CN107060800A - A kind of shield-tunneling construction huge stone handling construction method - Google Patents
A kind of shield-tunneling construction huge stone handling construction method Download PDFInfo
- Publication number
- CN107060800A CN107060800A CN201710138502.4A CN201710138502A CN107060800A CN 107060800 A CN107060800 A CN 107060800A CN 201710138502 A CN201710138502 A CN 201710138502A CN 107060800 A CN107060800 A CN 107060800A
- Authority
- CN
- China
- Prior art keywords
- boulder
- obstacle
- construction
- hole
- place
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000010276 construction Methods 0.000 title claims abstract description 39
- 239000004575 stone Substances 0.000 title claims abstract description 12
- 238000005266 casting Methods 0.000 claims abstract description 17
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 15
- 239000010959 steel Substances 0.000 claims abstract description 15
- 238000005520 cutting process Methods 0.000 claims abstract description 11
- 239000002689 soil Substances 0.000 claims abstract description 8
- 238000000034 method Methods 0.000 claims description 7
- 238000007569 slipcasting Methods 0.000 claims description 3
- 239000002002 slurry Substances 0.000 claims description 3
- 238000002347 injection Methods 0.000 claims description 2
- 239000007924 injection Substances 0.000 claims description 2
- 230000005484 gravity Effects 0.000 abstract description 3
- 239000011435 rock Substances 0.000 description 4
- 230000015572 biosynthetic process Effects 0.000 description 3
- 238000005553 drilling Methods 0.000 description 3
- 230000005641 tunneling Effects 0.000 description 3
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 3
- 241000234282 Allium Species 0.000 description 2
- 235000002732 Allium cepa var. cepa Nutrition 0.000 description 2
- 238000009412 basement excavation Methods 0.000 description 2
- 239000010438 granite Substances 0.000 description 2
- 241000282326 Felis catus Species 0.000 description 1
- 206010033799 Paralysis Diseases 0.000 description 1
- 229920002472 Starch Polymers 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 239000006071 cream Substances 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000004880 explosion Methods 0.000 description 1
- 229910052500 inorganic mineral Inorganic materials 0.000 description 1
- 230000002045 lasting effect Effects 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 239000011707 mineral Substances 0.000 description 1
- 238000004886 process control Methods 0.000 description 1
- 238000004080 punching Methods 0.000 description 1
- 238000004904 shortening Methods 0.000 description 1
- 235000019698 starch Nutrition 0.000 description 1
- 239000008107 starch Substances 0.000 description 1
- 239000002699 waste material Substances 0.000 description 1
- 238000005303 weighing Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D9/00—Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
- E21D9/12—Devices for removing or hauling away excavated material or spoil; Working or loading platforms
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D5/00—Lining shafts; Linings therefor
- E21D5/06—Lining shafts; Linings therefor with iron or steel
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D9/00—Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
- E21D9/06—Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geology (AREA)
- Environmental & Geological Engineering (AREA)
- Mechanical Engineering (AREA)
- Excavating Of Shafts Or Tunnels (AREA)
Abstract
The invention discloses a kind of shield-tunneling construction huge stone handling construction method, comprise the following steps:The orientation of Construction of Silo is determined according to obstacle boulder;Carry out Construction of Silo and lay steel pile casting;Laterally construction forms the hole in place being located at below obstacle boulder in vertical shaft, formed by the high pressure jer cutting soil body and discharge cutting dregs through vertical shaft, the work completion until place hole is spreaded manuer in holes, obstacle boulder is dropped down onto in hole in place, the hole in place that space is slightly larger than obstacle boulder volume is excavated below obstacle boulder by construction shaft, obstacle boulder is guided to be moved in the hole in place outside tunnel cross-section by the gravity of shield machine or obstacle boulder in itself, shield machine is set to be passed through on original design tunnel axis, abandoning tradition is abolished mode by force to obstacle boulder, obstacle huge stone handling is simple and quick, cost is low, short construction period.
Description
Technical field
The present invention relates to tunneling shield technical field of construction, more particularly to a kind of shield-tunneling construction huge stone handling construction method.
Background technology
At present, the construction of the engineerings such as urban subway tunnel, road and rail tunnel, water conservancy water-conveyance tunnel is carried out using shield machine
Deng more and more universal, it has the advantages that automaticity is high, speed of application is fast, quality is good, safe.Wherein, soil pressure is put down
Weighing apparatus formula shield machine is wider to the adaptability on stratum, is to apply a kind of more type, its operation principle is the knife using shield machine
Disk cuts the soil body or rock mass, with the propulsion of shield machine, and the soil that knife cutting gets off enters in the native storehouse of shield machine, passes through spiral transferring
The control of the casting such as machine and its casting valve mechanism is sent, matching for soil discharge quantity and shield driving amount is realized, shield driving is formed
Keep excavating the stable dynamic equilibrium of face simultaneously, Shield Construction Method Used is smooth.
However, when granitic formation carries out constructing tunnel using shield machine, being frequently encountered " boulder ", (granite is spherical
Waste) cause shield machine driving difficult, it is impossible to normal construction.Granite onion weathering thing is a kind of common weathering phenomenon,
It is in residual soil and weathered rock formation, because being influenceed the weathering to be formed is uneven to remain by the arrangement of mineral anisotropy and fractured zones
Body, due to weathering ball surrounding rock mass, with onion weathering rock mass there is larger gap in intensity itself, often there is soft or hard uneven ground
Matter phenomenon, this just easily causes tool damage, results even in cutterhead deformation, causes whole shield machine to be paralysed.
At present, in granitic formation tunneling shield tunneling process, the method for disposal of boulder is run into substantially:Verifying shield
In front of structure after " boulder " distributing position and size, according to live periphery human settlement, geology and geomorphology, underground utilities move towards situation,
The methods such as surface drilling explosion, punching are broken, manually digging hole is abolished are taken to abolish boulder.
The content of the invention
The technical problems to be solved by the invention are to provide the shield-tunneling construction huge stone handling that a kind of efficiency of construction is high, cost is low
Construction method.
To solve the technical scheme that above-mentioned technical problem is used:A kind of shield-tunneling construction huge stone handling construction method, including
Following steps:
S1, basis verify size, the position of the residing underground space of obstacle boulder, determine the orientation of Construction of Silo;
S2, progress Construction of Silo reach predetermined well depth, and the steel pile casting that diameter is less than vertical shaft aperture is laid in vertical shaft;
Former slurry coat method in S3, pump drainage steel pile casting, meanwhile, to injection paste mud between steel pile casting and vertical shaft inwall;
S4, the size according to obstacle boulder, the position of the residing underground space, laterally construction is formed positioned at obstacle boulder in vertical shaft
The hole in place of lower section, hole in place is formed by the high pressure jer cutting soil body and discharges cutting dregs through vertical shaft, until
Place hole is spreaded manuer in holes work completion, and obstacle boulder dropped down onto in hole in place;
S5, to slip casting at original obstacle boulder position and vertical shaft is filled, the steel pile casting in removal shaft.
Beneficial effect:In this shield-tunneling construction huge stone handling construction method, abandoning tradition is abolished by force to obstacle boulder
Mode, excavates the hole in place that space is slightly larger than obstacle boulder volume below obstacle boulder by construction shaft, passes through shield
The gravity guiding obstacle boulder of machine or obstacle boulder in itself is moved in the hole in place outside tunnel cross-section, shield machine is set in original
Passed through on meter tunnel axis, obstacle huge stone handling is simple and quick, cost is low, short construction period.
Brief description of the drawings
The present invention is described further with reference to the accompanying drawings and examples;
Fig. 1 is the structural representation of the embodiment of the present invention.
Embodiment
A kind of reference picture 1, shield-tunneling construction huge stone handling construction method of the invention, comprises the following steps:
S1, size, the position of the residing underground space for verifying using drilling machine obstacle boulder 1, to determine to excavate the lonely stone of obstacle
The position and the space of required excavation in hole 2 in place, it is ensured that do not hinder the normal pick of follow-up shield machine after obstacle boulder dropping place
Enter;
S2, using Big Diameter Hole Drills earth's surface through designed appropriate location drilling carry out vertical shaft 3 construct, boring procedure uses mud
Starch retaining wall pore-forming;
S3, the construction of vertical shaft 3 are reached after design well depth, insert the steel pile casting 4 for being slightly less than the inwall aperture of vertical shaft 3 with well depth equal length,
The cat ladder 5 that vertical shaft 3 is passed in and out for staff is welded with steel pile casting 4;
S4, using former slurry coat method in slush pump pump drainage steel pile casting 4, meanwhile, inject cream between steel pile casting 4 and the inwall of vertical shaft 3
Shape mud 6;
After mud is cleaned out in S5, steel pile casting 4, workmen enter vertical shaft 3, by obstacle boulder 1 hole in place 2 it is relevant
Parameter, sets up an operation platform below the elevation location in the horizontal hole 7 of processing boulder, carries out the processing horizontal hole 7 of boulder and in place
The construction in hole 2;
S6, hole in place 2 carry out cutting excavation using high-pressure water jet, and the high process control in the bottom of hole 2 in place and the horizontal bottom of hole 7 of boulder are high
Cheng Xiangtong, the dregs that high pressure jer cutting is excavated is flowed into vertical shaft 3 by the horizontal hole 7 of boulder, and uses slush pump by cutting
Outside dregs discharge vertical shaft 3, excavated by the lasting cutting of high-pressure water jet, dregs is constantly discharged outside vertical shaft, until hole is applied
Work is completed, obstacle boulder dropping place;
S7, when determining that obstacle boulder 1 is had moved into outside shield tunnel section, to original obstacle boulder position at slip casting and fill
Steel pile casting 4 in vertical shaft 3, removal shaft 3, recovers original place looks.
The hole in place 2 that space is slightly larger than obstacle boulder volume is excavated below obstacle boulder 1 by construction shaft, passed through
The gravity guiding obstacle boulder 1 of shield machine or obstacle boulder 1 itself is moved in the hole in place 2 outside tunnel cross-section, makes shield
Machine is passed through on original design tunnel axis, obstacle boulder 1 is not abolished, to save substantial amounts of human and material resources, wealth
Power and the duration for shortening processing boulder.
Embodiments of the present invention are explained in detail above in conjunction with accompanying drawing, but the invention is not restricted to above-mentioned embodiment party
Formula, can also be before present inventive concept not be departed from the knowledge that the technical field those of ordinary skill possesses
Put that various changes can be made.
Claims (1)
1. a kind of shield-tunneling construction huge stone handling construction method, it is characterised in that comprise the following steps:
S1, basis verify size, the position of the residing underground space of obstacle boulder, determine the orientation of Construction of Silo;
S2, progress Construction of Silo reach predetermined well depth, and the steel pile casting that diameter is less than vertical shaft aperture is laid in vertical shaft;
Former slurry coat method in S3, pump drainage steel pile casting, meanwhile, to injection paste mud between steel pile casting and vertical shaft inwall;
S4, the size according to obstacle boulder, the position of the residing underground space, laterally construction is formed positioned at obstacle boulder in vertical shaft
The hole in place of lower section, hole in place is formed by the high pressure jer cutting soil body and discharges cutting dregs through vertical shaft, until
Place hole is spreaded manuer in holes work completion, and obstacle boulder dropped down onto in hole in place;
S5, to slip casting at original obstacle boulder position and vertical shaft is filled, the steel pile casting in removal shaft.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710138502.4A CN107060800A (en) | 2017-03-09 | 2017-03-09 | A kind of shield-tunneling construction huge stone handling construction method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710138502.4A CN107060800A (en) | 2017-03-09 | 2017-03-09 | A kind of shield-tunneling construction huge stone handling construction method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107060800A true CN107060800A (en) | 2017-08-18 |
Family
ID=59622517
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710138502.4A Pending CN107060800A (en) | 2017-03-09 | 2017-03-09 | A kind of shield-tunneling construction huge stone handling construction method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107060800A (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109026039A (en) * | 2018-10-19 | 2018-12-18 | 深圳市工勘岩土集团有限公司 | Subway tunnel shield tunnels boulder deep hole blasting and pre-processes construction method |
CN109372526A (en) * | 2018-11-12 | 2019-02-22 | 中铁工程装备集团有限公司 | The novel balancing earth-pressure shielding machine of foreign matter obstacle can be passed through |
CN109441454A (en) * | 2018-09-11 | 2019-03-08 | 广东水电二局股份有限公司 | A kind of construction method of underground lonestone reception room |
CN109505614A (en) * | 2019-01-09 | 2019-03-22 | 海南大学 | A kind of shield machine directly promotes the construction method by boulder |
CN110578524A (en) * | 2019-08-27 | 2019-12-17 | 中交第二航务工程局有限公司 | Boulder treatment construction method for dense drilling and crushing in shield region |
CN114837681A (en) * | 2022-06-07 | 2022-08-02 | 江苏旭睿重工科技有限公司 | Quick stone removing device for soil bin of shield machine and construction method thereof |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH08254094A (en) * | 1995-03-15 | 1996-10-01 | Fujita Corp | Boulder removing method for jacking method |
CN201933510U (en) * | 2011-03-14 | 2011-08-17 | 中国水电顾问集团成都勘测设计研究院 | Outlet shaft structure of underground factories in hydroelectric engineering |
CN102518442A (en) * | 2011-12-14 | 2012-06-27 | 中铁十二局集团第二工程有限公司 | Method for processing isolated stone groups in shield excavation karren section |
CN103032071A (en) * | 2012-12-09 | 2013-04-10 | 中铁十二局集团有限公司 | Shield receiving forward-shift construction method of boulder group open excavation and embedment mutation space |
CN103075161A (en) * | 2013-01-16 | 2013-05-01 | 中铁隧道集团有限公司 | Quick underground obstacle clearing method for slurry shield construction |
CN103790594A (en) * | 2014-02-26 | 2014-05-14 | 中铁一局集团有限公司 | Method for exploring and processing interior of boulder hole in front for shield method construction |
CN103924980A (en) * | 2014-04-24 | 2014-07-16 | 上海隧道工程股份有限公司 | Obstacle removing construction method |
JP2015074957A (en) * | 2013-10-11 | 2015-04-20 | 鹿島建設株式会社 | Tunnel excavation method and sediment removal method |
CN105604553A (en) * | 2015-12-21 | 2016-05-25 | 上海市基础工程集团有限公司 | Construction method for exploration and treatment of shield driving complex formation boulders |
-
2017
- 2017-03-09 CN CN201710138502.4A patent/CN107060800A/en active Pending
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH08254094A (en) * | 1995-03-15 | 1996-10-01 | Fujita Corp | Boulder removing method for jacking method |
CN201933510U (en) * | 2011-03-14 | 2011-08-17 | 中国水电顾问集团成都勘测设计研究院 | Outlet shaft structure of underground factories in hydroelectric engineering |
CN102518442A (en) * | 2011-12-14 | 2012-06-27 | 中铁十二局集团第二工程有限公司 | Method for processing isolated stone groups in shield excavation karren section |
CN103032071A (en) * | 2012-12-09 | 2013-04-10 | 中铁十二局集团有限公司 | Shield receiving forward-shift construction method of boulder group open excavation and embedment mutation space |
CN103075161A (en) * | 2013-01-16 | 2013-05-01 | 中铁隧道集团有限公司 | Quick underground obstacle clearing method for slurry shield construction |
JP2015074957A (en) * | 2013-10-11 | 2015-04-20 | 鹿島建設株式会社 | Tunnel excavation method and sediment removal method |
CN103790594A (en) * | 2014-02-26 | 2014-05-14 | 中铁一局集团有限公司 | Method for exploring and processing interior of boulder hole in front for shield method construction |
CN103924980A (en) * | 2014-04-24 | 2014-07-16 | 上海隧道工程股份有限公司 | Obstacle removing construction method |
CN105604553A (en) * | 2015-12-21 | 2016-05-25 | 上海市基础工程集团有限公司 | Construction method for exploration and treatment of shield driving complex formation boulders |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109441454A (en) * | 2018-09-11 | 2019-03-08 | 广东水电二局股份有限公司 | A kind of construction method of underground lonestone reception room |
CN109026039A (en) * | 2018-10-19 | 2018-12-18 | 深圳市工勘岩土集团有限公司 | Subway tunnel shield tunnels boulder deep hole blasting and pre-processes construction method |
CN109372526A (en) * | 2018-11-12 | 2019-02-22 | 中铁工程装备集团有限公司 | The novel balancing earth-pressure shielding machine of foreign matter obstacle can be passed through |
CN109505614A (en) * | 2019-01-09 | 2019-03-22 | 海南大学 | A kind of shield machine directly promotes the construction method by boulder |
CN110578524A (en) * | 2019-08-27 | 2019-12-17 | 中交第二航务工程局有限公司 | Boulder treatment construction method for dense drilling and crushing in shield region |
CN114837681A (en) * | 2022-06-07 | 2022-08-02 | 江苏旭睿重工科技有限公司 | Quick stone removing device for soil bin of shield machine and construction method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
AU2020101047A4 (en) | Method for filling underground cavity in bedrock by grouting and hydraulic filling device | |
CN107060800A (en) | A kind of shield-tunneling construction huge stone handling construction method | |
CN205172598U (en) | Pipe curtain spouts a supporting construction soon | |
CN108560541B (en) | Rotary drilling full-casing follow-up rock face drilling construction method | |
CN102943466B (en) | Construction method for miniature steel pipe concrete pile to penetrate through roadbed layer for reinforcing soft foundation construction | |
CN110656947B (en) | Method for tunneling raised section of seabed bedrock | |
CN108678130A (en) | A kind of non-digging drag pipe construction method | |
CN104153352A (en) | Karst geology rotary-drilling bored concrete pile hole forming process | |
CN106088099B (en) | A kind of subway foundation pit anchor cable processing method | |
CN106149679A (en) | The construction technology of diaphram wall built by slotter | |
CN110952528A (en) | Construction method of cement-soil underground continuous wall under complex geological conditions | |
CN108842764B (en) | Rotary stirring type anchor pipe construction method | |
CN107339122B (en) | Construction method for treating goaf by steel pipe column | |
CN109667276A (en) | A kind of karst cave treatment and tracking grouting construction method | |
CN101158269B (en) | Method for drilling roadbed small-caliber horizontal jacking pipe and drill bit | |
CN203821414U (en) | Structure of protecting wall of hole-digging pile | |
CN105649010A (en) | Grouting pile construction technology | |
CN108071110A (en) | Rotary drilling rig Pile method under complex geological condition | |
CN110130909A (en) | The construction method of building up station is worn under a kind of shield in powder land floor | |
CN114059527A (en) | Large-diameter mixing pile construction method suitable for high-groundwater-level hard soil layer | |
CN112196494B (en) | Construction process and construction equipment for geological pipeline jointed between rock and soil layer | |
CN103850261A (en) | In-rock deep foundation pit rock-socketed water-stop curtain construction method | |
CN104631479B (en) | Construction method of soil-changing and stirring waterproof curtain | |
CN103161469A (en) | Method for excavating vertical shaft to underground repair pipe-jacking tool pipe | |
CN205296194U (en) | Rich irrigated land layer undercut tunnel interlock pipe curtain |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |