CN109853393A - A kind of the hanging cable construction system and its construction method of king-tower vertical transfer cable-stayed bridge - Google Patents

A kind of the hanging cable construction system and its construction method of king-tower vertical transfer cable-stayed bridge Download PDF

Info

Publication number
CN109853393A
CN109853393A CN201910208308.8A CN201910208308A CN109853393A CN 109853393 A CN109853393 A CN 109853393A CN 201910208308 A CN201910208308 A CN 201910208308A CN 109853393 A CN109853393 A CN 109853393A
Authority
CN
China
Prior art keywords
tower
cable
king
vertical transfer
stayed bridge
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910208308.8A
Other languages
Chinese (zh)
Inventor
廖辉红
龙组游
唐艳
刘德坤
曹选辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hunan Union Intelligent Technology Co Ltd
Original Assignee
Hunan Union Intelligent Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hunan Union Intelligent Technology Co Ltd filed Critical Hunan Union Intelligent Technology Co Ltd
Priority to CN201910208308.8A priority Critical patent/CN109853393A/en
Publication of CN109853393A publication Critical patent/CN109853393A/en
Pending legal-status Critical Current

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The invention discloses a kind of hanging cable construction methods of king-tower vertical transfer cable-stayed bridge.The hanging cable construction method of the king-tower vertical transfer cable-stayed bridge is the following steps are included: open up the fixed device mounting hole in tower end in overhead;Earth anchor is installed;The fixed device in tower end and load-bearing cableway steel strand wires are installed;Angle pulley, promotion hoist engine and rack winch in installation fulcrum tooling, tower;After king-tower vertical transfer, load-bearing cableway steel strand wires are connect to simultaneously tensioning with earth anchor;Suspension cable pulls out anchor head, connects with haulage cable;It promotes hoist engine and promotes suspension cable, rack winch cooperation guiding completes the installation of tower end;Carry out aerial exhibition rope;The beam-ends anchor head of suspension cable is pulled out by traction device, completes the installation of suspension cable beam-ends;It repeats, remaining suspension cable is installed.The invention discloses a kind of hanging cable construction systems of king-tower vertical transfer cable-stayed bridge.The hanging cable construction system and its construction method of king-tower vertical transfer cable-stayed bridge provided by the invention can overcome live unfavorable conditions, reduce construction risk, reduce expense.

