the sheathed cable encasing-tube in the outside of cable wire in order to protect this cable wire.
The present embodiment also provides a kind of safety island assembly, and this safety island assembly comprises two groups of intelligent and safe banisters,Two groups of intelligent and safe banisters are disposed on the position of crossing in road central authorities, and vertical with zebra stripes.Two groups of intelligent and safe banisters of above-mentioned safety island assembly are arranged on the central authorities of crossing, during safety island is becomeThe station of continuing, can carry out and point be sidelong row the pedestrian of safety island assembly both sides according to the variation of signal lamp, saves rowPeople passes by one's way the time, improves crossing traffic order, improves the pass by one's way frequency and frequency, traffic efficiency increase by 25% withOn.
Above content is only preferred embodiment of the present utility model, for those of ordinary skill in the art, complies withAccording to thought of the present utility model, all will change in specific embodiments and applications this explanationBook content should not be construed as restriction of the present utility model.

Claims (10)

1. an intelligent and safe banister, it is characterized in that, comprise spaced main vertical rod and auxiliary pole, between described main vertical rod and described auxiliary pole, safe guard strip is set, the motor being electrically connected with control system is set in described main vertical rod, and the two ends of safe guard strip respectively along described main vertical rod and auxiliary pole vertically upward or move down described in described motor Synchronization Control.
2. intelligent and safe banister according to claim 1, it is characterized in that, the first coaster that in described main vertical rod, setting can slide up and down along described main vertical rod, the second coaster that in described auxiliary pole, setting can slide up and down along described auxiliary pole, described safe guard strip two ends respectively with described the first coaster, described the second coaster connects, cable wire stretching device is set in described auxiliary pole, described motor is connected with described the first coaster by steel wire, described the first coaster is connected with described the second coaster by the first pulley assembly, described the second coaster is connected with described cable wire stretching device by the second pulley assembly.
3. intelligent and safe banister according to claim 2, it is characterized in that, on described the first coaster, be provided with the unhook assembly being electrically connected with emergency circuit, described unhook assembly comprises and being fixedly installed on described the first coaster and near the magnetic apparatus of described motor, in described magnetic apparatus, be provided with the axle locking bar parallel with described safe guard strip, described axle locking bar one end is convexly set in outside described magnetic apparatus, and be connected with the axle bumper plate that is arranged on described magnetic apparatus one side, one end of described steel wire arranges snap close, described steel wire one end is by described snap close and the socket of axle locking bar, the other end is connected with described motor,
Described unhook assembly is connected with the fault detection module in control system, in the time of described electrical fault, described axle locking bar is retracted in described magnetic apparatus, the described snap close of described steel wire and described axle locking bar depart from, and described the first coaster and described the second coaster drive on described safe guard strip and move under the effect of described cable wire stretching device.
4. intelligent and safe banister according to claim 3, it is characterized in that, described cable wire stretching device is balance weight assembly, described balance weight assembly comprises the counterweight iron block that is arranged in described auxiliary pole and can moves up and down along described auxiliary pole, the upper end of described counterweight iron block is connected with described the second pulley assembly, and the weight of described counterweight iron block is greater than the weight sum of described the first coaster, described the second coaster, described unhook assembly and described safe guard strip.
5. intelligent and safe banister according to claim 4, it is characterized in that, the 3rd slide rail is set in described auxiliary pole along its length, the both sides of described counterweight iron block arrange groove, described groove two ends are symmetrically installed with roller, described counterweight iron block is rolled and is connected with described the 3rd slide rail by described roller, and described the 3rd slide rail has two spaced tracks, and described at least one, track is provided with to slow down the deceleration assembly of described balance weight assembly sliding speed;
Described deceleration assembly comprises flaps and resistance shell fragment, described flaps is arranged in described track, and the length direction along described track extends, described flaps is between the roller and described track of described balance weight assembly, on the described track sidewall relative with the roller of described balance weight assembly, be arranged at intervals with the installing hole that some and described resistance shell fragment matches, described resistance shell fragment one end is fixed on sidewall by described installing hole, the other end and described flaps butt, along the descent direction of described balance weight assembly, the elastic force of described resistance shell fragment increases gradually.
6. intelligent and safe banister according to claim 2, it is characterized in that, described cable wire stretching device is cable wire stretcher, described cable wire stretcher is fixedly connected with described auxiliary pole, in described cable wire stretcher, be provided with spring and connecting axle, described spring is connected with the cable wire in described the second pulley assembly by described connecting axle; Or,
Described cable wire stretching device is extension spring, and described extension spring is fixedly connected with described auxiliary pole, and extends along the length direction of described auxiliary pole.
7. according to the intelligent and safe banister described in claim 1 to 6 any one, it is characterized in that, on described main vertical rod or described auxiliary pole, be provided with the human body infrared inductor and the voice broadcasting system that are electrically connected with described control system.
8. according to the intelligent and safe banister described in claim 1 to 6 any one, it is characterized in that, the control circuit of described motor is connected with the traffic light signal control circuit at crossing, is provided with the Switching Power Supply device that the pulse current of described traffic light signal is converted to the power supply of described control system in described main vertical rod.
9. according to the intelligent and safe banister described in claim 2 to 6 any one, it is characterized in that, the upper end of described main vertical rod and described auxiliary pole is provided with the All-weather shed of PVC structural membrane material;
On described the first coaster and/or described the second coaster, be provided with the guard strip expansion bend being connected with the end of described safe guard strip; And/or,
On described safe guard strip, be provided with elastic cord; Or,
Described safe guard strip is elastic cord.
10. a safety island assembly, is characterized in that, comprises two groups of intelligent and safe banisters as described in claim 1 to 9 any one, and described two groups of intelligent and safe banisters are disposed on the position of crossing in road central authorities, and vertical with zebra stripes.
CN201520998984.7U 2015-12-03 2015-12-03 Intelligent security banister and safety island subassembly Withdrawn - After Issue CN205242299U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520998984.7U CN205242299U (en) 2015-12-03 2015-12-03 Intelligent security banister and safety island subassembly

