CN204624958U - The row of hanging - Google Patents
The row of hanging Download PDFInfo
- Publication number
- CN204624958U CN204624958U CN201520214288.2U CN201520214288U CN204624958U CN 204624958 U CN204624958 U CN 204624958U CN 201520214288 U CN201520214288 U CN 201520214288U CN 204624958 U CN204624958 U CN 204624958U
- Authority
- CN
- China
- Prior art keywords
- fixed pulley
- group
- pulley group
- fixed
- pieces
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
The utility model relates to one and hangs row, it comprises girder (1), it is characterized in that the middle part of described girder (1) is disposed with dead sheave group (5) from left to right, first fixed pulley group (6), second fixed pulley group (7), 3rd fixed pulley group (8) and connection assembly pulley (9), dead sheave group (5), first fixed pulley group (6), second fixed pulley group (7), a running block (10) is provided with from left to right between 3rd fixed pulley group (8) and connection assembly pulley (9), there is steel cable (11) successively by dead sheave group (5), first fixed pulley group (6), second fixed pulley group (7), 3rd fixed pulley group (8), connect assembly pulley (9) and four groups of running blocks (10) connections.The utility model has when being applicable to large-scale segmental hoisting each suspension centre can be made unanimously stressed, ensures safety; Be applicable to can regulate lifting inclination angle, the advantage of raising the efficiency when building berth main frame is installed.
Description
Technical field
The utility model relates to one and hangs row.
Background technology
The important corollary equipment that the row of hanging is large-scale segmental hoisting, building berth main frame is installed.
The lifting of two aspects below the row's of hanging main services:
1, the lifting of large-scale segmentation
For pursuing Speed of Shipbuilding faster, total set of segmentation weight is now increasing, and large-scale segmental hoisting need arrange multiple hanger, tradition lifting time can not ensure that each suspension centre is unanimously stressed, when local certain suspension centre stressed excessive time, to lifting safety have certain influence.
2, building berth main frame is installed
The installation of building berth main frame is the installation of important main equipment on ship, and to being lifted with higher requirement, building berth has certain inclination angle, and needs main frame parallel with main engine seating when main frame is installed, and tradition lifting is difficult to reach.
Therefore seek each suspension centre can be made unanimously stressed when one is applicable to large-scale segmental hoisting, ensure safety; Be applicable to can regulate lifting inclination angle when building berth main frame is installed, the row of hanging raised the efficiency is particularly important.
Summary of the invention
The purpose of this utility model is to overcome above-mentioned deficiency, each suspension centre can be made unanimously stressed when providing one to be applicable to large-scale segmental hoisting, ensures safety; Be applicable to can regulate lifting inclination angle, the row of hanging raised the efficiency when building berth main frame is installed.
The purpose of this utility model is achieved in that
One hangs row, it comprises girder, it is characterized in that the inside, two ends, left and right of described girder is respectively arranged with left end fixed pulley group and right-hand member fixed pulley group, hanger is provided with in the middle part of described girder, the middle part of described girder is disposed with dead sheave group from left to right, first fixed pulley group, second fixed pulley group, 3rd fixed pulley group and connection assembly pulley, dead sheave group, first fixed pulley group, second fixed pulley group, a running block is provided with from left to right between 3rd fixed pulley group and connection assembly pulley, add up to four groups of running blocks, there is steel cable successively by dead sheave group, first fixed pulley group, second fixed pulley group, 3rd fixed pulley group, connect assembly pulley and four groups of running blocks connections, the two groups of moving pulley brackets arranged before and after running block comprises, pipe link is connected with between two groups of moving pulley brackets, the top of moving pulley bracket is provided with movable pulley, the bottom of moving pulley bracket is provided with lower fixed pulley.
Preferred as one, girder is made up of the connecting panel between two pieces, front and back heavy steel plate and two pieces of heavy steel plate.
Preferred as one, dead sheave group comprises two dead sheaves be arranged in through the anchor shaft of the two pieces of heavy steel plate in front and back and front and back on anchor shaft, two dead sheaves lay respectively at the front and back of girder, first fixed pulley group, second fixed pulley group and the 3rd fixed pulley group are identical structure, this structure comprises two fixed pulleys be arranged in through the fixed pulley axis of the two pieces of heavy steel plate in front and back and front and back on fixed pulley axis, two fixed pulleys lay respectively at the front and back of girder, connect assembly pulley and comprise two pieces, the left and right connecting panel be longitudinally arranged in girder, before and after between two pieces of connecting panels, two transverse axis are all set, two transverse axis are arranged two groups and connect fixed pulley.