Description

A kind of the hanging cable construction system and its construction method of king-tower vertical transfer cable-stayed bridge
Technical field
The present invention relates to CONSTRUCTION OF CABLE-STAYED BRIDGE technical fields, specifically, being related to a kind of hanging cable construction of king-tower vertical transfer cable-stayed bridge System and its construction method.
Background technique
Cable-stayed bridge is also known as Cable stayed bridge, can be divided into steel deck cable stayed bridge, in conjunction with girder stayed-cable bridge and coagulation by material difference used in beam Native girder stayed-cable bridge.Cable-stayed bridge is mainly made of Sarasota, girder, suspension cable, is directly to be pulled in girder on bridge tower with many drag-lines A kind of bridge, be by the tower of pressure-bearing, the rope of tension and to hold a kind of structural system that curved beam body combines.Cable-stayed bridge is one Kind of self-anchored type system, the horizontal force of suspension cable by joist support by.Beam is further supported at other than being supported on pier by king-post extraction On suspension cable.More and more Cable stayed Bridge Main Towers use head tower structure, and since head tower self weight is lighter, vertical transfer construction is can be used in king-tower And it shapes.
After Construction of Pylon, hanging cable of stay cable construction is carried out, traditional hanging cable method generally uses tower crane or truck crane Lifting hanging cable is carried out, or sets up scaffold auxiliary messenger wire, or mounting suspension carries out lifting hanging cable at the top of king-tower.
According to tower crane lifting method carry out installation suspension cable, it is desirable that scene has tower crane mounting condition, to ground into Row consolidation process, tower crane need to be attached on king-tower, and hanging cable, which finishes, to repair king-tower.
Installation suspension cable is carried out according to truck crane, when mounting height is higher, the truck crane tonnage needed is larger, lease Expense is relatively high, and there are biggish insecurity factors for truck crane itself.
According to scaffold auxiliary messenger wire, scaffolding steel pipe lease expenses is high, and scaffold building risk is big, need to depend on master Tower needs to repair king-tower after construction.
Hanging cable construction is carried out according to the mode in king-tower mounting suspension, needs to ask the item at the top of king-tower with mounting suspension Part, and need additional suspender that hanger is lifted upper tower top and install.
Method more than carries out hanging cable construction, exist have ready conditions do not allow, security risk is high, the drawbacks such as costly.
Summary of the invention
In order to solve the construction of above-mentioned hanging cable exist have ready conditions do not allow, security risk is high, costly technical problem, this hair It is bright that the hanging cable construction system and its construction method of a kind of king-tower vertical transfer cable-stayed bridge are provided, live unfavorable conditions can not only be overcome, Construction risk, reduction expense can also be reduced.
The present invention provides a kind of hanging cable construction methods of king-tower vertical transfer cable-stayed bridge, comprising the following steps:
Step 1: opening up the fixed device mounting hole in tower end respectively in the main span side of overhead and end bay side before king-tower is marched into the arena;
Step 2: installation earth anchor: earth anchor, and the earth anchor and the tower end is respectively set in the main span and end bay beam-ends of cable-stayed bridge Fixed device mounting hole is corresponding;
Step 3: the fixed device in tower end is mounted respectively to the fixed device mounting hole in tower end, then by track cable after king-tower is marched into the arena One end of road steel strand wires is connected with the fixed device in the tower end;
Step 4: angle pulley, promotion hoist engine and rack winch, described to mention in installation fulcrum tooling, tower before king-tower vertical transfer The end for rising the boom hoist cable of hoist engine is equipped with hoist cable folder living, and the haulage cable of the rack winch is to be installed First skew cables cableway pipe stretches out;
Step 5: the other end of the load-bearing cableway steel strand wires is connect with the earth anchor and tensioning, formation are held after king-tower vertical transfer Weight cableway;
Step 6: suspension cable is pulled out anchor head, and gripped with hoist cable work, by the haulage cable and the anchor head phase Connection;
Step 7: starting the promotion hoist engine, suspension cable is promoted, the rack winch cooperation guiding will be described Anchor head is sent into cableway pipe, screws on nut, completes the installation of tower end;
Step 8: hoist cable folder living is not pressed from both sides auxiliary stopper along suspension cable slide downward, while using breathing out, opened up in the air Rope;
Step 9: the beam-ends anchor head of suspension cable is pulled out cableway pipe by traction device, nut is screwed on, completes suspension cable beam-ends peace Dress;
