CN204357128U CN201420717291.1U CN201420717291U CN204357128U CN 204357128 U CN204357128 U CN 204357128U CN 201420717291 U CN201420717291 U CN 201420717291U CN 204357128 U CN204357128 U CN 204357128U
Authority
CN
China
Prior art keywords
pull bar
rod
construction formwork
main body
diameter
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420717291.1U
Other languages
Chinese (zh)
Inventor
林德亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201420717291.1U priority Critical patent/CN204357128U/en
Application granted granted Critical
Publication of CN204357128U publication Critical patent/CN204357128U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model discloses a kind of construction formwork pull bar, comprise the pull bar main body be arranged between two construction formworks, described pull bar main body comprises the body of rod and is separately positioned on the connecting portion at body of rod two ends, described body of rod cross section is circular, and the diameter in the cross section at these body of rod two ends is unequal, the body of rod forms the conical structure at the similar band constant slope angle designed with withdrawing pattern in mould, after concrete curing, one end less from body of rod diameter is beaten to one end that diameter is larger, pull bar main body can be taken out, take out very convenient, and without the need to sheathed plastic pipe, save a large amount of plastic pipes, and simplify the installation procedure of pull bar, greatly reduce cost, and the contact surface of pull bar and body of wall is smooth, what seal during repairing is effective, not easily occur leaking.

Description

Construction formwork pull bar
Technical field
The utility model relates to a kind of pull bar be applied in construction formwork.
Background technology
Along with the development of building trade, the proportion of cast-in-place concrete structure increases day by day, and labour cost constantly increases, and traditional wooden form intensity is low, can the number of turnover few, need to consume a large amount of timber and manpower; Steel form then weight is large, and the demoulding is difficult, and construction needs plant equipment to assist, and aluminum alloy building template is a kind of novel construction formwork, and it has lightweight, and the number of turnover is many, repeatedly has enough to meet the need low cost and other advantages.Aluminum alloy mould plate generally includes system horizontal, frame system, support column, support keel, the compositions such as construction formwork, construction formwork is generally used for building body of wall, flooring, normally two sides construction formwork supports the use, except being fixed except the construction formwork of two sides by frame system, also pull bar need be set at the interior location of two construction formworks, further reinforcing two construction formwork, be out of shape to prevent concrete spreading, after concrete curing, pull bar need be taken out, conveniently pull bar takes out, traditional way is sheathed plastic pipe on pull bar, but in real process, construction formwork system is generally used for the construction of large-scale flooring, pull bar required for it is a lot, this just causes a large amount of wastes of plastic pipe, and sleeve pipe intricate operation, increase cost.Because want filling-up hole mouth, may may cause uneven or leak by the bad such words of contact surface if former cement contacts with plastic pipe.
Summary of the invention
In order to overcome the deficiencies in the prior art, the utility model provides a kind of construction formwork pull bar.
The utility model solves the technical scheme that its technical problem adopts:
Construction formwork pull bar, comprise the pull bar main body be arranged between two construction formworks, described pull bar main body comprises the body of rod and is separately positioned on the connecting portion at body of rod two ends, described body of rod cross section is circular, and the diameter in the cross section at these body of rod two ends is unequal, the body of rod is made to form the conical structure at a band constant slope angle.
Described draft angle is set to 0.2 °-1 °.
Described connecting portion is provided with the connecting hole position corresponding with the installing hole on construction formwork.
Described connecting portion is a flat structure, with the side of construction formwork of fitting.
Described body of rod surface is provided with lube layer or release agent.
The beneficial effects of the utility model are: construction formwork pull bar, comprise the pull bar main body be arranged between two construction formworks, described pull bar main body comprises the body of rod and is separately positioned on the connecting portion at body of rod two ends, described body of rod cross section is circular, and the diameter in the cross section at these body of rod two ends is unequal, the body of rod forms the conical structure at the similar band constant slope angle designed with withdrawing pattern in mould, after concrete curing, one end less from body of rod diameter is beaten to one end that diameter is larger, pull bar main body can be taken out, take out very convenient, and without the need to sheathed plastic pipe, save a large amount of plastic pipes, and simplify the installation procedure of pull bar, greatly reduce cost, and the contact surface of pull bar and body of wall is smooth, what seal during repairing is effective, not easily occur leaking.
Accompanying drawing explanation
Below in conjunction with drawings and Examples, the utility model is further illustrated.
Schematic diagram when Fig. 1 is the utility model application;
Fig. 2 is the close-up schematic view of part A in the utility model Fig. 1;
Fig. 3 is structural representation of the present utility model.
Detailed description of the invention
Referring to figs. 1 through Fig. 3, Fig. 1, schematic diagram when Fig. 2 is the utility model specific embodiment application, Fig. 3 is the structural representation of the utility model specific embodiment, as shown in the figure, construction formwork pull bar, comprise the pull bar main body 1 be arranged between two construction formworks, described pull bar main body 1 comprises the body of rod 20 and is separately positioned on the connecting portion 21 at the body of rod 20 two ends, 22, the described body of rod 20 cross section is circular, and the diameter d 1 in the cross section at these body of rod 20 two ends, d2 is unequal, the body of rod 20 is made to form the similar conical structure being with constant slope angle designed with withdrawing pattern in mould, after concrete curing, one end less from the body of rod 20 diameter is beaten to one end that diameter is larger, pull bar main body 1 can be taken out, take out very convenient, and without the need to sheathed plastic pipe, save a large amount of plastic pipes, and simplify the installation procedure of pull bar, greatly reduce cost, and the contact surface of pull bar and body of wall is smooth, what seal during repairing is effective, not easily occur leaking.
In the utility model, described draft angle is set to 0.2 °-1 °, as preferably in the present embodiment, this draft angle is set to 0.5 °, ensure the laser intensity of pull bar, and do not affect the taking-up of pull bar, and offer convenience for follow-up tie rod hole Concrete Filled.
As preferably, described connecting portion 21,22 is a flat structure, with the side of construction formwork of fitting, described connecting portion 21,22 is provided with the connecting hole position corresponding with the installing hole on construction formwork, to facilitate the assembling of pull bar and construction formwork.
In the utility model, for further facilitating the taking-up of pull bar, also at the body of rod 20 surface brush last layer lubrication oil, lube layer can be formed, in addition, also at the body of rod 20 surface spraying release agent, can reach the effect of the taking-up facilitating pull bar equally.
Above better enforcement of the present utility model is illustrated; certainly; the utility model can also adopt form different from the embodiment described above; the equivalent conversion that those of ordinary skill in the art do under the prerequisite without prejudice to spirit of the present invention or change accordingly, all should belong in protection domain of the present utility model.

Claims (5)

1. construction formwork pull bar, comprise the pull bar main body be arranged between two construction formworks, it is characterized in that: described pull bar main body comprises the body of rod and is separately positioned on the connecting portion at body of rod two ends, described body of rod cross section is circular, and the diameter in the cross section at these body of rod two ends is unequal, the body of rod is made to form the conical structure at a band constant slope angle.
2. construction formwork pull bar according to claim 1, is characterized in that: described draft angle is set to 0.2 °-1 °.
3. construction formwork pull bar according to claim 1, is characterized in that: described connecting portion is provided with the connecting hole position corresponding with the installing hole on construction formwork.
4. construction formwork pull bar according to claim 1, is characterized in that: described connecting portion is a flat structure, with the side of construction formwork of fitting.
5. construction formwork pull bar according to claim 1, is characterized in that: described body of rod surface is provided with lube layer or release agent.
CN201420717291.1U 2014-11-25 2014-11-25 Construction formwork pull bar Expired - Fee Related CN204357128U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420717291.1U CN204357128U (en) 2014-11-25 2014-11-25 Construction formwork pull bar

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420717291.1U CN204357128U (en) 2014-11-25 2014-11-25 Construction formwork pull bar

Publications (1)

Publication Number Publication Date
CN204357128U true CN204357128U (en) 2015-05-27

Family

ID=53258606

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420717291.1U Expired - Fee Related CN204357128U (en) 2014-11-25 2014-11-25 Construction formwork pull bar

Country Status (1)

Country Link
CN (1) CN204357128U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104499712A (en) * 2014-11-25 2015-04-08 林德亮 Building formwork pull rod

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104499712A (en) * 2014-11-25 2015-04-08 林德亮 Building formwork pull rod

Similar Documents

Publication Publication Date Title
CN103061504B (en) Concrete slab Pipe installing hole to be provided construction mould and construction method
CN203856202U (en) Simple pullable sizing device of reserved holes
CN104499712A (en) Building formwork pull rod
CN103255866B (en) Roof circular arc-shaped dome structure and manufacturing method
CN106223611A (en) Standpipe hole presetting mold and construction method thereof
CN110344506B (en) Anti-leakage plugging treatment process for split bolt holes of outer wall
CN104047419A (en) Wall linking method of scaffold and wall-linking member used by scaffold
CN204357128U (en) Construction formwork pull bar
CN203977884U (en) A kind of steel reinforcement protective sleeve pipe
CN204626953U (en) A kind of for kitchen guarding, plate falls and hang die device
CN204299162U (en) To encorbelment steel I-beam anchor structure
CN201292667Y (en) Composite mould for pre-arranged hole for installation work pipe
CN208009182U (en) A kind of prefabricated assembled Cement Concrete Pavement Slab
CN205777472U (en) A kind of steel wood veneer template
CN103104099A (en) Method for constructing wall pulling steel bars in frame column and structure thereof
CN205558324U (en) Protective sheath of prevent pollution reinforcing bar when pouring floor
CN102926544A (en) Method for constructing wall pulling steel bars in frame column and structure thereof
CN203755682U (en) Secondary pouring form board constructing structure for small opening of concrete structure floor slab
CN204531405U (en) Movable template device convenient to clearance of stair construction joint position
CN206769245U (en) A kind of combination construction component for strengthening Sloping roof construction quality
CN201671338U (en) Water-stop screw rod
CN205476452U (en) Connection structure of shear force wall and floor
CN203201148U (en) Combined inner support of wall formwork
CN110863598A (en) Construction method for cast-in-situ floor slab construction hole
CN202706537U (en) Building vertical drain pipe plugging mould

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150527

Termination date: 20161125

CF01 Termination of patent right due to non-payment of annual fee