Preferred as one, left end fixed pulley group comprise one be communicated with before and after the left fixed shaft of two pieces of heavy steel plate and front and back be arranged in two left end fixed pulleys on left fixed shaft, right-hand member fixed pulley group comprise one be communicated with before and after the right fixed shaft of two pieces of heavy steel plate and front and back be arranged in two right-hand member fixed pulleys on right fixed shaft.
Compared with prior art, the beneficial effects of the utility model are:
The utility model has when being applicable to large-scale segmental hoisting each suspension centre can be made unanimously stressed, ensures safety; Be applicable to can regulate lifting inclination angle, the advantage of raising the efficiency when building berth main frame is installed.
Accompanying drawing explanation
Fig. 1 is the front elevation that the utility model hangs row.
Fig. 2 is the birds-eye view that the utility model hangs row.
Fig. 3 is the A-A cutaway view of Fig. 1.
Wherein:
Girder 1
Left end fixed pulley group 2
Right-hand member fixed pulley group 3
Hanger 4
Dead sheave group 5
First fixed pulley group 6
Second fixed pulley group 7
3rd fixed pulley group 8
Connect assembly pulley 9
Running block 10, moving pulley bracket 10.1, pipe link 10.2, upper movable pulley 10.3, lower fixed pulley 10.4
The row of hanging 11.
Detailed description of the invention
See Fig. 1 ~ Fig. 3, the one that the utility model relates to hangs row, and it comprises girder 1, and girder 1 is made up of the connecting panel between two pieces, front and back heavy steel plate and two pieces of heavy steel plate.
The inside, two ends, left and right of described girder 1 is respectively arranged with left end fixed pulley group 2 and right-hand member fixed pulley group 3, left end fixed pulley group 2 comprise one be communicated with before and after the left fixed shaft of two pieces of heavy steel plate and front and back be arranged in two left end fixed pulleys on left fixed shaft, right-hand member fixed pulley group 3 comprise one be communicated with before and after the right fixed shaft of two pieces of heavy steel plate and front and back be arranged in two right-hand member fixed pulleys on right fixed shaft.
Heavy steel plate top, two pieces, front and back in the middle part of described girder 1 is provided with hanger 4, hanger 4 is provided with two lifting hole(eyelet)s that left and right is arranged.
The middle part of described girder 1 is disposed with dead sheave group 5 from left to right, first fixed pulley group 6, second fixed pulley group 7, 3rd fixed pulley group 8 and connection assembly pulley 9, dead sheave group 5, first fixed pulley group 6, second fixed pulley group 7, a running block 10 is provided with from left to right between 3rd fixed pulley group 8 and connection assembly pulley 9, add up to four groups of running blocks 10, first fixed pulley group 6, second fixed pulley group 7, the height of the 3rd fixed pulley group 8 and connection assembly pulley 9 is consistent, the height of dead sheave group 5 is higher than the first fixed pulley group 6, second fixed pulley group 7, the height of the 3rd fixed pulley group 8 and connection assembly pulley 9, the height of running block 10 is lower than the first fixed pulley group 6, second fixed pulley group 7, the height of the 3rd fixed pulley group 8 and connection assembly pulley 9.Steel cable 11 is had dead sheave group 5, first fixed pulley group 6, second fixed pulley group 7, the 3rd fixed pulley group 8, connection assembly pulley 9 and four groups of running blocks 10 to be connected successively.Wherein dead sheave group 5 comprises two dead sheaves be arranged in through the anchor shaft of the two pieces of heavy steel plate in front and back and front and back on anchor shaft, two dead sheaves lay respectively at the front and back of girder 1, first fixed pulley group 6, second fixed pulley group 7 and the 3rd fixed pulley group 8 are identical structure, this structure comprises two fixed pulleys be arranged in through the fixed pulley axis of the two pieces of heavy steel plate in front and back and front and back on fixed pulley axis, two fixed pulleys lay respectively at the front and back of girder 1, connect assembly pulley 9 and comprise two pieces, the left and right connecting panel be longitudinally arranged in girder 1, before and after between two pieces of connecting panels, two transverse axis are all set, two transverse axis are arranged two groups and connect fixed pulley.The two groups of moving pulley brackets 10.1 arranged before and after running block 10 comprises, pipe link 10.2 is connected with between two groups of moving pulley brackets 10.1, the top of moving pulley bracket 10.1 is provided with movable pulley 10.3, and the bottom of moving pulley bracket 10.1 is provided with lower fixed pulley 10.4.
One end of steel rope 11 is fixed on a dead sheave in dead sheave group 5 front by shackle, and then steel rope 11 walks around the upper movable pulley 10.3 in first group of running block 10 front successively, the fixed pulley in the first fixed pulley group 6 front, the upper movable pulley 10.3 in second group of running block 10 front, the fixed pulley in the second fixed pulley group 7 front, the upper movable pulley 10.3 in the 3rd group of running block 10 front, the fixed pulley in the 3rd fixed pulley group 6 front, the upper movable pulley 10.3 in the 4th group of running block 10 front, connect the connection fixed pulley in assembly pulley 9 front, connect the connection fixed pulley at assembly pulley 9 rear, the upper movable pulley 10.3 at the 4th group of running block 10 rear, the fixed pulley at the 3rd fixed pulley group 6 rear, the upper movable pulley 10.3 at the 3rd group of running block 10 rear, the fixed pulley at the second fixed pulley group 7 rear, the upper movable pulley 10.3 at second group of running block 10 rear, the fixed pulley at the first fixed pulley group 6 rear and the upper movable pulley 10.3 at first group of running block 10 rear, be then fixed on the other end of steel rope 11 on the dead sheave at dead sheave group 5 rear by shackle.
During use, on hanger 4, wear connecting steel wire ropes as required or winding connecting steel wire ropes on the lower fixed pulley 10.4 of left end fixed pulley group 2, right-hand member fixed pulley group 3 and four groups of running blocks 10.
Claims (4)
1. the row of hanging, it comprises girder (1), it is characterized in that the inside, two ends, left and right of described girder (1) is respectively arranged with left end fixed pulley group (2) and right-hand member fixed pulley group (3), described girder (1) middle part is provided with hanger (4), the middle part of described girder (1) is disposed with dead sheave group (5) from left to right, first fixed pulley group (6), second fixed pulley group (7), 3rd fixed pulley group (8) and connection assembly pulley (9), dead sheave group (5), first fixed pulley group (6), second fixed pulley group (7), a running block (10) is provided with from left to right between 3rd fixed pulley group (8) and connection assembly pulley (9), add up to four groups of running blocks (10), there is steel cable (11) successively by dead sheave group (5), first fixed pulley group (6), second fixed pulley group (7), 3rd fixed pulley group (8), connect assembly pulley (9) and four groups of running blocks (10) connections, two groups of moving pulley brackets (10.1) of arranging before and after running block (10) comprises, pipe link (10.2) is connected with between two groups of moving pulley brackets (10.1), the top of moving pulley bracket (10.1) is provided with movable pulley (10.3), the bottom of moving pulley bracket (10.1) is provided with lower fixed pulley (10.4).
2. one according to claim 1 hangs row, it is characterized in that girder (1) is made up of the connecting panel between two pieces, front and back heavy steel plate and two pieces of heavy steel plate.
3. one according to claim 2 hangs row, it is characterized in that dead sheave group (5) comprises two dead sheaves be arranged in through the anchor shaft of the two pieces of heavy steel plate in front and back and front and back on anchor shaft, two dead sheaves lay respectively at the front and back of girder (1), first fixed pulley group (6), second fixed pulley group (7) and the 3rd fixed pulley group (8) are identical structure, this structure comprises two fixed pulleys be arranged in through the fixed pulley axis of the two pieces of heavy steel plate in front and back and front and back on fixed pulley axis, two fixed pulleys lay respectively at the front and back of girder (1), connect assembly pulley (9) and comprise two pieces, the left and right connecting panel be longitudinally arranged in girder (1), before and after between two pieces of connecting panels, two transverse axis are all set, two transverse axis are arranged two groups and connect fixed pulley.
4. the one according to Claims 2 or 3 hangs row, it is characterized in that left end fixed pulley group (2) comprise one be communicated with before and after the left fixed shaft of two pieces of heavy steel plate and front and back be arranged in two left end fixed pulleys on left fixed shaft, right-hand member fixed pulley group (3) comprise one be communicated with before and after the right fixed shaft of two pieces of heavy steel plate and front and back be arranged in two right-hand member fixed pulleys on right fixed shaft.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520214288.2U CN204624958U (en) | 2015-04-11 | 2015-04-11 | The row of hanging |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520214288.2U CN204624958U (en) | 2015-04-11 | 2015-04-11 | The row of hanging |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204624958U true CN204624958U (en) | 2015-09-09 |
Family
ID=54044007
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520214288.2U Expired - Fee Related CN204624958U (en) | 2015-04-11 | 2015-04-11 | The row of hanging |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204624958U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106545170A (en) * | 2015-09-21 | 2017-03-29 | 上海公路桥梁(集团)有限公司 | Rod member hoisting method |
CN109969927A (en) * | 2019-04-23 | 2019-07-05 | 上海外高桥造船有限公司 | A kind of hanging row and its application method |
CN112456305A (en) * | 2020-12-02 | 2021-03-09 | 上海江南长兴造船有限责任公司 | Linear segmented turning-over method |
-
2015
- 2015-04-11 CN CN201520214288.2U patent/CN204624958U/en not_active Expired - Fee Related
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106545170A (en) * | 2015-09-21 | 2017-03-29 | 上海公路桥梁(集团)有限公司 | Rod member hoisting method |
CN106545170B (en) * | 2015-09-21 | 2019-03-19 | 上海公路桥梁(集团)有限公司 | Rod piece hoisting method |
CN109969927A (en) * | 2019-04-23 | 2019-07-05 | 上海外高桥造船有限公司 | A kind of hanging row and its application method |
CN109969927B (en) * | 2019-04-23 | 2020-05-15 | 上海外高桥造船有限公司 | Hanging row and using method thereof |
CN112456305A (en) * | 2020-12-02 | 2021-03-09 | 上海江南长兴造船有限责任公司 | Linear segmented turning-over method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201545635U (en) | Holding rod with double flat arms | |
CN203820281U (en) | Hanger for prefabricating building component pulley block | |
CN203143877U (en) | Elevator machine room arrangement structure | |
CN205346612U (en) | Many hoisting points of integral component of building assembly hoist and mount automatic balance hoist | |
CN205387439U (en) | Mast hoisting accessory | |
CN204624958U (en) | The row of hanging | |
CN204917648U (en) | Turbine rotor lifts by crane instrument | |
CN106758860B (en) | Across the cable walking cord clip handling mounting device of one kind and method | |
CN100567129C (en) | A kind of hoisting device for loop wheel machine | |
CN205034918U (en) | Villa elevator knapsack elevator sedan -chair frame | |
CN109853393A (en) | A kind of the hanging cable construction system and its construction method of king-tower vertical transfer cable-stayed bridge | |
CN101660295B (en) | Hoisting method of arch bridge arch rib or beam body along bridge direction | |
CN208932792U (en) | A kind of Prefabricated stacking floor demoulding lifting hanger | |
CN203295024U (en) | Multi-rope self-balancing hoisting device | |
CN204624959U (en) | Building berth main frame installation hoisting structure | |
CN101863423B (en) | Steel box beam cable carrying lifter for construction of suspension bridge | |
CN202030434U (en) | Large-span whole-section hoisting sling for steel box girder | |
CN204624901U (en) | Two steel band drives villa elevator | |
CN202116184U (en) | Multipoint self-balancing lifting appliance of cable crane | |
CN203402809U (en) | Three-group vertical connection pulley block series connection type hanging row | |
CN105329766A (en) | Automatic balance type lifting beam | |
CN206692241U (en) | A kind of cable crane tackling system of serial power and double lifting point | |
CN203667795U (en) | Suspensory rigging adopting series connection of five groups of vertically connected pulley blocks | |
CN107311048A (en) | Cable crane | |
CN203079490U (en) | Counterweight device for elevator |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20150909 Termination date: 20210411 |
|
CF01 | Termination of patent right due to non-payment of annual fee |