CN104925677A - Large-scale ultrahigh lift height floating crane - Google Patents

Large-scale ultrahigh lift height floating crane Download PDF

Info

Publication number
CN104925677A
CN104925677A CN201510309438.2A CN201510309438A CN104925677A CN 104925677 A CN104925677 A CN 104925677A CN 201510309438 A CN201510309438 A CN 201510309438A CN 104925677 A CN104925677 A CN 104925677A
Authority
CN
China
Prior art keywords
jib
hook
arm support
pulley system
shears
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510309438.2A
Other languages
Chinese (zh)
Other versions
CN104925677B (en
Inventor
胡文佳
王悦民
沈莹
管伟伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Maritime University
China Merchants Heavy Industry Jiangsu Co Ltd
Original Assignee
Shanghai Maritime University
China Merchants Heavy Industry Jiangsu Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Maritime University, China Merchants Heavy Industry Jiangsu Co Ltd filed Critical Shanghai Maritime University
Priority to CN201510309438.2A priority Critical patent/CN104925677B/en
Publication of CN104925677A publication Critical patent/CN104925677A/en
Application granted granted Critical
Publication of CN104925677B publication Critical patent/CN104925677B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C23/00Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
    • B66C23/18Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes
    • B66C23/36Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes mounted on road or rail vehicles; Manually-movable jib-cranes for use in workshops; Floating cranes
    • B66C23/52Floating cranes
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C23/00Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
    • B66C23/06Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes with jibs mounted for jibbing or luffing movements
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C23/00Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
    • B66C23/62Constructional features or details
    • B66C23/64Jibs
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C23/00Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
    • B66C23/62Constructional features or details
    • B66C23/72Counterweights or supports for balancing lifting couples
    • B66C23/78Supports, e.g. outriggers, for mobile cranes

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Jib Cranes (AREA)

Abstract

The invention discloses a large-scale ultrahigh lift height floating crane. The large-scale ultrahigh lift height floating crane comprises an arm support bracket, an arm support, a small arm support and an A-bracket which are connected in sequence, wherein a main hook pulley system, a dead rope pulley system and a main rigging hook pulley system are arranged on the arm support; an arm support head adjusting mechanism, a dead rope mechanism and an auxiliary winch mechanism are arranged at the root part of the arm support; an assistant hook pulley system, an assistant rigging hook pulley system and an arm support head adjusting pulley system for connecting the arm support and the small arm support are arranged on the small arm support; the arm support bracket is arranged at the bottom of the arm support; a limiting system and a lubricating system are arranged at the connecting part of the arm support and the arm support bracket; a metal structure and a luffing pulley system are arranged on the A-bracket; a ladder platform and a machine room are arranged at the lower part of the A-bracket. The floating crane is high in lifting height and huge in weight, can lift a maximal 3000 ton object to the height of 165 m at a time, and is high in mounting efficiency and low in cost; the original mounting is changed, spud legs of the floating crane are successfully mounted at a time, the cost is lower, and the mounting efficiency is improved.

