CN205131595U - Docking block - Google Patents

Docking block Download PDF

Info

Publication number
CN205131595U
CN205131595U CN201520906417.4U CN201520906417U CN205131595U CN 205131595 U CN205131595 U CN 205131595U CN 201520906417 U CN201520906417 U CN 201520906417U CN 205131595 U CN205131595 U CN 205131595U
Authority
CN
China
Prior art keywords
headblock
docking block
clump
pillar stiffener
combination
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520906417.4U
Other languages
Chinese (zh)
Inventor
叶再金
刘库成
陈昌盛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Taizhou Yuanshan Shipping Project Co Ltd
Original Assignee
Taizhou Yuanshan Shipping Project Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Taizhou Yuanshan Shipping Project Co Ltd filed Critical Taizhou Yuanshan Shipping Project Co Ltd
Priority to CN201520906417.4U priority Critical patent/CN205131595U/en
Application granted granted Critical
Publication of CN205131595U publication Critical patent/CN205131595U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses a docking block, include cement pier and place the combination headblock on cement pier, cement pier sets up 1 at least spinal branch dagger, the through -hole that supplies the support column to wear to establish is seted up to the combination headblock, the support column can go up and down in the orientation of perpendicular mound face, wherein be provided with in this cement pier to make the support column have the elastic component that breaks away from cement pier trend, and its terminal surface exceeds the upper surface of combination headblock after the installation of support column, when the support column descends the support column the terminal surface can with the upper surface looks parallel and level of combination headblock, boats and ships have a buffering effect before through the docking block support, abate boats and ships to the instantaneous produced pressure of docking block and lead to the fact collapse docking block's the circumstances of pressure.

Description

A kind of docking block
Technical field
The utility model relates to ship building frock, and more particularly, it relates to a kind of boats and ships that support and carries out manufacturing the docking block overhauled.
Background technology
Dock is a kind of hydraulic structure for building or overhaul boats and ships, dock is divided into dry dock and floating drydock, just for dry dock when boats and ships enter dry dock repair time, first with filling with sluicing facility to water-filling in depressed place, when flushing with water level outside depressed place in depressed place, open dock gate, utilize tractor equipment to be led at a slow speed in docking by boats and ships, afterwards water body in depressed place is drained, boats and ships are seated on docking block.During the ship undocking repaiied or built, first pour water in depressed place, when water level flushes to dock gate, open dock gate, lead ship and undock.
Due in the process that the water in dock is slowly drained, increasing pressure for docking block is large, the gravity that pressure suffered by docking block equals boats and ships self deducts the buoyancy of water to boats and ships, pressure after boats and ships depart from water suffered by docking block can be approximately equal to the gravity of boats and ships, the moment that buoyancy disappears is for the stressed unexpected increase of docking block, easily this immense pressure produced instantaneously causes docking block to be collapsed by pressure, impacts the maintenance of boats and ships.
Utility model content
For the deficiency that prior art exists, the purpose of this utility model be to provide a kind of have pooling feature eliminate moment bring the docking block of pressure.
For achieving the above object, the utility model provides following technical scheme: a kind of docking block, comprise clump and the combination headblock be placed on clump, described clump arranges at least 1 pillar stiffener, described combination headblock offers the through hole worn for pillar stiffener, described pillar stiffener can be elevated on the direction in vertical pier face, wherein be provided with in this clump and make pillar stiffener have the elastic component departing from clump trend, and its end face exceeds the upper surface of combination headblock after the installation of pillar stiffener, when pillar stiffener declines, the end face of pillar stiffener can be mutually concordant with the upper surface of combination headblock.
By adopting technique scheme, first boats and ships contact with pillar stiffener and play a buffering effect in decline process, to extenuate after boats and ships depart from water completely the pressure to the instantaneous increase produced described in docking block, until boats and ships contact with combination headblock, avoid boats and ships and the instantaneous mutation pressure pressure that docking block produces is collapsed docking block.
As preferably, described clump offers the slippage slot for pillar stiffener lifting carriage, offers a storage tank in the bottom of clump, and described elastic component to be placed in storage tank and inconsistent with the bottom of slippage slot.
By adopting technique scheme, the directional tagging that slippage slot is elevated as pillar stiffener, and in the storage tank that elastic component is contained in pillar stiffener, play a good position-limiting action.
As preferably, described combination headblock is made up of upper headblock and stow-wood pad, and wherein this stow-wood pad is made up of the angle timber wedge that two angles are relative.
By adopting technique scheme, the angle timber wedge composition stow-wood pad that two angles are relative reduces the internal stress because boats and ships produce combination headblock.
As preferably, described combination headblock is fixed on clump by steel rope binding.
By adopting technique scheme, fixed form is simple, is convenient to change combination headblock.
As preferably, the end face of described pillar stiffener is provided with cushion.
By adopting technique scheme, reduce boats and ships to the crushing of pillar stiffener.
As preferably, described cushion is rubber pad or silicagel pad.
By adopting technique scheme, have the advantage of rotproofness, the corrosion reducing seawater improves service life.
As preferably, described elastic component is set to spring.
By adopting technique scheme, spring is common elastic component, and cost performance is high.
As preferably, half arc is arranged in the both sides of described clump.
By adopting technique scheme, clump both sides half arc arranges the scuffing can avoided to human body in transportation, and reduce long-time in sea water immersion process both sides especially seamed edge ftracture, the support strength of entire lowering clump.
Compared with prior art, the utility model has the advantage of: boats and ships had a buffering effect before being supported by docking block, extenuate boats and ships and cause for instantaneous the produced pressure of docking block pressure to collapse the situation of docking block.
Accompanying drawing explanation
Fig. 1 is the structural representation of docking block;
Fig. 2 is the exploded perspective view of docking block;
Fig. 3 is the cutaway view of docking block.
Accompanying drawing illustrates: 10, clump; 11, arcwall face; 12, bore a hole; 13, slippage slot; 20, headblock is combined; 21, upper headblock; 22, stow-wood pad; 221, angle timber wedge; 23, through hole; 30, steel rope; 40, pillar stiffener; 41, cushion; 42, storage tank; 50, elastic component.
Detailed description of the invention
Be described in further detail utility model by specific embodiment below in conjunction with accompanying drawing, following examples are descriptive, be not determinate protection domain of the present utility model.
Composition graphs 2 and Fig. 3, a kind of docking block comprises the clump 10 of bottom and the combination headblock 20 be placed on clump 10, the left and right sides of clump 10 is provided with arcwall face 11, clump 10 offers at least 1 slippage slot 13, in slippage slot 13, slippage is connected with pillar stiffener 40, pillar stiffener 40 moves up and down in the vertical guiding of slippage slot 13, pillar stiffener 40 be a cylinder its be made up of corrosion-resistant steel, an end face of pillar stiffener 40 offers storage tank 42, elastic component 50 is provided with in storage tank 42 and between the bottom of slippage slot 13, elastic component 50 is fixed in the effect lower limit of storage tank 42, spring is selected to use as elastic component 50 in the present embodiment.
Combination headblock 20 comprises headblock 21 and stow-wood pad 22, and stow-wood pad 22 is made up of the angle timber wedge 221 that two pieces of angles are relative, upper headblock 21 from top to bottom superposes successively with two pieces of angle timber wedge 221 threes, whole combination headblock 20 offers through hole 23, pillar stiffener 40 is located on through hole 23, for improving the fixed property of combination headblock 20 on clump 10, preferred pillar stiffener 40 arranges at least 2, and be play a buffer action further, the upper surface of pillar stiffener 40 is provided with cushion 41, cushion 41 is rubber pad or silicagel pad, a buffering effect is played for making pillar stiffener 40, the upper surface of normal condition lower support post 40 is higher than the upper surface of headblock 21, make boats and ships first inconsistent with pillar stiffener 40, and upper surface can reach and flushes with the upper surface of upper headblock 21 when pillar stiffener 40 declines.
See Fig. 1, when installing docking block, combination headblock 20 being placed on clump 10, clump 10 offering perforation 12, perforation 12 is equipped with steel rope 30, by steel rope 30, combination headblock 20 being bundled on clump 10.
The above is only preferred implementation of the present utility model, protection domain of the present utility model be not only confined to above-described embodiment, and all technical schemes belonged under the utility model thinking all belong to protection domain of the present utility model.It should be pointed out that for those skilled in the art, do not departing from the some improvements and modifications under the utility model principle prerequisite, these improvements and modifications also should be considered as protection domain of the present utility model.

Claims (8)

1. a docking block, comprise clump (10) and the combination headblock (20) be placed on clump (10), it is characterized in that, described clump (10) arranges at least 1 pillar stiffener (40), described combination headblock (20) offers the through hole (23) worn for pillar stiffener (40), described pillar stiffener (40) can be elevated on the direction in vertical pier face, wherein be provided with the elastic component (50) making pillar stiffener (40) have disengaging clump (10) trend in this clump (10), and its end face exceeds the upper surface of combination headblock (20) after the installation of pillar stiffener (40), when pillar stiffener (40) declines, the end face of pillar stiffener (40) can be mutually concordant with the upper surface of combination headblock (20).
2. a kind of docking block according to claim 1, it is characterized in that, described clump (10) offers the slippage slot (13) for pillar stiffener (40) lifting carriage, offer a storage tank (42) in the bottom of clump (10), it is interior and inconsistent with the bottom of slippage slot (13) that described elastic component (50) is placed in storage tank (42).
3. a kind of docking block according to claim 1 and 2, is characterized in that, described combination headblock (20) is made up of upper headblock (21) and stow-wood pad, and wherein this stow-wood pad is made up of the angle timber wedge (221) that two angles are relative.
4. a kind of docking block according to claim 3, is characterized in that, described combination headblock (20) is fixed on clump (10) by steel rope (30) binding.
5. a kind of docking block according to claim 1, is characterized in that, the end face of described pillar stiffener (40) is provided with cushion (41).
6. a kind of docking block according to claim 5, is characterized in that, described cushion (41) is rubber pad or silicagel pad.
7. a kind of docking block according to claim 1, is characterized in that, described elastic component (50) is set to spring.
8. a kind of docking block according to claim 1, is characterized in that, half arc is arranged in the both sides of described clump (10).
CN201520906417.4U 2015-11-13 2015-11-13 Docking block Expired - Fee Related CN205131595U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520906417.4U CN205131595U (en) 2015-11-13 2015-11-13 Docking block

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520906417.4U CN205131595U (en) 2015-11-13 2015-11-13 Docking block

Publications (1)

Publication Number Publication Date
CN205131595U true CN205131595U (en) 2016-04-06

Family

ID=55617412

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520906417.4U Expired - Fee Related CN205131595U (en) 2015-11-13 2015-11-13 Docking block

Country Status (1)

Country Link
CN (1) CN205131595U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107585272A (en) * 2017-10-13 2018-01-16 江苏扬子鑫福造船有限公司 One kind is used for super large marine curved surface area docking block
CN110254662A (en) * 2019-06-27 2019-09-20 广船国际有限公司 A kind of docking block shift unit and method
CN112572723A (en) * 2020-12-04 2021-03-30 沪东中华造船(集团)有限公司 Horizontal height adjusting method for dock block of floating dock
CN112572724A (en) * 2020-12-04 2021-03-30 沪东中华造船(集团)有限公司 Method for calibrating horizontal height of dock block of floating dock
CN113602451A (en) * 2021-09-03 2021-11-05 上海外高桥造船有限公司 Special steel docking block for carrying passenger liner in dock stage

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107585272A (en) * 2017-10-13 2018-01-16 江苏扬子鑫福造船有限公司 One kind is used for super large marine curved surface area docking block
CN110254662A (en) * 2019-06-27 2019-09-20 广船国际有限公司 A kind of docking block shift unit and method
CN112572723A (en) * 2020-12-04 2021-03-30 沪东中华造船(集团)有限公司 Horizontal height adjusting method for dock block of floating dock
CN112572724A (en) * 2020-12-04 2021-03-30 沪东中华造船(集团)有限公司 Method for calibrating horizontal height of dock block of floating dock
CN113602451A (en) * 2021-09-03 2021-11-05 上海外高桥造船有限公司 Special steel docking block for carrying passenger liner in dock stage

Similar Documents

Publication Publication Date Title
CN205131595U (en) Docking block
WO2016127477A1 (en) Floating type self-elevating drilling platform
CN103910044B (en) A kind of large-scale the floating structures semi-submersible type lifting platform and application process thereof
CN103917439A (en) Offshore platform with outset columns
CN105035278B (en) Low-heave semi-submersible offshore structure
CN105151236A (en) Platform device for submerging, surfacing, moving and carrying floating piers and towers and working method thereof
WO2010028762A3 (en) Device for hauling and installing an offshore wind power station arrangement comprising at least one raft foundation, and method for hauling and installing such a raft foundation including a mast
CN105293306A (en) Integral offshore wind turbine hoisting device achieving multi-freedom-degree compensation
CN201313621Y (en) Automatically turned and restored rocker
CN101804849A (en) Construction program of semi-submersible platform for offshore oil and gas development
CN103895828A (en) Double-curved-surface floating type production oil storage platform
CN201580543U (en) Pipe bundle type stand column platform
CN203902799U (en) Double-curved-surface-shaped floating oil production and storage platform
CN203889020U (en) Semi-submersible type ocean platform with inclined stand column
CN204916099U (en) Semi -submerged barge tilting dive stern deadwood
CN106005266B (en) Wear unrestrained formula buoy structure and buoyage
CN202416258U (en) Marine platform damping device capable of increasing berthing capacity
CN204059289U (en) The controlled floating foundation of resistance is overhead blocks ship's repairs & maintenance facilities
CN201825221U (en) Semi-submersible type drilling platform
CN204037857U (en) Floating Production oil storage emptying equipment alongside fender structure
CN204587263U (en) Steel fender
CN105947123A (en) Double-body semi-submerged ship with submersible deck
CN206766292U (en) Middle-size and small-size submarine handling torpedo new exclusive landing stage
CN204956869U (en) Deepwater semi-submersible drilling platform
CN102030087A (en) Semi-submersible platform for offshore drilling

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160406

Termination date: 20161113