CN205175775U - Novel concrete is drawn built -in fitting device - Google Patents
Novel concrete is drawn built -in fitting device Download PDFInfo
- Publication number
- CN205175775U CN205175775U CN201520952962.7U CN201520952962U CN205175775U CN 205175775 U CN205175775 U CN 205175775U CN 201520952962 U CN201520952962 U CN 201520952962U CN 205175775 U CN205175775 U CN 205175775U
- Authority
- CN
- China
- Prior art keywords
- draw
- groove
- concrete
- built
- fitting device
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Investigating Strength Of Materials By Application Of Mechanical Stress (AREA)
Abstract
The utility model provides a novel concrete is drawn built -in fitting device, the concrete is drawn the built -in fitting device to include a test piece mould, two connection slot and a cross draw -in groove formula mount, two connection slot symmetries set up in the test piece mould, cross draw -in groove formula mount includes a long limit and a minor face, the minor face both ends all set up a first draw -in groove, second draw -in groove and third draw -in groove that long limit both ends set up around all being provided with two, two the first draw -in grooves of minor face and two wall connections of the left and right sides of test piece mould, two wall connections around two second draw -in grooves on long limit and the test piece mould, two third draw -in grooves on long limit are fixed connection slot spacing in the test piece mould. The utility model discloses a concrete goes on fast after being drawn the draw -in groove formula mount of the device of built -in fitting can make the concrete sample, easy operation, and can not appear moving and torsional phenomenon at preparation concrete in -process.
Description
Technical field
The utility model relates to technical field of buildings, particularly relates to a kind of new concrete tension built-in fitting device.
Background technology
Early stripping formwork system technology is a kind of novel " Fast-dismantle system ", is in engineering and promotes the use the stage.Should " Fast-dismantle system " be exactly when the concrete that certain one deck is built reaches some strength, under the prerequisite ensureing construction safety, except the vertical rod retained and tear open evening except supporting member, beam bottom mother plate be done sth. in advance dismounting, thus accelerating construction progress.
Whether sustain damage under construction loads effect to inquire into early-age concrete, the mechanical property of research concrete under tension damage load action becomes one of research work of wherein key.For this reason, by a kind of device pre-buried in concrete sample, applying damage by this built-in fitting to concrete is a kind of conventional research method.Existing concrete in tension pre-embedded device, the location of built-in fitting and fixing not accurate enough, and concrete sample is easily moved and reverses in making Concrete, make the concrete made solid not, firm, and can not remove immediately and carry out turnover use.
Summary of the invention
The technical problems to be solved in the utility model, be to provide a kind of new concrete tension built-in fitting device, and built-in fitting can be fixed fast, remove in concreting process, and turnover uses.After concrete sample is shaping, be connected with the bayonet socket of built-in fitting by connecting link, thus realize applying pulling force to concrete.
The utility model problem is achieved in that a kind of new concrete tension built-in fitting device, and described concrete in tension built-in fitting device comprises a test specimen mould, two connection draw-in grooves and a cruciform card slot type fixed mount; Described two connection draw-in grooves are symmetricly set in test specimen mould; Described cruciform card slot type fixed mount comprises a long limit and a minor face, and described minor face both ends all arrange one first draw-in groove, the second draw-in groove that both ends, long limit are arranged before and after being provided with two and the 3rd draw-in groove; Two the first draw-in grooves of described minor face are connected with left and right two wall of test specimen mould, and two second draw-in grooves on described long limit are connected with front and back two wall of test specimen mould, and connection draw-in groove is fixed spacing in test specimen mould by two the 3rd draw-in grooves on long limit.
Further, described connection draw-in groove comprises the steel plate layer with bayonet, structural adhesive layer and the concrete layer that set gradually.
Further, the length of described 3rd draw-in groove is greater than the length of described second draw-in groove.
Further, the bayonet socket of described steel plate layer is " one " font.
Further, described concrete in tension built-in fitting device also comprises connecting link, and described connecting link connects with the bayonet socket being connected draw-in groove.
The utility model tool has the following advantages: pre-buried fixing simple and convenient, the accurate positioning of connection draw-in groove of the present utility model.For accurate location and the convenient fixing of built-in fitting, the utility model devises a cruciform card slot type fixed mount, is fixed by 4 notches and test specimen die wall, can ensure that cruciform card slot type fixed mount is not moved and reverses; Meanwhile, the notch on cruciform card slot type fixed mount is connected draw-in groove again notch with built-in fitting is interconnected, thus guarantees that built-in fitting connects draw-in groove and is not moved and reverses.Meanwhile, owing to being all connected by notch between each part, built-in fitting connects draw-in groove and can locate fast and accurately.In addition, cruciform card slot type fixed mount can be removed immediately after test specimen mould builds full concrete, and turnover uses.After concrete sample is shaping, be connected with the bayonet socket of built-in fitting by connecting link, thus realize applying pulling force to concrete.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model.
Fig. 2 is the structural representation of concrete in tension built-in fitting device of the present utility model together with circular sleeve assembling.
Fig. 3 is the structural representation of connection draw-in groove of the present utility model.
Fig. 4 is the cross sectional representation of connection draw-in groove of the present utility model.
Fig. 5 is cruciform card slot type fixed rack structure schematic diagram of the present utility model.
Embodiment
Refer to shown in Fig. 1 to Fig. 5, a kind of new concrete tension built-in fitting device of the present utility model, described concrete in tension built-in fitting device 1 comprises a test specimen mould 11, two and connects draw-in groove 12 and a cruciform card slot type fixed mount 13; Described two connection draw-in grooves 12 are symmetricly set in test specimen mould 11; Described connection draw-in groove 12 comprises the steel plate layer with bayonet 121, structural adhesive layer 122 and the concrete layer 123 that set gradually; Described cruciform card slot type fixed mount 13 comprises long limit 131 and a minor face 132, and described minor face 132 both ends all arrange one first draw-in groove 1321, the second draw-in groove 1311 that both ends, long limit 131 are arranged before and after being provided with two and the 3rd draw-in groove 1312; Two the first draw-in grooves 1321 of described minor face 132 are connected with left and right two wall of test specimen mould 11, two second draw-in grooves 1311 on described long limit 131 are connected with front and back two wall of test specimen mould 11, and connection draw-in groove 12 is fixed spacing in test specimen mould 11 by two the 3rd draw-in grooves 1312 on long limit 131.
Wherein, the length of described 3rd draw-in groove 1312 is greater than the length of described second draw-in groove 1311.Connection draw-in groove 12 can better be fixed by such 3rd draw-in groove 1312.121 bayonet sockets of described steel plate layer are " one " font.Described concrete in tension built-in fitting device also comprises connecting link (not shown), and described connecting link connects with the bayonet socket being connected draw-in groove.Such can to concrete in tension built-in fitting device apply pulling force.
Principle of work of the present utility model is as follows:
Connect draw-in groove by two and be placed in a test specimen mould, and be fixed by a cruciform card slot type fixed mount; Described cruciform card slot type fixed mount comprises a long limit and a minor face, and described minor face both ends all arrange one first draw-in groove, the second draw-in groove that both ends, long limit are arranged before and after being provided with two and the 3rd draw-in groove; Two the first draw-in grooves of described minor face are connected with left and right two wall of test specimen mould, and two second draw-in grooves on described long limit are connected with front and back two wall of test specimen mould, and connection draw-in groove is fixed spacing in test specimen mould by two the 3rd draw-in grooves on long limit; Described minor face both ends all arrange the first draw-in groove thus limit the displacement of cruciform card slot type fixed mount along X, Z-direction, and around the rotation of X, Y, Z axis; On the long limit of this external cruciform card slot type fixed mount, (position of corresponding pre-buried connection draw-in groove) arranges 2 the second draw-in grooves and the 3rd draw-in groove of front and back respectively.2 second draw-in grooves (position of corresponding pre-buried connection draw-in groove) of this cruciform card slot type fixed mount connect with the notch on pre-buried connection draw-in groove, thus limit the displacement of connection draw-in groove along X, Z-direction, and around the rotation of X, Y, Z axis, reach the object of fixing pre-buried draw-in groove.
Two circular sleeves 2 are connected with test specimen mould, i.e. brushing release agent on circular sleeve, then circular sleeve are passed the preformed hole on test specimen mould, be enclosed within described connection draw-in groove;
Casting concrete and form removal, namely after test specimen mould filled by concrete, test specimen mould is put on bumper and shakes, immediately cruciform card slot type fixed mount is taken out afterwards, fill concrete hole and with reinforcing bar plug and pound ensure closely knit, at interval of a period of time slewing circle sleeve pipe, after concrete final set, circular sleeve is extracted out, form preformed hole; After concrete sample maintenance reaches striking time, remove the template of test specimen mould, form concrete sample.
In a word, pre-buried fixing simple and convenient, the accurate positioning of connection draw-in groove of the present utility model.For accurate location and the convenient fixing of built-in fitting, the utility model devises a cruciform card slot type fixed mount, is fixed by 4 notches and test specimen die wall, can ensure that cruciform card slot type fixed mount is not moved and reverses; Meanwhile, the notch on cruciform card slot type fixed mount is connected draw-in groove again notch with built-in fitting is interconnected, thus guarantees that built-in fitting connects draw-in groove and is not moved and reverses.Meanwhile, owing to being all connected by notch between each part, built-in fitting connects draw-in groove and can locate fast and accurately.In addition, cruciform card slot type fixed mount can be removed immediately after test specimen mould builds full concrete, and turnover uses.After concrete sample is shaping, be connected with the bayonet socket of built-in fitting by connecting link, thus realize applying pulling force to concrete.
The foregoing is only preferred embodiment of the present utility model, all equalizations done according to the utility model claim change and modify, and all should belong to covering scope of the present utility model.
Claims (5)
1. a new concrete tension built-in fitting device, is characterized in that: described concrete in tension built-in fitting device comprises a test specimen mould, two connection draw-in grooves and a cruciform card slot type fixed mount; Described two connection draw-in grooves are symmetricly set in test specimen mould; Described cruciform card slot type fixed mount comprises a long limit and a minor face, and described minor face both ends all arrange one first draw-in groove, the second draw-in groove that both ends, long limit are arranged before and after being provided with two and the 3rd draw-in groove; Two the first draw-in grooves of described minor face are connected with left and right two wall of test specimen mould, and two second draw-in grooves on described long limit are connected with front and back two wall of test specimen mould, and connection draw-in groove is fixed spacing in test specimen mould by two the 3rd draw-in grooves on long limit.
2. a kind of new concrete tension built-in fitting device according to claim 1, is characterized in that: described connection draw-in groove comprises the steel plate layer with bayonet, structural adhesive layer and the concrete layer that set gradually.
3. a kind of new concrete tension built-in fitting device according to claim 1, is characterized in that: the length of described 3rd draw-in groove is greater than the length of described second draw-in groove.
4. a kind of new concrete tension built-in fitting device according to claim 1, is characterized in that: the bayonet socket of described steel plate layer is " one " font.
5. a kind of new concrete tension built-in fitting device according to claim 2, is characterized in that: described concrete in tension built-in fitting device also comprises connecting link, and described connecting link connects with the bayonet socket being connected draw-in groove.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520952962.7U CN205175775U (en) | 2015-11-25 | 2015-11-25 | Novel concrete is drawn built -in fitting device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520952962.7U CN205175775U (en) | 2015-11-25 | 2015-11-25 | Novel concrete is drawn built -in fitting device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205175775U true CN205175775U (en) | 2016-04-20 |
Family
ID=55739753
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520952962.7U Expired - Fee Related CN205175775U (en) | 2015-11-25 | 2015-11-25 | Novel concrete is drawn built -in fitting device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205175775U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111006998A (en) * | 2019-12-24 | 2020-04-14 | 青岛理工大学 | Concrete loading device for simulating stress state of any point of tunnel |
CN111595656A (en) * | 2020-06-08 | 2020-08-28 | 天津大学 | Forming die for testing interface fracture performance of dissimilar concrete and preparation method |
-
2015
- 2015-11-25 CN CN201520952962.7U patent/CN205175775U/en not_active Expired - Fee Related
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111006998A (en) * | 2019-12-24 | 2020-04-14 | 青岛理工大学 | Concrete loading device for simulating stress state of any point of tunnel |
CN111006998B (en) * | 2019-12-24 | 2021-06-29 | 青岛理工大学 | Concrete loading device for simulating stress state of any point of tunnel |
CN111595656A (en) * | 2020-06-08 | 2020-08-28 | 天津大学 | Forming die for testing interface fracture performance of dissimilar concrete and preparation method |
CN111595656B (en) * | 2020-06-08 | 2021-08-24 | 天津大学 | Forming die for testing interface fracture performance of dissimilar concrete and preparation method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103195450B (en) | Hydraulic pressure tunnel invert operation trolley and inverted arch construction method | |
CN205175775U (en) | Novel concrete is drawn built -in fitting device | |
CN212295160U (en) | Prefabricated assembled concrete shear force wall | |
CN106088361B (en) | A kind of self-locking tenon tooth formula precast concrete and preparation method thereof | |
CN205329858U (en) | Pre -buried muscle positioner of cast -in -place layer or prefabricated wallboard and connection structure thereof | |
CN106499173B (en) | The aluminum alloy mould plate mechanism of building floor construction is used for based on BIM technology | |
CN216239746U (en) | Narrow and small space concrete structure template is propped up and is established device | |
CN201539095U (en) | Unbonded prestressed concrete silo wall column stretching end joint sliding die system | |
CN202265778U (en) | High-precision precast-beam positioning structure | |
CN105040973A (en) | Outer decorating layer formwork for conical columns of comprehensive gym and construction method of outer decorating layer formwork | |
CN109184195B (en) | Method for plugging concrete outer wall hole | |
CN102213032A (en) | Construction method for connecting reinforcing bars of structural columns | |
CN204139622U (en) | Adjustable segmented column steel bar positioning fixture | |
CN201730330U (en) | Beam formwork for building | |
CN106284978A (en) | A kind of movement joint both sides shear wall synchronous construction technique and canalization template | |
CN103306476A (en) | Method for quickly removing formwork | |
CN103643646A (en) | Bracket-free and pull rod-free steel template device for overhead cast-in-place concrete anti-collision wall | |
CN214110854U (en) | Precast beam form removal frock | |
CN202031309U (en) | Suspending operation platform for structural concrete constructions | |
CN203924687U (en) | A kind of plastic formwork structure that detachably recycles | |
CN103266569A (en) | Pre-assembly method of steel bridge | |
CN209620589U (en) | A kind of fixing templates | |
CN203569693U (en) | Pre-buried iron part with steel ties arranged on concrete structure | |
CN102268921A (en) | Beam template for construction | |
CN203066493U (en) | Positioning die for precise construction of main reinforcement of pillar |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20160420 Termination date: 20191125 |
|