CN104975658A - Pre-fixed plate system wall insulation system construction technology - Google Patents

Pre-fixed plate system wall insulation system construction technology Download PDF

Info

Publication number
CN104975658A
CN104975658A CN201410128139.4A CN201410128139A CN104975658A CN 104975658 A CN104975658 A CN 104975658A CN 201410128139 A CN201410128139 A CN 201410128139A CN 104975658 A CN104975658 A CN 104975658A
Authority
CN
China
Prior art keywords
screw thread
warming plate
thread member
plate
construction technology
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410128139.4A
Other languages
Chinese (zh)
Other versions
CN104975658B (en
Inventor
花海东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Woniushan Building Energy Saving Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201410128139.4A priority Critical patent/CN104975658B/en
Publication of CN104975658A publication Critical patent/CN104975658A/en
Application granted granted Critical
Publication of CN104975658B publication Critical patent/CN104975658B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Finishing Walls (AREA)
  • Building Environments (AREA)

Abstract

The invention relates to the building wall insulation system construction technology, and specifically refers to a pre-fixed plate system wall insulation system construction technology; the core of the technology is to use a drilling, pre-buried or bonding mode to lead out vertical outward thread rod from a base wall; the thread rods are bonded or hung with one or more layers of insulation plates; an outer side of the insulation plate is provided with thread caps in a screwing or knocking mode, thus firmly fixing the insulation plates on the base wall; then later polishing-plastering netting steps are followed. The pre-fixed plate system wall insulation system construction technology solves seepage and virtual fixation disadvantages of the conventional technology, optimizes a construction flow, ensures engineering quality, reduces construction cost, and has wide application in civil building and cold storage engineering.

Description

Pre-fix plate body system wall insulation system construction technology
Technical field
The present invention relates to the construction technology of construction wall heat-insulation system, especially relate to one and pre-fix plate body system wall insulation system construction technology
Background technology
Energy-saving and emission-reduction be the whole world common faced by problem, and building energy conservation is its important component part.External Thermal Insulation System is the important means realizing building energy conservation.Adopt at present usually external insulating system for thinly plastered external wall based on various heat preservation plate material as the citation form of exterior-wall heat insulation.
Substantially identical based on the plastering exterior wall outer heat preservation system construction technology of heat preservation plate material at present, summing up gets up is exactly: after base course wall process, first sticking heat-preservation plate, to hole again mounting fixing parts, after polishing, smear polymer mortar and be pressed into grid cloth, as in Chongqing City's engineering construction standard " nonflammable expansion polyphenyl plate architectural exterior insulation system application technology code " (DBJ50/T-160-2013), defining the construction technology shown in Fig. 1.
The shortcoming of current existence:
1, owing to first installing warming plate, rear boring mounting fixing parts, the quality in hole cannot be observed.Also cannot dust in cleaning eye in Practical Project.
2, the thickness that drilling depth must be greater than warming plate adds the degree of depth entering base course wall, needs to use longer drill bit.If when northeastward etc. severe cold area or power conservation requirement improve further, need length to reach the drill bit of 20-30 centimeter length, not easily construct, the easy breaking of rod, easily cause reaming, affect fixture installation quality.
3, to southern rainy regions, when requiring to carry out leak stopping to hole, due to the existence of warming plate, cannot plugging watertight effectively.
4, to engineerings such as freezers, when needing multi-layer heat preserving plate is installed (sometimes reaching 4-6 layer), multi-layer heat preserving plate cannot be fixed with a fixture simultaneously, need to adopt multiple temporary fixed measure or interim measure, while affecting progress, also increase cost.
5, after sticking heat-preservation plate in a short time, during mounting fixing parts, easy disturbance adhesive mortar, affects sticking strength, causes empty sticky.
Summary of the invention
1, goal of the invention
The object of the invention is to the shortcoming overcoming existing technique, the construction technology pre-fixing plate body system wall insulation system of technically reliable, economical rationality, easy construction is provided.
2, technical scheme
For achieving the above object, the present invention adopts following technical scheme:
For overcoming above-mentioned shortcoming, invent and pre-fixed plate body system wall insulation system construction technology, its core adopts the modes such as boring, pre-buried or stickup, the screw thread member Vertical dimension is drawn from base course wall, then paste on screw thread member, hang warming plate (one or more layers), thus warming plate is temporarily anchored on body of wall, blocked a shot by screw thread in the outside of warming plate, thus insulation is fixed on base course wall firmly, and then carry out polishing below---the series of processes such as pressure network of plastering.
3, beneficial effect
The present invention pre-fixes plate body system wall insulation system construction technology, and tool has the following advantages:
1, when there is no warming plate, screw rod being installed, can drilling depth being reduced, shorten the length of the bit, ensure drilling quality.
2, conveniently can take to fill the multiple leaking-stopping measures such as cementitious material, ensure that the position of mounting fixing parts does not produce seepage.
3, conveniently can install the warming plate of super thick, can hang some layers of warming plate simultaneously, last property internal thread block is fixing, does not need temporary fixed measure, saves duration and cost.Fixing external screw thread rod member first can be checked and accepted in operation and in management.
4, in operation and management, can first check and accept fixing external threaded, overcome the shortcoming that concealed work is inconvenient to check and accept.Stop drilling depth inadequate, even false fixing phenomenon.
5, under Base Smoothness meets the requirements of situation, can save sticking mortar, directly warming plate is hung in dry operation, has greatly saved cost and duration.
Accompanying drawing explanation
Fig. 1 is conventional panels system wall insulation system construction technology figure;
Fig. 2 pre-fixes plate body system wall insulation system construction technology figure;
Fig. 3 is screw thread block elevation a and sectional drawing b;
Fig. 4 is band cap thread rod member sectional drawing c and elevation d;
Fig. 5 is screw thread member.
Detailed description of the invention
Implementation example 1:
To masonry wall, when leveling layer is plastered, the screw thread of Fig. 3 is blocked a shot, plane is embedded in leveling mortar layer inwardly, after mortar solidification, screw thread member (Fig. 5) with the corresponding length of warming plate thickness is connected on pre-buried screw thread block (Fig. 3), tip outwardly, then paste on screw thread member, hang warming plate (one or more layers), tighten fixing with the screw thread block shown in Fig. 3 again, plane, then carries out polishing below-smear polymer mortar-bury series of processes such as pasting grid cloth outwardly.
Implementation example 2:
To masonry wall, pre-buried band cap thread rod member as shown in Figure 4 in leveling mortar layer, block is in screed, screw thread member vertical wall outwardly, after mortar solidification, screw thread member pastes, hangs warming plate (one or more layers), then tighten fixing with the screw thread block shown in Fig. 3, then carry out polishing below-smear polymer mortar-bury the series of processes such as subsides grid cloth.
Implementation example 3:
On the body of wall of existing leveling layer, or cast-in-place concrete wall, or existing old metope, with the sizeable hole of boring of electric hammer, and cementitious material is filled in hole, screw thread member is as shown in Figure 5 installed, the length of rod member is corresponding with the thickness of heat insulating material, tip outwardly, then paste on screw thread member and hang warming plate (one or more layers), tighten fixing with the screw thread block shown in Fig. 3 again, the polishing then carried out below---is smeared polymer mortar---and is buried series of processes such as pasting grid cloth.

Claims (7)