Step 10: six ~ step 9 of repeating said steps, remaining suspension cable is installed.
In a kind of preferred embodiment of the hanging cable construction method of king-tower vertical transfer cable-stayed bridge provided by the invention, the step Four specifically: fulcrum tooling is mounted on the load-bearing cableway steel strand wires close to one end of the fixed device in the tower end;It will be in tower Angle pulley is mounted on the corresponding position of cableway pipe in tower;Hoist engine will be promoted and rack winch is separately mounted on bridge floor, And described the same side for promoting hoist engine and being located at king-tower with the fulcrum tooling, the rack winch are located at the another of king-tower Side;The boom hoist cable for promoting hoist engine passes through the fulcrum tooling, and its end is equipped with hoist cable folder living;The traction The haulage cable of hoist engine passes through king-tower, and stretches out from the first skew cables cableway pipe to be installed.
In a kind of preferred embodiment of the hanging cable construction method of king-tower vertical transfer cable-stayed bridge provided by the invention, the earth anchor 2 are respectively set in cable-stayed bridge main span and end bay beam-ends, main span side and end bay side of the fixed device in the tower end on king-tower top 2 are respectively set, and is corresponded with the earth anchor;Respectively with the load-bearing between the fixed device of the earth anchor and the tower end Cableway steel strand wires are connected, and the main span side of king-tower and end bay side is made respectively to form 2 load-bearing cableways.
The present invention also provides a kind of hanging cable construction system of king-tower vertical transfer cable-stayed bridge, including earth anchor, the fixed device in tower end, Angle pulley in load-bearing cableway steel strand wires, fulcrum tooling, promotion hoist engine, hoist cable folder living, rack winch and tower, the earth anchor It is respectively arranged on cable-stayed bridge main span and end bay beam-ends;The fixed device in the tower end is respectively arranged on main span side and end bay at the top of king-tower Side, and it is corresponding with the earth anchor;The both ends of the load-bearing cableway steel strand wires are separately connected the earth anchor and corresponding institute State the fixed device in tower end;The fulcrum tooling is fixedly arranged on the load-bearing cableway steel strand wires;It the promotion hoist engine and described leads Draw hoist engine to be set on bridge floor;Described the same side for promoting hoist engine and being located at king-tower with the fulcrum tooling, and the promotion Hoist engine and the fulcrum tooling correspond;The rack winch is located at the other side of king-tower;The promotion hoist engine Boom hoist cable passes through the fulcrum tooling, and the boom hoist cable end is equipped with hoist cable folder living;It is turned in the tower Pulley is set to inside king-tower, and corresponding with cableway pipe in king-tower, and the haulage cable of the rack winch is across described Angle pulley in tower.
In a kind of preferred embodiment of the hanging cable construction system of king-tower vertical transfer cable-stayed bridge provided by the invention, the earth anchor 2 are respectively set in cable-stayed bridge main span and end bay beam-ends, main span side and end bay side of the fixed device in the tower end on king-tower top 2 are respectively set, and the fixed device of the earth anchor and the tower end corresponds.
In a kind of preferred embodiment of the hanging cable construction system of king-tower vertical transfer cable-stayed bridge provided by the invention, the tower end Fixed device includes deck and sleeve, and one end of the deck is connected with the sleeve by pin shaft, the other end and king-tower tower Wall is fixedly connected.
In a kind of preferred embodiment of the hanging cable construction system of king-tower vertical transfer cable-stayed bridge provided by the invention, the load-bearing Cableway steel strand wires use φ 15.2mm steel strand wires.
In a kind of preferred embodiment of the hanging cable construction system of king-tower vertical transfer cable-stayed bridge provided by the invention, the fulcrum Tooling includes single hole anchor device, anti-sliding plug and fixed pulley, and the single hole anchor device is sheathed on the weighing cableway steel strand wires;It is described anti- Sliding plug is set to one end of the single hole anchor device;The fixed pulley is set to the lower section of the single hole anchor device.
In a kind of preferred embodiment of the hanging cable construction system of king-tower vertical transfer cable-stayed bridge provided by the invention, the hoist cable Folder living wears size of mouthful size less than the anchor head of suspension cable.
Compared to the prior art, the hanging cable construction system of king-tower vertical transfer cable-stayed bridge provided by the invention and its construction method tool Have following the utility model has the advantages that hanging cable construction does not have to Ground Treatment, without installing tower crane or use in the higher-height situation of hanging cable Truck crane can not only overcome live unfavorable conditions, moreover it is possible to reduce construction risk, reduction expense.