Description

A kind of large-scale superelevation lifting altitude crane barge
Technical field
What the present invention relates to is a kind of large-scale superelevation lifting altitude crane barge installed for ocean engineering.
Background technology
Crane barge is the important equipment for ocean engineering installation and lifting and installation, be widely used in the installation of offshore platform, build in operation, be particularly applied to ocean engineering hoisting operation field, as the installation of platform, the maintenance of derrick, the installation etc. of offshore wind power equipment; Meanwhile, crane barge is also the important equipment that seabed is installed.Existing crane barge is divided into coastal waters crane barge and deep ocean work crane barge according to purposes, coastal waters crane barge hoisting capacity is little, between general 1000 ~ 3000 tons, installation crane barge hoisting capacity is also little, be mainly used in the installation of port machinery equipment, and the hoisting capacity of deep ocean work is relatively large, because the hoisting capacity of installing crane barge directly determines the construction ability of this crane barge.At present, the crane barge hoisting capacity of largest domestic is 7500 tons, crane barge hoisting capacity is in the world also in equal rank, but along with the development of ocean engineering, it is trend that crane barge maximizes, sea frock is standby along with keeping the large-scale development, therefore, installing area at sea, original crane barge can not adapt to the trend that ocean engineering maximizes, installation exercise efficiency is too low, seriously constrain the development of ocean engineering, and the present invention adapts to the trend that ocean engineering maximizes just, invent the crane barge that hoisting capacity is 3000 tons of lifting altitudes 165 meters, tens meters are exceeded than existing crane barge ability, greatly expand the scope of work of crane barge, that originally cannot install can install now, also substantially increase the efficiency of installation simultaneously, reduce the cost of installation, obtain larger economic benefit.
Existing crane barge mainly contains two large classes: fixed arm posture crane barge and swinging crane barge, fixed arm posture crane barge comprises jib, support, Shears etc.The lifting power of fixed arm posture crane barge is large, and structure stress form is good, and use relatively more extensive, and crane barge is not high due to lifting altitude, applies extensive, when equal hoisting capacity, the deadweight of fixed arm posture crane barge is lighter, and safety of structure is high.Therefore the crane barge that crane barge design adopts fixed arm posture, particularly coastal waters to install mostly mostly adopts fixed arm posture, the crane barge of this form, and lifting power is larger, and stress form is good, ensure that the stability of structure.Therefore, current crane barge adopts fixed arm posture crane barge to carry out operation usually, particularly ocean engineering installs crane barge, installation exercise is to liking, need to provide huge lifting power to tear steel plate, again its segmentation is installed, this needs ocean engineering to install the safety of this body structure of crane barge, must ensure that crane barge has enough lifting altitudes under the prerequisite of enough hoisting capacities, and crane barge will possess the hoisting capacity of super large, platform leg segmentation installed, now the lifting altitude of crane barge seems and is even more important quickly.
Along with weight equipment technology in ocean develops rapidly to maximization, high-technicalization direction, heavy-duty floating crane is also to maximization, high efficiency development, to adapt to the needs of Overseas Development situation, development of new techniques, existing heavy type is installed crane barge schedule work and is revealed following features: first: crane barge lifting altitude is huge, second: crane barge hoisting capacity is huge, 3rd: crane barge operating load is severe, the 4th: crane barge operating efficiency is high, disposable for spud leg segmentation installation can at sea come up by requirement; 5th, crane barge safety is high, and crane barge structure not only will bear huge hoisting capacity, and will realize when lifting the verting of lift heavy, the action such as to stand up, and realizes ocean engineering installation exercise.Therefore, it is high that heavy-duty floating crane must meet structural strength, and provide load large, stability safety is high, and heavy-duty floating crane must meet under above requirement condition, and deadweight is light as much as possible, reduces productive costs, improves the commercial efficiency of crane barge.
Summary of the invention
The object of the invention is to provide a kind of large-scale superelevation lifting altitude crane barge.
The technical solution used in the present invention is:
A kind of large-scale superelevation lifting altitude crane barge, described crane barge comprises crane barge jib, little jib, jib support, Shears, described jib support, jib is connected successively with little jib, and described jib is provided with main hook pulley system, dead rope pulley system and main hook rigging hook pulley system, described jib root is provided with jib head adjusting mechanism, dead rope mechanism and auxiliary hoist mechanism, little jib of telling is provided with auxiliary hook pulley system, auxiliary hook rigging hook pulley system, the jib head connecting jib and little jib adjusts pulley system, is provided with jib support, is provided with 1500T hook case below described jib support bottom described jib, 750T hook case, described jib and jib support junction are provided with caging system, lubricating system, described Shears is provided with metal construction, luffing pulley system, below is provided with ladder landing platform, is provided with machine house below described Shears, is provided with main hoisting mechanism in described machine house, auxiliary hoisting mechanism, main hook rigging hook mechanism, auxiliary hook rigging hook mechanism, luffing mechanism, electric system, nameplate is arranged.
Described jib comprises jib I, jib II, jib III, jib IV, jib V, jib VI, jib VII, jib VIII.
Described little jib comprises ladder frame and pull bar, and described ladder frame and pull bar pass through stud connection.
Described Shears comprises entablatrance, Shears depression bar and Shears pull bar, between described Shears depression bar and Shears pull bar, level is provided with waling stripe I, waling stripe II from top to bottom, described waling stripe I, waling stripe II are connected with herringbone pull bar with clamp II with clamp I, shaft sleeve II respectively by by axle sleeve I, described waling stripe II is connected with Shears depression bar by axle II, and described waling stripe I is provided with between waling stripe II digonal link be connected with Shears depression bar by axle I.
Advantage of the present invention: crane barge lifting height superelevation, weight are huge, disposablely can be promoted to the height of 165 meters, maximumly reach 3000 tons, installation effectiveness is high, cost is low, and crane barge of the present invention changes original installation, adopts crane barge disposable by spud leg successful installation, greatly save the cost of installation, improve the efficiency of installation.
Accompanying drawing explanation
Below in conjunction with the drawings and specific embodiments, the present invention is described in further detail.
Fig. 1 is the structural representation of crane barge;
Fig. 2 is the birds-eye view of crane barge;
Fig. 3 is jib structure schematic diagram;
Fig. 4 is little jib structure schematic diagram;
Fig. 5 is Shears structural representation.
Wherein: 1, main hook pulley system; 2, dead rope pulley system; 3, main hook rigging hook pulley system; 4, auxiliary hook pulley system; 5, metal construction; 6, ladder landing platform; 7, luffing pulley system; 8, jib head adjusting mechanism; 9, jib head adjustment pulley system; 10, auxiliary hoisting mechanism; 11, auxiliary hook rigging hook mechanism; 12, luffing mechanism; 13, main hoisting mechanism; 14, machine house; 15, main hook rigging hook mechanism; 16, dead rope mechanism; 17, auxiliary hoist mechanism; 18, auxiliary hook rigging hook pulley system; 19,1500T hook case; 20,750T hook case; 21, caging system; 22, lubricating system; 23, electric system; 24, nameplate is arranged; 25, jib; 26, jib support; 27, little jib; 28, Shears; 29, jib I; 30, jib II; 31, jib III; 32, jib IV; 33, jib V; 34, jib VI; 35, jib VII; 36, jib VIII; 37, ladder frame; 38, pull bar; 39, hinge; 40, Shears pull bar; 41, Shears depression bar; 42, waling stripe I; 43, digonal link; 44, waling stripe II; 45, entablatrance; 46, axle I; 47, axle II; 48, clamp I; 49, clamp II; 50, axle sleeve I; 51, shaft sleeve II.
Detailed description of the invention
As Figure 1-5, a kind of large-scale superelevation lifting altitude crane barge, crane barge comprises crane barge jib 25, little jib 27, jib support 26, Shears 28, described jib support, jib is connected successively with little jib, and jib is provided with main hook pulley system 1, dead rope pulley system 2 and main hook rigging hook pulley system 3, jib root is provided with jib head adjusting mechanism 8, dead rope mechanism 16 and auxiliary hoist mechanism 17, little jib is provided with auxiliary hook pulley system 4, auxiliary hook rigging hook pulley system 18, the jib head connecting jib and little jib adjusts pulley system 9, is provided with jib support, is provided with 1500T hook case 19 below jib support bottom jib, 750T hook case 20, jib and jib support junction are provided with caging system 21, lubricating system 22, Shears is provided with metal construction 5, luffing pulley system 7, below is provided with ladder landing platform 6, is provided with machine house 14 below Shears, is provided with main hoisting mechanism 13 in machine house, auxiliary hoisting mechanism 10, main hook rigging hook mechanism 15, auxiliary hook rigging hook mechanism 11, luffing mechanism 12, electric system 23, nameplate arranges 24, and jib comprises jib I 29, jib II 30, jib III 31, jib IV 32, jib V 33, jib VI 34, jib VII 35, jib VIII 36, little jib comprises ladder frame 37 and pull bar 38, and ladder frame is connected by hinge 39 with pull bar, and Shears comprises entablatrance 45, Shears depression bar 41 and Shears pull bar 40, between Shears depression bar and Shears pull bar, level is provided with waling stripe I 42 from top to bottom, waling stripe II 44, waling stripe I, waling stripe II is respectively by passing through axle sleeve I 50 and clamp I 48, shaft sleeve II 51 is connected with herringbone pull bar with clamp II 49, and waling stripe II is connected with Shears depression bar by axle II 47, is provided with the digonal link 43 be connected with Shears depression bar by axle I 46 between waling stripe I with waling stripe II.Crane barge 3000t hoisting crane is made up of the suspension hook of 4 750t, wherein main hook 750t two and auxiliary hook 750t two equal lateral arrangement, can lift by crane separately separately, also can organize between two respectively by connecting traverse and, form the suspension hook lifting of 2 1500t, suspension hook laterally also can freely rotate, and the maximum angle between main hook two suspension hooks and auxiliary hook two suspension hooks reaches 40o.Jib form is unique, the jib of this hoisting crane is the form of major and minor jib, principal arm frame adopts truss structure, and secondary arm frame is steel flanged beam box-beam structure, and the primary member of jib all adopts high strength steel Q690D to make, secondary arm frame has separately a set of luffing mechanism, for controlling the work range of auxiliary hook, its hard-over is 30o, under the state that the machine can be made to remain unchanged in main hook amplitude, change the amplitude of auxiliary hook, in order to adjust the position of lifting components and to realize in place.The cord strength that crane barge adopts is high, multiplying power is few, it is large to be input to the moment of torsion of reel, and high to the requirement of drive system, principal organ all adopts Multipoint Drive mode uniquely, under the prerequisite meeting job requirement, can reduce cost.Utilizing auxiliary hoist can dispatch in process at boats and ships is shelved on all suspension hooks in hook case, security needs when dispatching to meet.Crane barge uses advanced finite element method to adapt to the load combinations of various sea situation.
Crane barge lifting height superelevation of the present invention, weight are huge, disposablely can be promoted to the height of 165 meters, maximumly reach 3000 tons, lifting hook work combination is various, flexible, adapts to the needs of offshore lifting, installation effectiveness is high, cost is low, and crane barge of the present invention changes original installation, adopts crane barge disposable by spud leg successful installation, greatly save the cost of installation, improve the efficiency of installation.

Claims (4)

1. a large-scale superelevation lifting altitude crane barge, is characterized in that: described crane barge comprises crane barge jib, little jib, jib support, Shears, described jib support, jib is connected successively with little jib, and described jib is provided with main hook pulley system, dead rope pulley system and main hook rigging hook pulley system, described jib root is provided with jib head adjusting mechanism, dead rope mechanism and auxiliary hoist mechanism, little jib of telling is provided with auxiliary hook pulley system, auxiliary hook rigging hook pulley system, the jib head connecting jib and little jib adjusts pulley system, is provided with jib support, is provided with 1500T hook case below described jib support bottom described jib, 750T hook case, described jib and jib support junction are provided with caging system, lubricating system, described Shears is provided with metal construction, luffing pulley system, below is provided with ladder landing platform, is provided with machine house below described Shears, is provided with main hoisting mechanism in described machine house, auxiliary hoisting mechanism, main hook rigging hook mechanism, auxiliary hook rigging hook mechanism, luffing mechanism, electric system, nameplate is arranged.
2. one according to claim 1 large-scale superelevation lifting altitude crane barge, is characterized in that: described jib comprises jib I, jib II, jib III, jib IV, jib V, jib VI, jib VII, jib VIII.
3. one according to claim 1 large-scale superelevation lifting altitude crane barge, is characterized in that: described little jib comprises ladder frame and pull bar, and described ladder frame and pull bar pass through stud connection.
4. one according to claim 1 large-scale superelevation lifting altitude crane barge, it is characterized in that: described Shears comprises entablatrance, Shears depression bar and Shears pull bar, between described Shears depression bar and Shears pull bar, level is provided with waling stripe I from top to bottom, waling stripe II, described waling stripe I, waling stripe II is respectively by passing through axle sleeve I and clamp I, shaft sleeve II is connected with herringbone pull bar with clamp II, described waling stripe II is connected with Shears depression bar by axle II, described waling stripe I is provided with between waling stripe II digonal link be connected with Shears depression bar by axle I.
CN201510309438.2A 2015-06-09 2015-06-09 A kind of large-scale superelevation lifting altitude crane barge Active CN104925677B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510309438.2A CN104925677B (en) 2015-06-09 2015-06-09 A kind of large-scale superelevation lifting altitude crane barge

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510309438.2A CN104925677B (en) 2015-06-09 2015-06-09 A kind of large-scale superelevation lifting altitude crane barge

Publications (2)

Publication Number Publication Date
CN104925677A true CN104925677A (en) 2015-09-23
CN104925677B CN104925677B (en) 2017-09-26

Family

ID=54113156

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510309438.2A Active CN104925677B (en) 2015-06-09 2015-06-09 A kind of large-scale superelevation lifting altitude crane barge

Country Status (1)

Country Link
CN (1) CN104925677B (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105417403A (en) * 2016-01-08 2016-03-23 招商局重工(江苏)有限公司 Method for installing ultrahigh ultra-large type floating crane in dock
CN106115499A (en) * 2016-08-18 2016-11-16 四川远星橡胶有限责任公司 A kind of sucked type crane with Double-sucker
CN107826986A (en) * 2017-11-27 2018-03-23 中交第二航务工程局有限公司 A kind of amplitude variation type erection crane with A type structure arms
CN108328492A (en) * 2018-03-29 2018-07-27 徐工集团工程机械股份有限公司 A kind of superpower boom system of multi-arm frame with mapping function
CN108726359A (en) * 2018-06-04 2018-11-02 中天科技集团海洋工程有限公司 A kind of loop wheel machine turn technique
WO2018208158A1 (en) * 2017-05-12 2018-11-15 Itrec B.V. Hoisting crane for use on an offshore vessel and method of operation
CN109264592A (en) * 2018-09-26 2019-01-25 中船华南船舶机械有限公司 A kind of crane and working method
CN113247794A (en) * 2021-06-01 2021-08-13 徐州嘉联建设工程有限公司 Combined hoisting equipment for steel structure roof for building and construction method thereof
CN113526349A (en) * 2021-07-27 2021-10-22 上海亥伯智能科技有限公司 Detection method and detection system for diagonal pulling of heavy crane hook

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2010195541A (en) * 2009-02-26 2010-09-09 Yorigami Maritime Construction Co Ltd Floating crane
CN101880006A (en) * 2010-06-24 2010-11-10 大连华锐股份有限公司 Roll-on device and method for large fixed type rotary crane
CN203474313U (en) * 2013-06-13 2014-03-12 上海振华重工(集团)股份有限公司 Single-boom type crane
CN103640990A (en) * 2013-11-25 2014-03-19 无锡起岸重工机械有限公司 Floating crane
CN103879904A (en) * 2014-03-17 2014-06-25 江苏华西村海洋工程服务有限公司 Ocean crane ship and moving method thereof
CN204778489U (en) * 2015-06-09 2015-11-18 招商局重工(江苏)有限公司 Large -scale super high load -lifting height crane barge

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2010195541A (en) * 2009-02-26 2010-09-09 Yorigami Maritime Construction Co Ltd Floating crane
CN101880006A (en) * 2010-06-24 2010-11-10 大连华锐股份有限公司 Roll-on device and method for large fixed type rotary crane
CN203474313U (en) * 2013-06-13 2014-03-12 上海振华重工(集团)股份有限公司 Single-boom type crane
CN103640990A (en) * 2013-11-25 2014-03-19 无锡起岸重工机械有限公司 Floating crane
CN103879904A (en) * 2014-03-17 2014-06-25 江苏华西村海洋工程服务有限公司 Ocean crane ship and moving method thereof
CN204778489U (en) * 2015-06-09 2015-11-18 招商局重工(江苏)有限公司 Large -scale super high load -lifting height crane barge

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
沈莹 等: "大型非旋转浮式起重机结构形式分析", 《中国工程机械学报》 *
陈杰: "1200t起重船起重***研究", 《船舶设计与研究》 *

