CN204515086U - The auto-action proving installation of automatic change over - Google Patents

The auto-action proving installation of automatic change over Download PDF

Info

Publication number
CN204515086U
CN204515086U CN201520149740.1U CN201520149740U CN204515086U CN 204515086 U CN204515086 U CN 204515086U CN 201520149740 U CN201520149740 U CN 201520149740U CN 204515086 U CN204515086 U CN 204515086U
Authority
CN
China
Prior art keywords
change over
automatic change
thimble
base plate
proving installation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520149740.1U
Other languages
Chinese (zh)
Inventor
安建珍
王树利
管柯
杨海军
韦柳军
石崇祯
茅云
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
WUXI HANKWANG ELECTRIC CO Ltd
Original Assignee
WUXI HANKWANG ELECTRIC CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by WUXI HANKWANG ELECTRIC CO Ltd filed Critical WUXI HANKWANG ELECTRIC CO Ltd
Priority to CN201520149740.1U priority Critical patent/CN204515086U/en
Application granted granted Critical
Publication of CN204515086U publication Critical patent/CN204515086U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Connections Arranged To Contact A Plurality Of Conductors (AREA)

Abstract

The utility model relates to a kind of auto-action proving installation of automatic change over, and comprise base plate, feature is: on described base plate, arrange mounting guide rail, and mounting guide rail is surrounded by three guide rails and forms the rectangular area consistent with automatic change over size, shape; Arrange four thimbles respectively in the both sides up and down of described base plate, each thimble corresponds respectively to the connection terminal of automatic change over both sides, and thimble is connected with additional power source respectively by wire, and each thimble is arranged on the output terminal of air valve respectively.Described mounting guide rail surrounds a side opening of the rectangular area formed, and arranges fixation clip in opening side, and one end and the base plate of fixation clip are rotationally connected.The summit of described each thimble is all consistent to the distance between corresponding connection terminal.The utility model meets the requirement that automatic transfer switching electric appliance confirms verification test, and the various functions characteristic of convenient test automatic change over, raises the efficiency.