Detailed description of the invention
To describe the technical solutions in the embodiments of the present invention more clearly, make required in being described below to embodiment Attached drawing is briefly described, it should be apparent that, drawings in the following description are only some embodiments of the invention, for For those of ordinary skill in the art, without creative efforts, it can also be obtained according to these attached drawings other Attached drawing, in which:
Fig. 1 is the flow chart of the hanging cable construction method of king-tower vertical transfer cable-stayed bridge provided by the invention;
Fig. 2 is the overall structure diagram of the hanging cable construction system of king-tower vertical transfer cable-stayed bridge provided by the invention;
Fig. 3 is the structural schematic diagram of the fixed device in tower end of the hanging cable construction system of the cable-stayed bridge of king-tower vertical transfer shown in Fig. 2;
Fig. 4 is the enlarged drawing in the hanging cable construction system of the cable-stayed bridge of king-tower vertical transfer shown in Fig. 2 at A;
Fig. 5 is the enlarged drawing in the hanging cable construction system of the cable-stayed bridge of king-tower vertical transfer shown in Fig. 2 at B.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that the described embodiments are merely a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts all other Embodiment shall fall within the protection scope of the present invention.
Also referring to Fig. 1 ~ Fig. 5, wherein Fig. 1 is the hanging cable construction method of king-tower vertical transfer cable-stayed bridge provided by the invention Flow chart;Fig. 2 is the overall structure diagram of the hanging cable construction system of king-tower vertical transfer cable-stayed bridge provided by the invention;Fig. 3 is The structural schematic diagram of the fixed device in the tower end of the hanging cable construction system of the cable-stayed bridge of king-tower vertical transfer shown in Fig. 2;Fig. 4 is main shown in Fig. 2 Enlarged drawing in the hanging cable construction system of tower vertical transfer cable-stayed bridge at A;Fig. 5 is the hanging cable construction of the cable-stayed bridge of king-tower vertical transfer shown in Fig. 2 Enlarged drawing in system at B.The hanging cable construction system 1 of the king-tower vertical transfer cable-stayed bridge include earth anchor 11, the fixed device 12 in tower end, Load-bearing cableway steel strand wires 13, fulcrum tooling 14 are promoted to turn in hoist engine 15, hoist cable folder 16 living, rack winch 17 and tower and be slided Wheel 18, the earth anchor 11 is respectively arranged on cable-stayed bridge main span and end bay beam-ends;The fixed device 12 in the tower end is respectively arranged on king-tower 21 The main span side and end bay side at top, and it is corresponding with the earth anchor 11;The both ends of the load-bearing cableway steel strand wires 13 are separately connected The fixed device 12 of the earth anchor 11 and the corresponding tower end;The fulcrum tooling 14 is fixedly arranged on the load-bearing cableway steel and twists On line 13, for providing fulcrum for the promotion of suspension cable 22;The promotion hoist engine 15 and the rack winch 17 are set to On bridge floor;Described the same side for promoting hoist engine 15 and being located at king-tower 21 with the fulcrum tooling 14, and the promotion hoist engine 15 It is corresponded with the fulcrum tooling 14, the promotion for suspension cable 22 provides power;The rack winch 17 is located at king-tower 21 other side, and be arranged close to king-tower 21;The boom hoist cable 151 for promoting hoist engine 15 passes through the fulcrum tooling 14, and 151 end of the boom hoist cable is equipped with hoist cable folder 16 living, hoist cable folder 16 living can be along 22 free skating of suspension cable It is dynamic;Angle pulley 18 is set to inside king-tower 21 in the tower, and corresponding with cableway pipe in king-tower, and the rack winch 17 Haulage cable 171 pass through the tower in angle pulley 18, realize the haulage cable 171 in king-tower 21 smoothly turn To.
The earth anchor 11 is respectively set 2 in cable-stayed bridge main span and end bay beam-ends, and the fixed device 12 in the tower end is in king-tower The main span side and end bay side on 21 tops are respectively set 2, and the fixed device 12 of the earth anchor 11 and the tower end corresponds, institute It states and is connected respectively with the load-bearing cableway steel strand wires 13 between earth anchor 11 and the fixed device 12 in the tower end, make the master of king-tower 21 2 load-bearing cableways are respectively formed across side and end bay side.
The fixed device 12 in the tower end includes deck 121 and sleeve 123, one end of the deck 121 and the sleeve 123 It is connected by pin shaft 125, the other end is fixedly connected with 21 tower wall of king-tower.
The load-bearing cableway steel strand wires 13 use φ 15.2mm steel strand wires.
The fulcrum tooling 14 includes single hole anchor device 141, anti-sliding plug 143 and fixed pulley 145,141 sets of the single hole anchor device On the weighing cableway steel strand wires 13;The anti-sliding plug 143 is set to one end of the single hole anchor device 141;The fixed pulley 145 are set to the lower section of the single hole anchor device 141.
Hoist cable folder 16 living wears size of mouthful size less than the anchor head 221 of suspension cable 22, when hoist cable folder 16 living It cannot then continue to slide when sliding into the anchor head 221 of suspension cable 22, enable the mentioning with the boom hoist cable 151 of suspension cable 22 It rises and is lifted up.
The present invention also provides a kind of hanging cable construction methods of king-tower vertical transfer cable-stayed bridge, comprising the following steps:
Before S1, king-tower are marched into the arena, the fixed device mounting hole in tower end is opened up respectively in the main span side of 21 tower top of king-tower and end bay side;
S2, installation earth anchor 11: earth anchor 11, and the earth anchor 11 and the tower is respectively set in the main span and end bay beam-ends of cable-stayed bridge Hold fixed device mounting hole corresponding;
After S3, king-tower 21 are marched into the arena, the fixed device 12 in tower end is mounted respectively to the fixed device mounting hole in tower end, then by track cable One end of road steel strand wires 13 is connected with the fixed device 12 in the tower end;
Before S4,21 vertical transfer of king-tower, angle pulley 18, promotion hoist engine 15 and rack winch 17 in installation fulcrum tooling 14, tower, The end of the boom hoist cable 151 for promoting hoist engine 15 is equipped with hoist cable folder 16 living, the traction of the rack winch 17 Wirerope 171 is stretched out from the first skew cables cableway pipe to be installed;
Specifically, fulcrum tooling 14 is mounted on the load-bearing cableway steel strand wires 13 close to the one of the fixed device 12 in the tower end End;Angle pulley 18 in tower is mounted on the corresponding position of cableway pipe in tower;Hoist engine 15 will be promoted and rack winch 17 divides It is not mounted on bridge floor, and described the same side for promoting hoist engine 15 and being located at king-tower 21 with the fulcrum tooling 14, the traction Hoist engine 17 is located at the other side of king-tower 21;The boom hoist cable 151 for promoting hoist engine 15 passes through the fulcrum tooling 14, And its end is equipped with hoist cable folder 16 living;The haulage cable 171 of the rack winch 17 passes through king-tower 21, and to be installed The first skew cables cableway pipe stretch out;
After S5,21 vertical transfer of king-tower, the other end of the load-bearing cableway steel strand wires 13 is connect to simultaneously tensioning with the earth anchor 11, is formed Load-bearing cableway;
S6, suspension cable 22 is pulled out to anchor head 221, and is blocked with hoist cable folder 16 living, by the haulage cable 171 with it is described Anchor head 221 is connected;
The haulage cable 171 is connected with the anchor head 221, and traction guiding can be played when 22 tower end of suspension cable is installed Effect;
S7, the starting promotion hoist engine 15, suspension cable 22 is promoted, the cooperation of rack winch 17 guiding, by institute It states anchor head 221 and is sent into cableway pipe, screw on nut, complete the installation of tower end;
S8, hoist cable folder 16 living is not pressed from both sides into auxiliary stopper along 22 slide downward of suspension cable, while using breathing out, is opened up in the air Rope;
S9, the beam-ends anchor head of suspension cable 22 is pulled out by cableway pipe by traction device, screws on nut, complete suspension cable beam-ends peace Dress;
S10, the S6 ~ S9 is repeated, remaining suspension cable is installed.
The earth anchor 11 is respectively set 2 in cable-stayed bridge main span and end bay beam-ends, and the fixed device 12 in the tower end is in king-tower The main span side and end bay side on 21 tops are respectively set 2, and correspond with the earth anchor 11;The earth anchor 11 and the tower end It is connected respectively with the load-bearing cableway steel strand wires 13 between fixed device 12, forms the main span side of king-tower 21 and end bay side respectively 2 load-bearing cableways.
The hanging cable construction system and its construction method 1 of king-tower vertical transfer cable-stayed bridge provided by the invention have below beneficial to effect Fruit: in the higher-height situation of hanging cable, hanging cable construction does not have to Ground Treatment, without installing tower crane or using truck crane, not only Live unfavorable conditions can be overcome, moreover it is possible to reduce construction risk, reduction expense.
The above description is only an embodiment of the present invention, is not intended to limit the scope of the invention, all to utilize this hair Equivalent structure or equivalent flow shift made by bright specification and accompanying drawing content is applied directly or indirectly in other relevant skills Art field, is included within the scope of the present invention.

Claims (9)

1. a kind of hanging cable construction method of king-tower vertical transfer cable-stayed bridge, which comprises the following steps:
Step 1: opening up the fixed device mounting hole in tower end respectively in the main span side of overhead and end bay side before king-tower is marched into the arena;
Step 2: installation earth anchor: earth anchor, and the earth anchor and the tower end is respectively set in the main span and end bay beam-ends of cable-stayed bridge Fixed device mounting hole is corresponding;
Step 3: the fixed device in tower end is mounted respectively to the fixed device mounting hole in tower end, then by track cable after king-tower is marched into the arena One end of road steel strand wires is connected with the fixed device in the tower end;
Step 4: angle pulley, promotion hoist engine and rack winch, described to mention in installation fulcrum tooling, tower before king-tower vertical transfer The end for rising the boom hoist cable of hoist engine is equipped with hoist cable folder living, and the haulage cable of the rack winch is to be installed First skew cables cableway pipe stretches out;
Step 5: the other end of the load-bearing cableway steel strand wires is connect with the earth anchor and tensioning, formation are held after king-tower vertical transfer Weight cableway;
Step 6: suspension cable is pulled out anchor head, and gripped with hoist cable work, by the haulage cable and the anchor head phase Connection;
Step 7: starting the promotion hoist engine, suspension cable is promoted, the rack winch cooperation guiding will be described Anchor head is sent into cableway pipe, screws on nut, completes the installation of tower end;
Step 8: hoist cable folder living is not pressed from both sides auxiliary stopper along suspension cable slide downward, while using breathing out, opened up in the air Rope;
Step 9: the beam-ends anchor head of suspension cable is pulled out cableway pipe by traction device, nut is screwed on, completes suspension cable beam-ends peace Dress;
Step 10: six ~ step 9 of repeating said steps, remaining suspension cable is installed.
2. the hanging cable construction method of king-tower vertical transfer cable-stayed bridge according to claim 1, which is characterized in that the step 4 tool Body are as follows: fulcrum tooling is mounted on the load-bearing cableway steel strand wires close to one end of the fixed device in the tower end;It will be turned in tower Pulley is mounted on the corresponding position of cableway pipe in tower;Hoist engine will be promoted and rack winch is separately mounted on bridge floor, and institute It states and promotes the same side that hoist engine is located at king-tower with the fulcrum tooling, the rack winch is located at the other side of king-tower;Institute The boom hoist cable for promoting hoist engine is stated across the fulcrum tooling, and its end is equipped with hoist cable folder living;The traction elevator The haulage cable of machine passes through king-tower, and stretches out from the first skew cables cableway pipe to be installed.
3. the hanging cable construction method of king-tower vertical transfer cable-stayed bridge according to claim 1, which is characterized in that the earth anchor is oblique Bridge main span and end bay beam-ends is drawn to be respectively set 2, the fixed device in the tower end is distinguished in the main span side on king-tower top and end bay side Setting 2, and corresponded with the earth anchor;Respectively with the load-bearing cableway between the fixed device of the earth anchor and the tower end Steel strand wires are connected, and the main span side of king-tower and end bay side is made respectively to form 2 load-bearing cableways.
4. a kind of hanging cable construction system of king-tower vertical transfer cable-stayed bridge, which is characterized in that including earth anchor, tower end fixed device, load-bearing Angle pulley in cableway steel strand wires, fulcrum tooling, promotion hoist engine, hoist cable folder living, rack winch and tower, the earth anchor difference Set on cable-stayed bridge main span and end bay beam-ends;The fixed device in the tower end is respectively arranged on main span side and end bay side at the top of king-tower, and It is corresponding with the earth anchor;The both ends of the load-bearing cableway steel strand wires are separately connected the earth anchor and the corresponding tower end Fixed device;The fulcrum tooling is fixedly arranged on the load-bearing cableway steel strand wires;The promotion hoist engine and the traction elevator Machine is set on bridge floor;Described the same side for promoting hoist engine and being located at king-tower with the fulcrum tooling, and the promotion hoist engine It is corresponded with the fulcrum tooling;The rack winch is located at the other side of king-tower;The promotion steel for promoting hoist engine Cord passes through the fulcrum tooling, and the boom hoist cable end is equipped with hoist cable folder living;Angle pulley is set in the tower Inside king-tower, and it is corresponding with cableway pipe in king-tower, and the haulage cable of the rack winch passes through in the tower and turns To pulley.
5. the hanging cable construction system of king-tower vertical transfer cable-stayed bridge according to claim 4, which is characterized in that the earth anchor is oblique Bridge main span and end bay beam-ends is drawn to be respectively set 2, the fixed device in the tower end is distinguished in the main span side on king-tower top and end bay side Setting 2, and the fixed device of the earth anchor and the tower end corresponds.
6. the hanging cable construction system of king-tower vertical transfer cable-stayed bridge according to claim 4, which is characterized in that the tower end is fixed Device includes deck and sleeve, and one end of the deck is connected with the sleeve by pin shaft, and the other end and king-tower tower wall are solid Fixed connection.
7. the hanging cable construction system of king-tower vertical transfer cable-stayed bridge according to claim 4, which is characterized in that the load-bearing cableway Steel strand wires use φ 15.2mm steel strand wires.
8. the hanging cable construction system of king-tower vertical transfer cable-stayed bridge according to claim 4, which is characterized in that the fulcrum tooling Including single hole anchor device, anti-sliding plug and fixed pulley, the single hole anchor device is sheathed on the weighing cableway steel strand wires;The anti-sliding plug Set on one end of the single hole anchor device;The fixed pulley is set to the lower section of the single hole anchor device.
9. the hanging cable construction system of king-tower vertical transfer cable-stayed bridge according to claim 4, which is characterized in that hoist cable folder living Wear mouthful size less than suspension cable anchor head size.
CN201910208308.8A 2019-03-19 2019-03-19 A kind of the hanging cable construction system and its construction method of king-tower vertical transfer cable-stayed bridge Pending CN109853393A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910208308.8A CN109853393A (en) 2019-03-19 2019-03-19 A kind of the hanging cable construction system and its construction method of king-tower vertical transfer cable-stayed bridge

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910208308.8A CN109853393A (en) 2019-03-19 2019-03-19 A kind of the hanging cable construction system and its construction method of king-tower vertical transfer cable-stayed bridge

Publications (1)

Publication Number Publication Date
CN109853393A true CN109853393A (en) 2019-06-07

Family

ID=66901210

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910208308.8A Pending CN109853393A (en) 2019-03-19 2019-03-19 A kind of the hanging cable construction system and its construction method of king-tower vertical transfer cable-stayed bridge

Country Status (1)

Country Link
CN (1) CN109853393A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112575691A (en) * 2020-12-29 2021-03-30 中交二公局第二工程有限公司 Cable hanging system and method for single-column type cable tower cable-stayed bridge
CN113123240A (en) * 2021-04-12 2021-07-16 中国建筑第八工程局有限公司 Installation device for stay cable of special-shaped leaning tower and construction method thereof
CN113969546A (en) * 2021-11-11 2022-01-25 无锡金诚工程技术服务有限公司 Manned maintenance platform for external traction type stay cable
CN114481859A (en) * 2022-03-22 2022-05-13 中铁十一局集团有限公司 Method for hanging and replacing steel pipe arch of railway

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB218987A (en) * 1923-07-13 1925-09-07 Bleichert & Co Adolf Improvements in wire ropeways
CN102444086A (en) * 2011-10-14 2012-05-09 中铁大桥局股份有限公司 Cable hanging system for inclined stay cable of bridge and cable hanging method for inclined stay cable of bridge
CN103147404A (en) * 2013-04-02 2013-06-12 中铁大桥局股份有限公司 System and method for hanging stay cable at tower end of height limiting cable-stayed bridge
CN105442458A (en) * 2016-01-29 2016-03-30 中铁大桥(郑州)缆索有限公司 Method for hanging and installing stay cable of cable-stayed bridge special-shaped tower pillar
CN108149928A (en) * 2017-12-21 2018-06-12 中交路桥华南工程有限公司 The tower end installation method of suspension cable
CN209779465U (en) * 2019-03-19 2019-12-13 湖南联智智能科技有限公司 main tower erects cable-stay bridge's string cable construction system that changes