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520998984.7U CN205242299U (en) 2015-12-03 2015-12-03 Intelligent security banister and safety island subassembly

Publications (1)

Publication Number Publication Date
CN205242299U true CN205242299U (en) 2016-05-18

Family

ID=55941379

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520998984.7U Withdrawn - After Issue CN205242299U (en) 2015-12-03 2015-12-03 Intelligent security banister and safety island subassembly

Country Status (1)

Country Link
CN (1) CN205242299U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105442471A (en) * 2015-12-03 2016-03-30 李映辉 Intelligent safety barrier and safety island component
CN109914297A (en) * 2019-03-13 2019-06-21 山东亲橙里教学用品有限公司 It is a kind of to penetrate with the gate for stopping isolation
CN114253192A (en) * 2021-12-17 2022-03-29 杭州海康威视数字技术股份有限公司 Gate synchronous control system and method

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105442471A (en) * 2015-12-03 2016-03-30 李映辉 Intelligent safety barrier and safety island component
CN105442471B (en) * 2015-12-03 2018-02-09 李映辉 Intelligent and safe banister and safety island component
CN109914297A (en) * 2019-03-13 2019-06-21 山东亲橙里教学用品有限公司 It is a kind of to penetrate with the gate for stopping isolation
CN109914297B (en) * 2019-03-13 2024-05-17 深圳艾迪泰格科技有限公司 Gate with blocking isolation
CN114253192A (en) * 2021-12-17 2022-03-29 杭州海康威视数字技术股份有限公司 Gate synchronous control system and method

Similar Documents

Publication Publication Date Title
CN105442471A (en) Intelligent safety barrier and safety island component
CN205242299U (en) Intelligent security banister and safety island subassembly
CN105799714A (en) No-parking type microcirculation urban rail traffic system
CN107424417A (en) A kind of non-machine of crossing people automatically controls emergency gate lock system
CN205171415U (en) Formula of holding court from behind a screen intelligent security banister and safety island subassembly
CN203452016U (en) Solar sound absorption and insulation barrier
CN107190670A (en) A kind of crossing security partition device
CN206376206U (en) A kind of highways device
CN102565450A (en) Method for detecting speed and coming direction of motor trolley
CN202390783U (en) Intelligent crosswalk traffic light fixed wheel lifting type flexible door control device
CN207133984U (en) A kind of non-machine of crossing people automatically controls emergency gate lock system
CN101020556B (en) Fast city conveying line
CN201778294U (en) Jaywalking-preventing barrier
CN207497870U (en) A kind of street crossing energy-conserving elevator
CN209292795U (en) Traffic system for overhead track
CN204895489U (en) Grade crossing hangs formula emergency switch
CN206986785U (en) A kind of crossing security partition device
CN102303612A (en) Double-layer rail three-dimensional rapid transit system
CN207594965U (en) A kind of micro- rail track structure
CN207497866U (en) A kind of street crossing energy-conserving elevator of double ladder synchronous operations
CN207227994U (en) Intelligent anti-theft lock for side coil parking stall
CN206769493U (en) Underground rotating type stereo carport
CN204688141U (en) Manual and electric dual-purpose trackless hurdle, level crossing door
CN207208100U (en) A kind of railway transport vehicle closes handrail door with automatic
CN205295987U (en) Lead way apart from response intelligence warning rail guard

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20160518

Effective date of abandoning: 20180209

AV01 Patent right actively abandoned