CN204778489U - Large -scale super high load -lifting height crane barge - Google Patents
Large -scale super high load -lifting height crane barge Download PDFInfo
- Publication number
- CN204778489U CN204778489U CN201520391826.5U CN201520391826U CN204778489U CN 204778489 U CN204778489 U CN 204778489U CN 201520391826 U CN201520391826 U CN 201520391826U CN 204778489 U CN204778489 U CN 204778489U
- Authority
- CN
- China
- Prior art keywords
- jib
- hook
- pulley system
- shears
- cantilever crane
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Jib Cranes (AREA)
Abstract
The utility model discloses a large -scale super high load -lifting height crane barge, including consecutive cantilever crane support, the cantilever crane, little cantilever crane and man -like shelf, be equipped with the main hook pulley system on the cantilever crane, dead rope pulley system and main hook rigging hook pulley system, the cantilever crane root is equipped with cantilever crane head guiding mechanism, dead rope mechanism and auxiliary winch mechanism, be equipped with the auxiliary hook pulley system on the little cantilever crane, auxiliary hook rigging hook pulley system, connect the cantilever crane and adjust the pulley system with the cantilever crane head of little cantilever crane, the cantilever crane bottom is equipped with the cantilever crane support, the cantilever crane is equipped with spacing system with cantilever crane leg joint department, lubricating system, be equipped with metallic structure on the man -like shelf, become width of cloth pulley system, the below is equipped with the ladder landing platform, the engine house, the utility model discloses the high superelevation of crane barge jack -up, weight are huge, can once only promote to 165 meters height, can reach 3000 tons, and the installation effectiveness is high, and is with low costs, has changed original installation, adopt the crane barge once only install the spud leg successfully, and the cost is lower, have improved the efficiency of installing.
Description
Technical field
The utility model relates to a kind of large-scale superelevation lifting altitude crane barge installed for ocean engineering.
Background technology
Crane barge is the important equipment for ocean engineering installation and lifting and installation, be widely used in the installation of offshore platform, build in operation, be particularly applied to ocean engineering hoisting operation field, as the installation of platform, the maintenance of derrick, the installation etc. of offshore wind power equipment; Meanwhile, crane barge is also the important equipment that seabed is installed.Existing crane barge is divided into coastal waters crane barge and deep ocean work crane barge according to purposes, coastal waters crane barge hoisting capacity is little, between general 1000 ~ 3000 tons, installation crane barge hoisting capacity is also little, be mainly used in the installation of port machinery equipment, and the hoisting capacity of deep ocean work is relatively large, because the hoisting capacity of installing crane barge directly determines the construction ability of this crane barge.At present, the crane barge hoisting capacity of largest domestic is 7500 tons, crane barge hoisting capacity is in the world also in equal rank, but along with the development of ocean engineering, it is trend that crane barge maximizes, sea frock is standby along with keeping the large-scale development, therefore, installing area at sea, original crane barge can not adapt to the trend that ocean engineering maximizes, installation exercise efficiency is too low, seriously constrain the development of ocean engineering, and the utility model adapts to the trend that ocean engineering maximizes just, utility model hoisting capacity is the crane barge of 3000 tons of lifting altitudes 165 meters, tens meters are exceeded than existing crane barge ability, greatly expand the scope of work of crane barge, that originally cannot install can install now, also substantially increase the efficiency of installation simultaneously, reduce the cost of installation, obtain larger economic benefit.
Existing crane barge mainly contains two large classes: fixed arm posture crane barge and swinging crane barge, fixed arm posture crane barge comprises jib, support, Shears etc.The lifting power of fixed arm posture crane barge is large, and structure stress form is good, and use relatively more extensive, and crane barge is not high due to lifting altitude, applies extensive, when equal hoisting capacity, the deadweight of fixed arm posture crane barge is lighter, and safety of structure is high.Therefore the crane barge that crane barge design adopts fixed arm posture, particularly coastal waters to install mostly mostly adopts fixed arm posture, the crane barge of this form, and lifting power is larger, and stress form is good, ensure that the stability of structure.Therefore, current crane barge adopts fixed arm posture crane barge to carry out operation usually, particularly ocean engineering installs crane barge, installation exercise is to liking, need to provide huge lifting power to tear steel plate, again its segmentation is installed, this needs ocean engineering to install the safety of this body structure of crane barge, must ensure that crane barge has enough lifting altitudes under the prerequisite of enough hoisting capacities, and crane barge will possess the hoisting capacity of super large, platform leg segmentation installed, now the lifting altitude of crane barge seems and is even more important quickly.
