CN204343663U - 一种混凝土毛面墙体成型模板 - Google Patents
一种混凝土毛面墙体成型模板 Download PDFInfo
- Publication number
- CN204343663U CN204343663U CN201420752361.7U CN201420752361U CN204343663U CN 204343663 U CN204343663 U CN 204343663U CN 201420752361 U CN201420752361 U CN 201420752361U CN 204343663 U CN204343663 U CN 204343663U
- Authority
- CN
- China
- Prior art keywords
- template
- stratum reticulare
- iron wire
- forming panel
- wall forming
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Finishing Walls (AREA)
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
本实用新型涉及一种混凝土毛面墙体成型模板,包括常规工程模板、若干截面为“工”字形的模板背肋、铁丝网层、若干木三角条;所述若干条所述模板背肋彼此平行且均匀间隔设置,其一侧面固定在常规工程模板外表面;铁丝网层覆盖在所述若干条所述模板背肋的另一侧面;所述若干条木三角条彼此平行且均匀间隔设置在所述两侧铁丝网层外侧面,该木三角条与所述模板背肋固定。本实用新型操作方法简单、使用相关材料、工具简便,减少了人、材、机的投入,节约后续施工成本。
Description
技术领域
本发明涉及核电工程施工领域,尤其涉及混凝土毛面墙体成型模板。
背景技术
目前建筑领域对图纸有大面积毛面要求的结构表面采用凿毛成型。混凝土表面凿毛需投入大量人、材、机具,制约施工进度并造成环境及噪音污染。
现有技术采用的铁丝网模板仅应用在竖向结构施工缝处,且存在严重漏浆的缺陷,无法满足墙体大面积毛面质量要求。
发明内容
本发明的要解决的技术问题是提供一种克服了现有技术中存在严重漏浆的缺陷,可以满足墙体大面积毛面质量要求的混凝土毛面墙体成型模板。
为了解决上述技术问题,本发明的技术方案为,一种混凝土毛面墙体成型模板,包括常规工程模板、若干截面为“工”字形的模板背肋、铁丝网层、若干木三角条;
所述若干条所述模板背肋彼此平行且均匀间隔设置,其一侧面固定在常规工程模板外表面;铁丝网层覆盖在所述若干条所述模板背肋的另一侧面;所述若干条木三角条彼此平行且均匀间隔设置在所述两侧铁丝网层外侧面,该木三角条与所述模板背肋固定。
所述铁丝网层包括两层层叠设置的铁丝网,所述两层铁丝网的孔洞相互错开;
所述铁丝网层涂刷有胶装缓凝剂。
所述毛面墙体成型模板固定在混凝土墙体两侧。
本发明的有益效果:
(1)本发明操作方法简单、使用相关材料、工具简便,减少了人、材、机的投入,节约后续施工成本;
(2)本发明克服了现有技术中存在严重漏浆的缺陷,可以满足墙体大面积毛面质量要求。
附图说明
图1为本发明混凝土毛面墙体成型模板立体示意图;
图2为本发明混凝土毛面墙体成型模板使用状态图。
图中:1-铁丝网,2-面板,3-木三角条,4-模板背肋,5-吊耳,6-高强螺杆,7-混凝土墙。
具体实施方式
以下结合附图和实施例对本发明做进一步描述。
本发明的一种混凝土毛面墙体成型工艺,包括以下步骤:
步骤一、采用高强木料加工截面为“工”字形的模板背肋4,进而加工截面为三角形的木三角条3;
步骤二、将若干条所述模板背肋4彼此平行且均匀间隔设置,并将其一侧面固定在常规工程模板外表面;
步骤三、将两层铁丝网1层叠设置,且保证两层铁丝网1的孔洞相互错开;
步骤四、将所述两层铁丝网1铺设在干条所述模板背肋4的另一侧面,将所述木三角条3彼此平行且均匀间隔设置在所述两侧铁丝网1外侧面,并通过螺钉将木三角条3与所述模板背肋4固定,从而获得毛面墙体成型模板;木三角条3卡住铁丝网1,从而多铁丝网1的限位;
步骤五、在所述毛面墙体成型模板支设前一小时,对其有铁丝网的一侧涂刷一层缓凝剂,从而获得施工用成型模板;此种缓凝剂是一种胶状缓凝剂,缓凝时间长;
步骤六、在混凝土墙7两侧分别铺设步骤五获得的施工用成型模板,采用高强螺杆对两侧的施工用成型模板进行对拉加固,进而采用测量仪器进行调整,保证整个模板体系的准确度;
步骤七、开始对两侧固定有施工用模板的混凝土墙7进行混凝土的浇筑,浇筑过程中振捣棒不能触碰模板,以保证铁丝网的完整性;
步骤八、混凝土初凝后终凝前,每拆除一块施工用模板,对该施工用模板覆盖区域混凝土进行冲毛,从上往下形成流水冲毛带,确保每一冲毛的石子露出1/3,整个混凝土墙7冲毛结束后,将拆除的施工用模板表面清理干净,将铁丝网更换,便可以重新使用。
本发明的一种混凝土毛面墙体成型模板,包括常规工程模板、若干截面为“工”字形的模板背肋4、铁丝网层、若干木三角条3;
所述若干条所述模板背肋4彼此平行且均匀间隔设置,其一侧面固定在常规工程模板外表面;铁丝网层覆盖在所述若干条所述模板背肋4的另一侧面;所述若干条木三角条3彼此平行且均匀间隔设置在所述两侧铁丝网层外侧面,该木三角条3与所述模板背肋4固定。
所述铁丝网层包括两层层叠设置的铁丝网1,所述两层铁丝网1的孔洞相互错开;
所述铁丝网层涂刷有胶装缓凝剂;
所述毛面墙体成型模板通过高强螺杆对拉固定在混凝土墙体两侧。
Claims (4)
1.一种混凝土毛面墙体成型模板,其特征在于:包括常规工程模板、若干截面为“工”字形的模板背肋、铁丝网层、若干木三角条;
所述若干条所述模板背肋彼此平行且均匀间隔设置,其一侧面固定在常规工程模板外表面;铁丝网层覆盖在所述若干条所述模板背肋的另一侧面;所述若干条木三角条彼此平行且均匀间隔设置在所述两侧铁丝网层外侧面,该木三角条与所述模板背肋固定。
2.按照权利要求1所述的混凝土毛面墙体成型模板,其特征在于:所述铁丝网层包括两层层叠设置的铁丝网,所述两层铁丝网的孔洞相互错开。
3.按照权利要求1所述的混凝土毛面墙体成型模板,其特征在于:所述铁丝网层涂刷有胶装缓凝剂。
4.按照权利要求1所述的混凝土毛面墙体成型模板,其特征在于:所述毛面墙体成型模板固定在混凝土墙体两侧。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420752361.7U CN204343663U (zh) | 2014-12-04 | 2014-12-04 | 一种混凝土毛面墙体成型模板 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420752361.7U CN204343663U (zh) | 2014-12-04 | 2014-12-04 | 一种混凝土毛面墙体成型模板 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204343663U true CN204343663U (zh) | 2015-05-20 |
Family
ID=53226940
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201420752361.7U Expired - Fee Related CN204343663U (zh) | 2014-12-04 | 2014-12-04 | 一种混凝土毛面墙体成型模板 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204343663U (zh) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105715041A (zh) * | 2014-12-04 | 2016-06-29 | 中国核工业二四建设有限公司 | 一种混凝土毛面墙体成型工艺及模板 |
CN111550052A (zh) * | 2020-05-30 | 2020-08-18 | 深圳市建工集团股份有限公司 | 超高层核心筒外侧楼板明埋式钢筋预留及免凿毛施工方法 |
-
2014
- 2014-12-04 CN CN201420752361.7U patent/CN204343663U/zh not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105715041A (zh) * | 2014-12-04 | 2016-06-29 | 中国核工业二四建设有限公司 | 一种混凝土毛面墙体成型工艺及模板 |
CN105715041B (zh) * | 2014-12-04 | 2018-06-15 | 中国核工业二四建设有限公司 | 一种混凝土毛面墙体成型工艺及模板 |
CN111550052A (zh) * | 2020-05-30 | 2020-08-18 | 深圳市建工集团股份有限公司 | 超高层核心筒外侧楼板明埋式钢筋预留及免凿毛施工方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204983391U (zh) | 免拆预制混凝土梁模板 | |
CN102121315B (zh) | 紧定式钢套管预留孔洞施工方法 | |
CN204826614U (zh) | 免拆预制混凝土墙体模板 | |
CN204343663U (zh) | 一种混凝土毛面墙体成型模板 | |
CN203452378U (zh) | 一种后浇带定位结构 | |
CN203008370U (zh) | 楼梯踏板浇筑模板 | |
CN106930523A (zh) | 一种砼结构集水坑可拆卸模板加固技术 | |
CN203514793U (zh) | 一种设备预留模板 | |
CN102912977A (zh) | 一种用于浇筑定型楼梯的模具 | |
CN104074354A (zh) | 一种插板式现浇楼梯模板及其使用方法 | |
CN108265897A (zh) | 一种改进的楼梯施工缝处理施工方法 | |
CN105715041B (zh) | 一种混凝土毛面墙体成型工艺及模板 | |
CN105019599A (zh) | 免拆预制混凝土梁保温模板 | |
CN203924713U (zh) | 一种混凝土楼板上孔洞的预留装置 | |
CN204754213U (zh) | 一种无粘结预应力钢绞线张拉端穴模 | |
CN203755682U (zh) | 一种混凝土结构楼板小洞口二次浇筑模板施工结构 | |
CN204418666U (zh) | 一种建筑工地用有侧墙楼梯模板 | |
CN204040457U (zh) | 木框塑料模板体系 | |
CN204531405U (zh) | 一种便于楼梯施工缝位置清理的活动模板装置 | |
CN203514792U (zh) | 一种抽屉式楼梯施工缝模板装置 | |
CN207211731U (zh) | 框架内柱柱脚组合定位套模板 | |
CN207110461U (zh) | 一种定型化可周转式楼梯钢模板 | |
CN205024573U (zh) | 混凝土快速振捣抹平机 | |
CN202689554U (zh) | 一种混凝土墙体模板定位支撑装置 | |
CN204343674U (zh) | 一种方便收面的新型工具式楼梯模板 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20150520 Termination date: 20171204 |
|
CF01 | Termination of patent right due to non-payment of annual fee |