CN204624958U - The row of hanging - Google Patents

The row of hanging Download PDF

Info

Publication number
CN204624958U
CN204624958U CN201520214288.2U CN201520214288U CN204624958U CN 204624958 U CN204624958 U CN 204624958U CN 201520214288 U CN201520214288 U CN 201520214288U CN 204624958 U CN204624958 U CN 204624958U
Authority
CN
China
Prior art keywords
fixed pulley
group
pulley group
fixed
pieces
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520214288.2U
Other languages
Chinese (zh)
Inventor
周科伟
何剑鸣
***
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu New Yangzi Shipbuilding Co Ltd
Original Assignee
Jiangsu New Yangzi Shipbuilding Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu New Yangzi Shipbuilding Co Ltd filed Critical Jiangsu New Yangzi Shipbuilding Co Ltd
Priority to CN201520214288.2U priority Critical patent/CN204624958U/en
Application granted granted Critical
Publication of CN204624958U publication Critical patent/CN204624958U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model relates to one and hangs row, it comprises girder (1), it is characterized in that the middle part of described girder (1) is disposed with dead sheave group (5) from left to right, first fixed pulley group (6), second fixed pulley group (7), 3rd fixed pulley group (8) and connection assembly pulley (9), dead sheave group (5), first fixed pulley group (6), second fixed pulley group (7), a running block (10) is provided with from left to right between 3rd fixed pulley group (8) and connection assembly pulley (9), there is steel cable (11) successively by dead sheave group (5), first fixed pulley group (6), second fixed pulley group (7), 3rd fixed pulley group (8), connect assembly pulley (9) and four groups of running blocks (10) connections.The utility model has when being applicable to large-scale segmental hoisting each suspension centre can be made unanimously stressed, ensures safety; Be applicable to can regulate lifting inclination angle, the advantage of raising the efficiency when building berth main frame is installed.

Description

The row of hanging
Technical field
The utility model relates to one and hangs row.
Background technology
The important corollary equipment that the row of hanging is large-scale segmental hoisting, building berth main frame is installed.
The lifting of two aspects below the row's of hanging main services:
1, the lifting of large-scale segmentation
For pursuing Speed of Shipbuilding faster, total set of segmentation weight is now increasing, and large-scale segmental hoisting need arrange multiple hanger, tradition lifting time can not ensure that each suspension centre is unanimously stressed, when local certain suspension centre stressed excessive time, to lifting safety have certain influence.
2, building berth main frame is installed
The installation of building berth main frame is the installation of important main equipment on ship, and to being lifted with higher requirement, building berth has certain inclination angle, and needs main frame parallel with main engine seating when main frame is installed, and tradition lifting is difficult to reach.
Therefore seek each suspension centre can be made unanimously stressed when one is applicable to large-scale segmental hoisting, ensure safety; Be applicable to can regulate lifting inclination angle when building berth main frame is installed, the row of hanging raised the efficiency is particularly important.
Summary of the invention
The purpose of this utility model is to overcome above-mentioned deficiency, each suspension centre can be made unanimously stressed when providing one to be applicable to large-scale segmental hoisting, ensures safety; Be applicable to can regulate lifting inclination angle, the row of hanging raised the efficiency when building berth main frame is installed.
The purpose of this utility model is achieved in that
One hangs row, it comprises girder, it is characterized in that the inside, two ends, left and right of described girder is respectively arranged with left end fixed pulley group and right-hand member fixed pulley group, hanger is provided with in the middle part of described girder, the middle part of described girder is disposed with dead sheave group from left to right, first fixed pulley group, second fixed pulley group, 3rd fixed pulley group and connection assembly pulley, dead sheave group, first fixed pulley group, second fixed pulley group, a running block is provided with from left to right between 3rd fixed pulley group and connection assembly pulley, add up to four groups of running blocks, there is steel cable successively by dead sheave group, first fixed pulley group, second fixed pulley group, 3rd fixed pulley group, connect assembly pulley and four groups of running blocks connections, the two groups of moving pulley brackets arranged before and after running block comprises, pipe link is connected with between two groups of moving pulley brackets, the top of moving pulley bracket is provided with movable pulley, the bottom of moving pulley bracket is provided with lower fixed pulley.
Preferred as one, girder is made up of the connecting panel between two pieces, front and back heavy steel plate and two pieces of heavy steel plate.
Preferred as one, dead sheave group comprises two dead sheaves be arranged in through the anchor shaft of the two pieces of heavy steel plate in front and back and front and back on anchor shaft, two dead sheaves lay respectively at the front and back of girder, first fixed pulley group, second fixed pulley group and the 3rd fixed pulley group are identical structure, this structure comprises two fixed pulleys be arranged in through the fixed pulley axis of the two pieces of heavy steel plate in front and back and front and back on fixed pulley axis, two fixed pulleys lay respectively at the front and back of girder, connect assembly pulley and comprise two pieces, the left and right connecting panel be longitudinally arranged in girder, before and after between two pieces of connecting panels, two transverse axis are all set, two transverse axis are arranged two groups and connect fixed pulley.
Preferred as one, left end fixed pulley group comprise one be communicated with before and after the left fixed shaft of two pieces of heavy steel plate and front and back be arranged in two left end fixed pulleys on left fixed shaft, right-hand member fixed pulley group comprise one be communicated with before and after the right fixed shaft of two pieces of heavy steel plate and front and back be arranged in two right-hand member fixed pulleys on right fixed shaft.
Compared with prior art, the beneficial effects of the utility model are:
The utility model has when being applicable to large-scale segmental hoisting each suspension centre can be made unanimously stressed, ensures safety; Be applicable to can regulate lifting inclination angle, the advantage of raising the efficiency when building berth main frame is installed.
Accompanying drawing explanation
Fig. 1 is the front elevation that the utility model hangs row.
Fig. 2 is the birds-eye view that the utility model hangs row.
Fig. 3 is the A-A cutaway view of Fig. 1.
Wherein:
Girder 1
Left end fixed pulley group 2
Right-hand member fixed pulley group 3
Hanger 4
Dead sheave group 5
First fixed pulley group 6
Second fixed pulley group 7
3rd fixed pulley group 8
Connect assembly pulley 9
Running block 10, moving pulley bracket 10.1, pipe link 10.2, upper movable pulley 10.3, lower fixed pulley 10.4
The row of hanging 11.
Detailed description of the invention
See Fig. 1 ~ Fig. 3, the one that the utility model relates to hangs row, and it comprises girder 1, and girder 1 is made up of the connecting panel between two pieces, front and back heavy steel plate and two pieces of heavy steel plate.
The inside, two ends, left and right of described girder 1 is respectively arranged with left end fixed pulley group 2 and right-hand member fixed pulley group 3, left end fixed pulley group 2 comprise one be communicated with before and after the left fixed shaft of two pieces of heavy steel plate and front and back be arranged in two left end fixed pulleys on left fixed shaft, right-hand member fixed pulley group 3 comprise one be communicated with before and after the right fixed shaft of two pieces of heavy steel plate and front and back be arranged in two right-hand member fixed pulleys on right fixed shaft.
Heavy steel plate top, two pieces, front and back in the middle part of described girder 1 is provided with hanger 4, hanger 4 is provided with two lifting hole(eyelet)s that left and right is arranged.
The middle part of described girder 1 is disposed with dead sheave group 5 from left to right, first fixed pulley group 6, second fixed pulley group 7, 3rd fixed pulley group 8 and connection assembly pulley 9, dead sheave group 5, first fixed pulley group 6, second fixed pulley group 7, a running block 10 is provided with from left to right between 3rd fixed pulley group 8 and connection assembly pulley 9, add up to four groups of running blocks 10, first fixed pulley group 6, second fixed pulley group 7, the height of the 3rd fixed pulley group 8 and connection assembly pulley 9 is consistent, the height of dead sheave group 5 is higher than the first fixed pulley group 6, second fixed pulley group 7, the height of the 3rd fixed pulley group 8 and connection assembly pulley 9, the height of running block 10 is lower than the first fixed pulley group 6, second fixed pulley group 7, the height of the 3rd fixed pulley group 8 and connection assembly pulley 9.Steel cable 11 is had dead sheave group 5, first fixed pulley group 6, second fixed pulley group 7, the 3rd fixed pulley group 8, connection assembly pulley 9 and four groups of running blocks 10 to be connected successively.Wherein dead sheave group 5 comprises two dead sheaves be arranged in through the anchor shaft of the two pieces of heavy steel plate in front and back and front and back on anchor shaft, two dead sheaves lay respectively at the front and back of girder 1, first fixed pulley group 6, second fixed pulley group 7 and the 3rd fixed pulley group 8 are identical structure, this structure comprises two fixed pulleys be arranged in through the fixed pulley axis of the two pieces of heavy steel plate in front and back and front and back on fixed pulley axis, two fixed pulleys lay respectively at the front and back of girder 1, connect assembly pulley 9 and comprise two pieces, the left and right connecting panel be longitudinally arranged in girder 1, before and after between two pieces of connecting panels, two transverse axis are all set, two transverse axis are arranged two groups and connect fixed pulley.The two groups of moving pulley brackets 10.1 arranged before and after running block 10 comprises, pipe link 10.2 is connected with between two groups of moving pulley brackets 10.1, the top of moving pulley bracket 10.1 is provided with movable pulley 10.3, and the bottom of moving pulley bracket 10.1 is provided with lower fixed pulley 10.4.
One end of steel rope 11 is fixed on a dead sheave in dead sheave group 5 front by shackle, and then steel rope 11 walks around the upper movable pulley 10.3 in first group of running block 10 front successively, the fixed pulley in the first fixed pulley group 6 front, the upper movable pulley 10.3 in second group of running block 10 front, the fixed pulley in the second fixed pulley group 7 front, the upper movable pulley 10.3 in the 3rd group of running block 10 front, the fixed pulley in the 3rd fixed pulley group 6 front, the upper movable pulley 10.3 in the 4th group of running block 10 front, connect the connection fixed pulley in assembly pulley 9 front, connect the connection fixed pulley at assembly pulley 9 rear, the upper movable pulley 10.3 at the 4th group of running block 10 rear, the fixed pulley at the 3rd fixed pulley group 6 rear, the upper movable pulley 10.3 at the 3rd group of running block 10 rear, the fixed pulley at the second fixed pulley group 7 rear, the upper movable pulley 10.3 at second group of running block 10 rear, the fixed pulley at the first fixed pulley group 6 rear and the upper movable pulley 10.3 at first group of running block 10 rear, be then fixed on the other end of steel rope 11 on the dead sheave at dead sheave group 5 rear by shackle.
During use, on hanger 4, wear connecting steel wire ropes as required or winding connecting steel wire ropes on the lower fixed pulley 10.4 of left end fixed pulley group 2, right-hand member fixed pulley group 3 and four groups of running blocks 10.

Claims (4)

1. the row of hanging, it comprises girder (1), it is characterized in that the inside, two ends, left and right of described girder (1) is respectively arranged with left end fixed pulley group (2) and right-hand member fixed pulley group (3), described girder (1) middle part is provided with hanger (4), the middle part of described girder (1) is disposed with dead sheave group (5) from left to right, first fixed pulley group (6), second fixed pulley group (7), 3rd fixed pulley group (8) and connection assembly pulley (9), dead sheave group (5), first fixed pulley group (6), second fixed pulley group (7), a running block (10) is provided with from left to right between 3rd fixed pulley group (8) and connection assembly pulley (9), add up to four groups of running blocks (10), there is steel cable (11) successively by dead sheave group (5), first fixed pulley group (6), second fixed pulley group (7), 3rd fixed pulley group (8), connect assembly pulley (9) and four groups of running blocks (10) connections, two groups of moving pulley brackets (10.1) of arranging before and after running block (10) comprises, pipe link (10.2) is connected with between two groups of moving pulley brackets (10.1), the top of moving pulley bracket (10.1) is provided with movable pulley (10.3), the bottom of moving pulley bracket (10.1) is provided with lower fixed pulley (10.4).
2. one according to claim 1 hangs row, it is characterized in that girder (1) is made up of the connecting panel between two pieces, front and back heavy steel plate and two pieces of heavy steel plate.
3. one according to claim 2 hangs row, it is characterized in that dead sheave group (5) comprises two dead sheaves be arranged in through the anchor shaft of the two pieces of heavy steel plate in front and back and front and back on anchor shaft, two dead sheaves lay respectively at the front and back of girder (1), first fixed pulley group (6), second fixed pulley group (7) and the 3rd fixed pulley group (8) are identical structure, this structure comprises two fixed pulleys be arranged in through the fixed pulley axis of the two pieces of heavy steel plate in front and back and front and back on fixed pulley axis, two fixed pulleys lay respectively at the front and back of girder (1), connect assembly pulley (9) and comprise two pieces, the left and right connecting panel be longitudinally arranged in girder (1), before and after between two pieces of connecting panels, two transverse axis are all set, two transverse axis are arranged two groups and connect fixed pulley.
4. the one according to Claims 2 or 3 hangs row, it is characterized in that left end fixed pulley group (2) comprise one be communicated with before and after the left fixed shaft of two pieces of heavy steel plate and front and back be arranged in two left end fixed pulleys on left fixed shaft, right-hand member fixed pulley group (3) comprise one be communicated with before and after the right fixed shaft of two pieces of heavy steel plate and front and back be arranged in two right-hand member fixed pulleys on right fixed shaft.
CN201520214288.2U 2015-04-11 2015-04-11 The row of hanging Expired - Fee Related CN204624958U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520214288.2U CN204624958U (en) 2015-04-11 2015-04-11 The row of hanging

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520214288.2U CN204624958U (en) 2015-04-11 2015-04-11 The row of hanging

Publications (1)

Publication Number Publication Date
CN204624958U true CN204624958U (en) 2015-09-09

Family

ID=54044007

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520214288.2U Expired - Fee Related CN204624958U (en) 2015-04-11 2015-04-11 The row of hanging

Country Status (1)

Country Link
CN (1) CN204624958U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106545170A (en) * 2015-09-21 2017-03-29 上海公路桥梁(集团)有限公司 Rod member hoisting method
CN109969927A (en) * 2019-04-23 2019-07-05 上海外高桥造船有限公司 A kind of hanging row and its application method
CN112456305A (en) * 2020-12-02 2021-03-09 上海江南长兴造船有限责任公司 Linear segmented turning-over method

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106545170A (en) * 2015-09-21 2017-03-29 上海公路桥梁(集团)有限公司 Rod member hoisting method
CN106545170B (en) * 2015-09-21 2019-03-19 上海公路桥梁(集团)有限公司 Rod piece hoisting method
CN109969927A (en) * 2019-04-23 2019-07-05 上海外高桥造船有限公司 A kind of hanging row and its application method
CN109969927B (en) * 2019-04-23 2020-05-15 上海外高桥造船有限公司 Hanging row and using method thereof
CN112456305A (en) * 2020-12-02 2021-03-09 上海江南长兴造船有限责任公司 Linear segmented turning-over method

Similar Documents

Publication Publication Date Title
CN201545635U (en) Holding rod with double flat arms
CN203820281U (en) Hanger for prefabricating building component pulley block
CN203143877U (en) Elevator machine room arrangement structure
CN205346612U (en) Many hoisting points of integral component of building assembly hoist and mount automatic balance hoist
CN205387439U (en) Mast hoisting accessory
CN204624958U (en) The row of hanging
CN204917648U (en) Turbine rotor lifts by crane instrument
CN106758860B (en) Across the cable walking cord clip handling mounting device of one kind and method
CN100567129C (en) A kind of hoisting device for loop wheel machine
CN205034918U (en) Villa elevator knapsack elevator sedan -chair frame
CN109853393A (en) A kind of the hanging cable construction system and its construction method of king-tower vertical transfer cable-stayed bridge
CN101660295B (en) Hoisting method of arch bridge arch rib or beam body along bridge direction
CN208932792U (en) A kind of Prefabricated stacking floor demoulding lifting hanger
CN203295024U (en) Multi-rope self-balancing hoisting device
CN204624959U (en) Building berth main frame installation hoisting structure
CN101863423B (en) Steel box beam cable carrying lifter for construction of suspension bridge
CN202030434U (en) Large-span whole-section hoisting sling for steel box girder
CN204624901U (en) Two steel band drives villa elevator
CN202116184U (en) Multipoint self-balancing lifting appliance of cable crane
CN203402809U (en) Three-group vertical connection pulley block series connection type hanging row
CN105329766A (en) Automatic balance type lifting beam
CN206692241U (en) A kind of cable crane tackling system of serial power and double lifting point
CN203667795U (en) Suspensory rigging adopting series connection of five groups of vertically connected pulley blocks
CN107311048A (en) Cable crane
CN203079490U (en) Counterweight device for elevator

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150909

Termination date: 20210411

CF01 Termination of patent right due to non-payment of annual fee