Description

The auto-action proving installation of automatic change over
Technical field
The utility model relates to a kind of auto-action proving installation of automatic change over, and especially a kind of automatic transfer switching electric appliance dispatches from the factory and confirms the proving installation of inspection acting characteristic.
Background technology
The controller electric power system of PC level automatic change over and the power supply of control secondary circuit are all provided by primary circuit, generally, commissioning staff will connect primary circuit, and then manually the switch transition situation of automatic change in decompression situation debugged by switch; Debugged the action situation of power supply automatic change in overvoltage/undervoltage situation by pressure regulator, such debugging bothers very much, all will access two-way three-phase four-wire power at every turn, and necessary screw fastening, dismantle again after having debugged wiring, process is loaded down with trivial details, expends time in long.
Summary of the invention
The purpose of this utility model overcomes the deficiencies in the prior art, a kind of auto-action proving installation of dynamic switch is provided, meet the requirement that automatic transfer switching electric appliance confirms verification test, raise the efficiency, save time, automatic control power supply voltage, the various functions characteristic of convenient test automatic change over.
According to the technical scheme that the utility model provides, a kind of auto-action proving installation of automatic change over, comprise base plate, feature is: on described base plate, arrange mounting guide rail, and mounting guide rail is surrounded by three guide rails and forms the rectangular area consistent with automatic change over size, shape; Arrange four thimbles respectively in the both sides up and down of described base plate, each thimble corresponds respectively to the connection terminal of automatic change over both sides, and thimble is connected with additional power source respectively by wire, and each thimble is arranged on the output terminal of air valve respectively.
Further, described mounting guide rail surrounds a side opening of the rectangular area formed, and arranges fixation clip in opening side, and one end and the base plate of fixation clip are rotationally connected.
Further, the summit of described each thimble is all consistent to the distance between corresponding connection terminal.
Further, also comprise touch display screen, touch display screen is connected with proving installation by cable.
The utility model has the following advantages:
(1) the mounting guide rail size of proving installation described in the utility model and the mounting base consistent size of automatic change over, can ensure that installation is fixed, and ensure that each pole connection terminal of automatic change over contacts with thimble well, instead of the complex process that screw is fixing, the dismounting of automatic change over is very convenient, test result is accurate, and speed is fast;
(2) test event that the utility model is all is all performed by programmable touch display screen, completed by electric elements such as Single-chip Controlling pressure regulator and relays, realize the automatic conversion of automatic change in under-voltage, overvoltage, decompression, single-phase fault situation, data are accurate, intuitively read.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model.
Fig. 2 is the structural representation of described mounting guide rail.
Fig. 3 is the schematic diagram of touch display screen.
Embodiment
Below in conjunction with concrete accompanying drawing, the utility model is described in further detail.
As shown in FIG. 1 to 3: the auto-action proving installation of described automatic change over comprises base plate 1, mounting guide rail 2, fixation clip 3, thimble 4, air valve 5, automatic change over 6, connection terminal 7, touch display screen 8, cable 9, wire 10 etc.
As shown in Figure 1 and Figure 2, the utility model comprises base plate 1, base plate 1 arranges mounting guide rail 2, mounting guide rail 2 is surrounded by three guide rails and forms the rectangular area consistent with automatic change over 6 size, shape, one side opening of this rectangular area, automatic change over 6 can be put into mounting guide rail 2 by this opening part and surround the region formed, and in opening side, fixation clip 3 is set, one end and the base plate 1 of fixation clip 3 are rotationally connected, after automatic change over 6 is put into and is put in place, rotate fixation clip 3 automatic change over is fixed, be convenient to test; In the both sides up and down of described base plate 1, four thimbles 4 are set respectively, each thimble 4 corresponds respectively to the connection terminal 7 of automatic change over 6 both sides, thimble 4 is connected with additional power source respectively by wire 10, each thimble 4 is arranged on the output terminal of air valve 5 respectively, and thimble 4 promotes thimble 4 by the air pressure of air valve 5; The summit of described each thimble 4 is all consistent to the distance between corresponding connection terminal 7.
As shown in Figure 3, the utility model also comprises touch display screen 8, touch display screen 8 is connected with proving installation by cable 9, all test events are all operated by touch display screen 8, the control module of the high-grade single-chip microcomputer composition of AVR is adopted to finish the work, tester can carry out setting parameter by touch display screen 8, enlightenment test event.
The material of described thimble 4 is 2.5mm brass bar, is positive conductive material, ensures that primary circuit is reliably connected.
In use, the automatic change over 6 that will test is put in fixing mounting guide rail 2, and mounting guide rail 2 is according to the ready-made fixture of the size of automatic change over 6, as long as automatic change over 6 is put into position, just can not move, then rotate fixation clip 3, automatic change over 6 is fixed; Opening power, touch display screen 8 starts test, enlightens corresponding air valve 5, thus promote corresponding thimble 4 by air pressure, connection terminal 7 good contact of thimble 4 meeting and automatic change over 6, and produces certain pressure, ensures that contact is good; And thimble 4 is connected with additional power source by wire, installs without screw like this and power with regard to the primary circuit achieving automatic change over 6.After test completes, air valve 5 is opened, and thimble 4 is retracted original position, automatic change over 6 primary circuit power-off, again not knockout screw.Rotate fixation clip 3, automatic change over 6 can easily be taken down.Proving installation described in the utility model test is simple, and speed is efficient soon, and parameter can sets itself, and convenient, flexible, operating personnel's easily-learned easily mastered, can improve testing efficiency and accuracy greatly.

Claims (4)

1. the auto-action proving installation of an automatic change over, comprise base plate (1), it is characterized in that: on described base plate (1), arrange mounting guide rail (2), mounting guide rail (2) is surrounded by three guide rails and forms the rectangular area consistent with automatic change over (6) size, shape; Four thimbles (4) are set respectively in the both sides up and down of described base plate (1), each thimble (4) corresponds respectively to the connection terminal (7) of automatic change over (6) both sides, thimble (4) is connected with additional power source respectively by wire, and each thimble (4) is arranged on the output terminal of air valve (5) respectively.
2. the auto-action proving installation of automatic change over as claimed in claim 1, it is characterized in that: described mounting guide rail (2) surrounds a side opening of the rectangular area formed, and arrange fixation clip (3) in opening side, one end and the base plate (1) of fixation clip (3) are rotationally connected.
3. the auto-action proving installation of automatic change over as claimed in claim 1, is characterized in that: the summit of described each thimble (4) is all consistent to the distance between corresponding connection terminal (7).
4. the auto-action proving installation of automatic change over as claimed in claim 1, it is characterized in that: also comprise touch display screen (8), touch display screen (8) is connected with proving installation by cable (9).
CN201520149740.1U 2015-03-16 2015-03-16 The auto-action proving installation of automatic change over Expired - Fee Related CN204515086U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520149740.1U CN204515086U (en) 2015-03-16 2015-03-16 The auto-action proving installation of automatic change over

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520149740.1U CN204515086U (en) 2015-03-16 2015-03-16 The auto-action proving installation of automatic change over

Publications (1)

Publication Number Publication Date
CN204515086U true CN204515086U (en) 2015-07-29

Family

ID=53713045

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520149740.1U Expired - Fee Related CN204515086U (en) 2015-03-16 2015-03-16 The auto-action proving installation of automatic change over

Country Status (1)

Country Link
CN (1) CN204515086U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104730452A (en) * 2015-03-16 2015-06-24 无锡韩光电器股份有限公司 Automatic action testing device of automatic change-over switch

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104730452A (en) * 2015-03-16 2015-06-24 无锡韩光电器股份有限公司 Automatic action testing device of automatic change-over switch

Similar Documents

Publication Publication Date Title
CN103779967B (en) For TT&C system and the observing and controlling module thereof of distribution power automation terminal
CN104966457B (en) A kind of maintenance electrician's intelligent training checking system based on MCGS interfaces
CN204904704U (en) Maintenance electrician's intelligence training checking system based on MCGS interface
CN203786219U (en) Multifunctional automated test system
CN204515086U (en) The auto-action proving installation of automatic change over
CN202548291U (en) Special controller for testing mechanical behavior of pole-mounted vacuum automatic distribution switch
CN203870229U (en) Time-control voltage-regulating light fixture testing apparatus
CN204732551U (en) A kind of two enter four terminal bases gone out
CN203705605U (en) Running-in test console of indoor high-voltage vacuum breaker
CN204316171U (en) A kind of debugging operations platform of automatic change-over controller
CN101354417A (en) Circuit board test device of electrical energy meter based on virtual instrument technique
CN204681157U (en) A kind of intelligent double-power control system
CN203324854U (en) Heat tracing cable control system of common enclosure bus
CN104730452A (en) Automatic action testing device of automatic change-over switch
CN211319056U (en) Frequency converter debugging device
CN103513215A (en) Automatic switching detection apparatus of electric energy meter
CN206117293U (en) Each other is equipped with control circuit industrial furnace fan dual supply converter
CN209215570U (en) A kind of voltage current transformer test platform
CN203072269U (en) Electric appliance control cabinet with monitor camera
CN202720329U (en) Electric energy meter automatic switching detection device
CN204945324U (en) Control series products batch quiescent current test circuit
CN208299302U (en) A kind of gcs low-voltage cabinet being convenient for installation with maintenance
CN213750222U (en) Intermediate relay rapid calibration device
CN204215263U (en) Double-power controller verifying attachment
CN203689076U (en) Measurement and control module used for power distribution automation terminal and measurement and control module group thereof

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150729

Termination date: 20190316