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB218987A (en) * 1923-07-13 1925-09-07 Bleichert & Co Adolf Improvements in wire ropeways
CN102444086A (en) * 2011-10-14 2012-05-09 中铁大桥局股份有限公司 Cable hanging system for inclined stay cable of bridge and cable hanging method for inclined stay cable of bridge
CN103147404A (en) * 2013-04-02 2013-06-12 中铁大桥局股份有限公司 System and method for hanging stay cable at tower end of height limiting cable-stayed bridge
CN105442458A (en) * 2016-01-29 2016-03-30 中铁大桥(郑州)缆索有限公司 Method for hanging and installing stay cable of cable-stayed bridge special-shaped tower pillar
CN108149928A (en) * 2017-12-21 2018-06-12 中交路桥华南工程有限公司 The tower end installation method of suspension cable
CN209779465U (en) * 2019-03-19 2019-12-13 湖南联智智能科技有限公司 main tower erects cable-stay bridge's string cable construction system that changes

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112575691A (en) * 2020-12-29 2021-03-30 中交二公局第二工程有限公司 Cable hanging system and method for single-column type cable tower cable-stayed bridge
CN112575691B (en) * 2020-12-29 2024-05-31 中交二公局第二工程有限公司 Single-column cable tower cable-stayed bridge cable hanging system and method
CN113123240A (en) * 2021-04-12 2021-07-16 中国建筑第八工程局有限公司 Installation device for stay cable of special-shaped leaning tower and construction method thereof
CN113969546A (en) * 2021-11-11 2022-01-25 无锡金诚工程技术服务有限公司 Manned maintenance platform for external traction type stay cable
CN114481859A (en) * 2022-03-22 2022-05-13 中铁十一局集团有限公司 Method for hanging and replacing steel pipe arch of railway

Similar Documents

Publication Publication Date Title
CN102444086B (en) Cable hanging system for inclined stay cable of bridge and cable hanging method for inclined stay cable of bridge
CN101476293B (en) Non-stand construction method for large bridge arch rib
CN202090286U (en) Traction system suitable for self-anchored type double cable plane suspension bridge
CN105442458B (en) Method for hanging and installing stay cable of cable-stayed bridge special-shaped tower pillar
CN109853393A (en) A kind of the hanging cable construction system and its construction method of king-tower vertical transfer cable-stayed bridge
CN105401523B (en) Hanging mounting method of long heavy stay cable under space limited condition
CN106013812B (en) A kind of two-way monolayer cable net structure without support high-altitude overhead cable construction method
CN102912730A (en) Hoisting construction method for single-rib closure rope of large-span reinforced concrete arch bridge
CN109610922B (en) Typical topography iron tower assemblage construction equipment
CN202530769U (en) Large span steel structure high-altitude subsection hoisting support system
CN110143525A (en) A kind of deck unit erection gantry for having wide-angle and swinging shifting and climbing capacity
CN212025936U (en) Equipment for mounting continuous steel strand stay cable at tower end of cable-stayed bridge
CN105060125B (en) High tower structure of cable crane and its method for dismounting
CN216235734U (en) Vertical transportation hoisting structure for curtain wall unit plate
CN107344697A (en) Cable boom hoisting
CN205421022U (en) Suspension bridge stiffening beam handing equipment that slides
CN107476195A (en) A kind of suspension bridge transports the fortune beam tackle system of stiff girder
CN201325826Y (en) Rock anchor beam hoisting device for underground power house
CN109898422A (en) Rope method for rapidly mounting between a kind of abnormal shape steel bridge tower tower
CN209128888U (en) Anchor head traction device after a kind of suspension bridge dorsal funciculus
CN209779465U (en) main tower erects cable-stay bridge's string cable construction system that changes
CN206769526U (en) Jack up Multifunctional creeping gin pole
CN109235284A (en) A kind of construction equipment and method of no hoist cable beam section
CN201171147Y (en) Clamp for vertically mounting ultra-high layer cable
CN201102869Y (en) Large arm device of midair-disassembling horizontal lazy-arm type tower crane

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination