CN204238368U - Pre-fix plate body system wall insulation system - Google Patents

Pre-fix plate body system wall insulation system Download PDF

Info

Publication number
CN204238368U
CN204238368U CN201420154488.9U CN201420154488U CN204238368U CN 204238368 U CN204238368 U CN 204238368U CN 201420154488 U CN201420154488 U CN 201420154488U CN 204238368 U CN204238368 U CN 204238368U
Authority
CN
China
Prior art keywords
screw thread
plate body
layer
wall
thread member
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201420154488.9U
Other languages
Chinese (zh)
Inventor
花海东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Woniushan Building Energy Saving Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201420154488.9U priority Critical patent/CN204238368U/en
Application granted granted Critical
Publication of CN204238368U publication Critical patent/CN204238368U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Finishing Walls (AREA)
  • Working Measures On Existing Buildindgs (AREA)

Abstract

The utility model relates to one and pre-fixes plate body system wall insulation system, comprise base course wall, screw thread member, insulation layer and polymer mortar layer, it is characterized in that: one end of screw thread member is embedded in base course wall, through insulation layer, be connected with polymer mortar layer by block.Coordinate the mounting means adopting back of the body bolt, have the advantages that Path of Force Transfer is clear and definite, safe and reliable, speed of application is fast, with low cost, be suitable for new building and reconstruction of existing building.

Description

Pre-fix plate body system wall insulation system
Technical field
The utility model relates to construction wall heat-insulation system, especially relates to one and pre-fixes plate body system wall insulation system.
Background technology
Energy-saving and emission-reduction be the whole world common faced by problem, and building energy conservation is its important component part.External Thermal Insulation System is the important means realizing building energy conservation.Adopt at present usually external insulating system for thinly plastered external wall based on various heat preservation plate material as the citation form of exterior-wall heat insulation.
Substantially identical based on the plastering exterior wall outer heat preservation system construction technology of heat preservation plate material at present, summing up gets up is exactly: after base course wall process, first sticking heat-preservation plate, to hole again mounting fixing parts, after polishing, smear polymer mortar and be pressed into grid cloth, as in Chongqing City's engineering construction standard " nonflammable expansion polyphenyl plate architectural exterior insulation system application technology code " (DBJ50/T-160-2013), defining the construction technology shown in Fig. 1.The shortcoming of current existence:
1, owing to first installing warming plate, rear boring mounting fixing parts, the quality in hole cannot be observed.Also cannot dust in cleaning eye in Practical Project.
2, the thickness that drilling depth must be greater than warming plate adds the degree of depth entering base course wall, needs to use longer drill bit.If when northeastward etc. severe cold area or power conservation requirement improve further, need length to reach the drill bit of 20-30 centimeter length, not easily construct, the easy breaking of rod, easily cause reaming, affect fixture installation quality.
3, to southern rainy regions, when requiring to carry out leak stopping to hole, due to the existence of warming plate, cannot plugging watertight effectively.
4, to engineerings such as freezers, when needing multi-layer heat preserving plate is installed (sometimes reaching 4-6 layer), multi-layer heat preserving plate cannot be fixed with a fixture simultaneously, need to adopt multiple temporary fixed measure or interim measure, while affecting progress, also increase cost.
5, after sticking heat-preservation plate in a short time, during mounting fixing parts, easy disturbance adhesive mortar, affects sticking strength, causes empty sticky.
Summary of the invention
1, goal of the invention
The purpose of this utility model is the shortcoming overcoming existing technique, provides the new type of plate system wall insulation system of technically reliable, economical rationality, easy construction.
2, technical scheme
For achieving the above object, the utility model adopts following technical scheme:
For overcoming above-mentioned shortcoming, invent and pre-fixed plate body system wall insulation system construction technology, its core adopts the modes such as boring, pre-buried or stickup, the screw thread member Vertical dimension is drawn from base course wall, then paste on screw thread member, hang warming plate (one or more layers), thus warming plate is temporarily anchored on body of wall, blocked a shot by screw thread in the outside of warming plate, thus insulation is fixed on base course wall firmly, and then carry out polishing below---the series of processes such as pressure network of plastering.
3, beneficial effect
The utility model pre-fixes plate body system wall insulation system, and tool has the following advantages:
1, when there is no warming plate, screw rod being installed, can drilling depth being reduced, shorten the length of the bit, ensure drilling quality.
2, conveniently can take to fill the multiple leaking-stopping measures such as cementitious material, ensure that the position of mounting fixing parts does not produce seepage.
3, conveniently can install the warming plate of super thick, can hang some layers of warming plate simultaneously, last property internal thread block is fixing, does not need temporary fixed measure, saves duration and cost.Fixing external screw thread rod member first can be checked and accepted in operation and in management.
4, in operation and management, can first check and accept fixing external threaded, overcome the shortcoming that concealed work is inconvenient to check and accept.Stop drilling depth inadequate, even false fixing phenomenon.
5, under Base Smoothness meets the requirements of situation, can save sticking mortar, directly warming plate is hung in dry operation, has greatly saved cost and duration.
Accompanying drawing explanation
Fig. 1 is conventional panels system wall insulation system construction technology figure;
Fig. 2 pre-fixes plate body system wall insulation system construction technology figure;
Fig. 3 is screw thread block elevation a and sectional drawing b;
Fig. 4 is band cap thread rod member sectional drawing c and elevation d;
Fig. 5 is screw thread member;
Fig. 6 pre-fixes plate body system wall insulation system structural representation.
Detailed description of the invention
Implementation example 1:
To masonry wall, when leveling layer is plastered, the screw thread of Fig. 3 is blocked a shot, plane is embedded in leveling mortar layer inwardly, after mortar solidification, screw thread member (Fig. 5) with the corresponding length of warming plate thickness is connected on pre-buried screw thread block (Fig. 3), tip outwardly, then paste on screw thread member, hang warming plate (one or more layers), tighten fixing with the screw thread block shown in Fig. 3 again, plane, then carries out polishing below-smear polymer mortar-bury series of processes such as pasting grid cloth outwardly.
Implementation example 2:
Masonry wall, pre-buried band cap thread rod member as shown in Figure 4 in leveling mortar layer, block is in screed, screw thread member vertical wall outwardly, after mortar solidification, screw thread member pastes, hangs warming plate (one or more layers), then tighten fixing with the screw thread block shown in Fig. 3, then carry out polishing below-smear polymer mortar-bury the series of processes such as subsides grid cloth.
Implementation example 3:
On the body of wall of existing leveling layer, or cast-in-place concrete wall, or existing old metope, with the sizeable hole of boring of electric hammer, and cementitious material is filled in hole, screw thread member is as shown in Figure 5 installed, the length of rod member is corresponding with the thickness of heat insulating material, tip outwardly, then paste on screw thread member and hang warming plate (one or more layers), tighten fixing with the screw thread block shown in Fig. 3 again, the polishing then carried out below---is smeared polymer mortar---and is buried series of processes such as pasting grid cloth.

Claims (5)

1. pre-fix plate body system wall insulation system, comprise base course wall, screw thread member, insulation layer and polymer mortar layer, it is characterized in that: one end of screw thread member is embedded in base course wall, through insulation layer, be connected with polymer mortar layer by block.
2. according to claim 1ly pre-fix plate body system wall insulation system, it is characterized in that: above-mentioned insulation layer is the shaping sheet material of factory, can be expansion polyphenyl plate or extruded polystyrene board or polyurethane sheet or phenolic board or rock cotton board or phenolic board or foamed glass plate or foamed ceramic plate or the above-mentioned sheet material sheet material through a series of aft-loaded airfoil.
3. according to claim 1ly pre-fix plate body system wall insulation system, it is characterized in that: above-mentioned insulation layer can be one layer of heat preservation plate, also can be multi-layer heat preserving plate.
4. according to claim 1ly pre-fixing plate body system wall insulation system, it is characterized in that: above-mentioned screw thread member can be one or be made up of several component, and have the helicitic texture for connecting, leading portion is tip.
5. according to claim 1ly pre-fix plate body system wall insulation system, it is characterized in that: above-mentioned block inside have the mechanism be connected with screw thread member.
CN201420154488.9U 2014-04-02 2014-04-02 Pre-fix plate body system wall insulation system Expired - Lifetime CN204238368U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420154488.9U CN204238368U (en) 2014-04-02 2014-04-02 Pre-fix plate body system wall insulation system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420154488.9U CN204238368U (en) 2014-04-02 2014-04-02 Pre-fix plate body system wall insulation system

Publications (1)

Publication Number Publication Date
CN204238368U true CN204238368U (en) 2015-04-01

Family

ID=52767881

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420154488.9U Expired - Lifetime CN204238368U (en) 2014-04-02 2014-04-02 Pre-fix plate body system wall insulation system

Country Status (1)

Country Link
CN (1) CN204238368U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106978892A (en) * 2017-04-12 2017-07-25 重庆思贝肯节能技术开发有限公司 Spun gold heat insulating decorative board and its fabrication and installation method with built-in anchor
CN107747362A (en) * 2017-12-02 2018-03-02 江苏惠淳建设有限公司 Foam glass roof heat insulation insulation system and its construction method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106978892A (en) * 2017-04-12 2017-07-25 重庆思贝肯节能技术开发有限公司 Spun gold heat insulating decorative board and its fabrication and installation method with built-in anchor
CN107747362A (en) * 2017-12-02 2018-03-02 江苏惠淳建设有限公司 Foam glass roof heat insulation insulation system and its construction method
CN107747362B (en) * 2017-12-02 2019-07-19 江苏惠淳建设有限公司 Foam glass roof heat insulation insulation system and its construction method

Similar Documents

Publication Publication Date Title
CN204152000U (en) A kind of inorganic compounding insulation construction for in-situ concrete wall
CN205276769U (en) Light outer wall point is hung heat preservation decorative board combination anchor and is connect system
CN202718248U (en) Inorganic fire protection heat insulation board external wall heat insulation structure
CN103266672B (en) External wall heat preservation system and construction technology of recombination of polystyrene foam and heat preservation inorganic fireproof plate
CN204238368U (en) Pre-fix plate body system wall insulation system
CN203684414U (en) Rapid blocking structure of screw hole of concrete structure outer wall
CN203569739U (en) Heat preservation outer mold composite board for cast-in-place concrete
CN204401814U (en) Light polyurethane heat preservation and decoration of outer wall system
CN104975658A (en) Pre-fixed plate system wall insulation system construction technology
CN104632007B (en) A kind of erection of doors and windows method using energy-conservation auxiliary frame
CN203429810U (en) Thermal insulation mortar and molding polystyrene board compounding outer-wall external thermal insulation system
CN111058629A (en) Construction method for plugging through-wall bolt hole of concrete outer wall
CN204252367U (en) Air-conditioning duct wears the lightweight precast concrete component of building block exterior wall
CN103266677A (en) EPS composite board, external thermal insulation system and construction method
CN204059666U (en) Lightweight grouting wall
CN205153571U (en) Outer wall bolt hole novel to drawing block structure
CN204199451U (en) A kind of glass bead polymer mortar composite polyurethane external thermal insulation system
CN206844467U (en) Lintel type composite heat insulation block, lintel type composite heat insulating wall
CN204553458U (en) The anti-pawl anchoring bolt of a kind of brickwork
CN202074133U (en) Heat-preserving node structure for wall-penetrating pipe
CN202430840U (en) Outer-wall heat insulation structure
CN205348655U (en) External wall insulation decorates production board's mounting structure
CN204023805U (en) Air-condition plate heat-preserving node structure
CN203113543U (en) Installing device of vacuum insulated panel
CN103604002A (en) Through-wall pipeline construction structure

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20170607

Address after: Jiangning District of Nanjing City, Jiangsu province 211111 streets moling Road No. 12 mo Zhou

Patentee after: JIANGSU WONIUSHAN THERMAL INSULATION AND WATERPROOF TECHNOLOGY CO.,LTD.

Address before: Yudaojie Qinhuai District of Nanjing City, Jiangsu Province, No. 169 38-104 210007

Patentee before: Hua Haidong

TR01 Transfer of patent right
CP01 Change in the name or title of a patent holder

Address after: Jiangning District of Nanjing City, Jiangsu province 211111 streets moling Road No. 12 mo Zhou

Patentee after: Jiangsu Funiushan building energy saving Technology Co.,Ltd.

Address before: Jiangning District of Nanjing City, Jiangsu province 211111 streets moling Road No. 12 mo Zhou

Patentee before: JIANGSU WONIUSHAN THERMAL INSULATION AND WATERPROOF TECHNOLOGY Co.,Ltd.

CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 211111 No. 12, Mazhou East Road, Mau Ling Street, Jiangning District, Nanjing, Jiangsu

Patentee after: Woniushan building energy saving Co.,Ltd.

Address before: 211111 No. 12, Mazhou East Road, Mau Ling Street, Jiangning District, Nanjing, Jiangsu

Patentee before: Jiangsu Funiushan building energy saving Technology Co.,Ltd.

CP01 Change in the name or title of a patent holder
CX01 Expiry of patent term

Granted publication date: 20150401

CX01 Expiry of patent term