1. pre-fix plate body system wall insulation system construction technology, comprise base treatment and---screw thread member is installed and---glues,------------being pressed into grid cloth---smears polymer mortar to extension warming plate to smear polymer mortar in polishing to install screw thread block.
2. installation screw thread member according to claim 1, is characterized in that: adopt pre-buried or boring or the mode of pasting to draw perpendicular to the screw thread member of metope from base course wall.
3. the screw thread member according to claim 1 and 2, is characterized in that: screw thread member can be one or be made up of several component, and have the helicitic texture for connecting, leading portion is tip.
4. require described sticky, extension warming plate according to right 1, it is characterized in that: employing is pasted and extension combines or cladding mode installs warming plate, and warming plate can be one or more layers.
5. require described sticky, subsides warming plate according to right 1, it is characterized in that: warming plate can directly be pressed in screw thread member, or after on-the-spot perforate, then be suspended on screw thread member.
6. the warming plate according to claim 4 and 5, it is characterized in that: warming plate is the shaping sheet material of factory, can be expansion polyphenyl plate or extruded polystyrene board or polyurethane sheet or phenolic board or rock cotton board or phenolic board or foamed glass plate or foamed ceramic plate or the above-mentioned sheet material sheet material through a series of aft-loaded airfoil.
7. installation screw thread block according to claim 1, is characterized in that: block has the mechanism be connected with screw thread member, adopts the mode screwing or knock to install.
CN201410128139.4A 2014-04-02 2014-04-02 Pre-fix plate body system wall insulation system construction technology Active CN104975658B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410128139.4A CN104975658B (en) 2014-04-02 2014-04-02 Pre-fix plate body system wall insulation system construction technology

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410128139.4A CN104975658B (en) 2014-04-02 2014-04-02 Pre-fix plate body system wall insulation system construction technology

Publications (2)

Publication Number Publication Date
CN104975658A true CN104975658A (en) 2015-10-14
CN104975658B CN104975658B (en) 2019-01-22

Family

ID=54272588

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410128139.4A Active CN104975658B (en) 2014-04-02 2014-04-02 Pre-fix plate body system wall insulation system construction technology

Country Status (1)

Country Link
CN (1) CN104975658B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106193499A (en) * 2016-08-31 2016-12-07 山东刚磊建材科技有限公司 A kind of combined heat-insulating integral plate anchoring torr hanging hang structure and process
CN107724548A (en) * 2017-11-14 2018-02-23 中冶建工集团有限公司 Warming plate anchoring piece and the exterior wall heat-preserving system construction technology using the anchoring piece

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE19533381C1 (en) * 1995-09-09 1997-06-12 Sto Verotec Gmbh Projecting, rear-ventilated outer wall cladding
CN1334393A (en) * 2001-09-05 2002-02-06 李卫 Method for constructing insulating layer of external wall for building
CN2540462Y (en) * 2002-06-05 2003-03-19 王继强 Connecting fastening for external insulating layer for building blocks type exposed wall
JP2004084244A (en) * 2002-08-26 2004-03-18 Sumitomo Forestry Co Ltd Externally insulated external wall structure
CN2926365Y (en) * 2006-07-28 2007-07-25 范永光 Embedded brick with built-in fitting and externally thermal-insulating structure of external wall
CN101654932A (en) * 2009-09-25 2010-02-24 河北省烟草公司唐山市公司 Extruded-sheet external-wall external heat insulation construction method

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE19533381C1 (en) * 1995-09-09 1997-06-12 Sto Verotec Gmbh Projecting, rear-ventilated outer wall cladding
CN1334393A (en) * 2001-09-05 2002-02-06 李卫 Method for constructing insulating layer of external wall for building
CN2540462Y (en) * 2002-06-05 2003-03-19 王继强 Connecting fastening for external insulating layer for building blocks type exposed wall
JP2004084244A (en) * 2002-08-26 2004-03-18 Sumitomo Forestry Co Ltd Externally insulated external wall structure
CN2926365Y (en) * 2006-07-28 2007-07-25 范永光 Embedded brick with built-in fitting and externally thermal-insulating structure of external wall
CN101654932A (en) * 2009-09-25 2010-02-24 河北省烟草公司唐山市公司 Extruded-sheet external-wall external heat insulation construction method

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106193499A (en) * 2016-08-31 2016-12-07 山东刚磊建材科技有限公司 A kind of combined heat-insulating integral plate anchoring torr hanging hang structure and process
CN106193499B (en) * 2016-08-31 2020-06-02 山东刚磊建材科技有限公司 Anchoring and supporting structure of composite heat-insulation integrated plate and process method
CN107724548A (en) * 2017-11-14 2018-02-23 中冶建工集团有限公司 Warming plate anchoring piece and the exterior wall heat-preserving system construction technology using the anchoring piece
CN107724548B (en) * 2017-11-14 2019-11-08 中冶建工集团有限公司 Insulation board anchoring piece and the exterior wall heat-preserving system construction technology for using the anchoring piece

Also Published As

Publication number Publication date
CN104975658B (en) 2019-01-22

Similar Documents

Publication Publication Date Title
CN106245804B (en) Rear structure heat preservation integration building
CN205276769U (en) Light outer wall point is hung heat preservation decorative board combination anchor and is connect system
CN106760348A (en) A kind of insulation and decoration acoustic wall board and its construction method of installation
CN204152000U (en) A kind of inorganic compounding insulation construction for in-situ concrete wall
CN107965153B (en) Dry-laid rubble wall seismic strengthening and energy-saving reconstruction integrated method
CN103266672B (en) External wall heat preservation system and construction technology of recombination of polystyrene foam and heat preservation inorganic fireproof plate
CN113374095B (en) Construction method of high-strength short fiber composite building outer wall heat insulation layer
CN204238368U (en) Pre-fix plate body system wall insulation system
CN213741745U (en) External wall insulation structure
CN104975658A (en) Pre-fixed plate system wall insulation system construction technology
CN208009671U (en) A kind of inside and outside compound insulation structure of wall
CN204401814U (en) Light polyurethane heat preservation and decoration of outer wall system
CN206957099U (en) A kind of insulation and decoration acoustic wall board
CN104632007B (en) A kind of erection of doors and windows method using energy-conservation auxiliary frame
CN111733992A (en) External wall external thermal insulation system containing rock sliver composite board and construction process
CN203429810U (en) Thermal insulation mortar and molding polystyrene board compounding outer-wall external thermal insulation system
CN103266677A (en) EPS composite board, external thermal insulation system and construction method
CN203613682U (en) Cast-in-situ template for wall compound insulation system
CN204199451U (en) A kind of glass bead polymer mortar composite polyurethane external thermal insulation system
CN207229543U (en) A kind of bridge cutoff type crab-bolt
CN203361362U (en) Thick plaster exterior wall external thermal insulation system combining double-layer grid cloth and foamed cement boards
CN202430840U (en) Outer-wall heat insulation structure
CN206844467U (en) Lintel type composite heat insulation block, lintel type composite heat insulating wall
CN105220781A (en) A kind of waterproof composite insulation boards
CN210767274U (en) Waterproof mending-leakage structure of building outer wall

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
DD01 Delivery of document by public notice

Addressee: Hua Haidong

Document name: the First Notification of an Office Action

DD01 Delivery of document by public notice
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20170609

Address after: Jiangning District of Nanjing City, Jiangsu province 211111 streets moling Road No. 12 mo Zhou

Applicant after: Jiangsu Woniushan Insulation Waterproof Technology Co., Ltd.

Address before: Yudaojie Qinhuai District of Nanjing City, Jiangsu province 210007 No. 169 Yushuiwan garden 38-104

Applicant before: Hua Haidong

GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: Jiangning District of Nanjing City, Jiangsu province 211111 streets moling Road No. 12 mo Zhou

Patentee after: Jiangsu Funiushan building energy saving Technology Co., Ltd

Address before: Jiangning District of Nanjing City, Jiangsu province 211111 streets moling Road No. 12 mo Zhou

Patentee before: JIANGSU WONIUSHAN THERMAL INSULATION AND WATERPROOF TECHNOLOGY Co.,Ltd.

CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 211111 No. 12, Mazhou East Road, Mau Ling Street, Jiangning District, Nanjing, Jiangsu

Patentee after: Woniushan building energy saving Co.,Ltd.

Address before: 211111 No. 12, Mazhou East Road, Mau Ling Street, Jiangning District, Nanjing, Jiangsu

Patentee before: Jiangsu Funiushan building energy saving Technology Co.,Ltd.

CP01 Change in the name or title of a patent holder