CN205046827U - Movable slope face operation construction platform - Google Patents

Movable slope face operation construction platform Download PDF

Info

Publication number
CN205046827U
CN205046827U CN201520525611.8U CN201520525611U CN205046827U CN 205046827 U CN205046827 U CN 205046827U CN 201520525611 U CN201520525611 U CN 201520525611U CN 205046827 U CN205046827 U CN 205046827U
Authority
CN
China
Prior art keywords
slope
construction operation
operation platform
platform
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201520525611.8U
Other languages
Chinese (zh)
Inventor
张建博
段金林
谢豪
王晓峰
邓伯均
姜鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina Guiyang Engineering Corp Ltd
Original Assignee
PowerChina Guiyang Engineering Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PowerChina Guiyang Engineering Corp Ltd filed Critical PowerChina Guiyang Engineering Corp Ltd
Priority to CN201520525611.8U priority Critical patent/CN205046827U/en
Application granted granted Critical
Publication of CN205046827U publication Critical patent/CN205046827U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

The utility model discloses a movable slope operation construction platform, which comprises a walking device (1) made of scaffold steel pipes, a construction operation platform (2), a land wheel (3), a steel wire rope (4), a guide wheel (5) and a winch (6); the winch (6) is fixed at the high position of the slope surface and is connected with a walking device (1) made of scaffold steel pipes and a construction operation platform (2) into a whole through a guide wheel (5) and a steel wire rope (4); the walking device (1) consists of four land wheels (3), a first cross rod (7), a first vertical rod (8) and an inclined strut (9); the construction operation platform (2) comprises guardrails (10), scaffold boards (11), a second cross rod (12) and a second vertical rod (13). The utility model discloses a fix the hoist engine in the slope eminence, be located the high altitude construction platform's of slope removal through wire rope and leading wheel control. The construction platform can be used for slope construction operation of different natural slope angles.

Description

A kind of moveable slope job execution platform
Technical field
The utility model relates to structure design and the use thereof of domatic job execution platform in Hydraulic and Hydro-Power Engineering, is specifically related to a kind of moveable slope job execution platform.
Background technology
At present, domatic job execution generally adopts sets up movable Scaffold, fastener type steel pipe scaffold, hanging basket, hoist etc. as operation platform, solves a difficult problem for work high above the ground, drastically increases working security.For special work high above the ground such as building curtain wall cleaning maintenances, then adopt the mode of " spider-man ".
Movable Scaffold can be that the work high above the ground of job site workman solves vertical and horizontal transport problem.It mainly contains the compositions such as main frame, horizontal frame, counterbracing, scaffold floor.Often by the active operation platform as metope whitewashing, altitude plant maintenance, high-altitude ad production etc.But movable Scaffold is suitable only for smooth and ground has the place of certain bearing capacity to use, and is not suitable for slope, and its height is general also restricted.
Fastener type steel pipe scaffold is interconnected by certain requirement by steel pipe with standard fastener, the construction operation support set up from bottom to top.Be mainly used in floor height, the construction of building that the standard width of a room in an old-style house is larger and various side slope construction on-the-spot.Although fastener type steel pipe scaffold can erection construction platform at burnishing surface, slope, side slope packway etc., need the materials such as steel tube fastener more, invest larger.Large height, large-area steel pipe scaffold are set up and also strictly must be set up according to related specifications, otherwise have serious potential safety hazard.Setting up and removing all wastes time and energy, and can not move freely, inefficiency.
Hanging basket is the Work machine of construction work work high above the ground, acts on curtain wall and installs, outside Wall Cleaning.Hoist is also the platform of carrying people or goods lifting or the elevating mechanism equipment of semiclosed platform or device on passage vertically.Hanging basket is comparatively large by execution conditions restriction, and some construction plant, especially water power, highway icocline slope project can not install hanging basket.Hoist also limits by execution conditions, and some construction plant hoist can not be marched into the arena and its operation platform area that can provide and highly also limited, and is not suitable for slope construction.
Utility model content
The purpose of this utility model is to prior art high and medium operation especially the slope deficiency setting up mobile operation platform and the difficult problem run into, and proposes a kind of moveable domatic job execution platform, to improve the security reliability of domatic high-altitude application.
The technical solution of the utility model is such:
This job execution platform of the present utility model comprises with lower member: it comprises the running gear that scaffolding steel pipe makes, construction operation platform, land wheel, wire rope, directive wheel and hoist engine; Described hoist engine is fixed on slope eminence, by the running gear of directive wheel and wire rope connecting pin hand cradle steel pipe manufacturing and the entirety of construction operation platform composition; Running gear is made up of four land wheels, cross bar one, montant one and diagonal brace.The type of attachment of cross bar one, montant one, diagonal brace can adjust according to actual conditions, and the main principle of assembling should ensure that the structural safety that it is formed is reliable.Construction operation platform is that scaffolding steel pipe is formed by connecting by standard rotary buckle, standard right-angle coupler, and it mainly comprises: guardrail, scaffolding board, cross bar two and montant two.Guardrail mainly works the protective action providing construction operation platform, requires that it highly should lower than 1.2m; The operating surface of scaffolding board mainly construction operation platform, it can adopt the form of bolt or iron wire colligation to be connected with braced structures cross bar below, montant; The supporting frame of cross bar and montant mainly construction operation platform.
The running gear that construction operation platform is made by standard rotary buckle and scaffolding steel pipe is connected to become entirety.Their angle of cut is α, and when mainly ensureing running gear along domatic walking, construction operation platform remains level as far as possible, is beneficial to workman's construction.The numerical value of angle of cut α and side slope nature angle of repose β mutually more than.Angle of cut α is the angle of the plane that in the plane that forms of cross bar one in running gear and construction operation platform, cross bar two is made.The position of the cross bar one in running gear on the cross bar two of construction operation platform can be adjusted according to the nature angle of repose β of actual side slope, realize the construction requirement that moveable domatic job execution platform can adapt to different slope angle.Wherein, in the cross bar in the cross bar in running gear and operating platform in cross bar, running gear and construction operation platform, montant two is all that employing standard rotary buckle connects.
The utility model is for the construction operation such as armature boring, high slope pneumatically placed concrete more practical of more smooth, the same work plane slope of excavation than certain slope engineering.
The utility model controls to be positioned at the movement of the work high above the ground operation platform of slope by being fixed on the hoist engine of slope eminence, wire rope and directive wheel, prevent translational speed too fast, ensure the mobile security of job execution platform.And apparatus structure composition is simple, this operation platform may be used for the domatic construction operation of different nature angle of repose.The guardrail of construction operation platform mainly works the protective action providing construction operation platform, requires that it highly should lower than 1.2m; For ensureing safety during workman's construction operation, also can safety belt be tied up on the cross bar of operation platform, workman's constructing operation safety can be conducive to like this.
Accompanying drawing explanation
Fig. 1 is moveable domatic job execution working platform schematic diagram of the present utility model;
Fig. 2 is that the axle of running gear surveys view
Fig. 3 is that the axle of construction operation platform surveys view
Fig. 4 is the axis side view of moveable domatic job execution platform of the present utility model.
Description of reference numerals: 1-running gear, 2-construction operation platform, 3-land wheel, 4-wire rope, 5-directive wheel, 6-hoist engine, 7-cross bar one, 8-montant one, 9-diagonal brace, 10-guardrail, 11-scaffolding board, 12-cross bar two, 13-montant two.
Detailed description of the invention
Below in conjunction with drawings and Examples, the utility model is described in further detail.
As shown in Figure 1, the utility model is a kind of moveable domatic job execution platform, the running gear 1 that it is made by scaffolding steel pipe, construction operation platform 2, land wheel 3, wire rope 4, directive wheel 5 and hoist engine 6 critical piece composition.Be fixed on the hoist engine 6 of slope eminence, control by wire rope 4 and directive wheel 5 movement being positioned at the work high above the ground construction operation platform 2 of slope, prevent translational speed too fast, ensure the mobile security of job execution operating platform 2, and apparatus structure composition is simple.This operation platform may be used for the domatic construction operation of different nature angle of repose.The position of the cross bar 1 in running gear 1 on the cross bar 2 12 of construction operation platform 2 can be adjusted according to the nature angle of repose β of actual side slope, make construction operation platform 2 remain level as far as possible, be beneficial to workman's construction, the construction requirement that this moveable domatic job execution platform can adapt to different slope angle can be realized.
As shown in Figure 2 and Figure 4, running gear 1 is made up of four land wheels 3, cross bar 1, montant 1 and diagonal brace 9; As shown in Figure 3, construction operation platform 2 comprises guardrail 10, scaffolding board 11, cross bar 2 12 and montant 2 13.This operation platform has certain safeguard protection to construction operation personnel.The guardrail 10 of construction operation platform 2 mainly works the protective action providing construction operation platform, requires that it highly should lower than 1.2m; For ensureing safety during workman's construction operation, also safety belt can be tied up on the cross bar 2 12 of construction operation platform 2, workman's constructing operation safety can be conducive to like this.
Certainly, more than just embody rule example of the present utility model, the technical scheme that the utility model also has other embodiment, all employings to be equal to replacement or equivalent transformation to be formed, all drops within the protection domain required by the utility model.

Claims (3)

1. a moveable slope job execution platform, is characterized in that: it comprises the running gear (1) that scaffolding steel pipe makes, construction operation platform (2), land wheel (3), wire rope (4), directive wheel (5) and hoist engine (6); Described hoist engine (6) is fixed on slope eminence, the entirety consisted of running gear (1) and the construction operation platform (2) of directive wheel (5) and wire rope (4) connecting pin hand cradle steel pipe manufacturing; Running gear (1) is made up of four land wheels (3), cross bar one (7), montant one (8) and diagonal brace (9); Construction operation platform (2) comprises guardrail (10), scaffolding board (11), cross bar two (12) and montant two (13).
2. moveable slope job execution platform according to claim 1, is characterized in that: guardrail (10) highly should lower than 1.2m; Scaffolding board (11) adopts the form of bolt or iron wire colligation to be connected with braced structures cross bar two (12) below and montant two (13); Cross bar two (12) and montant two (13) are the supporting frames of construction operation platform (2).
3. moveable slope job execution platform according to claim 2, is characterized in that: the running gear (1) that construction operation platform (2) is made by standard rotary buckle and scaffolding steel pipe is connected to become entirety; The angle of cut of construction operation platform (2) and his running gear (1) is α, the numerical value of angle of cut α and side slope nature angle of repose β mutually more than.
CN201520525611.8U 2015-07-20 2015-07-20 Movable slope face operation construction platform Active CN205046827U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520525611.8U CN205046827U (en) 2015-07-20 2015-07-20 Movable slope face operation construction platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520525611.8U CN205046827U (en) 2015-07-20 2015-07-20 Movable slope face operation construction platform

Publications (1)

Publication Number Publication Date
CN205046827U true CN205046827U (en) 2016-02-24

Family

ID=55340421

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520525611.8U Active CN205046827U (en) 2015-07-20 2015-07-20 Movable slope face operation construction platform

Country Status (1)

Country Link
CN (1) CN205046827U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105780786A (en) * 2016-03-07 2016-07-20 三峡大学 Screw type self-balancing operation platform for side slope construction
CN107651044A (en) * 2017-08-16 2018-02-02 河南恒睿机械制造有限公司 A kind of high gradient slope draws walking drilling slope-climbing machine automatically
CN112960610A (en) * 2021-02-01 2021-06-15 西安航空学院 Mountain slope is subsided and is restoreed and use draw gear
CN115573358A (en) * 2022-11-08 2023-01-06 山东省地矿工程集团有限公司 Mine abrupt slope ecological remediation uses device

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105780786A (en) * 2016-03-07 2016-07-20 三峡大学 Screw type self-balancing operation platform for side slope construction
CN107651044A (en) * 2017-08-16 2018-02-02 河南恒睿机械制造有限公司 A kind of high gradient slope draws walking drilling slope-climbing machine automatically
CN112960610A (en) * 2021-02-01 2021-06-15 西安航空学院 Mountain slope is subsided and is restoreed and use draw gear
CN115573358A (en) * 2022-11-08 2023-01-06 山东省地矿工程集团有限公司 Mine abrupt slope ecological remediation uses device
CN115573358B (en) * 2022-11-08 2023-08-22 山东省地矿工程集团有限公司 Device for ecological restoration of steep slope of mine

Similar Documents

Publication Publication Date Title
CN201158933Y (en) High-rise maintaining scaffold device with extruding structure
CN205046827U (en) Movable slope face operation construction platform
CN100365237C (en) Autolifting type variable-shape diassembllable integrated lifting steel plateform system and construction method thereof
CN103711301A (en) Construction method and device for two-track movable electric basket and lifting hoist
CN204126230U (en) Assembly scaffold unit
CN203487803U (en) Safety protection structure for elevator shaft construction
CN206233541U (en) A kind of interior top external climbing mould bases operation platform for construction of super highrise building
CN205314519U (en) High altitude operation platform based on truss
CN205955171U (en) Fall to ground scaffold collet device
CN206753085U (en) A kind of sliding platform for being used to install high-altitude wire frame steel construction
CN112727147A (en) Outdoor suspended step dismantling method
CN109594759A (en) The double-deck outer protection rack device of height-adjustable pin-connected panel and its application method
CN202401775U (en) Safety protection platform for elevator shaft
CN205259559U (en) Four -wheel removes scaffold combination operation platform
CN204848050U (en) A crossbeam braced system for tower crane
CN202055507U (en) Desulfurizing tower examination and repair platform
CN215978575U (en) Safety protection system for dismantling reinforced concrete water tower in limited space
CN205617771U (en) Construction operation platform and pipe -line transportation integrated device in high residential building elevartor shaft
CN204754150U (en) Dish -type node formula scaffold
CN213171212U (en) A hoisting apparatus for building engineering
CN210369827U (en) Scaffold for building external wall construction
CN203923923U (en) High pier steel truss girder sets up gate-type lifting station
CN204703533U (en) A kind of lift-type discharging protection double-purpose platform
CN203594215U (en) High-altitude large-area work platform semi-automatic lifting apparatus
CN203701552U (en) Attached scaffold for lifted through worm, gear and screw rod

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant