CN204359884U - A kind of Power Transformer in Field load testing apparatus - Google Patents

A kind of Power Transformer in Field load testing apparatus Download PDF

Info

Publication number
CN204359884U
CN204359884U CN201520068077.2U CN201520068077U CN204359884U CN 204359884 U CN204359884 U CN 204359884U CN 201520068077 U CN201520068077 U CN 201520068077U CN 204359884 U CN204359884 U CN 204359884U
Authority
CN
China
Prior art keywords
transformer
mutual inductor
precision measurement
measurement unit
testing apparatus
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201520068077.2U
Other languages
Chinese (zh)
Inventor
郑含博
韩金华
王伟
王立楠
李予全
李晓纲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Electric Power Research Institute of State Grid Henan Electric Power Co Ltd
Henan Enpai High Tech Group Co Ltd
Original Assignee
State Grid Corp of China SGCC
Electric Power Research Institute of State Grid Henan Electric Power Co Ltd
Henan Enpai High Tech Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Electric Power Research Institute of State Grid Henan Electric Power Co Ltd, Henan Enpai High Tech Group Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201520068077.2U priority Critical patent/CN204359884U/en
Application granted granted Critical
Publication of CN204359884U publication Critical patent/CN204359884U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Testing Electric Properties And Detecting Electric Faults (AREA)

Abstract

A kind of Power Transformer in Field load testing apparatus, for testing tested transformer, comprise power supply, high-tension switch cabinet, induction voltage regulator, intermediate transformer, compensation condenser group, mutual inductor precision measurement unit and experiment control system set of equipments, one side joint power supply of high-tension switch cabinet, the opposite side of high-tension switch cabinet connects induction voltage regulator, induction voltage regulator, intermediate transformer, compensation condenser group, mutual inductor precision measurement unit passes through connection successively, compensation condenser group is had to drop into the calculating of combinations of voltages and combined capacity, controlling functions, significantly reduce the requirement to site test power supply capacity.

Description

A kind of Power Transformer in Field load testing apparatus
Technical field
The present invention relates to high voltage electric equipment experimental technique field, particularly relate to the rig-site utilization device of power transformer load test.
Background technology
In recent years, along with the fast development of electric system, user requires more and more higher to the economy of high voltage electric equipment especially power transformer and reliability service.The load loss of transformer is a key technical index, and it is for the economical operation of transformer and have extremely important meaning the serviceable life of transformer itself; And short-circuit impedance determines transformer when Operation of Electric Systems on electrodynamic size when the impact of voltage ripple of power network and transformer generation Outlet Short Circuit Fault, simultaneously short-circuit impedance still determines that can transformer a necessary condition of parallel running.The load loss of transformer and this two indices of short-circuit impedance can be measured by transformer load test and obtain, user carries out load test at the scene can check this two indices whether in the scope that national standard and user require, and the hidden danger in transformer circuit can be checked, therefore field load test is the important technical of qualification transformer performance and quality.
The load test of transformer is usually by transformer side winding (being generally low-pressure side) short circuit, and the alternating voltage of rated frequency is added from opposite side winding, make the electric current in Transformer Winding reach ratings, measure added impedance voltage (i.e. short-circuit impedance) and short circuit loss.Three-winding transformer load test should be measured different winding centerings three, non-tested winding open circuit.
At the scene in test, because tested transformer short-circuit capacity is comparatively large, the capacity of required experiment power supply is often difficult to meet the demands, and causes test unit supporting with it as requirement when induction voltage regulator, intermediate transformer etc. should not meet site test.Due to high by site test voltage, that test current large, measuring accuracy requires high-technology factor restriction, rarely had at operation scene the examination realizing high-power transformer load test in the past, lacked the load testing apparatus effectively checking Winding in Power Transformer quality from load loss angle.
Summary of the invention
The object of the present invention is to provide a kind of Power Transformer in Field load testing apparatus, can the load loss of Measurement accuracy transformer and short-circuit impedance, assessment transformer energy loss operationally and safety operation level, thus effectively check winding material and the processing quality of transformer, improve power transformer safety operation level.
Technical scheme of the present invention is:
A kind of Power Transformer in Field load testing apparatus, for testing tested transformer, comprise power supply, high-tension switch cabinet, induction voltage regulator, intermediate transformer, compensation condenser group, mutual inductor precision measurement unit and experiment control system set of equipments, one side joint power supply of high-tension switch cabinet, the opposite side of high-tension switch cabinet connects induction voltage regulator, induction voltage regulator, intermediate transformer, compensation condenser group, mutual inductor precision measurement unit passes through connection successively, mutual inductor precision measurement unit is arranged in precision measurement mutual inductor cabinet, mutual inductor precision measurement unit comprises voltage transformer (VT) summation current transformer, compensation condenser group is made up of 2 group capacitor groups, and compensation condenser group equiva lent impedance is ZC, and tested Transformer Short Circuit Impedance is ZT, then ZC ≈ ZT.
Compensation condenser gross rated capacity is 10500kVar, and rated voltage is respectively 11.0/19.0kV.
Power supply is three-phase 380V, capacity 500kW.
The rated capacity of induction voltage regulator is 500kVA, is specifiedly input as 0.38kV/880A, and specified output is 0 ~ 0.65kV/444A.
Intermediate transformer rated capacity is 500kVA, and regulative mode is that electronic off circuit tap changer regulates.
The scale of precision of the voltage transformer (VT) of mutual inductor precision measurement unit is 0.01 grade, rated voltage and rated capacity are respectively 40.0kV, 0.5VA, the scale of precision of the current transformer of mutual inductor precision measurement unit is 0.01 grade, and rated voltage and rated capacity are respectively 40.0kV, 5VA.
Advantage of the present invention:
The first, load loss test can be carried out to 35 ~ 220kV electric pressure Transformer on Site;
The second, can the load loss of Measurement accuracy transformer and short-circuit impedance index, and there is load loss measure the automatic computing function of test findings;
3rd, there is calculating, controlling functions that compensation condenser group drops into combinations of voltages and combined capacity, significantly reduce the requirement to site test power supply capacity;
4th, it is convenient that device installs transformation, and test method is flexible; Cost is low, and cost performance is high.
Accompanying drawing explanation
Fig. 1 is structure principle chart of the present invention;
In figure, 1 is high-tension switch cabinet, and 2 is induction voltage regulator, and 3 is intermediate transformer, and 4 represent compensation condenser group, and 5 is precision measurement mutual inductor cabinet, and 6 represent product to be tested;
Fig. 2 is Capacitor banks compensation principle figure of the present invention.
Embodiment
As shown in Figure 1, the present invention includes high-tension switch cabinet 1, induction voltage regulator 2, intermediate transformer 3, two groups of oil immersed type compensation condenser groups 4, mutual inductor precision measurement unit 5 and experiment control system set of equipments, for testing product to be tested 6, product to be tested 6 is tested transformer.Induction voltage regulator 2, intermediate transformer 3, compensation condenser group 4 use private cable to be connected with precision measurement mutual inductor cabinet, mutual inductor precision measurement unit 5 is positioned at precision measurement mutual inductor cabinet, comprise a power cable and linear quadratic control cable, wherein each root of linear quadratic control cable all adopts the aviation plug of different core number, prevents from mispluging.
Apparatus of the present invention are exclusively used in 35 ~ 220kV electric pressure transformer field and carry out load loss measurement test, and it is as shown in table 1 that standard is followed in the present invention's design.
Table 1 manufactures and designs the standard of following
The power supply of apparatus of the present invention is three-phase 380V(power frequency 50Hz) capacity 500kW.Wherein, induction voltage regulator 2 rated capacity is 500kVA, is specifiedly input as 0.38kV/880A, and specified output is 0 ~ 0.65kV/444A.Intermediate transformer 3 rated capacity is 500kVA, and rated voltage is 0.65/ (1.9,3.3,11.0,6.3,17.3,23.1,30.0,40.0) kV, and regulative mode is that electronic off circuit tap changer regulates.Mutual inductor precision measurement unit 5 comprises voltage transformer (VT) summation current transformer, the scale of precision of voltage transformer (VT) is 0.01 grade, rated voltage and rated capacity are respectively 40.0kV, 0.5VA, and the scale of precision of current transformer is 0.01 grade, and rated voltage and rated capacity are respectively 40.0kV, 5VA.
In load test, because active loss is much smaller than perceptual reactive loss, the perception that the output capacity of testing equipment is mainly tested transformer is idle, proposes higher requirement to the capacity of experiment power supply, and therefore load loss test is at present confined to carry out in manufacturing plant substantially.Given this, the present invention adopts adjustable Capacitor banks in parallel with test product, utilizes the capacitive reactive power of compensation condenser group 4 to compensate the perception of tested transformer idle, thus the electric current effectively reducing power supply and pressure regulator exports, compensation principle as shown in Figure 2, wherein z crepresent compensation condenser group equiva lent impedance, z trepresent tested Transformer Short Circuit Impedance.For reaching good compensation effect, the capacitive reactive power of compensation condenser group 4 should be idle close to the perception of tested transformer, namely z cz t.According to calculating and economic comparison, the compensation condenser group 4 that the present invention adopts adopts 2 group capacitor group compositions, cause the difference of parameter according to tested transformer capacity difference, by the connected mode different to 2 group capacitor group selections, farthest can meet test needs.The present invention's 2 compensation condenser gross rated capacities are 10500kVar, rated voltage is respectively 11.0/19.0kV, manual shunting switch is taked to regulate input and the excision of each group of compensation condenser, be used for carrying out reactive-current compensation in transformer load loss process of the test, to reduce requirement to power supply capacity, thus make 35 ~ 220kV electric pressure Power Transformer in Field carry out load loss test to become possibility.
In sum, apparatus of the present invention theory structure is simple, breach the restriction of transformer load site test to power supply capacity demand, make 35 ~ 220kV electric pressure Power Transformer in Field carry out load loss measurement test and become possibility, thus effectively check winding material and the processing quality of transformer, improve power transformer safety operation level.

Claims (6)

1. a Power Transformer in Field load testing apparatus, for testing tested transformer, it is characterized in that: comprise power supply, high-tension switch cabinet, induction voltage regulator, intermediate transformer, compensation condenser group, mutual inductor precision measurement unit and experiment control system set of equipments, one side joint power supply of high-tension switch cabinet, the opposite side of high-tension switch cabinet connects induction voltage regulator, induction voltage regulator, intermediate transformer, compensation condenser group, mutual inductor precision measurement unit passes through connection successively, mutual inductor precision measurement unit is arranged in precision measurement mutual inductor cabinet, mutual inductor precision measurement unit comprises voltage transformer (VT) summation current transformer, compensation condenser group is made up of 2 group capacitor groups, and compensation condenser group equiva lent impedance is z c, tested Transformer Short Circuit Impedance is z t, then z cz t.
2. Power Transformer in Field load testing apparatus according to claim 1, is characterized in that: compensation condenser gross rated capacity is 10500kVar, and rated voltage is respectively 11.0/19.0kV.
3. Power Transformer in Field load testing apparatus according to claim 1 and 2, is characterized in that: power supply is three-phase 380V, capacity 500kW.
4. Power Transformer in Field load testing apparatus according to claim 1 and 2, is characterized in that: the rated capacity of induction voltage regulator is 500kVA, is specifiedly input as 0.38kV/880A, and specified output is 0 ~ 0.65kV/444A.
5. Power Transformer in Field load testing apparatus according to claim 1 and 2, is characterized in that: intermediate transformer rated capacity is 500kVA, and regulative mode is that electronic off circuit tap changer regulates.
6. Power Transformer in Field load testing apparatus according to claim 1 and 2, it is characterized in that: the scale of precision of the voltage transformer (VT) of mutual inductor precision measurement unit is 0.01 grade, rated voltage and rated capacity are respectively 40.0kV, 0.5VA, the scale of precision of the current transformer of mutual inductor precision measurement unit is 0.01 grade, and rated voltage and rated capacity are respectively 40.0kV, 5VA.
CN201520068077.2U 2015-01-30 2015-01-30 A kind of Power Transformer in Field load testing apparatus Active CN204359884U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520068077.2U CN204359884U (en) 2015-01-30 2015-01-30 A kind of Power Transformer in Field load testing apparatus

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520068077.2U CN204359884U (en) 2015-01-30 2015-01-30 A kind of Power Transformer in Field load testing apparatus

Publications (1)

Publication Number Publication Date
CN204359884U true CN204359884U (en) 2015-05-27

Family

ID=53261346

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520068077.2U Active CN204359884U (en) 2015-01-30 2015-01-30 A kind of Power Transformer in Field load testing apparatus

Country Status (1)

Country Link
CN (1) CN204359884U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104635083A (en) * 2015-01-30 2015-05-20 国网河南省电力公司电力科学研究院 Field load testing device for power transformer
CN105807172A (en) * 2016-06-01 2016-07-27 国家电网公司 Ultrahigh voltage substation simulated operation verifying system

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104635083A (en) * 2015-01-30 2015-05-20 国网河南省电力公司电力科学研究院 Field load testing device for power transformer
CN105807172A (en) * 2016-06-01 2016-07-27 国家电网公司 Ultrahigh voltage substation simulated operation verifying system

Similar Documents

Publication Publication Date Title
CN101424728B (en) On site precision detecting test line for high-voltage current transformer
CN201319064Y (en) Test circuit for field accuracy detection of high-voltage current transformer
CN105044479A (en) Apparatus for large-scale oil-immersed transformer no-load and on-load comprehensive tests and method
CN101726715A (en) Online calibration method for error characteristics of voltage transformer for power system
CN101833043A (en) Method for measuring electric capacity and dielectric loss of capacitance type voltage transformer
CN102593737B (en) Relay protection vector checkout facility method before putting into operation with the transformer station of capacitance compensation
CN102087347A (en) Charged test method for current transformer and application thereof
CN101958530A (en) Main transformer differential protection CT polarity check method of pumped storage power station
CN109581168A (en) A kind of converter power transformer In situ DC partial discharge test system and method
CN105207203B (en) A kind of UHV transmission line highly resistance compensation method
CN103336188A (en) Current boosting apparatus suitable for GIS equipment
CN103884933A (en) Temperature rise test method for large transformer
CN204359884U (en) A kind of Power Transformer in Field load testing apparatus
CN104635083A (en) Field load testing device for power transformer
CN108614213A (en) The polarity test method of transformer unit differential protection
CN202330691U (en) Field calibrating equipment for voltage transformer
CN103616581B (en) The method of without disconnecting power lead test reactive power compensator
CN101257213A (en) Reactive-load compensation method for high capacity high electric impedance distributing transformator attrition experiment
CN108152779A (en) Electronic current mutual inductor check system and method
CN205720536U (en) Alternating current filter breaker alternating current-direct current mixes pressure connection circuit
CN104808022A (en) Temperature rise test connection method for three-side combined operation of three-phase three-winding transformer
CN102269786B (en) Load testing device for triple-frequency transformer
Santos et al. Electrical requirements for half-wavelength power transmission line design
CN204515031U (en) Large Oil immersion transformer is empty, load test complex
CN211955677U (en) System of differential pressure monitor

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant