CN205078927U - Nuclear power station assembled pipeline bracket - Google Patents

Nuclear power station assembled pipeline bracket Download PDF

Info

Publication number
CN205078927U
CN205078927U CN201520844760.0U CN201520844760U CN205078927U CN 205078927 U CN205078927 U CN 205078927U CN 201520844760 U CN201520844760 U CN 201520844760U CN 205078927 U CN205078927 U CN 205078927U
Authority
CN
China
Prior art keywords
pipe clamp
nuclear power
power station
utility
type support
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201520844760.0U
Other languages
Chinese (zh)
Inventor
韩浪
陈兴华
刘琴
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China General Nuclear Power Corp
China Nuclear Power Engineering Co Ltd
Original Assignee
China General Nuclear Power Corp
China Nuclear Power Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China General Nuclear Power Corp, China Nuclear Power Engineering Co Ltd filed Critical China General Nuclear Power Corp
Priority to CN201520844760.0U priority Critical patent/CN205078927U/en
Application granted granted Critical
Publication of CN205078927U publication Critical patent/CN205078927U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Supports For Pipes And Cables (AREA)
  • Mutual Connection Of Rods And Tubes (AREA)

Abstract

The utility model discloses a nuclear power station assembled pipeline bracket, its including be used for restrained line the pipe strap and with the steel construction that the pipe strap is connected, the pipe strap with connected mode between the steel construction is for can dismantle the connection. The utility model discloses nuclear power station assembled pipeline bracket adopts detachable connection form, can effectually satisfy support adjustment requirement, avoids the welding repeatedly to the support, has guaranteed the engineering quality, and simultaneously, the segmental timbering can adapt to on -the -spot complicated condition, need not carry out welded connection, and on -the -spot installation and adjustment are easy, have improved the efficiency of construction. The utility model discloses nuclear power station assembled pipeline bracket is used for solving welding formula support adjustment difficulty, welds inaccessible problem, to changing morely or needing the pipeline that modified and installation environment are comparatively complicated, solid waste processing (TES) system like the nuclear power station can advance the alternative use the utility model discloses, make the installation of support more high -efficient, reliable.

