CN204940313U - Pipe well points constructing structure is used in a kind of quicksand formation construction - Google Patents
Pipe well points constructing structure is used in a kind of quicksand formation construction Download PDFInfo
- Publication number
- CN204940313U CN204940313U CN201520414741.4U CN201520414741U CN204940313U CN 204940313 U CN204940313 U CN 204940313U CN 201520414741 U CN201520414741 U CN 201520414741U CN 204940313 U CN204940313 U CN 204940313U
- Authority
- CN
- China
- Prior art keywords
- punching
- well casing
- embedded
- well
- constructing structure
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Revetment (AREA)
- Bulkheads Adapted To Foundation Construction (AREA)
Abstract
The utility model discloses a kind of quicksand formation construction pipe well points constructing structure, comprise punching and a well casing that an employing high pressure punch pattern obtains, the described punching degree of depth is greater than well casing length 300 ~ 500mm, diameter is 287mm, described well casing is embedded in this punching, coarse sand is embedded with between bottom the shaft bottom of described well casing and punching, and be embedded with filter pipe between described well casing outer wall and punching inwall, described filter pipe periphery is filled out and is provided with filtrate, and fills out between the well head of described well casing and punching and be provided with one deck clay; The utility model adopts and first digs deep hole at drifting sand layer and silty sand ground, on deep hole basis, bury the mode of well casing again underground, has carried out solid foundation, thus the work of drawing water can be carried out smoothly for next drawing water.
Description
Technical field
The utility model relates to a kind of building operations structure, particularly relates to a kind of quicksand formation construction pipe well points constructing structure.
Background technology
The littoral regional Construction bridge in the Yellow River has the particularity in its geographical position, it is drifting sand layer and silty sand ground that exploration geology data show a lot of location, be mingled with part of clay layer earth formation situation complicated and rare, and groundwater table height is also different, also there is very large difference in choosing of construction technology, sandy stratum meets water can produce phenomenon of caving in, in addition at the bottom of the bearing capacity of foundation soil of earth's surface, difficulty of construction is large, to safety, the reliability requirement harshness of construction overall plan, in other words preparative work before construction wants fully sturdy, and after implementing, the leeway of change and adjustment is less.Especially the project initial stage will get rid of the water content in soil layer, is not worth the good method used for reference at present.
Utility model content
The utility model is exactly for the problems referred to above, and propose a kind of quicksand formation construction pipe well points constructing structure, this structure can get rid of the water content in drifting sand layer and silty sand ground more easily, lays the first stone for building bridge.
For solving the problems of the technologies described above, a kind of quicksand formation construction pipe well points constructing structure that the utility model provides, comprise punching and a well casing that an employing high pressure punch pattern obtains, the described punching degree of depth is greater than well casing length 300 ~ 500mm, diameter is 287mm, described well casing is embedded in this punching, coarse sand is embedded with between bottom the shaft bottom of described well casing and punching, and be embedded with filter pipe between described well casing outer wall and punching inwall, described filter pipe periphery is filled out and is provided with filtrate, and fills out between the well head of described well casing and punching and be provided with one deck clay.
Further, the thickness of described filtrate is between 2-4mm.
Further, the soil thickness of described clay is more than 0.5 meter.
The utility model adopts and first digs deep hole at drifting sand layer and silty sand ground, on deep hole basis, bury the mode of well casing again underground, has carried out solid foundation, thus the work of drawing water can be carried out smoothly for next drawing water.
Accompanying drawing explanation
Shown in Fig. 1 is appearance assumption diagram of the present utility model.
Wherein: 1, punching; 2, well casing; 3, coarse sand; 4, filter pipe; 5, filtrate; 6, clay.
Detailed description of the invention
Below in conjunction with the drawings and specific embodiments, the utility model is described in more detail.
As shown in Figure 1, pipe well points constructing structure is used in a kind of quicksand formation construction, comprise punching 1 and a well casing 2 that an employing high pressure punch pattern obtains, the degree of depth of this punching 1 is greater than well casing 1 length 300 ~ 500mm, diameter is 287mm, and well casing 2 is embedded in this punching 1, is embedded with coarse sand 3 between bottom the shaft bottom of well casing 2 and punching 1, and be embedded with filter pipe 4 between the inwall of the outer wall of well casing 2 and punching 1, this filter pipe 4 can make water be deposited to the bottom of well casing 2 better; Fill out at filter pipe 4 periphery and be provided with filtrate 5, and fill out between the well head of well casing 2 and punching 1 and be provided with one deck clay 6; And the thickness of filtrate 5 is between 2-4mm, the soil thickness of clay 6 is more than 0.5 meter.By arranging filtrate 5 and the clay 6 of above-mentioned thickness, can allow between well casing 2 and punching 1 more firm in combination, being convenient to carry out smoothly in ensuing engineering of drawing water.
The above is only preferred embodiment of the present utility model; should be understood that; for those skilled in the art; under the prerequisite not departing from the utility model know-why; can also make some improvement and modification, these improve and modification also should be considered as protection domain of the present utility model.
Claims (3)
1. pipe well points constructing structure is used in a quicksand formation construction, comprise punching and a well casing that an employing high pressure punch pattern obtains, it is characterized in that, the described punching degree of depth is greater than well casing length 300 ~ 500mm, diameter is 287mm, described well casing is embedded in this punching, coarse sand is embedded with between bottom the shaft bottom of described well casing and punching, and be embedded with filter pipe between described well casing outer wall and punching inwall, described filter pipe periphery is filled out and is provided with filtrate, and fills out between the well head of described well casing and punching and be provided with one deck clay.
2. a kind of quicksand formation construction pipe well points constructing structure as claimed in claim 1, it is characterized in that, the thickness of described filtrate is between 2-4mm.
3. a kind of quicksand formation construction pipe well points constructing structure as claimed in claim 1, it is characterized in that, the soil thickness of described clay is more than 0.5 meter.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520414741.4U CN204940313U (en) | 2015-06-16 | 2015-06-16 | Pipe well points constructing structure is used in a kind of quicksand formation construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520414741.4U CN204940313U (en) | 2015-06-16 | 2015-06-16 | Pipe well points constructing structure is used in a kind of quicksand formation construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204940313U true CN204940313U (en) | 2016-01-06 |
Family
ID=55007755
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520414741.4U Expired - Fee Related CN204940313U (en) | 2015-06-16 | 2015-06-16 | Pipe well points constructing structure is used in a kind of quicksand formation construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204940313U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110219301A (en) * | 2019-07-09 | 2019-09-10 | 广东厚普建设工程有限公司 | A kind of PHC pipe pile static-pressure construction method |
-
2015
- 2015-06-16 CN CN201520414741.4U patent/CN204940313U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110219301A (en) * | 2019-07-09 | 2019-09-10 | 广东厚普建设工程有限公司 | A kind of PHC pipe pile static-pressure construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN100516380C (en) | Method for lowering water by combining phreatic water in footing groove with artesian aquifer - well stratifications | |
CN103643918B (en) | A kind of searching for Ordovician limestone mining area and the method preventing mine from seeping water | |
CN104404974A (en) | High-pressure-bearing water and thick sand and pebble formation deep foundation pit grouting bottom-sealing structure and construction technology thereof | |
CN103291326A (en) | Reconstructed bearing layer control technology of large-deformation roadway surrounding rock | |
CN102926392A (en) | Foundation pit dewatering system and construction method thereof | |
CN102071689B (en) | Optimized construction method of static pressure pile close to existing tunnel | |
Waltham | Control the drainage: the gospel accorded to sinkholes | |
CN107152309B (en) | A kind of coal seam is the high water level and high-speed drainage water damage control method of Main aquifer | |
CN206090597U (en) | Haplopore multitube tubular well | |
CN203939036U (en) | A kind of steel sheet pile cofferdam structure that is applicable to river course | |
CN108071110A (en) | Rotary drilling rig Pile method under complex geological condition | |
CN204940313U (en) | Pipe well points constructing structure is used in a kind of quicksand formation construction | |
CN103643674B (en) | Erect column pile construction method under geologic condition of pebble bed sandstone | |
CN205399503U (en) | Anti floating botton board anchor slab formula of basement machinery anchor stock that excels in | |
CN105040705A (en) | Ground foundation treatment construction technology under multi-karst-cave geological conditions | |
CN204252148U (en) | High artesian thick sand-pebble layer deep foundation ditch slip casting back cover structure | |
CN204311464U (en) | A kind of foundation pit dewatering constructing structure | |
CN105350544A (en) | Waterproof curtain used for stone-contained area and construction method thereof | |
CN202881962U (en) | Foundation pit dewatering structure | |
Barton et al. | Reactivation of landsliding following partial cliff stabilization at Barton-on-Sea, Hampshire, UK | |
Zingg et al. | The effects of advance drainage on face stability in homogeneous ground | |
CN103774698B (en) | Drainage-free construction method for soil engineering | |
CN204676518U (en) | Foundation pit dewatering protection system | |
CN105064384A (en) | Vacuum tube well precipitation system under special geological conditions | |
CN102345294A (en) | Graded dewatering structure for soft-soil foundation deep-pit earthwork excavation |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20160106 Termination date: 20160616 |