CN205200612U - Drilling equipment - Google Patents

Drilling equipment Download PDF

Info

Publication number
CN205200612U
CN205200612U CN201521034776.1U CN201521034776U CN205200612U CN 205200612 U CN205200612 U CN 205200612U CN 201521034776 U CN201521034776 U CN 201521034776U CN 205200612 U CN205200612 U CN 205200612U
Authority
CN
China
Prior art keywords
slide rail
frame
borehole drill
drill construction
balancing pole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201521034776.1U
Other languages
Chinese (zh)
Inventor
赵文兴
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Jinlan Auto Part Co Ltd
Original Assignee
Zhejiang Jinlan Auto Part Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Jinlan Auto Part Co Ltd filed Critical Zhejiang Jinlan Auto Part Co Ltd
Priority to CN201521034776.1U priority Critical patent/CN205200612U/en
Application granted granted Critical
Publication of CN205200612U publication Critical patent/CN205200612U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Earth Drilling (AREA)

Abstract

The utility model discloses a drilling equipment, including frame and drilling mechanism, be equipped with first slide rail in the frame and be used for drive drilling mechanism along the gliding actuating mechanism of frame, drilling mechanism passes through the drive arrangement drive and slides along first slide rail to set up, be equipped with the balance mechanism who is used for balancing drilling mechanism in the frame, pass through balance mechanism, to hole the mechanism weight with keep balance, thereby guarantee the in -process of drilling mechanism in the removal, do not need at every moment to hold it, thereby guaranteed that actuating mechanism does not need big power drive drilling mechanism to move, and when the mechanism that holes stops, the effort that need not receive actuating mechanism just can stop, thereby make actuating mechanism can at every moment not be in the state of high strength work, thereby make its life elongated.

