CN207159990U - One kind combination steel construction support pile - Google Patents

One kind combination steel construction support pile Download PDF

Info

Publication number
CN207159990U
CN207159990U CN201721092323.3U CN201721092323U CN207159990U CN 207159990 U CN207159990 U CN 207159990U CN 201721092323 U CN201721092323 U CN 201721092323U CN 207159990 U CN207159990 U CN 207159990U
Authority
CN
China
Prior art keywords
stake
steel stake
profile steel
empty stomach
piling bar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721092323.3U
Other languages
Chinese (zh)
Inventor
赵升峰
陈祉阳
章新
储征伟
黄广龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nanjing Surveying And Mapping Investigation And Research Institute Ltd By Share Ltd
Original Assignee
Nanjing Surveying And Mapping Investigation And Research Institute Ltd By Share Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nanjing Surveying And Mapping Investigation And Research Institute Ltd By Share Ltd filed Critical Nanjing Surveying And Mapping Investigation And Research Institute Ltd By Share Ltd
Priority to CN201721092323.3U priority Critical patent/CN207159990U/en
Application granted granted Critical
Publication of CN207159990U publication Critical patent/CN207159990U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model, which provides, discloses a kind of combination steel construction support pile, including band right-angle side abnormal shape empty stomach piling bar, H profile steel stake and U-shaped steel stake;Band right-angle side abnormal shape empty stomach piling bar is respectively provided with 2 cantilevers in its 2 vertical ends, and the end of cantilever is provided with the band right angle abnormal shape empty stomach piling bar cantilever ball for connection, and the space that its 4 right angles surround is the band right angle abnormal shape empty stomach piling bar empty stomach of up/down perforation;The both wings of H profile steel stake set the H profile steel stake circular arc buckle of 2 3/4 circular arcs respectively;The both ends of U-shaped steel stake are respectively set to U-shaped steel stake both ends ball;It is connected with right-angle side abnormal shape empty stomach piling bar by the band right angle abnormal shape empty stomach piling bar cantilever ball of stake side cantilevered distal end with H profile steel stake;U-shaped steel stake is connected by both ends U-shaped steel stake both ends ball with H profile steel stake.The utility model has the features such as speed of application is fast, and sealing performance is good, and anti-side surface pressure is more powerful, and the stable safety of supporting construction is good, supporting construction is repeatable to be utilized, environment friendly and pollution-free, has higher economic benefit, social benefit, environmental benefit.

Description

One kind combination steel construction support pile
Technical field
The realm of building construction is the utility model is related to, is specially that one kind is applied to small underground garage pattern foundation pit supporting structure, underground The temporary buildings such as fire cistern pattern foundation pit supporting structure, abutment cofferdam, flood-control intercepting and pipe gallery excavation supporting or part are forever built Build, the duration that is particularly suitable for use in is tight, low cost, and Deformation control requires the combination steel construction support pile of high base pit engineering.
Background technology
In recent years, as the construction of China hypogee flourishes, the development and utilization of the underground space is increasingly prosperous.With Land price rises steadily, and the utilization of the underground space all the more urgent, therefore, land red-line is close in the hypogee of planning; The municipal administration synthesis pipe gallery of planning is located under major urban arterial highway, the scope of pattern foundation pit supporting structure less and less, conventional branch during for excavating Fender pile, which adds water-seal pile to take up an area width, at least needs 2.0m, plus the operating space of construction machinery, then takes up an area scope and is not less than 5.0m, The utilization rate in soil certainly will be so reduced, it is less economical.For small underground room or pipe gallery, using traditional bored concrete pile or SMW engineering methods, not only long in time limit, cost is high, and pollutes environment.Therefore, active demand one kind can meet sealing in base pit engineering, And can meets earth-retaining, and occupation of land scope is small, cost relatively low supporting construction and construction method.
Number of patent application be CN201220144855.8 utility application disclose a kind of double steel sheet pile with H profile steel combined foundation ditch support structure.Including for the front-seat steel sheet pile of foundation ditch sealing, the H profile steel for foundation ditch earth-retaining, for auxiliary Help sealing and heel row steel sheet pile, the fastener of earth-retaining.H profile steel is by two pieces of bodies being arranged in parallel and the company that body links together Fitting forms, and the outside on body along its length, which is respectively arranged between front-seat steel sheet pile, heel row steel sheet pile, sets fastener.This reality Though with it is new realize the rigidity of structure is big, have earth-retaining water stopping function, reusable edible concurrently, suitable for cutting depth compared with deep basal pit Purpose, but still suffer from following deficiency:(1)After double steel sheet pile construction, occupation of land scope is excessive, makes effective use of land rate low;(2) H profile steel is arranged among two row's steel sheet piles and connected by fastener, and difficulty of construction is larger.Steel sheet pile piling process two campshed position must It must equidistantly construct, and a little off normal must not occur, otherwise H profile steel can not be inserted in the steel sheet pile of both sides.
Number of patent application is that CN201610481147.6 utility application discloses a kind of I-shaped clad steel Sheet pile, including Larsen steel sheet pile and I-steel.One side wing edge of I-steel is connected on the web of Larsen steel sheet pile concave surface.This reality Though with it is new have can rapid construction and the advantages of good water-stagnating effect, there is the advantages of non-deformability is good again, still suffer from as Lower deficiency:(1)I-steel is connected to Larsen steel sheet pile belly, adds the belly rigidity of steel sheet pile, but Larsen steel sheet pile fastener Interface rigidity does not increase, then the supporting construction weak link and does not solve;(2)One row's steel sheet pile, can be only formed one of sealing Act on, after excavation of foundation pit, percolating water situation is more serious.
Therefore, existing just structural support stake is improved, makes its simple in construction, saving building site, and water-stagnating effect is good Support pile, it has been a good problem to study.
The content of the invention
In order to overcome above-mentioned deficiency of the prior art, the utility model provide it is a kind of it is simple in construction, save it is for building Ground, and water-stagnating effect is good, especially suitable for medium and small underground parking garage, can be operated in the construction environment of narrow field Combine steel construction support pile.
What the purpose of this utility model was realized in:
One kind combination steel construction support pile, including band right-angle side abnormal shape empty stomach piling bar 2, H profile steel stake 1 and U-shaped steel stake 3;Institute State band right-angle side abnormal shape empty stomach piling bar 2 and be respectively provided with 2 cantilevers in its 2 vertical ends, the end of cantilever is provided with for connection Band right angle abnormal shape empty stomach piling bar cantilever ball 5, the space that its 4 right angles surround is the band right angle abnormal shape empty stomach piling bar of up/down perforation On an empty stomach 6;The both wings of the H profile steel stake 1 set the H profile steel stake circular arc buckle 4 of 2 3/4 circular arcs respectively;The two of the U-shaped steel stake 3 End is respectively set to U-shaped steel stake both ends ball 7;It is described straight by the band of stake side cantilevered distal end with right-angle side abnormal shape empty stomach piling bar 2 Angle abnormal shape empty stomach piling bar cantilever ball 5 is connected with H profile steel stake 1;The U-shaped steel stake 3 passes through both ends U-shaped steel stake both ends ball 7 and H Section-steel Piles 1 connect;
The sectional aspect ratio of described H profile steel stake 1 is 0.45~0.6, the H profile steel stake for confirming to use according to engineering design Cross-sectional sizes;
In the H profile steel stake circular arc buckle 4 for 3/4 circular arc that the both wings of described H profile steel stake are set arc diameter be 30~ 50mm, specific size determine that H profile steel stake section is bigger, and arc diameter is bigger according to H profile steel stake cross-sectional sizes;
Described effective length of side with right-angle side abnormal shape empty stomach piling bar 2 is identical with H profile steel stake width, convenient connection;
The band right angle abnormal shape empty stomach piling bar that the described vertical end cantilevered distal end with right-angle side abnormal shape empty stomach piling bar 2 is set hangs The diameter of arm ball 5 is less than H profile steel stake circular arc buckle diameter 10mm;
The height of the U-shaped steel stake 3 is less than 0.4 times of the width of H profile steel stake 1;
The diameter for the U-shaped steel stake both ends ball 7 that the both ends of U-shaped steel stake 3 are set is less than the diameter of H profile steel stake circular arc buckle 4 10mm;
A kind of construction method for combining steel construction support pile, comprises the following steps:(One), be H profile steel stake 1, band right-angle side Special-shaped empty stomach piling bar 2 and U-shaped steel stake 3, three calculate according to project scale and geological conditions by design and determine specific section Size and cross-sectional material thickness and grade, then made and transported again to scene or field fabrication by factory;(Two), be base area Matter situation is using overall, local or single sink;When the other factors such as geology limitation can not overall sink when, can be single or local Sink is to predetermined absolute altitude;(Three)It is that pit earthwork excavates, and follow-up steel purlin 10, purlin support and bracing members 8 are constructed.
A kind of construction method for combining steel construction support pile, comprises the following steps:
Step 1:The side right-angle corner of foundation ditch four will be arranged at right-angle side abnormal shape empty stomach piling bar 2;
Step 2:Along the foundation ditch sideline parallel to outer wall of underground structure, unwrapping wire H profile steel stake 1 and U-shaped steel stake 3, using machine Tool method is by H profile steel stake 1 and U-shaped steel stake 3 by root sink;
Step 3:The excavation pit earthwork, and according to design requirement, set up steel purlin 10 and bracing members 8;
Step 4:Basement or Underground Construction method and pit earthwork backfill are consistent with traditional foundation ditch.
Construction method takes following steps:
A kind of construction method of described combination steel construction support pile, its Specific construction step are as follows:1), selection want supporting Foundation ditch one of right-angle corner, by 1 band right-angle side abnormal shape empty stomach piling bar 2 through surveying setting-out, be arranged at foundation ditch right angle Corner, and be vertically pressed into first H profile steel stake 1 followed by the external force of construction machinery to designed elevation using machinery press-in Terrace ensures that the H profile steel stake circular arc buckle 4 of H profile steel stake 1 and the band with right-angle side abnormal shape empty stomach piling bar 2 are straight to designed elevation Angle abnormal shape empty stomach piling bar cantilever ball 5 closely interlocks, and forms effective sealing lock;Then external force is utilized by the first single u-shaped steel The vertically press-in terrace, and ensure that the fastener of U-shaped steel stake both ends ball 7 of the side of U-shaped steel stake 3 and first H profile steel stake 1 are another of stake 3 The grafting of 3/4H Section-steel Piles circular arcs buckle 4 of side, closely interlocks, and cooperatively form guiding;
2), next construct according to the method described above the second single u-shaped piling bar 3, treat the second single u-shaped piling bar 3 being pressed into terrace To after designed elevation, start second H profile steel stake 1 of constructing;In this way in proper order construct the 3rd single u-shaped piling bar 3, the 4th single u-shaped Piling bar 3, the 3rd H profile steel stake 1 ..., complete the construction of the combination steel construction support pile;
3), the excavation pit earthwork to first of inner support bottom absolute altitude, bracing members 8 and steel purlin are set up according to design requirement 10;The bracing members 8 are using the shaped steel of Two bors d's oeuveres H350 × 350;The both sides of bracing members 8 be respectively welded two block sizes for -200 × 200 × 16 horizontal steel stiffener 9;Described steel purlin 10 is using the shaped steel of Two bors d's oeuveres H400 × 400;The bracing members 8 enclose with steel Purlin 10 is linked together by welding end socket steel plate 11;In order to strengthen the integral anti-shearing performance of steel purlin, in the steel purlin 10 Vertical steel stiffener 12 is set between the section steel flange of use;For the stability that foundation ditch is overall, divided into the steel purlin 10 Put size be -500 × 300 × 16 it is horizontal to billet 14 and size be -500 × 250 × 16 vertical steel corbels 13;In order to enter one Step reinforcement steel purlin is with the connection for combining steel construction support pile and stably, between described steel purlin 10 and combination steel structure pile Weld size is -400 × 400 × 20 vertical billet 15, and uses a diameter of 25mm, and spacing is that 1500mm 2 steel are hung Muscle 17, it is welded in steel purlin and combination steel structure pile, as shown in Figure 7;Finally in described steel purlin 10 and combination steel construction Dense packing effect C25 concrete 16 in space between stake;
4), after bracing members 8 and steel purlin 10 are set up, and after fill concrete 16 reaches the 50% of design strength, continue Downward earth excavation;According to the design needs, second bracing members or the 3rd bracing members ... can be set, directly as stated above To earth excavation to foundation ditch bottom absolute altitude;
5), carry out basement or Underground Construction, its method and pit earthwork backfill are consistent with traditional foundation ditch.