Description

Nuclear power station assembling type support of pipelines
Technical field
The utility model relates to the Pipe installing of nuclear power station, more particularly, relates to a kind of nuclear power station assembling type support of pipelines.
Background technique
In nuclear power station designed and calculated process, relate to multiple specialties such as process system, civil engineering, equipment, due to change or the design improvement of upstream specialty, pipeline and support installing there will be larger variation.If adopt welding type support, be in-situ precast due to its overall structure and weld, support will face and repeatedly cut welding, easily crack and defect, there is the risk that reliability reduces in support using process.In addition, for the process pipe that some later stages change or improve, due to the pipeline of other specialty and equipment in place, installing space can be produced narrow and small in the process of design and installation, the inaccessible problem in welding position, cause support installing difficulty, and then installation quality and project progress are had a negative impact.
As in Solid Waste Treatment (TES) system of nuclear power station, its pipeline changes more or needs to improve, and installation environment is comparatively complicated, adopts welding type support to fix pipeline and will produce above-mentioned said problem.
Model utility content
The purpose of this utility model is: provide a kind of nuclear power station assembling type support of pipelines, solves the spatial operation difficulty that welding type support in Nuclear Power Station work progress may occur, and repeats the problem that welding quality cannot ensure after structure modify.
To achieve these goals, the utility model provides a kind of nuclear power station assembling type support of pipelines, comprises the pipe clamp for restrained line, and also comprise the steel structure be connected with described pipe clamp, the Placement between described pipe clamp and described steel structure is for removably connecting.
One as the utility model nuclear power station assembling type support of pipelines is improved, described pipe clamp comprises pipe clamp and lower pipe clamp, the through hole being used for restrained line is formed between pipe clamp and lower pipe clamp on described, extend respectively to both sides in the bottom of described lower pipe clamp and be provided with side plate, described side plate is by bolt or clip and described steel structure connection.
One as the utility model nuclear power station assembling type support of pipelines is improved, described pipe clamp comprises pipe clamp and lower pipe clamp, the through hole being used for restrained line is formed between pipe clamp and lower pipe clamp on described, be provided with a connection deck in the bottom of described lower pipe clamp, described lower pipe clamp is by described connection deck and described steel structure connection.
One as the utility model nuclear power station assembling type support of pipelines is improved, described upper pipe clamp, lower pipe clamp be connected deck and be bolted, by bolt or clip connected between the two ends of described connection deck and steel structure.
One as the utility model nuclear power station assembling type support of pipelines is improved, and described bolt is countersunk screw.
One as the utility model nuclear power station assembling type support of pipelines is improved, on described, form multiple through hole for receiving the pipeline be arranged in parallel between pipe clamp and lower pipe clamp.
One as the utility model nuclear power station assembling type support of pipelines is improved, and described steel structure arranges and is connected on civil engineering structure, steel platform fixing or fixing steel equipment.
One as the utility model nuclear power station assembling type support of pipelines is improved, and described upper pipe clamp is identical with the structure of lower pipe clamp.
Compared with prior art, the utility model nuclear power station assembling type support of pipelines adopts detachable Connecting format, effectively can meet support adjustment requirement, avoid, to the Rewelding of support, ensure that construction quality, simultaneously, segmental timbering can adapt to on-the-spot complex conditions, do not need to be welded to connect, in-site installation and adjustment easily, improve efficiency of construction.The utility model nuclear power station assembling type support of pipelines, for solving welding type support adjustment difficulty, welds inaccessible problem; For change more or need to improve and the pipeline that installation environment is comparatively complicated, as Solid Waste Treatment (TES) system of nuclear power station, choice for use the utility model can be shifted to an earlier date, make the installation of support more efficient, reliably.
Accompanying drawing explanation
Below in conjunction with the drawings and specific embodiments, the structure of the utility model nuclear power station assembling type support of pipelines and Advantageous Effects thereof are described in detail.
Fig. 1 is the structural representation of the utility model nuclear power station assembling type support of pipelines.
Embodiment
In order to make goal of the invention of the present utility model, technological scheme and Advantageous Effects thereof more clear, below in conjunction with the drawings and specific embodiments, the utility model is further elaborated.Should be understood that, the embodiment described in this specification is only used to explain the utility model, is not intended to limit the utility model.
Refer to Fig. 1, the utility model nuclear power station assembling type support of pipelines, comprises the pipe clamp for restrained line, and the steel structure be connected with pipe clamp; Pipe clamp is a kind of pipeline fixing device, and pipeline is retrained to realize spacing by pipe clamp; Steel structure is bearing structure, is generally steel frame, steel beam column or shaped steel, and steel structure can be connected on civil engineering structure, also can be connected on other steel platform fixing/equipment, by with removable steel structure with the use of, achieve supporting position adjustable.Pipe clamp comprises pipe clamp 1 and lower pipe clamp 2, forms the through hole being used for restrained line between upper pipe clamp 1 and lower pipe clamp 2, is provided with connects deck 4 in the bottom of lower pipe clamp 2, and lower pipe clamp 2 is connected with steel structure 6 by connecting deck 4; Upper pipe clamp 1 is identical with the structure of lower pipe clamp 2, and is conducive to manufacturing.Upper pipe clamp 1, lower pipe clamp 2 be connected deck 4 and connected by bolt 3, bolt 3 is countersunk screw, makes pipe clamp outstanding without local, is convenient to install and saves installing space; The two ends connecting deck 4 are connected by clip 5 with between steel structure 6, clip 5 is a kind of groove link, namely after connection deck 4 arranges groove with the outer surface of steel structure 6, available clip 5 is set in and is connected on deck 4 and steel structure 6 thus both are tightened up connection, simple to operate.
The installation steps of the utility model nuclear power station assembling type support of pipelines are as follows: (1) in the constraint point position of pipeline by upper pipe clamp 1, lower pipe clamp 2 be connected deck 4 and positioned by bolt 3 and to connect; (2) according to the position at pipe clamp place, adjustment steel structure 6 and the position of taking root a little thereof, ensure that pipe clamp is effectively connected with steel structure; Steel structure can be taken root on civil engineering structure, also can take root on other steel platform fixing/equipment; (3) treat after Steel Structure Installation, by clip 5, connection deck 4 and steel structure 6 are fixed, finally realize the constraint to pipeline.
The present embodiment is a kind of scheme of support releasable connection simple possible the most, can do as down conversion in other embodiments: go up pipe clamp, lower pipe clamp and be connected deck by the connection of the removably such as clip or screw, connect deck and be connected by the removably such as bolt or screw with between steel structure; Pipe clamp and Connection Card stand structure easily extensible, for the layout of intensive pipeline, as formed multiple through hole for receiving the pipeline be arranged in parallel between upper pipe clamp and lower pipe clamp; Or extend respectively to both sides in the bottom of lower pipe clamp and be provided with side plate to replace connection deck, side plate is by bolt, screw or clip and steel structure connection.
One as the utility model nuclear power station assembling type support of pipelines is improved, on described, form multiple through hole for receiving the pipeline be arranged in parallel between pipe clamp and lower pipe clamp.
The announcement of book and instruction according to the above description, the utility model those skilled in the art can also carry out suitable change and amendment to above-mentioned mode of execution.Therefore, the utility model is not limited to embodiment disclosed and described above, also should fall in the protection domain of claim of the present utility model modifications and changes more of the present utility model.In addition, although employ some specific terms in this specification, these terms just for convenience of description, do not form any restriction to the utility model.

Claims (8)

1. a nuclear power station assembling type support of pipelines, comprises the pipe clamp for restrained line, it is characterized in that, also comprise the steel structure be connected with described pipe clamp, the Placement between described pipe clamp and described steel structure is for removably connecting.
2. nuclear power station assembling type support of pipelines according to claim 1, it is characterized in that, described pipe clamp comprises pipe clamp and lower pipe clamp, the through hole being used for restrained line is formed between pipe clamp and lower pipe clamp on described, extend respectively to both sides in the bottom of described lower pipe clamp and be provided with side plate, described side plate is by bolt or clip and described steel structure connection.
3. nuclear power station assembling type support of pipelines according to claim 1, it is characterized in that, described pipe clamp comprises pipe clamp and lower pipe clamp, the space for receiving pipeline is formed on described between pipe clamp and lower pipe clamp, be provided with a connection deck in the bottom of described lower pipe clamp, described lower pipe clamp is by described connection deck and described steel structure connection.
4. nuclear power station assembling type support of pipelines according to claim 3, is characterized in that, described upper pipe clamp, lower pipe clamp be connected deck and be bolted, by bolt or clip connected between the two ends of described connection deck and steel structure.
5. nuclear power station assembling type support of pipelines according to claim 4, is characterized in that, described bolt is countersunk screw.
6. nuclear power station assembling type support of pipelines according to claim 1, is characterized in that, on described, form multiple through hole for receiving the pipeline be arranged in parallel between pipe clamp and lower pipe clamp.
7. nuclear power station assembling type support of pipelines according to claim 1, is characterized in that, described steel structure arranges and is connected on civil engineering structure, steel platform fixing or fixing steel equipment.
8. nuclear power station assembling type support of pipelines according to claim 3, is characterized in that, described upper pipe clamp is identical with the structure of lower pipe clamp.
CN201520844760.0U 2015-10-28 2015-10-28 Nuclear power station assembled pipeline bracket Active CN205078927U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520844760.0U CN205078927U (en) 2015-10-28 2015-10-28 Nuclear power station assembled pipeline bracket

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520844760.0U CN205078927U (en) 2015-10-28 2015-10-28 Nuclear power station assembled pipeline bracket

Publications (1)

Publication Number Publication Date
CN205078927U true CN205078927U (en) 2016-03-09

Family

ID=55431337

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520844760.0U Active CN205078927U (en) 2015-10-28 2015-10-28 Nuclear power station assembled pipeline bracket

Country Status (1)

Country Link
CN (1) CN205078927U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110566747A (en) * 2019-08-12 2019-12-13 中广核工程有限公司 Nuclear-grade instrument tube supporting combination structure

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110566747A (en) * 2019-08-12 2019-12-13 中广核工程有限公司 Nuclear-grade instrument tube supporting combination structure

Similar Documents

Publication Publication Date Title
CN204042187U (en) A kind of flexible pipeline support bracket
KR101399964B1 (en) Duct alignment device
CN205078927U (en) Nuclear power station assembled pipeline bracket
CN204921558U (en) A interim connecting device that is used for component and bracket to dock
KR102027154B1 (en) GRP pipe vertical load supporting device for
CN207333961U (en) A kind of improved blast furnace tapping machine in front hydraulic oil pipe clamp
CN202913423U (en) Pre-buried connecting device of facility base
CN206815542U (en) A kind of portable bracket pre-embedded bolt fixed structure
CN204692751U (en) The interim hanging board of steel-structure factory building
CN202165696U (en) Cable bridge fixing support clamping device of joist steel
CN204080636U (en) Steel pipe arch bridge arch rib installs flat turn supporting and location platform
CN204127480U (en) A kind of detachable built-in pipe channel fixing device
JP2012172733A (en) Supporting device of pipe constraining pipe axial direction
CN202467185U (en) Device for clamping templates on sides of beam
CN203797162U (en) Small-gap adjustable pipeline support device
KR20060120546A (en) Pipe supporting tool for riser pipe
CN220849072U (en) Construction fence capable of installing temporary hydropower pipeline
CN204782200U (en) A adjustable high pressure vacuum circuit breaker support for steel pipe tower
CN104612166A (en) Combined supporting device and method for hole wall supporting
CN207765907U (en) A kind of load supporting structure
CN205114254U (en) Large pipe conveyer
CN203189965U (en) Installing platform for transmission line on-line monitoring device
KR20130123776A (en) Automatic welding method about big pipe
CN103292037B (en) A kind of composite cable bridge-rack trailing arm
CN203238970U (en) Structural steel fixing support

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant