CN204609830U - Device at the bottom of a kind of anti-blockage holes - Google Patents
Device at the bottom of a kind of anti-blockage holes Download PDFInfo
- Publication number
- CN204609830U CN204609830U CN201420869509.5U CN201420869509U CN204609830U CN 204609830 U CN204609830 U CN 204609830U CN 201420869509 U CN201420869509 U CN 201420869509U CN 204609830 U CN204609830 U CN 204609830U
- Authority
- CN
- China
- Prior art keywords
- material storage
- foreign material
- storage tube
- gate valve
- valve
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
Abstract
The utility model discloses device at the bottom of a kind of anti-blockage holes, comprise the gate valve be connected to bottom conveying pipeline, the foreign material storage tube be connected with described gate valve, the stop valve be connected with described foreign material storage tube, blanking tube connects Grouting Pipe, and described foreign material storage tube is provided with relief valve.The utility model can store foreign matter, stops that foreign matter enters Grouting Pipe, and safely and conveniently can take out obstruction.
Description
Technical field
The utility model relates to a kind of boring high pressure and to metal run out device for plugging, in particular device at the bottom of a kind of anti-blockage holes.
Background technology
Slip casting technology of harnessing the river threatens the important channel in coal seam as liberation by water, feasible, the economical rationality of possessing skills, safe and reliable feature, and its scope of application is very wide, shutoff can be destroyed the water flowing fractured zone and conduit pipe that cause by various geological structure; Can aquifer be transformed, make it to become aquitard; Primary and the secondary space of water barrier, crack can be reinforced, make it to become the fluid-tight rock mass that blocks water.
Grout transformation changes method and the means of rock mass (layer) hydrogeological conditions as a kind of will by people, general principle is slurries dehydration in the space originally occupied by water by note layer or passage, consolidation or gellings under certain pressure, certain hour effect, make Seed harvest or gel and Rock Mass form the entirety that blocks water, thus change the hydrogeological conditions being unfavorable for digging up mine.Aquifer transformation can be played to the slip casting of thin layer limestone, effect that water producing fractures shutoff and water barrier are reinforced:
(1) to a large amount of reperfusion serosity of thin layer limestone, slurries along Karst Fissures diffusion, calculus, filling, the water " displacement " in aquifer out, make it not moisture or weak moisture at thin layer limestone.
(2) slurries are under grouting pressure effect, by thin layer limestone along the migration of Ordovician karst water supply thin layer limestone passage, diffusion, calculus, block or reduce conduit pipe, reducing the increment of Ordovician karst water.
(3) slurries are under grouting pressure effect, by thin layer limestone along the migration of seat earth crack, diffusion, calculus, and filling water barrier water producing fractures, strengthening, thickening seat earth.
The seam mining water damage control waterborne of high bearing bottom plate mainly contains two kinds of methods, that is: Draining hook and mining under safe waterpressure of aquifer.But dredge that to fall exploitation be with good conditionsi, for moisture abundant, nourishment condition is good, the artesian aquifer that head is high, as taked Draining hook measure, one is that the electric lighting bill is heavy in draining, and two is after coal seam has been adopted, and still need long-term draining, economy is extremely unreasonable.Meanwhile, can dredge for some aquifer and fall, but dredge scale of falling also by the restriction of mine drainage ability.Not only waste water resource, and affect production and take over, seriously restrict manufacturing schedule.Current coal mining mainly adopts floor undulation grouting and reinforcing and renovation technique, increases seat earth effective water-resisting layer thickness, administers the too grey water damage danger side of body of base plate high pressure-bearing, guarantees Safety of Coal Mine Production
Floor undulation limestone water damage preventing and controlling flow process is: work plane hydrogeological conditions pre assessment → physical prospecting engineering → govern compositive designs → drill slip casting (unrestrained water) engineering construction → quality examination (inspection eye, physical prospecting) → security evaluation.
Govern compositive design is the basis carrying out govern compositive, and the quality good or not of govern compositive design directly affects the construction safety of govern compositive, working measure and construction quality and construction effect.Therefore govern compositive designing requirement will have higher water prevention theoretical level and have the technician of abundant site operation experience to come, and understands construction condition completely, grasps the technical level of constructor and the equipment performance of use.Govern compositive design not only requires the reasonability of engineering design, science and operability in macroscopical, and require in each link and details is complete, safety, science, reasonable and can operate.
Carry out floor grouting transformation mine and all have surface grout injection station, each drill site is for slurry to down-hole to utilize surface grout injection station, and each ore deposit grouting pipeline reaches more than 10000 meter, and circuit failure (as blocking, spillage etc.) phenomenon occurs often.Wherein pipeline blockage deals with very because of difficulty, if processed not in time, the cement paste in flow inlet will solidify in pipeline, causes whole flow inlet road to scrap.The pipeline dredging can will solidified exactly, needs a large amount of manpower of cost and time, have impact on normal slip casting work, lose larger.
Slip casting material transport hole is the defeated slurry boring of leading to down-hole from ground, its inwall is the steel pipe of φ 89mm, and in long-term slip casting process, its inwall can deposit the same laitance coating of some similar incrustation scales, naturally come off or when by after coming off when extraneous vibration, fall into blocking pipeline at the bottom of hole.
Utility model content
The purpose of this utility model is to overcome the deficiencies in the prior art, provides device at the bottom of a kind of anti-blockage holes, solves the problem of jam of grouting pipe.
The utility model is achieved through the following technical solutions, the utility model comprises the gate valve be connected to bottom conveying pipeline, the foreign material storage tube be connected with described gate valve, the stop valve be connected with described foreign material storage tube, blanking tube connects Grouting Pipe, and described foreign material storage tube is provided with relief valve.
As one of preferred embodiment of the present utility model, the two ends of described gate valve connect bottom foreign material storage tube box conveying pipeline by flange respectively, and the two ends of foreign material storage tube connect stop valve and gate valve by flange.
As one of preferred embodiment of the present utility model, the diameter of described stop valve is 32mm.
As one of preferred embodiment of the present utility model, described foreign material storage tube is bend pipe structure.
The utility model has the following advantages compared to existing technology: the utility model can store foreign matter, stops that foreign matter enters Grouting Pipe, and safely and conveniently can take out obstruction.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model.
Detailed description of the invention
Below embodiment of the present utility model is elaborated; the present embodiment is implemented under premised on technical solutions of the utility model; give detailed embodiment and concrete operating process, but protection domain of the present utility model is not limited to following embodiment.
As shown in Figure 1, the present embodiment comprises the gate valve 2 being connected to bottom conveying pipeline 1, the foreign material storage tube 3 be connected with described gate valve 2, the stop valve 5 be connected with described foreign material storage tube 3, and blanking tube connects Grouting Pipe, and described foreign material storage tube 3 is provided with relief valve 6.The two ends of gate valve 2 to connect bottom foreign material storage tube 3 box conveying pipeline 1 respectively by flange 4, and the two ends of foreign material storage tube 3 connect stop valve 5 and gate valve 2 by flange 4.Flange 4 connects the replacing being convenient to dismounting and local damage.The diameter of stop valve 5 is 32mm.Foreign material storage tube 3 is bend pipe structure.
Once there be laitance coating to fall down in conveying pipeline, just can stop by φ 32mm stop valve 5, the Grouting Pipe of protection bottom is not blocked, and safe ready during process obstruction, only with closing gate valve 2, opens relief valve 6, dismantle flange 4, obstruction is taken out.Regularly to arrive at ordinary times at the bottom of hole and check diameter changing device, clear up lumps, disintegrating slag in time.
Claims (4)
1. a device at the bottom of anti-blockage holes, is characterized in that, comprises the gate valve be connected to bottom conveying pipeline, the foreign material storage tube be connected with described gate valve, the stop valve be connected with described foreign material storage tube, blanking tube connects Grouting Pipe, and described foreign material storage tube is provided with relief valve.
2. device at the bottom of a kind of anti-blockage holes according to claim 1, is characterized in that, the two ends of described gate valve connect bottom foreign material storage tube box conveying pipeline by flange respectively, and the two ends of foreign material storage tube connect stop valve and gate valve by flange.
3. device at the bottom of a kind of anti-blockage holes according to claim 1, is characterized in that, the diameter of described stop valve is 32mm.
4. device at the bottom of a kind of anti-blockage holes according to claim 1, is characterized in that, described foreign material storage tube is bend pipe structure.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420869509.5U CN204609830U (en) | 2014-12-18 | 2014-12-18 | Device at the bottom of a kind of anti-blockage holes |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420869509.5U CN204609830U (en) | 2014-12-18 | 2014-12-18 | Device at the bottom of a kind of anti-blockage holes |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204609830U true CN204609830U (en) | 2015-09-02 |
Family
ID=53962402
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201420869509.5U Expired - Fee Related CN204609830U (en) | 2014-12-18 | 2014-12-18 | Device at the bottom of a kind of anti-blockage holes |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204609830U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104929566A (en) * | 2014-12-18 | 2015-09-23 | 安徽恒源煤电股份有限公司 | Hole-bottom anti-blocking device |
-
2014
- 2014-12-18 CN CN201420869509.5U patent/CN204609830U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104929566A (en) * | 2014-12-18 | 2015-09-23 | 安徽恒源煤电股份有限公司 | Hole-bottom anti-blocking device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105952475B (en) | A kind of residual exploiting field inbreak abandoned working grouting and reinforcing technology of coal mine and method | |
CN104453913B (en) | A kind of Shaft Stopes front pre-grouting method | |
CN103821544B (en) | Tunneling and underground engineering high-pressure high-flow is dashed forward Water outburst treatment method | |
CN104694746A (en) | Ion-adsorption-type rare earth in-situ leaching method and leaching system thereof | |
CN105909265B (en) | Pass through the anti-protuberance retrusive deep hole grouting system and method for existing shield tunnel | |
CN112746849A (en) | Shaft water-carrying digging and building method | |
CN108590716A (en) | A kind of tunnel crosses rich water tomography tree root type and dredges water blockoff integral construction method | |
CN102758639A (en) | Anti-blowout long tube grouting method for limited-space tunnels | |
CN104929565A (en) | Double-layered grouting guide pipe | |
CN104929564A (en) | High-pressure water hole grouting and feeding device | |
CN103147435A (en) | Method for treating construction engineering foundation in gob | |
CN204609830U (en) | Device at the bottom of a kind of anti-blockage holes | |
CN105134069A (en) | Technology for constructing gas vertical shaft penetrating strong water-rich rock stratum through anti-well method | |
CN104315251B (en) | Artificial pipe jacking construction method under soil stone combination geological conditions | |
CN204627527U (en) | A kind of double-deck grouting pipe | |
CN204591208U (en) | A kind of double-deck grouting pipe | |
CN104631425B (en) | A kind of flyash of accelerating arranges the method oozing consolidation | |
CN201158823Y (en) | Recoverable impact drill steel pipe downcast well | |
CN104929566A (en) | Hole-bottom anti-blocking device | |
CN105089551A (en) | Casing pipe running reinforcing process of grouting hole opening pipe | |
CN108374468B (en) | Method for blocking damage of old flood drainage system of tailing pond | |
CN208251118U (en) | Slope reinforcement device | |
CN104452789A (en) | Homogeneous clay ash dam draining and seeping system | |
CN105297754B (en) | Structure for dredging barrier effect of underground engineering on underground water | |
CN104912515A (en) | Drill hole secondary reinforcing method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20150902 Termination date: 20151218 |
|
EXPY | Termination of patent right or utility model |