CN204474106U - Deep shaft manned lift device - Google Patents

Deep shaft manned lift device Download PDF

Info

Publication number
CN204474106U
CN204474106U CN201520102580.5U CN201520102580U CN204474106U CN 204474106 U CN204474106 U CN 204474106U CN 201520102580 U CN201520102580 U CN 201520102580U CN 204474106 U CN204474106 U CN 204474106U
Authority
CN
China
Prior art keywords
fixed
derrick
deep shaft
lift device
manned lift
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520102580.5U
Other languages
Chinese (zh)
Inventor
代强
李丹
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sinohydro Bureau 5 Co Ltd
Original Assignee
Sinohydro Bureau 5 Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sinohydro Bureau 5 Co Ltd filed Critical Sinohydro Bureau 5 Co Ltd
Priority to CN201520102580.5U priority Critical patent/CN204474106U/en
Application granted granted Critical
Publication of CN204474106U publication Critical patent/CN204474106U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Jib Cranes (AREA)

Abstract

The utility model discloses a kind of deep shaft manned lift device, belong to deep shaft constructing device field, its structure is: well head place is fixed with derrick, derrick upper end is fixed with pulley, also be provided with halliard, halliard puts pulley on the spot, and its one end is connected to mine winch, and the other end is fixed on cage.The utility model structure is simple, practical, safe and reliable, can effectively evade the security risk that workmen goes into the well.

Description

Deep shaft manned lift device
Technical field
The utility model relates to deep shaft constructing device field, is specifically related to a kind of deep shaft manned lift device.
Background technology
Vertical shaft is the important building in Hydraulic and Hydro-Power Engineering, mainly contains diversion vertical shaft, pressure regulation vertical shaft and exhaust air shaft etc.These vertical shafts not only difficulty of construction are large, and construction risk is high, this link that workmen goes into the well has maximum potential safety hazard, how to control this link well to seem particularly important, therefore, be badly in need of providing a kind of walk away safety deep shaft construction manned lift device practical again.
Utility model content
Technical problem to be solved in the utility model is to provide a kind of deep shaft manned lift device, adopt this jacking system convenient construction personnel easily on go into the well, most important is safer.
For solving the problems of the technologies described above, the technical scheme that the utility model adopts is as follows:
A kind of deep shaft manned lift device, its structure is: well head place is fixed with derrick, and derrick upper end is fixed with pulley, is also provided with halliard, and halliard puts pulley on the spot, and its one end is connected to mine winch, and the other end is fixed on cage.
As improvement, be also provided with safety rope, safety rope one end is fixed on derrick, and middle part is connected to the catching device of cage, and the other end is fixed with counterweight.
Further improvement, described derrick has kept flat checkered steel plate.
The beneficial effects of the utility model are: structure is simple, practical, safe and reliable, can effectively evade the security risk that workmen goes into the well.
Accompanying drawing explanation
Below in conjunction with the drawings and specific embodiments, the utility model is described in more detail, wherein:
Fig. 1 is the utility model deep shaft manned lift device integral structure schematic diagram.
Fig. 2 is that the utility model deep shaft manned lift device well head arranges schematic diagram.
Fig. 3 is the utility model deep shaft manned lift device well head place derrick three-dimensional structure schematic diagram.
In figure: 1-pulley; 2-derrick; 3-halliard; 4-safety rope; 5-cage; 6-counterweight; 7-well head; 8-checkered steel plate; 9-mine winch.
Detailed description of the invention
In order to solve the safety problem that workmen goes into the well, the utility model provides a kind of jacking system of Simple And Practical, and these device fabrication and installation are simple, safe and reliable.
The concrete structure of this device is: well head 7 place is fixed with derrick 2, derrick 2 makes primarily of employing I-beam section, channel-section steel and riffled iron, and girder I-beam section, derrick 2 top channel-section steel, after structural framework completes, walkway completely spreads checkered steel plate 8, and at periphery, protection railing is installed.Described derrick 2 upper end is fixed with pulley 1, also be provided with halliard 3, described halliard 3 puts pulley 1 on the spot, and its one end is connected to mine winch 9, the other end is fixed on cage 5, be elevated cage 5 by mine winch 9 by derrick 2 and transport workmen, safe and reliable for ensureing cage 5, mine winch 9 and cage 5 make by specialized factory.
Also be provided with safety rope 4, safety rope 4 adopts steel rope, and after derrick 2 fabrication and installation complete, safety rope 4 upper end is locked in derrick 2 top cross-bar and becomes suspended state.Described safety rope 4 one end is fixed on derrick 2, and middle part is connected to the catching device of cage 5, and the other end is fixed with counterweight 6.Generally 2 safety ropes are installed, if during lifting cage 5, halliard 3 breaks suddenly, and the catching device on cage 5 can jump at safety rope 4, are no more than 5cm by cage 5 unhook test tenesmus amount, very safe effect can be reached.
At present, successful Application is in storage station of Guangdong Qingyuan diversion vertical shaft (270m dark, diameter 10.4m) construction for the utility model technology, and application has good prospects.

