CN204597354U - Detachable 10 kilovolts of concrete bridge line force-saivng frames - Google Patents
Detachable 10 kilovolts of concrete bridge line force-saivng frames Download PDFInfo
- Publication number
- CN204597354U CN204597354U CN201520246439.2U CN201520246439U CN204597354U CN 204597354 U CN204597354 U CN 204597354U CN 201520246439 U CN201520246439 U CN 201520246439U CN 204597354 U CN204597354 U CN 204597354U
- Authority
- CN
- China
- Prior art keywords
- anchor ear
- kilovolts
- brace
- saivng
- detachable
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 230000009194 climbing Effects 0.000 claims description 2
- 238000010276 construction Methods 0.000 abstract description 8
- 210000003205 muscle Anatomy 0.000 abstract description 4
- 238000000034 method Methods 0.000 abstract description 2
- 230000005540 biological transmission Effects 0.000 description 1
- 238000007796 conventional method Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
The application relates to a kind of detachable 10 kilovolts of concrete bridge line force-saivng frames, comprise the upper and lower anchor ear of parallel arrangement, described upper anchor ear both sides level is laid with symmetrical drag link, described lower anchor ear side is equiped with symmetrical brace, being fixedly linked with drag link outer end in the middle part of described brace, being evenly laid with the tie point for being connected with wires-erecting pulley along brace interval.Owing to implementing technique scheme, the application is convenient to carry out Poling Construction to diameter at the wire of 185mm-240mm.Can greatly reduce workman's working strength, reduce muscle power and export, reduce construction risk, improve efficiency of construction.
Description
Technical field
The application relates to a kind of detachable 10 kilovolts of concrete bridge line force-saivng frames.
Background technology
Tradition 10 kilovolts of straight line concrete bridge lines, after formerly installing and fixing cross-arm, are fixed on cross-arm by wires-erecting pulley by linesman.Then use pull rope to be pulled to below cross-arm by wire, then by workman tiltedly lean out health adopt pure muscle power pickaback mode wire lifted with hands walk around cross-arm one end and put in wires-erecting pulley groove.Because circuit transmission capacity constantly increases, diameter of wire has had 90mm to be progressively promoted to 240mm, and difficulty of construction increases greatly, continue to adopt traditional stringing mode greatly to consume workman's muscle power, easily damage is caused to workman's health, there is security risk, reduce operating efficiency.
Summary of the invention
The object of the application is to propose a kind of detachable 10 kilovolts of concrete bridge line force-saivng frames of being convenient to carry out at the wire of 185mm-240mm diameter Poling Construction.
The object of the application is achieved in that detachable 10 kilovolts of concrete bridge line force-saivng frames, comprise the upper and lower anchor ear of parallel arrangement, described upper anchor ear both sides level is laid with symmetrical drag link, described lower anchor ear side is equiped with symmetrical brace, being fixedly linked with drag link outer end in the middle part of described brace, being evenly laid with the tie point for being connected with wires-erecting pulley along brace interval.
Owing to implementing technique scheme, the application is convenient to carry out Poling Construction to diameter at the wire of 185mm-240mm.Can greatly reduce workman's working strength, reduce muscle power and export, reduce construction risk, improve efficiency of construction.
Accompanying drawing illustrates: the concrete structure of the application is provided by following drawings and Examples:
Fig. 1 is detachable 10 kilovolts of concrete bridge line force-saivng frame structural representations.
Legend: 1, wires-erecting pulley, 2, brace, 3, wind-force tachymeter, 4, drag link, 5, upper anchor ear, 6, lower anchor ear, 7, rope ladder.
Embodiment:
The application by the restriction of following embodiment, can not determine concrete execution mode according to the technical scheme of the application and actual conditions.
Embodiment: as shown in Figure 1, detachable 10 kilovolts of concrete bridge line force-saivng frames comprise the upper and lower anchor ear 5,6 of parallel arrangement, described upper anchor ear 5 both sides level is laid with symmetrical drag link 4, described lower anchor ear 6 side is equiped with symmetrical brace 2, being fixedly linked with drag link 4 outer end in the middle part of described brace 2, being evenly laid with the tie point for being connected with wires-erecting pulley 1 along brace 2 interval.
Described drag link 4 is equiped with the holder for fixing wind-force tachymeter 3.
Live with the same position of lower anchor ear 6 and be connected in described two brace 2 lower ends.
Described lower anchor ear 6 is connected with the rope ladder 7 for climbing.
During use, first the application is fixed on above the cross-arm position of electric pole by upper and lower anchor ear 5,6, then wires-erecting pulley 1 is hung on brace 2, then cross-arm and coaster are installed 1 and fix.Then pull rope is used respectively by the wires-erecting pulley groove that is lowered into by wire again after above some groups of wire pull-ups to cross-arm on cross-arm.
First cross-arm is fixed compared to conventional method, wire directly cannot be pulled to above cross-arm by pull rope, by manpower wire must be lifted with hands and walk around cross-arm-end and just can put in pulley stile, the application is first fixed on above cross-arm position, can easily by above lifting wire to cross-arm, workman slightly adjusts and wire can be transferred in the wires-erecting pulley groove on cross-arm.
Above technical characteristic constitutes the most preferred embodiment of the application, and it has stronger adaptability and best implementation result, can increase and decrease inessential technical characteristic according to actual needs, meet the needs of different situations.
Claims (4)
1. detachable 10 kilovolts of concrete bridge line force-saivng frames, it is characterized in that: the upper and lower anchor ear comprising parallel arrangement, described upper anchor ear both sides level is laid with symmetrical drag link, described lower anchor ear side is equiped with symmetrical brace, being fixedly linked with drag link outer end in the middle part of described brace, being evenly laid with the tie point for being connected with wires-erecting pulley along brace interval.
2. detachable 10 kilovolts of concrete bridge line force-saivng frames as claimed in claim 1, is characterized in that: described drag link is equiped with the holder for fixing wind-force tachymeter.
3. detachable 10 kilovolts of concrete bridge line force-saivng frames as claimed in claim 1, is characterized in that: live with the same position of lower anchor ear and be connected in described two brace lower ends.
4. detachable 10 kilovolts of concrete bridge line force-saivng frames as claimed in claim 1, is characterized in that: described lower anchor ear is connected with the rope ladder for climbing.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520246439.2U CN204597354U (en) | 2015-04-22 | 2015-04-22 | Detachable 10 kilovolts of concrete bridge line force-saivng frames |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520246439.2U CN204597354U (en) | 2015-04-22 | 2015-04-22 | Detachable 10 kilovolts of concrete bridge line force-saivng frames |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204597354U true CN204597354U (en) | 2015-08-26 |
Family
ID=53933468
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520246439.2U Expired - Fee Related CN204597354U (en) | 2015-04-22 | 2015-04-22 | Detachable 10 kilovolts of concrete bridge line force-saivng frames |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204597354U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104779555A (en) * | 2015-04-22 | 2015-07-15 | 国家电网公司 | Detachable effort-saving stand for 10 KV concrete pole wiring |
-
2015
- 2015-04-22 CN CN201520246439.2U patent/CN204597354U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104779555A (en) * | 2015-04-22 | 2015-07-15 | 国家电网公司 | Detachable effort-saving stand for 10 KV concrete pole wiring |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203645249U (en) | Hook-net-plane-type charged crossing device | |
CN101582572B (en) | Method of extra-high voltage tension stringing | |
CN205178393U (en) | Super high tension transmission line equipotential live working device | |
CN203352049U (en) | Overhead line pulling-up assisting device | |
CN204597354U (en) | Detachable 10 kilovolts of concrete bridge line force-saivng frames | |
CN106356763A (en) | Method for entering equal potential of compact type electric transmission line and used folding ladder | |
CN103779809B (en) | The two oidiospore wire pitch operational method of charged adjustment | |
CN200987049Y (en) | Insulation rope ladder for live-wire process operation of earthing wire and optical fiber composite type aerial extension | |
CN104779555A (en) | Detachable effort-saving stand for 10 KV concrete pole wiring | |
CN102611057A (en) | Crossing mesh | |
CN207813473U (en) | A kind of hard ladder applied to ultra-high-tension power transmission line maintenance | |
CN203754114U (en) | Automatic retracting device for twice-carrying cable of heading machine | |
CN204538618U (en) | A kind of cable clip making cable movement on steel strand wire | |
CN206442059U (en) | A kind of insulated gin | |
CN204118374U (en) | The earth lead point protection device in succession of earth connection | |
CN204012462U (en) | A kind of for setting up the suspender of wire | |
CN203905791U (en) | Insulating ladder | |
CN203774728U (en) | Pre-twisted damping wire | |
CN208516850U (en) | A kind of cement rod-type power transmission line overhead ground wire auxiliary device | |
CN106115504A (en) | A kind of suspender | |
CN202970094U (en) | Guyed tower applied to transmission line project | |
CN202190023U (en) | Wire bracing device for overhead wire | |
CN204577991U (en) | Ropes aid | |
CN206735691U (en) | A kind of handling apparatus for deep basal pit installation reinforcing bar | |
CN205882554U (en) | Work platform on power line pole |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20150826 Termination date: 20180422 |