A kind of stable building heat preservation connects brick
Technical field
The utility model relates to apparatus for building technical field, particularly relates to a kind of stable building heat preservation and connects brick.
Background technology
At present, the building brick used in building site mostly is simple cuboid building brick, can only be connected, connect defective tightness each other between building brick with building brick by cement admixture, easy generation is slided mutually, and the whole wall body structure after causing building up is stable not.
China's publication, the patent No.: CN 203188440 U, a kind of building brick was once disclosed, it is characterized in that, building brick body upper surface is provided with downward groove, soffit is provided with the projection corresponding with groove center, be connected with groove fit by projection, improve stability and the safety of building, but this building brick is just connected and fixed in vertical direction, brick body in horizontal direction is still independently individual, do not tackle the problem at its root, in addition due to central punch, the intensity of brick body is made to receive impact, and not there is the functions such as thermal-insulating waterproof.
Utility model content
For solving the problems of the technologies described above, the utility model provides a kind of stable building heat preservation to connect brick, be respectively equipped with the engaging lug and link slot that match at the two ends of brick body, upper and lower surface is provided with connecting hole and connected unit, brick body all can be fixed in the vertical and horizontal direction, whole body of wall is made to become a complete entirety, and during building, splicing is convenient, improves speed of application, is provided with reinforcing rib and insulation layer in addition, the intensity of brick body is improved, and there is the effect of insulation.
For solving the problems of the technologies described above, the embodiment of the present application provides a kind of stable building heat preservation and connects brick, it is characterized in that: comprise the engaging lug, reinforcing rib and the insulation layer that are arranged on brick body, described brick body one end is provided with engaging lug, the other end is provided with the link slot matched, and described brick body upper surface is provided with connecting hole, and soffit is provided with the connected unit matched, described brick body inside is provided with reinforcing rib and insulation layer, and the inwall of affiliated connecting hole is provided with inner liner.
As the preferred embodiment of this programme, the structure of described engaging lug is wedge structure, and dimensions and link slot match.
As the preferred embodiment of this programme, described engaging lug and the entire length of link slot are 1/5 of brick body length, and width is identical with brick body with thickness.
As the preferred embodiment of this programme, described connecting hole and connected unit are all cylindrical, are highly 1/3 of brick height.
As the preferred embodiment of this programme, described reinforcing rib is " well " character form structure anyhow interlocked.
As the preferred embodiment of this programme, described inner liner is elastomeric material or other waterproofing materialss.
As the preferred embodiment of this programme, described insulation layer is made up of glass fiber.
The one or more technical schemes provided in the embodiment of the present application, at least have following technique effect or advantage:
Brick body can be made all to fix in the vertical and horizontal direction, and make whole body of wall become a complete entirety, structural stability is high, and splicing is convenient, improves speed of application, is provided with reinforcing rib and insulation layer in addition, the intensity of brick body is improved, and there is the effect of insulation.
Accompanying drawing explanation
In order to be illustrated more clearly in the utility model embodiment or technical scheme of the prior art, be briefly described to the accompanying drawing used required in embodiment or description of the prior art below, apparently, accompanying drawing in the following describes is only embodiments more of the present utility model, for those of ordinary skill in the art, under the prerequisite not paying creative work, other accompanying drawing can also be obtained according to these accompanying drawings.
Fig. 1 is the structural representation of the embodiment of the present application one.
In figure, 1, brick body, 2, engaging lug, 3, reinforcing rib, 4, insulation layer, 5, connected unit, 6, connecting hole, 7, inner liner, 8, link slot.
Detailed description of the invention
In order to better understand technique scheme, below in conjunction with Figure of description and concrete embodiment, technique scheme is described in detail.
Embodiment one:
In embodiment one, as shown in Figure 1, a kind of stable building heat preservation connects brick, comprise the engaging lug 2 be arranged on brick body 1, reinforcing rib 3 and insulation layer 4, described brick body 1 one end is provided with engaging lug 2, and the other end is provided with the link slot 8 matched, described brick body 1 upper surface is provided with connecting hole 6, soffit is provided with the connected unit 5 matched, and described brick body 1 inside is provided with reinforcing rib 3 and insulation layer 4, and the inwall of described connecting hole 6 is provided with inner liner 7.
Wherein, in actual applications, the structure of described engaging lug 2 is wedge structure, dimensions and link slot 8 match, when carrying out building splice, by the engaging lug 2 Snap joint groove 8 of adjacent bricks body 1, namely improve the stability of structure, can speed of application be improved again.
Wherein, in actual applications, described engaging lug 2 and the entire length of link slot 8 are 1/5 of brick body 1 length, and width is identical with brick body 1 with thickness.
Wherein, in actual applications, described connecting hole 6 and connected unit 5 are all cylindrical, highly be 1/3 of brick body 1 height, when building operations, the connected unit 5 on upper and lower brick body 1 is snapped in the link slot 6 of another adjacent brick body 1, the structural stability of building can be improved.
Wherein, in actual applications, described reinforcing rib 3 is anyhow staggered " well " character form structure, enhances the overall construction intensity of brick body 1, avoids, because having an impact to the intensity of brick body 1 after punching, extending the application life of brick body 1.
Wherein, in actual applications, described inner liner 7 is elastomeric material or other waterproofing materialss, namely adds the steadiness between connected unit 5 and connecting hole 6, can prevent again the liquid such as rainwater from flowing into, produce permeating corrosion to brick body 1, reduce application life.
Wherein, in actual applications, described insulation layer 4 is made up of glass fiber, enhances effect of heat insulation, and people, when opening heating installation or cold air, ensure that energy does not lose.
Technical scheme in above-mentioned the embodiment of the present application, at least there is following technique effect or advantage: brick body can be made all to fix in the vertical and horizontal direction, whole body of wall is made to become a complete entirety, structural stability is high, and splicing is convenient, improves speed of application, is provided with reinforcing rib and insulation layer in addition, the intensity of brick body is improved, and there is the effect of insulation.
Although described preferred embodiment of the present utility model, those skilled in the art once obtain the basic creative concept of cicada, then can make other change and amendment to these embodiments.So claims are intended to be interpreted as comprising preferred embodiment and falling into all changes and the amendment of the utility model scope.
Obviously, those skilled in the art can carry out various change and modification to the utility model and not depart from spirit and scope of the present utility model.Like this, if these amendments of the present utility model and modification belong within the scope of the utility model claim and equivalent technologies thereof, then the utility model is also intended to comprise these change and modification.