CN205062819U - Underground structure of arc precast pile and I shaped steel combination - Google Patents

Underground structure of arc precast pile and I shaped steel combination Download PDF

Info

Publication number
CN205062819U
CN205062819U CN201520728519.1U CN201520728519U CN205062819U CN 205062819 U CN205062819 U CN 205062819U CN 201520728519 U CN201520728519 U CN 201520728519U CN 205062819 U CN205062819 U CN 205062819U
Authority
CN
China
Prior art keywords
arc
shaped steel
preformed pile
precast pile
arc preformed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201520728519.1U
Other languages
Chinese (zh)
Inventor
赵升峰
章新
黄广龙
马世强
钟金宁
张西平
刘俊生
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nanjing surveying and mapping investigation and Research Institute Limited by Share Ltd
Original Assignee
NANJING SURVEYING MAPPING PROSPECTING RESEARCH INSTITUTE CO LTD
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NANJING SURVEYING MAPPING PROSPECTING RESEARCH INSTITUTE CO LTD filed Critical NANJING SURVEYING MAPPING PROSPECTING RESEARCH INSTITUTE CO LTD
Priority to CN201520728519.1U priority Critical patent/CN205062819U/en
Application granted granted Critical
Publication of CN205062819U publication Critical patent/CN205062819U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

The utility model discloses an underground structure of arc precast pile and I shaped steel combination relates to geotechnical engineering's technical field, especially relates to underground structure of arc precast pile and I shaped steel combination's technical field. Hold concurrently arc precast pile (1) of stagnant water including being used for the foundation ditch to keep off soil, be connected with I shaped steel (2) of being used for increasing arc precast pile (1) anti side rigidity on the peripheral lateral wall of arc precast pile (1), through being connected fastener (3) connection between arc precast pile (1) and the I shaped steel. Its cross -section of arc precast pile is the arc, and two tip of arc opening part do not set up spill plug -in components (4) and convex plug -in components (5) be connected with adjacent arc precast pile (1). The utility model discloses an anti side rigidity of structure is big, construction speed fast, have concurrently keep off soil with the stagnant water function, be applicable to the great mesh that digs the deep basal pit.

Description

The foundation pit supporting construction that a kind of arc preformed pile and i shaped steel combine
Technical field
The utility model relates to Geotechnical Engineering field, particularly relates to the foundation pit supporting construction that a kind of arc preformed pile and i shaped steel combine.
Background technology
Along with the paces of Urbanization in China are accelerated, the exploitation of the underground space obtain fast development, and foundation depth is also more and more darker, drives the design of its support of deep foundation ditch and construction technology also constantly to develop thereupon.
In each field of civil engineering, base pit engineering soldier pile, slope project slope protection pile and riverbank shore protection stake, often adopt bored pile, but it is slow to there is speed of application in the method, mud emission amount is large, and environment pollution is serious, and the shortcoming such as after concrete perfusion curing time is long; Traditional semicircle piling bar, U-shaped Larsen steel sheet pile or preformed pile, it is less than normal all to there is anti-side rigidity for pattern foundation pit supporting structure separately in it, is out of shape the shortcomings such as excessive, makes it be applicable to surrounding enviroment protection and requires higher and dig dark larger deep-foundation pit engineering and be restricted.
I shaped steel is also referred to as girder steel; the rectangular steel of to be cross section be " work " word shape; its area distributions than moderate, strong code reassignment ratio rationally; and longitudinal bending resistance strong, construct convenient, lightweight and economy is high; but because i shaped steel itself does not have snap close or connector, time separately for foundation pit supporting construction, can only soil be kept off; can not sealing, the requirement of protection foundation ditch surrounding enviroment can not be met.
Summary of the invention
The utility model object is to provide the foundation pit supporting construction that a kind of arc preformed pile and i shaped steel combine.Structure anti-side rigidity is large, speed of application fast, have gear soil and water stopping function concurrently, be applicable to surrounding enviroment protection requires the foundation pit supporting construction that high, to dig dark larger base pit engineering arc preformed pile and i shaped steel combine.
Realize technical solution of the present utility model:
The foundation pit supporting construction that a kind of arc preformed pile and i shaped steel combine, comprise the arc preformed pile (1) for the double sealing of foundation ditch gear soil, the peripheral sidewall of arc preformed pile (1) is connected with the i shaped steel (2) for increasing arc preformed pile (1) anti-side rigidity, arc preformed pile (1) is connected by connection fastener (3) with between i shaped steel.
Further, described its cross section of arc preformed pile is curved, and two of arc opening place ends arrange the spill plug-in unit (4) and convex plug-in unit (5) that are connected with adjacent arc preformed pile (1) respectively.
Further, described spill plug-in unit (4) and convex plug-in unit (5) cooperatively interact.
Further, described connection fastener (3) is U-shaped structure, number at least one.
Further, pile center's spacing of described arc preformed pile (1) is identical with i shaped steel (2) center distance.
Further, the action of described arc preformed pile (1) is 1 ~ 1.2 times of i shaped steel (2) depth of section.
The utility model adopts technique scheme, and compared with prior art tool has the following advantages:
The anti-side rigidity of arc preformed pile and i shaped steel combined foundation ditch support structure is large, and bending resistance is strong, can give full play to the advantage of arc preformed pile and i shaped steel.Both are connected by fastener, the separately construction of arc preformed pile and i shaped steel, continuous productive process.Arc preformed pile and i shaped steel as required, can arrange length flexibly.
Accompanying drawing explanation
Fig. 1 is arc preformed pile and i shaped steel combining structure schematic diagram.
Fig. 2 is the gear soil sealing continuous supporting wall schematic diagram that arc preformed pile and i shaped steel combining structure are formed.
Fig. 3 is the foundation pit supporting construction stereogram that arc preformed pile and i shaped steel combine.
Detailed description of the invention
Below in conjunction with accompanying drawing, the technical solution of the utility model is described in detail:
As shown in Figure 1, the foundation pit supporting construction that a kind of arc preformed pile and i shaped steel combine, comprise the arc preformed pile 1 for the double sealing of foundation ditch gear soil, the peripheral sidewall of arc preformed pile 1 is connected with the i shaped steel 2 for increasing arc preformed pile 1 anti-side rigidity, arc preformed pile 1 is connected by connection fastener 3 with between i shaped steel.
As shown in Figure 2, the foundation pit supporting construction that the utility model arc preformed pile and i shaped steel combine, its cross section of preformed pile is curved, and two of arc opening place ends arrange the spill plug-in unit 4 and convex plug-in unit 5 that are connected with adjacent arc preformed pile 1 respectively.Described spill plug-in unit 4 and convex plug-in unit 5 cooperatively interact.Two U-shaped connection fasteners can be set between arc preformed pile and i shaped steel, be separately positioned on two ends, junction.Pile center's spacing of described arc preformed pile 1 is identical with i shaped steel 2 center distance.The action of described arc preformed pile 1 is 1 ~ 1.2 times of i shaped steel 2 depth of section.
Based on the construction method of the foundation pit supporting construction that arc preformed pile of the present utility model and i shaped steel combine, comprise the following steps:
The first step: require and computational analysis according to site condition, surrounding enviroment protection, determine that the model of arc preformed pile (1), stake are long, determine the model of i shaped steel, length, spacing;
Second step: according to design length, the width of i shaped steel, arc preformed pile arranges connection fastener (3);
3rd step: the arc preformed pile (1) of construction band connection fastener (3);
4th step: construction i shaped steel (2), is made it be formed with arc preformed pile (1) by connection fastener (3) and is reliably connected;
5th step: Construction Support system, the excavation pit earthwork;
6th step: be excavated to the end, hole, build bed course and base plate in time, construction agent structure;
7th step: fertile groove backfill.
The foregoing is only preferred embodiment of the present utility model, not in order to limit the present invention, all do within spirit of the present utility model and principle any amendment, equivalent to replace and improvement etc., all should be included within protection scope of the present invention.

Claims (6)

1. the foundation pit supporting construction that combines of an arc preformed pile and i shaped steel, it is characterized in that, comprise the arc preformed pile (1) for the double sealing of foundation ditch gear soil, the peripheral sidewall of arc preformed pile (1) is connected with the i shaped steel (2) for increasing arc preformed pile (1) anti-side rigidity, arc preformed pile (1) is connected by connection fastener (3) with between i shaped steel.
2. the foundation pit supporting construction that combines of arc preformed pile as claimed in claim 1 and i shaped steel, it is characterized in that, described its cross section of arc preformed pile is curved, and two of arc opening place ends arrange the spill plug-in unit (4) and convex plug-in unit (5) that are connected with adjacent arc preformed pile (1) respectively.
3. the foundation pit supporting construction that combines of arc preformed pile as claimed in claim 2 and i shaped steel, it is characterized in that, described spill plug-in unit (4) and convex plug-in unit (5) cooperatively interact.
4., as the foundation pit supporting construction that the arc preformed pile as described in arbitrary in claims 1 to 3 and i shaped steel combine, it is characterized in that, connection fastener (3) is U-shaped structure, number at least one.
5., as the foundation pit supporting construction that the arc preformed pile as described in arbitrary in claims 1 to 3 and i shaped steel combine, it is characterized in that, pile center's spacing of described arc preformed pile (1) is identical with i shaped steel (2) center distance.
6., as the foundation pit supporting construction that the arc preformed pile as described in arbitrary in claims 1 to 3 and i shaped steel combine, it is characterized in that, the action of described arc preformed pile (1) is 1 ~ 1.2 times of i shaped steel (2) depth of section.
CN201520728519.1U 2015-09-18 2015-09-18 Underground structure of arc precast pile and I shaped steel combination Active CN205062819U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520728519.1U CN205062819U (en) 2015-09-18 2015-09-18 Underground structure of arc precast pile and I shaped steel combination

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520728519.1U CN205062819U (en) 2015-09-18 2015-09-18 Underground structure of arc precast pile and I shaped steel combination

Publications (1)

Publication Number Publication Date
CN205062819U true CN205062819U (en) 2016-03-02

Family

ID=55389394

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520728519.1U Active CN205062819U (en) 2015-09-18 2015-09-18 Underground structure of arc precast pile and I shaped steel combination

Country Status (1)

Country Link
CN (1) CN205062819U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112695767A (en) * 2020-12-22 2021-04-23 四汇建设集团有限公司 Water lowering structure and water lowering method for micro-expansive soil foundation pit soaked by underground water

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112695767A (en) * 2020-12-22 2021-04-23 四汇建设集团有限公司 Water lowering structure and water lowering method for micro-expansive soil foundation pit soaked by underground water

Similar Documents

Publication Publication Date Title
CN202559359U (en) Foundation pit supporting structure combined by steel sheet pile and H-shaped steel
CN104652443B (en) Construction method of the interim horizontal support of deep basal pit as permanent structure beam
CN103924602B (en) Deep Thick Soft Ground foundation ditch construction method
CN204510230U (en) Rich groundwater and the bad deep pit digging supporting and protection structure of geology
CN103306682B (en) Long-span and high-side-wall underground space building and excavation support method thereof
CN203768912U (en) Double prestressing force high-strength concrete rectangular pile foundation ditch supporting construction
CN104912082A (en) Inclined assembled double-row steel sheet pile foundation pit supporting structure and construction method thereof
CN202689009U (en) Steel sheet pile and tubular pile combined foundation pit supporting structure
CN108677926A (en) Coercion underground continuous wall and its construction method
CN202559375U (en) H-shaped steel underground diaphragm wall base pit support structure
CN103397634A (en) Anchoring construction method for fastener steel tube pile cofferdam
CN207159990U (en) One kind combination steel construction support pile
CN205062819U (en) Underground structure of arc precast pile and I shaped steel combination
CN203476354U (en) Underground excavation engineering major structure
CN103088831A (en) Overall assembly-type double-row steel pile foundation pit supporting structure
CN103306248A (en) High dam spillway foundation drainage system and excavation method
CN111322086A (en) Connection structure of sluicing cave and main tunnel
CN219261020U (en) Pre-consolidation grouting system for top arch and side wall of large underground tunnel
CN111778985A (en) Working pit structure close to river channel and installation method
CN208441083U (en) Half coercion underground continuous wall structure
CN104389609A (en) No-blasting mechanical digging method
CN215057394U (en) A excavation instrument for shallowly burying weak stratum tunnel
CN203321523U (en) Large-span high-side-wall underground space building
CN212801549U (en) H-shaped double-row steel sheet pile supporting structure
CN212405157U (en) Work pit structure near river channel

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 210000 No. 88 creative road, Jianye District, Jiangsu, Nanjing

Patentee after: Nanjing surveying and mapping investigation and Research Institute Limited by Share Ltd

Address before: 210000 No. 88 creative road, Jianye District, Jiangsu, Nanjing

Patentee before: Nanjing Surveying Mapping Prospecting Research Institute Co.,Ltd.