Positive beneficial effect:The utility model has the following advantages that for prior art:1. pass through band right-angle side The steel construction support system that special-shaped empty stomach piling bar, H profile steel stake and U-shaped steel stake are combined into, overall structure is simple, reliability is high;2. Save building site, mud-less pollution and without the permanent solid waste in underground, belong to Green environmental-protection building;3. because of later stage all kinds of piling bars It can extract recovery, therefore engineering comprehensive low cost;4. construction is convenient, it can greatly shorten the duration;5. Double-protection structure is used, Impermeability is further improved, meets seepage resistance demand;6. all kinds of piling bars can factory customization processing, save labour, improve work Condition, working security is improved, and there is wide applicability.
Brief description of the drawings
Fig. 1 is floor map of the present utility model;
Fig. 2 is that band right-angle side abnormal shape empty stomach piling bar described in the utility model is connected floor map with H profile steel stake;
Fig. 3 is that H profile steel stake described in the utility model is connected floor map with U-shaped steel stake;
Fig. 4 is H profile steel stake schematic perspective view described in the utility model;
Fig. 5 is band right-angle side abnormal shape empty stomach piling bar schematic perspective view described in the utility model;
Fig. 6 is U-shaped steel stake schematic perspective view described in the utility model;
Fig. 7 is the utility model and steel purlin attachment structure schematic diagram;
It is in figure:H profile steel stake 1, band right angle abnormal shape empty stomach piling bar 2, U-shaped steel stake 3, H profile steel stake circular arc buckle 4, band right angle Special-shaped empty stomach piling bar cantilever ball 5, band right angle abnormal shape empty stomach piling bar empty stomach 6, U-shaped steel stake both ends ball 7, bracing members 8, horizontal steel Stiffener 9, steel purlin 10, end socket steel plate 11, vertical steel stiffener 12, steel corbel 13, horizontal billet 14, vertical billet 15th, C25 plain concretes 16, steel hangs muscle 17.
Embodiment
Below in conjunction with the accompanying drawings and embodiment, the utility model is described further:
As shown in Fig. 1~7, one kind combines steel construction support pile, including band right-angle side abnormal shape empty stomach piling bar 2, H profile steel stake 1 and U-shaped steel stake 3;The band right-angle side abnormal shape empty stomach piling bar 2 is respectively provided with 2 cantilevers in its 2 vertical ends, and the end of cantilever is set The band right angle abnormal shape empty stomach piling bar cantilever ball 5 for connection is equipped with, the space that its 4 right angles surround is straight for the band of up/down perforation Angle abnormal shape empty stomach piling bar empty stomach 6;The both wings of the H profile steel stake 1 set the H profile steel stake circular arc buckle 4 of 2 3/4 circular arcs respectively;Institute The both ends for stating U-shaped steel stake 3 are respectively set to U-shaped steel stake both ends ball 7;The band right-angle side abnormal shape empty stomach piling bar 2 passes through stake side The band right angle abnormal shape empty stomach piling bar cantilever ball 5 of cantilevered distal end is connected with H profile steel stake 1;The U-shaped steel stake 3 passes through both ends U-shaped steel Stake both ends ball 7 is connected with H profile steel stake 1;
The sectional aspect ratio of described H profile steel stake 1 is 0.45~0.6, the H profile steel stake for confirming to use according to engineering design Cross-sectional sizes;
In the H profile steel stake circular arc buckle 4 for 3/4 circular arc that the both wings of described H profile steel stake are set arc diameter be 30~ 50mm, specific size determine that H profile steel stake section is bigger, and arc diameter is bigger according to H profile steel stake cross-sectional sizes;
Described effective length of side with right-angle side abnormal shape empty stomach piling bar 2 is identical with H profile steel stake width, convenient connection;
The band right angle abnormal shape empty stomach piling bar that the described vertical end cantilevered distal end with right-angle side abnormal shape empty stomach piling bar 2 is set hangs The diameter of arm ball 5 is less than H profile steel stake circular arc buckle diameter 10mm;
The height of the U-shaped steel stake 3 is less than 0.4 times of the width of H profile steel stake 1;
The diameter for the U-shaped steel stake both ends ball 7 that the both ends of U-shaped steel stake 3 are set is less than the diameter of H profile steel stake circular arc buckle 4 10mm;
A kind of construction method for combining steel construction support pile, comprises the following steps:
Step 1:The side right-angle corner of foundation ditch four will be arranged at right-angle side abnormal shape empty stomach piling bar 2;
Step 2:Along the foundation ditch sideline parallel to outer wall of underground structure, unwrapping wire H profile steel stake 1 and U-shaped steel stake 3, using machine Tool method is by H profile steel stake 1 and U-shaped steel stake 3 by root sink;
Step 3:The excavation pit earthwork, and according to design requirement, set up steel purlin 10 and bracing members 8;
Step 4:Basement or Underground Construction method and pit earthwork backfill are consistent with traditional foundation ditch.
Embodiment 1
One kind combination steel construction support pile and its construction method, consist of the following components:(One), be that H profile steel stake, band are straight Arm of angle abnormal shape empty stomach piling bar and U-shaped steel stake, three calculate according to project scale and geological conditions by design and determine specific cut Face size and cross-sectional material thickness and grade, then made and transported again to scene or field fabrication by factory;(Two), be basis Geological condition is using overall, local or single sink;When the other factors such as geology limitation can not overall sink when, can single or office Portion's sink is to predetermined absolute altitude;(Three), be pit earthwork excavate, and follow-up steel purlin, purlin support and bracing members construction, steel Purlin, steel support pile connect as shown in Figure 7 with bracing members.
Described combination steel construction system of deep foundation pit support, it is special-shaped empty by 4 band right-angle sides of four right-angle corners of foundation ditch Abdomen piling bar, some H profile steel stakes and some single u-shaped piling bar intervals composition, should will be positioned in detail before piling along pattern foundation pit supporting structure sideline Unwrapping wire, and discharge in order.It should be matched with U-shaped steel stake section according to the stake of geological condition H profile steel, the height of U-shaped steel stake is less than H profile steel 0.4 times of stake width, the ball diameter that U-shaped steel stake both ends are set is less than H profile steel stake circular arc buckle diameter 10mm;
A kind of construction method of described combination steel construction support pile, its Specific construction step are as follows:1), selection want supporting Foundation ditch one of right-angle corner, by 1 band right-angle side abnormal shape empty stomach piling bar 2 through surveying setting-out, be arranged at foundation ditch right angle Corner, and be vertically pressed into first H profile steel stake 1 followed by the external force of construction machinery to designed elevation using machinery press-in Terrace ensures that the H profile steel stake circular arc buckle 4 of H profile steel stake 1 and the band with right-angle side abnormal shape empty stomach piling bar 2 are straight to designed elevation Angle abnormal shape empty stomach piling bar cantilever ball 5 closely interlocks, and forms effective sealing lock;Then external force is utilized by the first single u-shaped steel The vertically press-in terrace, and ensure that the fastener of U-shaped steel stake both ends ball 7 of the side of U-shaped steel stake 3 and first H profile steel stake 1 are another of stake 3 The grafting of 3/4H Section-steel Piles circular arcs buckle 4 of side, closely interlocks, and cooperatively form guiding;
2), next construct according to the method described above the second single u-shaped piling bar 3, treat the second single u-shaped piling bar 3 being pressed into terrace To after designed elevation, start second H profile steel stake 1 of constructing;In this way in proper order construct the 3rd single u-shaped piling bar 3, the 4th single u-shaped Piling bar 3, the 3rd H profile steel stake 1 ..., complete the construction of the combination steel construction support pile;
3), the excavation pit earthwork to first of inner support bottom absolute altitude, bracing members 8 and steel purlin are set up according to design requirement 10;The bracing members 8 are using the shaped steel of Two bors d's oeuveres H350 × 350;The both sides of bracing members 8 be respectively welded two block sizes for -200 × 200 × 16 horizontal steel stiffener 9;Described steel purlin 10 is using the shaped steel of Two bors d's oeuveres H400 × 400;The bracing members 8 enclose with steel Purlin 10 is linked together by welding end socket steel plate 11;In order to strengthen the integral anti-shearing performance of steel purlin, in the steel purlin 10 Vertical steel stiffener 12 is set between the section steel flange of use;For the stability that foundation ditch is overall, divided into the steel purlin 10 Put size be -500 × 300 × 16 it is horizontal to billet 14 and size be -500 × 250 × 16 vertical steel corbels 13;In order to enter one Step reinforcement steel purlin is with the connection for combining steel construction support pile and stably, in described steel purlin 10 and combination steel structure pile(1、2 Or 3)Between weld size be -400 × 400 × 20 vertical billet 15, and use a diameter of 25mm, spacing is 1500mm 2 steel hangs muscles 17, it is welded in steel purlin and combination steel structure pile, as shown in Figure 7;Finally in described steel purlin 10 and combination Dense packing effect C25 concrete 16 in space between steel structure pile;
4), after bracing members 8 and steel purlin 10 are set up, and after fill concrete 16 reaches the 50% of design strength, continue Downward earth excavation;According to the design needs, second bracing members or the 3rd bracing members ... can be set, directly as stated above To earth excavation to foundation ditch bottom absolute altitude;
5), carry out basement or Underground Construction, its method and pit earthwork backfill are consistent with traditional foundation ditch.
The present embodiment has that speed of application is fast, and sealing performance is good, and anti-side surface pressure is more powerful, the stable safety of supporting construction Good, supporting construction is repeatable to be utilized, it is environment friendly and pollution-free the features such as, there is higher economic benefit, social benefit, environmental benefit.
The utility model has the following advantages that for prior art:1. by band right-angle side abnormal shape empty stomach piling bar, The steel construction support system that H profile steel stake and U-shaped steel stake are combined into, overall structure is simple, reliability is high;2. saving building site, Mud-less pollution and without the permanent solid waste in underground, belongs to Green environmental-protection building;3. because later stage all kinds of piling bars can extract recovery, Therefore engineering comprehensive low cost;4. construction is convenient, it can greatly shorten the duration;5. using Double-protection structure, further improve anti- Ability is oozed, meets seepage resistance demand;6. all kinds of piling bars can factory customization processing, save labour, improve working conditions, improve construction Security, and there is wide applicability.
Described above is only preferred embodiment of the present utility model, it is noted that for the common skill of the art For art personnel, some improvement can also be made on the premise of the utility model principle is not departed from, these improvement also should be regarded as The scope of protection of the utility model.

Claims (7)

1. one kind combination steel construction support pile, including band right-angle side abnormal shape empty stomach piling bar(2), H profile steel stake(1)With U-shaped steel stake (3);The band right-angle side abnormal shape empty stomach piling bar(2)2 cantilevers are respectively provided with its 2 vertical ends, the end of cantilever is provided with use In the band right angle abnormal shape empty stomach piling bar cantilever ball of connection(5), space that its 4 right angles surround is different for the band right angle of up/down perforation Type empty stomach piling bar is on an empty stomach(6);The H profile steel stake(1)Both wings the H profile steel stake circular arc buckles of 2 3/4 circular arcs is set respectively(4); The U-shaped steel stake(3)Both ends be respectively set to U-shaped steel stake both ends ball(7);The band right-angle side abnormal shape empty stomach piling bar(2) Pass through the band right angle abnormal shape empty stomach piling bar cantilever ball of stake side cantilevered distal end(5)With H profile steel stake(1)Connection;The U-shaped steel stake (3)Pass through both ends U-shaped steel stake both ends ball(7)With H profile steel stake(1)Connection.
A kind of 2. combination steel construction support pile according to claim 1, it is characterised in that:Described H profile steel stake(1)Cut Face the ratio of width to height is 0.45~0.6, the cross-sectional sizes for the H profile steel stake for confirming to use according to engineering design.
A kind of 3. combination steel construction support pile according to claim 1, it is characterised in that:Described H profile steel stake(1)Two The H profile steel stake circular arc buckle for 3/4 circular arc that the wing is set(4)Middle arc diameter is 30~50mm, and specific size is cut according to H profile steel stake Face size determines that H profile steel stake section is bigger, and arc diameter is bigger.
A kind of 4. combination steel construction support pile according to claim 1, it is characterised in that:Described band right-angle side is special-shaped empty Abdomen piling bar(2)Effective length of side it is identical with H profile steel stake width.
A kind of 5. combination steel construction support pile according to claim 1, it is characterised in that:Described band right-angle side is special-shaped empty Abdomen piling bar(2)Vertical end cantilevered distal end set band right angle abnormal shape empty stomach piling bar cantilever ball(5)Diameter be less than H profile steel stake Circular arc buckle diameter 10mm.
A kind of 6. combination steel construction support pile according to claim 1, it is characterised in that:The U-shaped steel stake(3)Height Less than H profile steel stake(1)0.4 times of width.
A kind of 7. combination steel construction support pile according to claim 1, it is characterised in that:The U-shaped steel stake(3)Both ends are set The U-shaped steel stake both ends ball put(7)Diameter be less than H profile steel stake circular arc buckle(4)Diameter 10mm.
CN201721092323.3U 2017-08-29 2017-08-29 One kind combination steel construction support pile Active CN207159990U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721092323.3U CN207159990U (en) 2017-08-29 2017-08-29 One kind combination steel construction support pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721092323.3U CN207159990U (en) 2017-08-29 2017-08-29 One kind combination steel construction support pile

Publications (1)

Publication Number Publication Date
CN207159990U true CN207159990U (en) 2018-03-30

Family

ID=61718788

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721092323.3U Active CN207159990U (en) 2017-08-29 2017-08-29 One kind combination steel construction support pile

Country Status (1)

Country Link
CN (1) CN207159990U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107326896A (en) * 2017-08-29 2017-11-07 南京市测绘勘察研究院股份有限公司 One kind combination steel construction support pile and construction method
CN109944252A (en) * 2019-03-20 2019-06-28 广东省基础工程集团有限公司 A kind of combination lattice steel sheet-pile wall and foundation ditch construction method
CN111851520A (en) * 2020-07-28 2020-10-30 上海市基础工程集团有限公司 Laminated variable-step cement soil continuous steel wall structure and setting method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107326896A (en) * 2017-08-29 2017-11-07 南京市测绘勘察研究院股份有限公司 One kind combination steel construction support pile and construction method
CN109944252A (en) * 2019-03-20 2019-06-28 广东省基础工程集团有限公司 A kind of combination lattice steel sheet-pile wall and foundation ditch construction method
CN111851520A (en) * 2020-07-28 2020-10-30 上海市基础工程集团有限公司 Laminated variable-step cement soil continuous steel wall structure and setting method

Similar Documents

Publication Publication Date Title
CN102434717B (en) Construction method of joist steel pipe-jacking work pit
CN103321246B (en) Underground diaphragm wall based foundation pit construction method
CN207159990U (en) One kind combination steel construction support pile
CN107326896A (en) One kind combination steel construction support pile and construction method
CN204738302U (en) Multi -storey frame formula double row pile supporting construction
CN103114595A (en) Support method and device of support pile preformed core-soil double-buttress inclined inner-strut foundation ditch
CN106498957A (en) Steel sheet pile cofferdam construction platform and integral construction method
CN207003421U (en) A kind of steel plate pilework for being seated hard rock top surface
CN101824825B (en) Deep foundation pit open cutting construction method
CN108729457A (en) A kind of steel pipe pile cofferdam and its construction method for bridge deepwater foundation
CN108035360A (en) A kind of method for pattern foundation pit supporting structure
CN209941754U (en) High-voltage power pipe culvert in-situ protection structure
CN107503354A (en) A kind of tower crane goes along with sb. to guard him bracing reinforcement and excavation method
CN201078234Y (en) Integral hydraulic pressure steel sheet piling curtain of vertical shaft construction overflowing sand bed
CN208934002U (en) A kind of barrier wall structure
CN104480945A (en) Inversed construction method for foundation pit
CN105804085A (en) Divisional construction method of multi-unit shaft-type underground stereo garage
CN206768831U (en) Support, anchor cable post-tensioning HU type building enclosures before a kind of steel pipe
CN216739642U (en) Lower through hole directional drilling working well
CN206220100U (en) A kind of deep foundation pit supporting structure for closing on protection building
CN212801549U (en) H-shaped double-row steel sheet pile supporting structure
CN207277341U (en) A kind of deformed steel pile pit supporting construction of seam dislocation connection
CN100593052C (en) Open cut foundation pit supporting and protecting method
CN206245325U (en) One kind lock steel pipe and Combined concrete pile cofferdam
CN220580010U (en) Miniature pile combined supporting structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant