CN204715393U - The long anchor rod type foundation structure of rock - Google Patents

The long anchor rod type foundation structure of rock Download PDF

Info

Publication number
CN204715393U
CN204715393U CN201520151370.5U CN201520151370U CN204715393U CN 204715393 U CN204715393 U CN 204715393U CN 201520151370 U CN201520151370 U CN 201520151370U CN 204715393 U CN204715393 U CN 204715393U
Authority
CN
China
Prior art keywords
flange
cushion cap
strength
cylinder cushion
anchor rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201520151370.5U
Other languages
Chinese (zh)
Inventor
马利鑫
马云龙
石健
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jian An Cheng (inner Mongolia) Amperex Technology Ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201520151370.5U priority Critical patent/CN204715393U/en
Application granted granted Critical
Publication of CN204715393U publication Critical patent/CN204715393U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Foundations (AREA)

Abstract

The utility model relates to the long anchor rod type foundation structure of a kind of rock, comprise base concrete cylinder cushion cap, the bottom surface of cylinder cushion cap is provided with high-strength grouting post, coaxially arrange an anchor pole in high-strength grouting post, anchor pole passes described cylinder cushion cap and is fixed in described high-strength grouting post by pressure grouting; The bottom of cylinder cushion cap is provided with end flange, end flange is provided with axis hole, all through high-strength bolt in axis hole, the upper end of high-strength bolt is through pre-buried flange, the bottom of pre-buried flange and end flange is equipped with leveling bolt, the top of pre-buried flange and end flange is equipped with clamp nut, and leveling bolt and clamp nut are all connected high-strength bolt.The utility model is pre-buried flange when foundation construction, make can directly lift when top fan bottom section tower cylinder is installed, without the need to the back-grouting technology intermission phase, fan bottom section tower cylinder installs and just can carry out post tensioning to high-strength bolt at once, proceeds stage casing afterwards, epimere tower cylinder is installed.

Description

The long anchor rod type foundation structure of rock
Technical field
The utility model relates to a kind of rigidity building lot field, the foundation construction structure mainly utilizing the frame for movement of concrete and rigid material to be formed, and is specifically related to the long anchor rod type foundation structure of a kind of rock.
Background technology
At present for large-scale or the frame of large equipment, the fixing of pylon, comprise wind-driven generator, wind turbine, power line street lighting and recoil simulator, bridge pad, business signboard, speedway signboard, Ski Lift etc. the concrete support basis adopting on-the-spot structure more.
Traditional foundation construction has two kinds, and one first in the soil body, carries out pile anchor rod boring, and install steel anchor rod in the borehole, carry out pressure grouting in the borehole after rockbolt installation, anchor pole is connected by being in the milk with surrounding soil.The construction of cushion cap is carried out after rockbolt installation, cushion cap is cast-in-place or precast concrete, the pre-buried end flange in foundation platform bottom, reach the 28 day length of time Deng concrete, section tower cylinder at the bottom of lifting fan, then carry out back-grouting, after back-grouting, after high-strength grouting intensity rises, (general 2-3 days) could carry out post tensioning process to high-strength bolt, and could lift follow-up tower cylinder afterwards, complex process, the technology intermission phase is long, difficulty of construction is large.
Another kind is in the construction technology on conventional concrete basis, need pre-buried installation foundation ring in basis, discharge ring is connected with blower fan tower barrel bolt, but the installation of discharge ring and leveling work complexity, difficulty of construction is large, the own cost of discharge ring high (an about 14-18 ten thousand), discharge ring volume is large, and transport is inconvenient.
Utility model content
The purpose of this utility model is to provide the long anchor rod type foundation structure of a kind of rock, the pre-buried flange when foundation construction, make can directly lift when top blower fan fan bottom section tower cylinder is installed, without the need to the back-grouting technology intermission phase, fan bottom section tower cylinder installs and just can carry out post tensioning to high-strength bolt at once, proceed stage casing tower cylinder afterwards and epimere tower cylinder is installed, easy construction, safe and reliable, this technology saves discharge ring, reduce cost, more traditional post-grouting method of attachment saves the duration, reduce difficulty of construction, greatly reduce construction cost, reduce construction risk.
The pre-buried flange when foundation construction, pre-buried pre-buried flange is connected with flange at the bottom of fan bottom section tower cylinder, fan bottom section tower cylinder can directly be lifted, without the need to the back-grouting technology intermission phase, fan bottom section tower cylinder installs and just can carry out post tensioning to high-strength bolt at once, proceeds stage casing afterwards, epimere tower cylinder is installed; This basis does not use expensive discharge ring, more saves cost.
The purpose of this utility model is achieved through the following technical solutions:
The long anchor rod type foundation structure of a kind of rock, comprise the base concrete cylinder cushion cap formed by concrete, described cylinder cushion cap is flat columned solid construction, the bottom surface of described cylinder cushion cap is provided with the high-strength grouting post along at least one circle distribution, described high-strength grouting post vertically connects described cylinder cushion cap, coaxially arrange an anchor pole in described high-strength grouting post, described anchor pole passes described cylinder cushion cap and is fixed in described high-strength grouting post by pressure grouting;
The flange of the horizontally disposed end is embedded with in the bottom of described cylinder cushion cap, flange of the described end is arranged at the inner side of described high-strength grouting post, flange of the described end is provided with at least one circumferentially equally distributed axis hole of shape, all through a high-strength bolt in described axis hole, the upper end of described high-strength bolt is through the pre-buried flange being arranged on described cylinder cushion cap top, and described pre-buried flange and end flange are parallel to each other.
Further, be provided with preformed groove between described cylinder cushion cap and pre-buried flange, after pre-buried flange described in leveling, post-grouting carried out to preformed groove, in described preformed groove, fill up high-strength concrete.
Further, be provided with in described preformed groove in eight equally distributed leveling bolts in orientation, the bottom of described leveling bolt is inserted in described cylinder cushion cap.
Further, the shape of described preformed groove is cannelure.
Further, described axis hole is uniformly distributed formed figure is two concentric circles.
Further, the width of described pre-buried flange is more than or equal to the breadth of section of flange of the described end.
Further, the outside of described high-strength bolt is provided with PVC sleeve pipe.
Further, described cylinder cushion cap is the structure of the concrete support of C35-C40 label.
Accompanying drawing explanation
With reference to the accompanying drawings the utility model is described in further detail below.
Fig. 1 is the structural representation of the long anchor rod type foundation structure of rock described in the utility model embodiment;
Fig. 2 is A direction view in Fig. 1.
In figure:
1, cylinder cushion cap; 2, high-strength grouting post; 3, anchor pole; 4, end flange; 5, high-strength bolt; 6, pre-buried flange; 7, leveling bolt; 8, built-in groove; 9, fan bottom section tower cylinder.
Detailed description of the invention
As shown in Figure 1-2, a kind of rock long anchor pole 3 formula foundation structure described in the utility model embodiment, comprise the base concrete cylinder cushion cap 1 formed by concrete, described cylinder cushion cap 1 is flat columned solid construction, and described cylinder cushion cap 1 is the structure of the concrete support of C-C label.
The bottom surface of described cylinder cushion cap 1 is provided with the high-strength grouting post 2 along an even circumferential distribution, described high-strength grouting post 2 vertically connects described cylinder cushion cap 1, described cylinder cushion cap 1 with the aspect ratio of high-strength grouting post 2 is: or:, described high-strength grouting post 2 is provided with gap with the junction of cylinder cushion cap 1, is provided with foamed plastics or with material section bar in described gap.
Coaxially arrange an anchor pole 3 in described high-strength grouting post 2, anchor pole 3 is deformed steel bar, and described anchor pole 3 is passed described cylinder cushion cap 1 and is fixed in described high-strength grouting post 2 by pressure grouting.
The inner side being in described high-strength grouting post 2 bottom described cylinder cushion cap 1 is embedded with the flange of the horizontally disposed end 4, flange of the described end 4 is provided with the axis hole in two concentric circumferences shape distributions, all through a high-strength bolt 5 in described axis hole, described high-strength bolt 5 is made to be uniformly distributed two concentric circles of formation, the outside of described high-strength bolt 5 is provided with PVC sleeve pipe, the both sides up and down described high-strength bolt 5 being located at end flange 4 are equipped with holding screw, for fixing.
The upper end of described high-strength bolt 5 is through the pre-buried flange 6 being arranged on described cylinder cushion cap 1 top, the width of described pre-buried flange 6 is more than or equal to the breadth of section of flange of the described end 4, preformed groove is provided with between described cylinder cushion cap 1 and pre-buried flange 6, preformed groove is left at its top after once grouting forming cylinder body cushion cap 1, the bottom of pre-buried flange 6 is made to have space, in this space, the leveling bolt 7 bottom pre-buried flange 6 is exposed, constructor regulates respectively and is located at eight equally distributed leveling bolts 7 in orientation, after the leveling of pre-buried flange 6, carry out back-grouting, two days are waited fill high-strength concrete in preformed groove after, fan bottom section tower cylinder 9 is directly built after reaching requirement hardness Deng high-strength concrete, without the need to waiting for the back-grouting technology intermission phase, fan bottom section tower cylinder 9 installs and just can carry out post tensioning to high-strength bolt 5 at once, proceed stage casing afterwards and epimere tower cylinder is installed.
The utility model is not limited to above-mentioned preferred forms; anyone can draw other various forms of products under enlightenment of the present utility model; no matter but any change is done in its shape or structure; every have identical with the application or akin technical scheme, all drops within protection domain of the present utility model.

Claims (8)

1. the long anchor rod type foundation structure of rock, comprise the base concrete cylinder cushion cap formed by concrete, described cylinder cushion cap is flat columned solid construction, it is characterized in that: the bottom surface of described cylinder cushion cap is provided with the high-strength grouting post along at least one circle distribution, described high-strength grouting post vertically connects described cylinder cushion cap, coaxially arrange an anchor pole in described high-strength grouting post, described anchor pole passes described cylinder cushion cap and is fixed in described high-strength grouting post by pressure grouting;
The flange of the horizontally disposed end is embedded with in the bottom of described cylinder cushion cap, flange of the described end is arranged at the inner side of described high-strength grouting post, flange of the described end is provided with at least one circumferentially equally distributed axis hole of shape, all through a high-strength bolt in described axis hole, the upper end of described high-strength bolt is through the pre-buried flange being arranged on described cylinder cushion cap top, and described pre-buried flange and end flange are parallel to each other.
2. the long anchor rod type foundation structure of rock according to claim 1, it is characterized in that: between described cylinder cushion cap and pre-buried flange, be provided with preformed groove, after pre-buried flange described in leveling, post-grouting is carried out to preformed groove, in described preformed groove, fill up high-strength concrete.
3. the long anchor rod type foundation structure of rock according to claim 2, is characterized in that: be provided with in described preformed groove in eight equally distributed leveling bolts in orientation, the bottom of described leveling bolt is inserted in described cylinder cushion cap.
4. the long anchor rod type foundation structure of rock according to claim 2, is characterized in that: the shape of described preformed groove is cannelure.
5. the long anchor rod type foundation structure of rock according to claim 1, is characterized in that: it is two concentric circles that described axis hole is uniformly distributed formed figure.
6. the long anchor rod type foundation structure of rock according to claim 1, is characterized in that: the width of described pre-buried flange is more than or equal to the breadth of section of flange of the described end.
7. the long anchor rod type foundation structure of rock according to claim 1, is characterized in that: the outside of described high-strength bolt is provided with PVC sleeve pipe.
8. the long anchor rod type foundation structure of rock according to claim 1, is characterized in that: described cylinder cushion cap is the structure of the concrete support of C35-C40 label.
CN201520151370.5U 2015-03-17 2015-03-17 The long anchor rod type foundation structure of rock Active CN204715393U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520151370.5U CN204715393U (en) 2015-03-17 2015-03-17 The long anchor rod type foundation structure of rock

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520151370.5U CN204715393U (en) 2015-03-17 2015-03-17 The long anchor rod type foundation structure of rock

Publications (1)

Publication Number Publication Date
CN204715393U true CN204715393U (en) 2015-10-21

Family

ID=54314397

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520151370.5U Active CN204715393U (en) 2015-03-17 2015-03-17 The long anchor rod type foundation structure of rock

Country Status (1)

Country Link
CN (1) CN204715393U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105604086A (en) * 2016-03-04 2016-05-25 北京中水新能工程技术有限公司 Fan foundation structure
CN105756077A (en) * 2016-02-17 2016-07-13 北京健安诚岩土工程有限公司 Foundation ring rock anchor rod foundation
CN107100079A (en) * 2017-05-25 2017-08-29 上海市政工程设计研究总院(集团)有限公司 A kind of construction method of the anchor structure of precast assembly overpass steel column
CN107237266A (en) * 2017-06-27 2017-10-10 中铁第四勘察设计院集团有限公司 Open cut rock anchor combination foundation and its inverse operation construction method
CN108532625A (en) * 2018-04-27 2018-09-14 湘电风能有限公司 A kind of foundation of wind-driven generator unit

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105756077A (en) * 2016-02-17 2016-07-13 北京健安诚岩土工程有限公司 Foundation ring rock anchor rod foundation
CN105604086A (en) * 2016-03-04 2016-05-25 北京中水新能工程技术有限公司 Fan foundation structure
CN105604086B (en) * 2016-03-04 2018-10-23 北京中水新能工程技术有限公司 Fan foundation structure
CN107100079A (en) * 2017-05-25 2017-08-29 上海市政工程设计研究总院(集团)有限公司 A kind of construction method of the anchor structure of precast assembly overpass steel column
CN107237266A (en) * 2017-06-27 2017-10-10 中铁第四勘察设计院集团有限公司 Open cut rock anchor combination foundation and its inverse operation construction method
CN108532625A (en) * 2018-04-27 2018-09-14 湘电风能有限公司 A kind of foundation of wind-driven generator unit

Similar Documents

Publication Publication Date Title
CN204715393U (en) The long anchor rod type foundation structure of rock
CN101892671B (en) Pile anchor rod foundation structure
CN101812842B (en) Tensionless filling pile structure
CN104674837A (en) Connection structure and connection method of draught fan foundation and draught fan tower barrel
CN103114604B (en) Prestressed concrete tubular type wind generating set foundation
CN201502061U (en) Recoverable prestressing anchor rope with double anchor heads
CN104612455B (en) Blower fan concrete tower and the integral structure on basis
CN104652428A (en) Inverted umbrella-shaped pile foundation structure
CN201826323U (en) Pile-anchor rod foundation structure
CN103741708B (en) Prefabricated concrete rod sleeve basis
CN210684762U (en) Foundation structure for road traffic sign
CN202348300U (en) Mine anchor cable
CN204551454U (en) A kind of piling strtucture of falling umbrella
CN204243696U (en) Novel electric checking bollard
CN204510253U (en) Pile for prestressed pipe formula foundation structure
CN204510989U (en) Multistage concrete towers cylinder integral structure
CN204226126U (en) The improved-type blower foundation ring of a kind of variation rigidity anchoring
CN103334447B (en) Tensionless filling pile structure
CN204510987U (en) Blower fan concrete towers cylinder and basic integral structure
CN204385762U (en) A kind of Rock Bolt Foundation structure
CN202090346U (en) Movable combined type ground anchor
CN201554033U (en) Tower crane foundation for deep foundation ditch
CN104453336B (en) Base structure of high-pressure steel pipe pole
CN204803906U (en) Connection structure of a fan basis and a fan tower section of thick bamboo
CN203383224U (en) Tension-free cast-in-place pile structure

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20170524

Address after: 013899 the Inner Mongolia Autonomous Region Xilinguole Meng Zhengxiangbaiqi minganto town development and Reform Bureau on the third floor Room 303

Patentee after: Jian An Cheng (Inner Mongolia) Amperex Technology Limited

Address before: 100176, C building, 2 F, BD International Plaza, 6 West Sheng Road, Beijing economic and Technological Development Zone, Beijing

Patentee before: Shi Jian

TR01 Transfer of patent right