Cited By (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105417403B (en) * 2016-01-08 2017-08-08 招商局重工(江苏)有限公司 A kind of method that ultra-high ultra-large floating crane is installed in dock
CN105417403A (en) * 2016-01-08 2016-03-23 招商局重工(江苏)有限公司 Method for installing ultrahigh ultra-large type floating crane in dock
CN106115499A (en) * 2016-08-18 2016-11-16 四川远星橡胶有限责任公司 A kind of sucked type crane with Double-sucker
WO2018208158A1 (en) * 2017-05-12 2018-11-15 Itrec B.V. Hoisting crane for use on an offshore vessel and method of operation
NL2018912B1 (en) * 2017-05-12 2018-11-15 Itrec Bv Hoisting crane for use on an offshore vessel and method of operation
CN110831886A (en) * 2017-05-12 2020-02-21 伊特里克公司 Lifting crane for use on an offshore vessel and method of operation
CN107826986A (en) * 2017-11-27 2018-03-23 中交第二航务工程局有限公司 A kind of amplitude variation type erection crane with A type structure arms
CN108328492A (en) * 2018-03-29 2018-07-27 徐工集团工程机械股份有限公司 A kind of superpower boom system of multi-arm frame with mapping function
CN108726359B (en) * 2018-06-04 2020-05-12 中天科技集团海洋工程有限公司 Crane turnover process
CN108726359A (en) * 2018-06-04 2018-11-02 中天科技集团海洋工程有限公司 A kind of loop wheel machine turn technique
CN109264592A (en) * 2018-09-26 2019-01-25 中船华南船舶机械有限公司 A kind of crane and working method
CN109264592B (en) * 2018-09-26 2023-07-21 中船华南船舶机械有限公司 Crane and working method
CN113247794A (en) * 2021-06-01 2021-08-13 徐州嘉联建设工程有限公司 Combined hoisting equipment for steel structure roof for building and construction method thereof
CN113247794B (en) * 2021-06-01 2022-12-20 徐州嘉联建设工程有限公司 Combined hoisting equipment for steel structure roof for building and construction method thereof
CN113526349A (en) * 2021-07-27 2021-10-22 上海亥伯智能科技有限公司 Detection method and detection system for diagonal pulling of heavy crane hook
CN113526349B (en) * 2021-07-27 2022-06-17 上海亥伯智能科技有限公司 Detection method and detection system for diagonal pulling of heavy crane hook

Also Published As

Publication number Publication date
CN104925677B (en) 2017-09-26

Similar Documents

Publication Publication Date Title
CN104925677A (en) Large-scale ultrahigh lift height floating crane
CN103145051B (en) Separated hoisting device of offshore wind turbine generator, and installation method
CN102491162B (en) Hoisting equipment and hoisting method
CN101983894B (en) Pretension and lay-off method and device of crane jib for ship
CN105417403A (en) Method for installing ultrahigh ultra-large type floating crane in dock
CN202415021U (en) Irrotational foldable variable-amplitude large-scale crane ship
CN104961043B (en) A kind of crane barge and its Multifunctional hanging hook, Multifunctional hanging hook group
CN203333189U (en) Hoisting device for ships
CN103640987A (en) Folding arm hydraulic crane
CN103708360B (en) Movable arm tower crane and standard knot introduction system thereof and standard knot introduction method
CN203332353U (en) 500-tonner crane ship
CN203112377U (en) Marine wind power generator set split hoisting device
CN104828713A (en) Compliant support frame and installation method of compliant support frame to large floating crane boom
CN204702437U (en) A kind of build-up type power pontoon combination mast crane device
CN204778489U (en) Large -scale super high load -lifting height crane barge
CN103539020B (en) Novel hoisting construction method and special hanging device
CN201686393U (en) Derrick mast hoisting tool
CN206569904U (en) A kind of suspender for lifting steel plate
CN207596369U (en) A kind of boom hoisting for being suitable for marine O&M
CN103663169A (en) Marine variable-frequency electric crane
CN204689457U (en) A kind of compliant bracing frame
CN203558758U (en) Marine electric crane
CN202897866U (en) Telescopic crane for ship
CN204297984U (en) Syllogic arm crane
CN203889884U (en) Replacing and lifting device for torch head of ocean platform

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant