CN204940313U - 一种流砂地层施工用管井井点施工结构 - Google Patents
一种流砂地层施工用管井井点施工结构 Download PDFInfo
- Publication number
- CN204940313U CN204940313U CN201520414741.4U CN201520414741U CN204940313U CN 204940313 U CN204940313 U CN 204940313U CN 201520414741 U CN201520414741 U CN 201520414741U CN 204940313 U CN204940313 U CN 204940313U
- Authority
- CN
- China
- Prior art keywords
- punching
- well casing
- embedded
- well
- constructing structure
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Revetment (AREA)
- Bulkheads Adapted To Foundation Construction (AREA)
Abstract
本实用新型公开了一种流砂地层施工用管井井点施工结构,包括一采用高压冲孔方式得到的冲孔以及一井管,所述冲孔深度大于井管长度300~500mm,直径为287mm,所述井管埋设于该冲孔内,所述井管的井底和冲孔底部之间埋设有粗砂,并且所述井管外壁和冲孔内壁之间埋设有滤水管,所述滤水管周边填设有滤料,并且所述井管的井口和冲孔之间填设有一层粘土;本实用新型采用先在流砂层和粉砂层挖设深孔、再在深孔基础上埋设井管的方式,为接下来抽水做好了坚实的基础,从而使抽水工作能顺利进行。
Description
技术领域
本实用新型涉及一种建筑施工结构,尤其涉及一种流砂地层施工用管井井点施工结构。
背景技术
黄河沿岸地区建造大桥有其地理位置的特殊性,勘探地质数据显示很多地段为流砂层和粉砂层,夹杂着部分粘土层地层结构情况复杂且罕见,且地下水位高度也不同,施工工艺的选取也存在很大的差异,沙质地层遇水会产生坍塌现象,加之地表地基承载力底,施工难度大,对施工整体方案的安全性、可靠性要求苛刻,换言之施工前准备工作要充分扎实,实施后变更调整的余地较小。尤其是项目初期要排除土层中的含水量,目前并没有值得借鉴的好方法。
实用新型内容
本实用新型就是针对上述问题,提出一种流砂地层施工用管井井点施工结构,该结构可以比较方便地排除流砂层和粉砂层中的含水量,为建设大桥打下基础。
为解决上述技术问题,本实用新型提供的一种流砂地层施工用管井井点施工结构,包括一采用高压冲孔方式得到的冲孔以及一井管,所述冲孔深度大于井管长度300~500mm,直径为287mm,所述井管埋设于该冲孔内,所述井管的井底和冲孔底部之间埋设有粗砂,并且所述井管外壁和冲孔内壁之间埋设有滤水管,所述滤水管周边填设有滤料,并且所述井管的井口和冲孔之间填设有一层粘土。
进一步的,所述滤料的厚度在2-4mm之间。
进一步的,所述粘土的土层厚度为0.5米以上。
本实用新型采用先在流砂层和粉砂层挖设深孔、再在深孔基础上埋设井管的方式,为接下来抽水做好了坚实的基础,从而使抽水工作能顺利进行。
附图说明
图1所示的是本实用新型的外观结构图。
其中:1、冲孔;2、井管;3、粗砂;4、滤水管;5、滤料;6、粘土。
具体实施方式
下面结合附图和具体实施方式对本实用新型作进一步详细地说明。
由图1可知,一种流砂地层施工用管井井点施工结构,包括一采用高压冲孔方式得到的冲孔1以及一井管2,该冲孔1的深度大于井管1长度300~500mm,直径为287mm,井管2埋设于该冲孔1内,在井管2的井底和冲孔1底部之间埋设有粗砂3,并且井管2的外壁和冲孔1的内壁之间埋设有滤水管4,该滤水管4可以使水更好地沉淀到井管2的底部;在滤水管4周边填设有滤料5,并且井管2的井口和冲孔1之间填设有一层粘土6;并且滤料5的厚度在2-4mm之间,粘土6的土层厚度为0.5米以上。通过设置上述厚度的滤料5以及粘土6,能够让井管2和冲孔1之间结合地更牢固,便于在接下来的抽水工程顺利进行。
以上所述仅是本实用新型的优选实施方式,应当指出,对于本技术领域的普通技术人员来说,在不脱离本实用新型技术原理的前提下,还可以做出若干改进和变型,这些改进和变型也应视为本实用新型的保护范围。
Claims (3)
1.一种流砂地层施工用管井井点施工结构,包括一采用高压冲孔方式得到的冲孔以及一井管,其特征在于,所述冲孔深度大于井管长度300~500mm,直径为287mm,所述井管埋设于该冲孔内,所述井管的井底和冲孔底部之间埋设有粗砂,并且所述井管外壁和冲孔内壁之间埋设有滤水管,所述滤水管周边填设有滤料,并且所述井管的井口和冲孔之间填设有一层粘土。
2.如权利要求1所述的一种流砂地层施工用管井井点施工结构,其特征在于,所述滤料的厚度在2-4mm之间。
3.如权利要求1所述的一种流砂地层施工用管井井点施工结构,其特征在于,所述粘土的土层厚度为0.5米以上。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520414741.4U CN204940313U (zh) | 2015-06-16 | 2015-06-16 | 一种流砂地层施工用管井井点施工结构 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520414741.4U CN204940313U (zh) | 2015-06-16 | 2015-06-16 | 一种流砂地层施工用管井井点施工结构 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204940313U true CN204940313U (zh) | 2016-01-06 |
Family
ID=55007755
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520414741.4U Expired - Fee Related CN204940313U (zh) | 2015-06-16 | 2015-06-16 | 一种流砂地层施工用管井井点施工结构 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204940313U (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110219301A (zh) * | 2019-07-09 | 2019-09-10 | 广东厚普建设工程有限公司 | 一种phc管桩静压施工方法 |
-
2015
- 2015-06-16 CN CN201520414741.4U patent/CN204940313U/zh not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110219301A (zh) * | 2019-07-09 | 2019-09-10 | 广东厚普建设工程有限公司 | 一种phc管桩静压施工方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN100516380C (zh) | 基坑潜水与承压含水层一井分层联合降水的方法 | |
CN103643918B (zh) | 一种针对奥陶系灰岩矿区的寻找及防止矿井渗水的方法 | |
CN103726495B (zh) | 近海深基坑支护结构及其施工方法 | |
CN104404974A (zh) | 高承压水厚砂卵石地层深基坑注浆封底结构及其施工工艺 | |
CN102926392A (zh) | 一种基坑降水***及其施工方法 | |
Waltham | Control the drainage: the gospel accorded to sinkholes | |
CN203939036U (zh) | 一种适用于河道的钢板桩围堰结构 | |
CN107152309B (zh) | 一种煤层为主含水层的高水高排水害防治方法 | |
CN102071689A (zh) | 既有隧道近旁静压桩的优化施工方法 | |
CN206090597U (zh) | 单孔多管管井 | |
CN103643674B (zh) | 卵石层砂岩地质条件下的立柱桩施工方法 | |
CN108071110A (zh) | 复杂地质条件下旋挖钻机嵌岩桩施工方法 | |
CN204940313U (zh) | 一种流砂地层施工用管井井点施工结构 | |
CN205399503U (zh) | 一种地下室抗浮底板锚板式机械锚固高强锚杆 | |
CN105040705A (zh) | 多溶洞地质条件下地基基础处理施工工艺 | |
CN204252148U (zh) | 高承压水厚砂卵石地层深基坑注浆封底结构 | |
CN204311464U (zh) | 一种基坑降水施工结构 | |
CN105350544A (zh) | 用于含有块石区域的止水帷幕及其施工方法 | |
Barton et al. | Reactivation of landsliding following partial cliff stabilization at Barton-on-Sea, Hampshire, UK | |
Zingg et al. | The effects of advance drainage on face stability in homogeneous ground | |
CN103774698B (zh) | 土工免排水施工方法 | |
CN204676518U (zh) | 基坑降水保护*** | |
CN108798589B (zh) | 一种含水层改性方法 | |
CN105064384A (zh) | 特殊地质条件下的真空管井降水*** | |
CN102345294A (zh) | 软土地基深基坑土方开挖分级降水结构 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20160106 Termination date: 20160616 |