CN205188837U - Cable suspension device suitable for hang basket - Google Patents

Cable suspension device suitable for hang basket Download PDF

Info

Publication number
CN205188837U
CN205188837U CN201520967605.8U CN201520967605U CN205188837U CN 205188837 U CN205188837 U CN 205188837U CN 201520967605 U CN201520967605 U CN 201520967605U CN 205188837 U CN205188837 U CN 205188837U
Authority
CN
China
Prior art keywords
plate
clamping plate
anchor
hanging
fixed mechanism
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520967605.8U
Other languages
Chinese (zh)
Inventor
井维东
史先刚
慕永青
邢华
景玉婷
刘祖胜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Seventh Engineering Division Corp Ltd
Original Assignee
China Construction Seventh Engineering Division Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Seventh Engineering Division Corp Ltd filed Critical China Construction Seventh Engineering Division Corp Ltd
Priority to CN201520967605.8U priority Critical patent/CN205188837U/en
Application granted granted Critical
Publication of CN205188837U publication Critical patent/CN205188837U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Load-Engaging Elements For Cranes (AREA)

Abstract

The utility model discloses a cable suspension device suitable for hang basket, including upper portion fixed establishment, lower part fixed establishment and hang the mechanism, upper portion fixed establishment sets up on case breast board upper portion, and lower part fixed establishment sets up in case breast board lower part, hangs the mechanism and passes case breast board and be connected upper portion fixed establishment and lower part fixed establishment, upper portion fixed establishment includes splint (1) and splint two (2), and splint (1) set up on two (2) upper portions on the splint, is provided with two opposite direction between two (2) at splint (1) and splint and is provided with channel -section steel (3). The utility model discloses cable suspension device suitable for hang basket's advantage is, safe and reliable, and stable in structure hangs effectually, can adapt to the execution conditions of various environment, has improved the security of construction, has eliminated the potential safety hazard.

Description

Be applicable to the erecting by overhang of Hanging Basket
Technical field
The utility model relates to a kind of hanging basket device for building, is especially applicable to the erecting by overhang of Hanging Basket.
Background technology
In recent years, the development of Bridges in Our Country building cause rapidly.As the construction method that prestressed continuous bridge is traditional, cantilever pouring engineering method is still widely used in bridge construction.The capital equipment of cantilever pouring engineering method is Hanging Basket, and end basket directly bears one of ingredient of concrete load as Hanging Basket, in Hanging Basket system, have very important effect, and whether the suspension centre of end basket is safe and reliable, is directly connected to the safety of whole Hanging Basket.Traditional Hanging Basket erecting by overhang adopts otic placode to be directly welded on crossbeam shaped steel top before and after end basket, but the erecting by overhang of such form of structure easily ruptures, is out of shape, and meet accident accident.
Utility model content
The purpose of this utility model is, for above-mentioned the deficiencies in the prior art, provides a kind of erecting by overhang being applicable to Hanging Basket, this erecting by overhang safely, stablize, hang effective.
The technical scheme that the erecting by overhang that the utility model is applicable to Hanging Basket adopts is as follows:
The utility model is applicable to the erecting by overhang of Hanging Basket, comprise top fixed mechanism, bottom fixed mechanism and hanging mechanism, top fixed mechanism is arranged on case beam base plate top, bottom fixed mechanism is arranged on case beam base plate bottom, and top fixed mechanism is connected with bottom fixed mechanism through case beam base plate by hanging mechanism; Described top fixed mechanism comprises clamping plate one and clamping plate two, clamping plate one are arranged on clamping plate two top, between clamping plate one and clamping plate two, be provided with two rightabouts be provided with channel-section steel, the gap passed for hanging mechanism is provided with between two channel-section steels, clamping plate one and clamping plate two are provided with the perforation of passing for hanging mechanism, and the gap between two perforation and two channel-section steels is coaxially arranged.
As preferred version of the present utility model, described bottom fixed mechanism comprises base plate, base plate bottom is provided with suspension part, described suspension part comprises left plate, right plate and anchor plate, left plate and right plate are separately positioned on the two ends, left and right of anchor plate upper surface, anchor plate is provided with the perforation of passing for hanging mechanism, left plate and right plate is provided with circular hole, in circular hole, has penetrated jointed shaft.
As preferred version of the present utility model, described hanging mechanism comprises anchor pole, nut, sleeve pipe and fixed bar, the shaft of anchor pole is through clamping plate one, clamping plate two, base plate and anchor plate, the two ends of anchor pole are fixed by nut check, sleeve pipe is nested with at anchor trend, and sleeve pipe is fixed on anchor pole through anchor pole and sleeve pipe by fixed bar.
As preferred version of the present utility model, stiffener is being set between the nut and anchor plate of anchor pole lower end.
The advantage that the utility model is applicable to the erecting by overhang of Hanging Basket is, safe and reliable, Stability Analysis of Structures, hangs effective, can adapt to the execution conditions of various environment, improve the safety of construction, eliminate potential safety hazard.
Accompanying drawing explanation
Fig. 1 is the front view that the utility model is applicable to the erecting by overhang of Hanging Basket.
Fig. 2 is the lateral view that the utility model is applicable to the erecting by overhang of Hanging Basket.
Detailed description of the invention
As shown in drawings, the utility model is applicable to the erecting by overhang of Hanging Basket, comprise top fixed mechanism, bottom fixed mechanism and hanging mechanism, top fixed mechanism is arranged on case beam base plate top, bottom fixed mechanism is arranged on case beam base plate bottom, and top fixed mechanism is connected with bottom fixed mechanism through case beam base plate by hanging mechanism.By erecting by overhang being arranged to the form of structure comprising top fixed mechanism, bottom fixed mechanism and hanging mechanism, bottom fixed mechanism is used for hanging Hanging Basket, bottom fixed mechanism is fixed on case beam base plate by hanging mechanism by top fixed mechanism, thus Dou Hanging Basket is firmly fixed on case beam bottom.
Top fixed mechanism comprises clamping plate 1 and clamping plate 22, clamping plate 1 are arranged on clamping plate 22 top, between clamping plate 1 and clamping plate 22, be provided with two rightabouts be provided with channel-section steel 3, the gap passed for hanging mechanism is provided with between two channel-section steels 3, clamping plate 1 and clamping plate 22 are provided with the perforation of passing for hanging mechanism, and the gap between two perforation and two channel-section steels is coaxially arranged.By top fixed mechanism being arranged to the form of structure comprising clamping plate one, clamping plate two and channel-section steel, clamping plate 1, clamping plate 22 and channel-section steel 3 are welded into an entirety, play the effect of anchoring platform, prevent anchor pole 9 rear end anchoring from loosening.Preferably, channel-section steel 3 inside is provided with reinforcing rib, when reinforcing rib can prevent anchor pole 9 pulling force excessive by nut by pull transfer to channel-section steel time channel-section steel stressed excessive generation distortion.Simultaneously preferably be provided with increasing at clamping plate 22 soffit to rub pad or increase the line that rubs, increase the pad that rubs for rubber pad, increasing the line that rubs is strip lines or spot-like projections.
Bottom fixed mechanism comprises base plate 4, base plate 4 bottom is provided with suspension part, described suspension part comprises left plate 5, right plate 6 and anchor plate 7, left plate 5 and right plate 6 are separately positioned on the two ends, left and right of anchor plate 7 upper surface, anchor plate 7 is provided with the perforation of passing for hanging mechanism, left plate 5 and right plate 6 are provided with circular hole, in circular hole, penetrate jointed shaft 8.Hanging Basket for being connected with the otic placode of Hanging Basket, thus is hung below the fixed mechanism of bottom by jointed shaft 8.By bottom fixed mechanism is arranged to the form of structure comprising base plate, left plate, right plate and anchor plate, base plate 4, left plate 5, right plate 6 and anchor plate 7 are welded into an entirety, anterior anchoring for anchor pole 9 is fixed, simultaneously bottom fixed mechanism is as its uniform force of parts of directly bearing Hanging Basket weight, prevent stressed excessive time produce distortion.Between the nut and anchor plate of anchor pole 9 lower end, stiffener 13 is being set.By arranging stiffener 13, the anterior anchoring that can improve anchor pole 9 is further stablized.
Hanging mechanism comprises anchor pole 9, nut 10, sleeve pipe 11 and fixed bar 12, the shaft of anchor pole 9 is through clamping plate 1, clamping plate 22, base plate 4 and anchor plate 7, the two ends of anchor pole 9 are locked by nut 10, sleeve pipe 11 is nested with in anchor pole 9 bottom, and sleeve pipe is fixed on anchor pole through anchor pole 9 and sleeve pipe 11 by fixed bar 12.The object of sleeve pipe 11 is when device is subject to horizontal shearing force, can bear this power, and protection anchor pole 9, because anchor pole 9 can bear very large axial force, but cannot bear horizontal shearing force.

Claims (4)

1. one kind is applicable to the erecting by overhang of Hanging Basket, comprise top fixed mechanism, bottom fixed mechanism and hanging mechanism, it is characterized in that: top fixed mechanism is arranged on case beam base plate top, bottom fixed mechanism is arranged on case beam base plate bottom, and top fixed mechanism is connected with bottom fixed mechanism through case beam base plate by hanging mechanism; Described top fixed mechanism comprises clamping plate one (1) and clamping plate two (2), clamping plate one (1) are arranged on clamping plate two (2) top, between clamping plate one (1) and clamping plate two (2), be provided with two rightabouts be provided with channel-section steel (3), the gap passed for hanging mechanism is provided with between two channel-section steels (3), clamping plate one (1) and clamping plate two (2) are provided with the perforation of passing for hanging mechanism, and the gap between two perforation and two channel-section steels is coaxially arranged.
2. the erecting by overhang being applicable to Hanging Basket according to claim 1, it is characterized in that: described bottom fixed mechanism comprises base plate (4), base plate (4) bottom is provided with suspension part, described suspension part comprises left plate (5), right plate (6) and anchor plate (7), left plate (5) and right plate (6) are separately positioned on the two ends, left and right of anchor plate (7) upper surface, anchor plate (7) is provided with the perforation of passing for hanging mechanism, left plate (5) and right plate (6) are provided with circular hole, in circular hole, penetrate jointed shaft (8).
3. the erecting by overhang being applicable to Hanging Basket according to claim 1, it is characterized in that: described hanging mechanism comprises anchor pole (9), nut (10), sleeve pipe (11) and fixed bar (12), the shaft of anchor pole (9) is through clamping plate one (1), clamping plate two (2), base plate (4) and anchor plate (7), the two ends of anchor pole (9) are locked by nut (10), sleeve pipe (11) is nested with in anchor pole (9) bottom, and sleeve pipe is fixed on anchor pole through anchor pole (9) and sleeve pipe (11) by fixed bar (12).
4. the erecting by overhang being applicable to Hanging Basket according to claim 3, is characterized in that: between the nut being positioned at anchor pole (9) lower end and anchor plate, arrange stiffener (13).
CN201520967605.8U 2015-11-30 2015-11-30 Cable suspension device suitable for hang basket Expired - Fee Related CN205188837U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520967605.8U CN205188837U (en) 2015-11-30 2015-11-30 Cable suspension device suitable for hang basket

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520967605.8U CN205188837U (en) 2015-11-30 2015-11-30 Cable suspension device suitable for hang basket

Publications (1)

Publication Number Publication Date
CN205188837U true CN205188837U (en) 2016-04-27

Family

ID=55781840

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520967605.8U Expired - Fee Related CN205188837U (en) 2015-11-30 2015-11-30 Cable suspension device suitable for hang basket

Country Status (1)

Country Link
CN (1) CN205188837U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110295545A (en) * 2019-06-03 2019-10-01 中铁大桥局集团有限公司 The erecting by overhang and its application method removed for upstroke movable framework side form

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110295545A (en) * 2019-06-03 2019-10-01 中铁大桥局集团有限公司 The erecting by overhang and its application method removed for upstroke movable framework side form

Similar Documents

Publication Publication Date Title
CN102900021B (en) Split mounting type bridge wet joint construction method
CN203188589U (en) Rigid-frame continuous beam zero block construction bracket supporting system
CN204781884U (en) Prop builder's jack of structure down
CN203296451U (en) Pole straightening device
CN107059617A (en) A kind of interim anchorage of combined type
CN205772794U (en) A kind of suspender of revealing all the details of concrete prefabricated element
CN104594206A (en) Suspended type dragging anchor socket and method for steel trussed beam longitudinal displacement
CN205188837U (en) Cable suspension device suitable for hang basket
CN204266133U (en) A kind of pier stud reinforcing cage whole lifting structure
CN206971689U (en) Support operating platform that is detachable and recycling
CN208650505U (en) The integrated template type attachment device of lifting platform
CN204343642U (en) Builder's jack corner support frame
CN203393637U (en) Bearing bracket
CN204151695U (en) Be applicable to the combination Hanging Basket system of continuous rigid frame bridge or the full beam section construction of continuous girder bridge
CN201284559Y (en) Fastener type steel pipe scaffold template stand
CN204199188U (en) A kind of head tower vertical turning lifting mechanism
CN204343647U (en) A kind of the shaped steel suspension scaffolding bracing frame
CN209907219U (en) Large-span front supporting point guy cable hanging basket limiting structure
CN204023414U (en) The few fulcrum support entirety of a kind of novel large falls rack device
CN204038917U (en) Dismountable external hanging service platform
CN203545501U (en) Auxiliary lifting device of inner crawl type tower crane in small space
CN203531357U (en) Wind load resistance device of attached-type lifting scaffold
CN203361596U (en) Auxiliary support of integrated lifting operation platform
CN106245530A (en) A kind of universal rod body CABLEWAY ERECTION SYSTEM removes engineering method
CN201786013U (en) Reusable anchor member for cantilever scaffold

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160427