Description

A kind of rig
Technical field
The utility model relates to a kind of part process equipment, and more particularly, it relates to a kind of rig.
Background technology
Boring is punched to some parts, facilitates some parts to carry out logical fluid and lubricate, or it is fixing conveniently to carry out installation, and metal parts punching is more difficult, at this moment, needs rig to hole, facilitates the punching of metal parts.
Application number be 201310540808.4 Chinese patent disclose a kind of drilling machine fixed length punching control device, it by arranging step device on the depth-control wheel of bench drill drilling machine, creeps into journey, reach the object of the keyhole degree of depth under controlling drill bit.Although this drilling machine punching control device can the degree of depth of effective keyhole, effective its operating efficiency of raising.Although this drilling machine fixed length punching control device can improve the operating efficiency of punching, but in its use procedure, the main frame of boring needs to slide up and down always, and its main frame comprise the result such as drill bit assembly and motor, its quality comparation is large, therefore, in the process slided up and down, the driving mechanism driving it to slide needs the force rate that provides larger, even also need to act on it when stopping is slided, like this, the working strength of driving mechanism is too high, easily make it damage, its service life can not be ensured.
Utility model content
For the deficiency that prior art exists, the purpose of this utility model is to provide a kind of rig, and it is too high and make the problem of its lifetime that this rig can solve driving mechanism working strength.
For achieving the above object, the utility model provides following technical scheme: a kind of rig, comprise frame and borehole drill construction, described frame is provided with the first slide rail and for driving borehole drill construction along the driving mechanism of housing slide, described borehole drill construction is driven by drive unit and slides along the first slide rail and arranges, and described frame is provided with the balanced controls for balancing drilling mechanism.
By adopting technique scheme, pass through balanced controls, by the weight of borehole drill construction with balance, thus ensure that borehole drill construction is in the process of movement, does not need at every moment to hold it, thus ensure that driving mechanism does not need high-power driving borehole drill construction to move, and when borehole drill construction stops, do not need the active force receiving driving mechanism just can stop, thus make driving mechanism at every moment can not be in the state of intensive work, thus make its service life elongated.
The utility model is set to further: described balanced controls comprise the balance weight be located in frame, and described balance weight and borehole drill construction adopt connection cord to be connected, and described frame is provided with balancing pole, and described connection cord is connected with balancing pole.
By adopting technique scheme, by connection cord, balance weight and balancing pole, balance weight and borehole drill construction is made to lay respectively at balancing pole both sides, by the setting of balance weight and connection cord, make the power that a pull-up is provided above borehole drill construction, and form a pair active force and reaction force with the gravity of borehole drill construction self, thus reach the object of balancing drilling mechanism gravity.
The utility model is set to further: described frame is provided with the second slide rail, and described balance weight slides along the second slide rail and arranges.
By adopting technique scheme, the setting of the second slide rail can ensure that balance weight slides along the second slide rail, thus it can not be made to rock, and causes force unbalance, affects borehole drill construction work.
The utility model is set to further: described connection cord adopts chain to form, and described balancing pole is provided with sprocket wheel, and described chain and sprocket wheel match.
By adopting technique scheme, carrying out transmission by sprocket wheel and chain, the stability of transmission can be ensured.
The utility model is set to further: described balancing pole is provided with at least two, and balancing pole is equipped with sprocket wheel, and described first slide rail and the second extreme are equipped with balancing pole.
By adopting technique scheme, generally speaking, pulling force can produce inclination, and the power tilted can make borehole drill construction or balance weight respectively and produce between the first slide rail and the second slide rail and extrude, produce extra frictional force, therefore, balancing pole and sprocket wheel are all set at the first slide rail and the second extreme, like this, chain is vertical with borehole drill construction and balance weight, thus ensure that pulling force and gravity are positioned at same straight line, unnecessary frictional force can not be produced, ensure the efficiency used.
Accompanying drawing explanation
Fig. 1 is the stereogram of the utility model embodiment;
Fig. 2 is the enlarged drawing at A place in Fig. 1;
Fig. 3 is the enlarged drawing at B place in Fig. 1;
Fig. 4 is the plane of the utility model embodiment.
Reference numeral: 1, borehole drill construction; 11, drive screw; 12, sliding panel; 13, the first drive motors; 14, the second drive motors; 15, drill bit; 16, connecting portion; 2, balanced controls; 21, balance weight; 22, connection cord; 23, balancing pole; 24, sprocket wheel; 3, the first slide rail; 4, the second slide rail; 5, frame.
Detailed description of the invention
Referring to figs. 1 through Fig. 4, a kind of rig of the utility model is described further.
As shown in Figures 1 to 4, a kind of rig, comprise frame 5 and borehole drill construction 1, frame 5 is provided with the first slide rail 3 and the driving mechanism for driving borehole drill construction 1 to slide along frame 5, borehole drill construction 1 is driven by drive unit and slides along the first slide rail 3 and arranges, frame 5 is provided with the balanced controls 2 for balancing drilling mechanism 1, by balanced controls 2, by the weight of borehole drill construction 1 with balance, thus ensure that borehole drill construction 1 is in the process of movement, do not need at every moment to hold it, thus ensure that driving mechanism does not need high-power driving borehole drill construction 1 to move, and when borehole drill construction 1 stops, do not need the active force receiving driving mechanism just can stop, thus make driving mechanism at every moment can not be in the state of intensive work, thus make its service life elongated.
As shown in figures 1 and 3, wherein, driving mechanism comprises drive screw 11 and the first drive motors 13, first drive motors 13 drives drive screw 11 to rotate, and borehole drill construction 1 comprises sliding panel 12, coordinate with the first slide rail 3, slide rail is provided with drill bit 15 and the second drive motors 14, second drive motors 14 drives drill bit 15 to rotate and holes, and on sliding panel 12, be provided with connecting portion 16, connecting portion 16 offers screwed hole, and drive screw 11 coordinates with screwed hole, after drive screw 11 rotates, sliding panel 12 is driven to slide along the first slide rail 3.
As depicted in figs. 1 and 2, balanced controls 2 comprise the balance weight 21 be located in frame 5, balance weight 21 and borehole drill construction 1 adopt connection cord 22 to be connected, frame 5 is provided with balancing pole 23, connection cord 22 is connected with balancing pole 23, by connection cord 22, balance weight 21 and balancing pole 23, balance weight 21 and borehole drill construction 1 is made to lay respectively at balancing pole 23 both sides, by the setting of balance weight 21 and connection cord 22, make the power that a pull-up is provided above borehole drill construction 1, and form a pair active force and reaction force with the gravity of borehole drill construction 1 self, thus reach the object of balancing drilling mechanism 1 gravity.
Frame 5 is provided with the second slide rail 4, balance weight 21 slides along the second slide rail 4 and arranges, the setting of the second slide rail 4 can ensure that balance weight 21 slides along the second slide rail 4, thus it can not be made to rock, and causes force unbalance, affect borehole drill construction 1 to work, connection cord 22 adopts chain to form, and balancing pole 23 is provided with sprocket wheel 24, and chain and sprocket wheel 24 match, carry out transmission by sprocket wheel 24 and chain, the stability of transmission can be ensured.
Balancing pole 23 is provided with at least two, and balancing pole 23 is equipped with sprocket wheel 24, first slide rail 3 and the second slide rail 4 end are equipped with balancing pole 23, generally speaking, pulling force can produce inclination, and the power tilted can make borehole drill construction 1 or balance weight 21 respectively and produce between the first slide rail 3 and the second slide rail 4 and extrude, produce extra frictional force, therefore, at the first slide rail 3 and the second slide rail 4 end, balancing pole 23 and sprocket wheel 24 are all set, like this, chain is vertical with borehole drill construction 1 and balance weight 21, thus ensure that pulling force and gravity are positioned at same straight line, unnecessary frictional force can not be produced, ensure the efficiency used.
The above is only preferred embodiment of the present utility model, protection domain of the present utility model be not only confined to above-described embodiment, and all technical schemes belonged under the utility model thinking all belong to protection domain of the present utility model.It should be pointed out that for those skilled in the art, do not departing from the some improvements and modifications under the utility model principle prerequisite, these improvements and modifications also should be considered as protection domain of the present utility model.

Claims (5)

1. a rig, comprise frame (5) and borehole drill construction (1), it is characterized in that: described frame (5) is provided with the first slide rail (3) and the driving mechanism for driving borehole drill construction (1) to slide along frame (5), described borehole drill construction (1) is driven by drive unit and slides along the first slide rail (3) and arranges, and described frame (5) is provided with the balanced controls (2) for balancing drilling mechanism (1).
2. a kind of rig according to claim 1, it is characterized in that: described balanced controls (2) comprise the balance weight (21) be located in frame (5), described balance weight (21) and borehole drill construction (1) adopt connection cord (22) to be connected, described frame (5) is provided with balancing pole (23), and described connection cord (22) is connected with balancing pole (23).
3. a kind of rig according to claim 2, is characterized in that: described frame (5) is provided with the second slide rail (4), and described balance weight (21) slides along the second slide rail (4) and arranges.
4. a kind of rig according to claim 3, is characterized in that: described connection cord (22) adopts chain to form, and described balancing pole (23) is provided with sprocket wheel (24), and described chain and sprocket wheel (24) match.
5. a kind of rig according to claim 4, it is characterized in that: described balancing pole (23) is provided with at least two, and balancing pole (23) is equipped with sprocket wheel (24), described first slide rail (3) and the second slide rail (4) end are equipped with balancing pole (23).
CN201521034776.1U 2015-12-12 2015-12-12 Drilling equipment Expired - Fee Related CN205200612U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201521034776.1U CN205200612U (en) 2015-12-12 2015-12-12 Drilling equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201521034776.1U CN205200612U (en) 2015-12-12 2015-12-12 Drilling equipment

Publications (1)

Publication Number Publication Date
CN205200612U true CN205200612U (en) 2016-05-04

Family

ID=55838353

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201521034776.1U Expired - Fee Related CN205200612U (en) 2015-12-12 2015-12-12 Drilling equipment

Country Status (1)

Country Link
CN (1) CN205200612U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115401509A (en) * 2022-09-29 2022-11-29 江苏贵钰航空工业有限公司 Counterweight device for machine tool

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115401509A (en) * 2022-09-29 2022-11-29 江苏贵钰航空工业有限公司 Counterweight device for machine tool
CN115401509B (en) * 2022-09-29 2023-06-06 江苏贵钰航空工业有限公司 Counterweight device for machine tool

Similar Documents

Publication Publication Date Title
CN104612581A (en) Soundless rock drilling and splitting integrated machine
GB2446744A (en) Top drive drilling apparatus
CN203808894U (en) Electric vertical core drilling rig
CN204609796U (en) Stile
CN205200612U (en) Drilling equipment
CN210829072U (en) Drilling equipment for engineering geological exploration
CN104763329B (en) A kind of forward beam normotopia follower of drill jumbo
CN205200600U (en) Bent axle puncher
CN205823182U (en) A kind of novel automatic drilling machine
CN102773514A (en) Digital controlled drilling equipment
CN203335073U (en) Fully-mechanized-mining coal drilling unit and fully-mechanized-mining coal drilling machine
CN210888815U (en) Special drilling device for preventing and treating water in coal mine tunnel
CN205638222U (en) Rig for oil development
CN212985204U (en) Electric portable prospecting drill
CN208792949U (en) A kind of rock drill
CN205778637U (en) A kind of wall body hole machinery
CN211448535U (en) Practical coal mine drilling machine
CN205297396U (en) Multi -functional rig of hydraulic pressure and rig centre gripping equipment thereof
CN209430242U (en) A kind of underground coal mine roof fall deliverance apparatus
CN103256049B (en) Combine and adopt coal drilling machine group
CN204646219U (en) Micro-camera trepan
CN208450656U (en) A kind of multiple-drilling machine expansion drill bit
CN103495761A (en) Power head
CN210948510U (en) A insert ground formula balance torque device for pore-forming construction equipment
CN218624105U (en) Drilling tool structure

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160504

Termination date: 20171212

CF01 Termination of patent right due to non-payment of annual fee