Claims (3)

1. a deep shaft manned lift device, it is characterized in that: well head (7) place is fixed with derrick (2), described derrick (2) upper end is fixed with pulley (1), also be provided with halliard (3), described halliard (3) puts pulley (1) on the spot, and its one end is connected to mine winch (9), the other end is fixed on cage (5).
2. deep shaft manned lift device as claimed in claim 1, it is characterized in that: be also provided with safety rope (4), described safety rope (4) one end is fixed on derrick (2), and middle part is connected to the catching device of cage (5), and the other end is fixed with counterweight (6).
3. deep shaft manned lift device as claimed in claim 1 or 2, is characterized in that: described derrick (2) has kept flat checkered steel plate (8).
CN201520102580.5U 2015-02-12 2015-02-12 Deep shaft manned lift device Expired - Fee Related CN204474106U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520102580.5U CN204474106U (en) 2015-02-12 2015-02-12 Deep shaft manned lift device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520102580.5U CN204474106U (en) 2015-02-12 2015-02-12 Deep shaft manned lift device

Publications (1)

Publication Number Publication Date
CN204474106U true CN204474106U (en) 2015-07-15

Family

ID=53629909

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520102580.5U Expired - Fee Related CN204474106U (en) 2015-02-12 2015-02-12 Deep shaft manned lift device

Country Status (1)

Country Link
CN (1) CN204474106U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105151942A (en) * 2015-10-28 2015-12-16 中国矿业大学 Cage-separating type miner safety protection device and method for vertical shaft lifter rope-breakage cage-crashing accident
CN105270950A (en) * 2015-10-28 2016-01-27 中国矿业大学 Vertical shaft elevator cage accident miner safety protection device and method
CN105858403A (en) * 2016-05-10 2016-08-17 中国水利水电第十四工程局有限公司 Device for stabilizing ropes of man-carrying lifting cage in vertical shaft excavating period and application method

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105151942A (en) * 2015-10-28 2015-12-16 中国矿业大学 Cage-separating type miner safety protection device and method for vertical shaft lifter rope-breakage cage-crashing accident
CN105270950A (en) * 2015-10-28 2016-01-27 中国矿业大学 Vertical shaft elevator cage accident miner safety protection device and method
CN105151942B (en) * 2015-10-28 2018-01-23 中国矿业大学 The disconnected rope accident of cage crashing of vertical shaft hoist takes off pot type miner safety guard and method
CN105858403A (en) * 2016-05-10 2016-08-17 中国水利水电第十四工程局有限公司 Device for stabilizing ropes of man-carrying lifting cage in vertical shaft excavating period and application method

Similar Documents

Publication Publication Date Title
CN205045698U (en) Reinforcement cage hoisting utensil
CN106006425B (en) A kind of high-rise building ground machine room lower large scale equipment hoisting transportation method
CN204199721U (en) A kind of erecting device for factory building construction high and medium structure
CN204474106U (en) Deep shaft manned lift device
CN203654702U (en) Operating platform for construction of reinforced concrete chimney
CN205397854U (en) Gasifier hoist and mount hoisting device
CN203173684U (en) Component for hoisting reinforcement cage
CN204022201U (en) A kind of weight-lifting equipment for vertical transport
CN207243334U (en) A kind of long and narrow working face large-sized transversal component high-altitude system in place
CN202689496U (en) Moving platform for steel pipe concrete post concrete casing
CN203889942U (en) Lifting device
CN203569872U (en) Same layer lifting type cantilever frame device
CN205575534U (en) Lattice formula groined type support body lifting means
CN202729645U (en) Tower crane with elevator
CN202481984U (en) Electric block transferring device for lifting scaffolds
CN201647851U (en) Multifunctional building crane
CN205894715U (en) Light steel structure is semi -automatic under enclosed construction constructs from hoisting machine that climbs
CN201770429U (en) Portal type framework used for hoisting and slipping
CN213653209U (en) Integrated construction movable platform for bridge flange plate
CN204508532U (en) Oil storage cave depot To Construction of Silo bont
CN203499232U (en) Attached lifting scaffold
CN204225467U (en) The intelligent elevated climbing frame platform of a kind of protection
CN203113754U (en) Lifting basket device applicable to narrow and vertical space
CN204138213U (en) Track gun carriage is used in a kind of cell cube curtain wall lifting
CN203728417U (en) Hoisting device of belt conveyor roller

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150715

Termination date: 20220212