Along with weight equipment technology in ocean develops rapidly to maximization, high-technicalization direction, heavy-duty floating crane is also to maximization, high efficiency development, to adapt to the needs of Overseas Development situation, development of new techniques, existing heavy type is installed crane barge schedule work and is revealed following features: first: crane barge lifting altitude is huge, second: crane barge hoisting capacity is huge, 3rd: crane barge operating load is severe, the 4th: crane barge operating efficiency is high, disposable for spud leg segmentation installation can at sea come up by requirement; 5th, crane barge safety is high, and crane barge structure not only will bear huge hoisting capacity, and will realize when lifting the verting of lift heavy, the action such as to stand up, and realizes ocean engineering installation exercise.Therefore, it is high that heavy-duty floating crane must meet structural strength, and provide load large, stability safety is high, and heavy-duty floating crane must meet under above requirement condition, and deadweight is light as much as possible, reduces productive costs, improves the commercial efficiency of crane barge.
Utility model content
The utility model object is to provide a kind of large-scale superelevation lifting altitude crane barge.
The technical solution adopted in the utility model is:
A kind of large-scale superelevation lifting altitude crane barge, described crane barge comprises crane barge jib, little jib, jib support, Shears, described jib support, jib is connected successively with little jib, and described jib is provided with main hook pulley system, dead rope pulley system and main hook rigging hook pulley system, described jib root is provided with jib head adjusting mechanism, dead rope mechanism and auxiliary hoist mechanism, described little jib is provided with auxiliary hook pulley system, auxiliary hook rigging hook pulley system, the jib head connecting jib and little jib adjusts pulley system, is provided with jib support, is provided with 1500t hook case below described jib support bottom described jib, 750t hook case, described jib and jib support junction are provided with caging system, lubricating system, described Shears is provided with metal construction, luffing pulley system, below is provided with ladder landing platform, is provided with machine house below described Shears, is provided with main hoisting mechanism in described machine house, auxiliary hoisting mechanism, main hook rigging hook mechanism, auxiliary hook rigging hook mechanism, luffing mechanism, electric system, nameplate is arranged.
Described jib comprises jib I, jib II, jib III, jib IV, jib V, jib VI, jib VII, jib VIII.
Described little jib comprises ladder frame and pull bar, and described ladder frame and pull bar pass through stud connection.
Described Shears comprises entablatrance, Shears depression bar and Shears pull bar, between described Shears depression bar and Shears pull bar, level is provided with waling stripe I, waling stripe II from top to bottom, described waling stripe I, waling stripe II are connected with herringbone pull bar with clamp II with clamp I, shaft sleeve II respectively by axle sleeve I, described waling stripe II is connected with Shears depression bar by axle II, and described waling stripe I is provided with between waling stripe II digonal link be connected with Shears depression bar by axle I.
Advantage of the present utility model: crane barge lifting height superelevation, weight are huge, disposablely can be promoted to the height of 165 meters, maximumly reach 3000 tons, installation effectiveness is high, cost is low, and crane barge of the present utility model changes original installation, adopts crane barge disposable by spud leg successful installation, greatly save the cost of installation, improve the efficiency of installation.
Accompanying drawing explanation
Below in conjunction with the drawings and specific embodiments, the utility model is described in further detail.
Fig. 1 is the structural representation of crane barge;
Fig. 2 is the birds-eye view of crane barge;
Fig. 3 is jib structure schematic diagram;
Fig. 4 is little jib structure schematic diagram;
Fig. 5 is Shears structural representation.
Wherein: 1, main hook pulley system; 2, dead rope pulley system; 3, main hook rigging hook pulley system; 4, auxiliary hook pulley system; 5, metal construction; 6, ladder landing platform; 7, luffing pulley system; 8, jib head adjusting mechanism; 9, jib head adjustment pulley system; 10, auxiliary hoisting mechanism; 11, auxiliary hook rigging hook mechanism; 12, luffing mechanism; 13, main hoisting mechanism; 14, machine house; 15, main hook rigging hook mechanism; 16, dead rope mechanism; 17, auxiliary hoist mechanism; 18, auxiliary hook rigging hook pulley system; 19,1500t hook case; 20,750t hook case; 21, caging system; 22, lubricating system; 23, electric system; 24, nameplate is arranged; 25, jib; 26, jib support; 27, little jib; 28, Shears; 29, jib I; 30, jib II; 31, jib III; 32, jib IV; 33, jib V; 34, jib VI; 35, jib VII; 36, jib VIII; 37, ladder frame; 38, pull bar; 39, hinge; 40, Shears pull bar; 41, Shears depression bar; 42, waling stripe I; 43, digonal link; 44, waling stripe II; 45, entablatrance; 46, axle I; 47, axle II; 48, clamp I; 49, clamp II; 50, axle sleeve I; 51, shaft sleeve II.
Detailed description of the invention
As Figure 1-5, a kind of large-scale superelevation lifting altitude crane barge, crane barge comprises crane barge jib 25, little jib 27, jib support 26, Shears 28, described jib support, jib is connected successively with little jib, and jib is provided with main hook pulley system 1, dead rope pulley system 2 and main hook rigging hook pulley system 3, jib root is provided with jib head adjusting mechanism 8, dead rope mechanism 16 and auxiliary hoist mechanism 17, little jib is provided with auxiliary hook pulley system 4, auxiliary hook rigging hook pulley system 18, the jib head connecting jib and little jib adjusts pulley system 9, is provided with jib support, is provided with 1500t hook case 19 below jib support bottom jib, 750t hook case 20, jib and jib support junction are provided with caging system 21, lubricating system 22, Shears is provided with metal construction 5, luffing pulley system 7, below is provided with ladder landing platform 6, is provided with machine house 14 below Shears, is provided with main hoisting mechanism 13 in machine house, auxiliary hoisting mechanism 10, main hook rigging hook mechanism 15, auxiliary hook rigging hook mechanism 11, luffing mechanism 12, electric system 23, nameplate arranges 24, and jib comprises jib I 29, jib II 30, jib III 31, jib IV 32, jib V 33, jib VI 34, jib VII 35, jib VIII 36, little jib comprises ladder frame 37 and pull bar 38, and ladder frame is connected by hinge 39 with pull bar, and Shears comprises entablatrance 45, Shears depression bar 41 and Shears pull bar 40, between Shears depression bar and Shears pull bar, level is provided with waling stripe I 42 from top to bottom, waling stripe II 44, waling stripe I, waling stripe II is respectively by axle sleeve I 50 and clamp I 48, shaft sleeve II 51 is connected with herringbone pull bar with clamp II 49, and waling stripe II is connected with Shears depression bar by axle II 47, is provided with the digonal link 43 be connected with Shears depression bar by axle I 46 between waling stripe I with waling stripe II.Crane barge 3000t hoisting crane is made up of the suspension hook of 4 750t, wherein main hook 750t two and auxiliary hook 750t two equal lateral arrangement, can lift by crane separately separately, also can organize between two respectively by connecting traverse and, form the suspension hook lifting of 2 1500t, suspension hook laterally also can freely rotate, and the maximum angle between main hook two suspension hooks and auxiliary hook two suspension hooks reaches 40o.Jib form is unique, the jib of this hoisting crane is the form of major and minor jib, principal arm frame adopts truss structure, and secondary arm frame is steel flanged beam box-beam structure, and the primary member of jib all adopts high strength steel Q690D to make, secondary arm frame has separately a set of luffing mechanism, for controlling the work range of auxiliary hook, its hard-over is 30o, under the state that the machine can be made to remain unchanged in main hook amplitude, change the amplitude of auxiliary hook, in order to adjust the position of lifting components and to realize in place.The cord strength that crane barge adopts is high, multiplying power is few, it is large to be input to the moment of torsion of reel, and high to the requirement of drive system, principal organ all adopts Multipoint Drive mode uniquely, under the prerequisite meeting job requirement, can reduce cost.Utilizing auxiliary hoist can dispatch in process at boats and ships is shelved on all suspension hooks in hook case, security needs when dispatching to meet.Crane barge uses advanced finite element method to adapt to the load combinations of various sea situation.
The utility model crane barge lifting height superelevation, weight are huge, disposablely can be promoted to the height of 165 meters, maximumly reach 3000 tons, lifting hook work combination is various, flexible, adapts to the needs of offshore lifting, installation effectiveness is high, cost is low, and crane barge of the present utility model changes original installation, adopts crane barge disposable by spud leg successful installation, greatly save the cost of installation, improve the efficiency of installation.
Claims (4)
1. a large-scale superelevation lifting altitude crane barge, is characterized in that: described crane barge comprises crane barge jib, little jib, jib support, Shears, described jib support, jib is connected successively with little jib, and described jib is provided with main hook pulley system, dead rope pulley system and main hook rigging hook pulley system, described jib root is provided with jib head adjusting mechanism, dead rope mechanism and auxiliary hoist mechanism, described little jib is provided with auxiliary hook pulley system, auxiliary hook rigging hook pulley system, the jib head connecting jib and little jib adjusts pulley system, is provided with jib support, is provided with 1500t hook case below described jib support bottom described jib, 750t hook case, described jib and jib support junction are provided with caging system, lubricating system, described Shears is provided with metal construction, luffing pulley system, below is provided with ladder landing platform, is provided with machine house below described Shears, is provided with main hoisting mechanism in described machine house, auxiliary hoisting mechanism, main hook rigging hook mechanism, auxiliary hook rigging hook mechanism, luffing mechanism, electric system, nameplate is arranged.
2. one according to claim 1 large-scale superelevation lifting altitude crane barge, is characterized in that: described jib comprises jib I, jib II, jib III, jib IV, jib V, jib VI, jib VII, jib VIII.
3. one according to claim 1 large-scale superelevation lifting altitude crane barge, is characterized in that: described little jib comprises ladder frame and pull bar, and described ladder frame and pull bar pass through stud connection.
4. one according to claim 1 large-scale superelevation lifting altitude crane barge, it is characterized in that: described Shears comprises entablatrance, Shears depression bar and Shears pull bar, between described Shears depression bar and Shears pull bar, level is provided with waling stripe I from top to bottom, waling stripe II, described waling stripe I, waling stripe II is respectively by axle sleeve I and clamp I, shaft sleeve II is connected with herringbone pull bar with clamp II, described waling stripe II is connected with Shears depression bar by axle II, described waling stripe I is provided with between waling stripe II digonal link be connected with Shears depression bar by axle I.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520391826.5U CN204778489U (en) | 2015-06-09 | 2015-06-09 | Large -scale super high load -lifting height crane barge |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520391826.5U CN204778489U (en) | 2015-06-09 | 2015-06-09 | Large -scale super high load -lifting height crane barge |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204778489U true CN204778489U (en) | 2015-11-18 |
Family
ID=54518581
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520391826.5U Active CN204778489U (en) | 2015-06-09 | 2015-06-09 | Large -scale super high load -lifting height crane barge |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204778489U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104925677A (en) * | 2015-06-09 | 2015-09-23 | 招商局重工(江苏)有限公司 | Large-scale ultrahigh lift height floating crane |
-
2015
- 2015-06-09 CN CN201520391826.5U patent/CN204778489U/en active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104925677A (en) * | 2015-06-09 | 2015-09-23 | 招商局重工(江苏)有限公司 | Large-scale ultrahigh lift height floating crane |
CN104925677B (en) * | 2015-06-09 | 2017-09-26 | 招商局重工(江苏)有限公司 | A kind of large-scale superelevation lifting altitude crane barge |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104925677A (en) | Large-scale ultrahigh lift height floating crane | |
CN103145051B (en) | Separated hoisting device of offshore wind turbine generator, and installation method | |
CN102491162B (en) | Hoisting equipment and hoisting method | |
CN101983894B (en) | Pretension and lay-off method and device of crane jib for ship | |
CN105417403B (en) | A kind of method that ultra-high ultra-large floating crane is installed in dock | |
CN202415021U (en) | Irrotational foldable variable-amplitude large-scale crane ship | |
WO2016173238A1 (en) | Floating crane and multifunctional suspension hook and multifunctional suspension hook group thereof | |
CN203333189U (en) | Hoisting device for ships | |
CN204702437U (en) | A kind of build-up type power pontoon combination mast crane device | |
CN210973614U (en) | Marine wind power major diameter single pile upset frock | |
CN203112377U (en) | Marine wind power generator set split hoisting device | |
CN203332353U (en) | 500-tonner crane ship | |
CN104828713A (en) | Compliant support frame and installation method of compliant support frame to large floating crane boom | |
CN204778489U (en) | Large -scale super high load -lifting height crane barge | |
CN201427842Y (en) | Fully rotary crane for ship | |
CN201686393U (en) | Derrick mast hoisting tool | |
CN204727438U (en) | A kind of crane hanger | |
CN105317031B (en) | A kind of ship lift main equipment room bridge main beam hanging method | |
CN204778275U (en) | But balancing jack -up hoist | |
CN207596369U (en) | A kind of boom hoisting for being suitable for marine O&M | |
CN204040598U (en) | The two rocker pole of a kind of remote control hydraulic | |
CN203558758U (en) | Marine electric crane | |
CN202897866U (en) | Telescopic crane for ship | |
CN204689457U (en) | A kind of compliant bracing frame | |
CN207257907U (en) | A kind of guide pile ship for over-water construction |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |