CN204141067U - A kind of pipe clamp of pipeline - Google Patents

A kind of pipe clamp of pipeline Download PDF

Info

Publication number
CN204141067U
CN204141067U CN201420462927.2U CN201420462927U CN204141067U CN 204141067 U CN204141067 U CN 204141067U CN 201420462927 U CN201420462927 U CN 201420462927U CN 204141067 U CN204141067 U CN 204141067U
Authority
CN
China
Prior art keywords
bolt
clamping plate
group
snubber block
shaped groove
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201420462927.2U
Other languages
Chinese (zh)
Inventor
翟长辉
李江南
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Weichai Power Co Ltd
Original Assignee
Weichai Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Weichai Power Co Ltd filed Critical Weichai Power Co Ltd
Priority to CN201420462927.2U priority Critical patent/CN204141067U/en
Application granted granted Critical
Publication of CN204141067U publication Critical patent/CN204141067U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

The utility model relates to pipeline mounting technology field, a kind of pipe clamp of pipeline is provided, described pipe clamp of pipeline comprises the first clamping plate, second clamping plate, first group of snubber block, second group of snubber block, the first bolt is fixed in 3rd group of snubber block and a constraint, second bolt, 3rd bolt and the 4th bolt, first clamping plate and the second clamping plate arrange the first bolt hole and the second bolt hole respectively, in order to complete first group of snubber block, second group of snubber block, fixing of 3rd group of snubber block, difference the first U-shaped groove on damping fritter, second U-shaped groove and the 3rd U-shaped groove, second U-shaped groove and the 3rd U-shaped groove are in order to realize and the first bolt, second bolt, adapting of 3rd bolt and the 4th bolt, three independent first group of snubber blocks arranged, second group of snubber block and the 3rd group of snubber block can adjust according to wanting the position of restrained line, realize the fixed installation to pipeline, avoid the problem occurring when fixing tube fixing difficulty and cannot fixing.

Description

A kind of pipe clamp of pipeline
Technical field
The utility model belongs to pipeline mounting technology field, particularly relates to a kind of pipe clamp of pipeline.
Background technique
In the assembly process of diesel engine, the installation of high-pressure oil pipe is very important link, existing high-pressure oil pipe (multitube side-by-side configuration) when mounted, is generally first contained in Injection Pump, oil sprayer two ends high-pressure oil pipe pine, and then is fixed on high-pressure oil pipe support with pipe clamp.
At present, the pipe clamp be applied on high-pressure oil pipe support mainly comprises intermediate plate, bolt and snubber block, and snubber block is an entirety, and constraint is arranged in the middle of two panels intermediate plate, after assembling high-pressure oil pipe, tights a bolt, and realizes fixing.
But often have problems during the assembling of pipe clamp, if high-pressure oil pipe processes slightly problem, high-pressure oil pipe first respectively pine be contained in after on Injection Pump, oil sprayer, easily cause the fixing difficulty of pipe clamp or cannot fix.When usually running into this situation, installation personnel can bend high-pressure oil pipe temporarily, and this temporary measure may produce high-pressure oil pipe and damage.
Model utility content
The purpose of this utility model is to provide a kind of pipe clamp of pipeline, is intended to solve prior art after high-pressure oil pipe is installed to Injection Pump, oil sprayer, the problem easily causing pipe clamp to fix difficulty or cannot fix during assembling pipe clamp.
The utility model realizes like this, a kind of pipe clamp of pipeline, described pipe clamp of pipeline comprises the first clamping plate and the second clamping plate, described first clamping plate are provided with the first bolt hole extending to the other end from one end, described second clamping plate are provided with second bolt hole corresponding with described first bolt hole, correspondingly between described first bolt hole with described second bolt hole arrange the first bolt, the second bolt, the 3rd bolt and the 4th bolt, the end of described first bolt, the second bolt, the 3rd bolt and the 4th bolt respectively correspondence arranges tightening nut;
First group of snubber block, second group of snubber block and the 3rd group of snubber block are set between described first clamping plate and described second clamping plate respectively, the damping fritter that described first group of snubber block, second group of snubber block and the 3rd group of snubber block are oppositely arranged by upper and lower two respectively forms, described damping fritter is oppositely arranged the first U-shaped groove face is horizontally arranged with for retraining through pipeline up and down, and the both sides of described first U-shaped groove are vertically provided with the second U-shaped groove and the 3rd U-shaped groove that adapt with described first bolt, the second bolt, the 3rd bolt and the 4th bolt.
As a kind of improved plan, described first clamping plate and the second clamping plate are respectively equipped with the anti-shedding mechanism preventing described damping fritter from coming off.
As a kind of improved plan, described anti-shedding mechanism comprises the slide way mechanism be arranged on described first clamping plate and the second clamping plate and the extension removal stop section be arranged on described damping fritter, and described extension removal stop section and described slide way mechanism match.
As a kind of improved plan, described slide way mechanism comprises the bending vertical edge and limited part that are extended to form by the ing jaw body of the first clamping plate or the second clamping plate, and described ing jaw body, bending vertical edge and described limited part enclose the chute forming described extension removal stop section.
As a kind of improved plan, the end of described first bolt, the second bolt, the 3rd bolt and the 4th bolt respectively correspondence arranges tightening nut.
As a kind of improved plan, described first bolt, the second bolt, the 3rd bolt and between the 4th bolt and described first clamping plate, spring washer is set respectively.
Because pipe clamp of pipeline comprises the first clamping plate, second clamping plate, first group of snubber block, second group of snubber block, the first bolt is fixed in 3rd group of snubber block and a constraint, second bolt, 3rd bolt and the 4th bolt, the first clamping plate and the second clamping plate are arranged and the first bolt respectively, second bolt, 3rd bolt and the first bolt hole corresponding to the 4th bolt and the second bolt hole, in order to complete the first clamping plate and the second clamping plate to first group of snubber block, second group of snubber block, fixing of 3rd group of snubber block, meanwhile, difference the first U-shaped groove on damping fritter, second U-shaped groove and the 3rd U-shaped groove, wherein, upper and lower two the first U-type groove are oppositely arranged, and for passing and restrained line, the second U-shaped groove and the 3rd U-shaped groove are in order to realize and the first bolt, second bolt, adapting of 3rd bolt and the 4th bolt, three independent first group of snubber blocks arranged, second group of snubber block and the 3rd group of snubber block can adjust according to wanting the position of restrained line, realize the fixed installation to pipeline, avoid the problem occurring when fixing tube fixing difficulty and cannot fixing.
Owing to arranging anti-shedding mechanism respectively on the first clamping plate and the second clamping plate, when needs dismounting pipe clamp, avoid the problem that damping fritter is scattered.
Because anti-shedding mechanism comprises the slide way mechanism be arranged on described first clamping plate and the second clamping plate and the extension removal stop section be arranged on described damping fritter, described extension removal stop section and described slide way mechanism match, slide way mechanism comprises the bending vertical edge and limited part that are extended to form by the ing jaw body of the first clamping plate or the second clamping plate, described ing jaw body, bending vertical edge and described limited part enclose the chute forming described extension removal stop section, realize damping fritter to slide in the constraint of slide way mechanism, avoid when dismantling pipe clamp, the problem that damping fritter drops.
Accompanying drawing explanation
Fig. 1 is the structural representation of the pipe clamp of pipeline that the utility model provides;
Fig. 2 is the left view of Fig. 1;
Fig. 3 to Fig. 6 is the structural representation of the damping fritter that the utility model provides;
Wherein, 1-first clamping plate, 2-second clamping plate, 3-first bolt, 4-second bolt, 5-the 3rd bolt, 6-the 4th bolt, 7-first group of snubber block, 8-second group of snubber block, 9-the 3rd group of snubber block, 10-damping fritter, the U-shaped groove of 11-first, the U-shaped groove of 12-second, the U-shaped groove of 13-the 3rd, 14-slide way mechanism, 141-bends vertical edge, 142-limited part, 15-extends removal stop section, 16-tightening nut, 17-spring washer.
Embodiment
In order to make the purpose of this utility model, technological scheme and advantage clearly understand, below in conjunction with drawings and Examples, the utility model is further elaborated.Should be appreciated that specific embodiment described herein only in order to explain the utility model, and be not used in restriction the utility model.
Fig. 1 shows the structural representation of the pipe clamp of pipeline that the utility model provides, and for convenience of explanation, only gives the part relevant to the utility model in figure.
Pipe clamp of pipeline comprises the first clamping plate 1 and the second clamping plate 2, described first clamping plate 1 are provided with the first bolt hole extending to the other end from one end, described second clamping plate 2 are provided with second bolt hole corresponding with described first bolt hole, correspondingly between described first bolt hole with described second bolt hole arrange the first bolt 3, second bolt 4, the 3rd bolt 5 and the 4th bolt 6, the end of described first bolt 3, second bolt 4, the 3rd bolt 5 and the 4th bolt 6 respectively correspondence arranges tightening nut 16;
Between described first clamping plate 1 and described second clamping plate 2, first group of snubber block 7 is set respectively, second group of snubber block 8 and the 3rd group of snubber block 9, described first group of snubber block 7, the damping fritter 10 that second group of snubber block 8 and the 3rd group of snubber block 9 are oppositely arranged by upper and lower two respectively forms, described damping fritter about 10 is oppositely arranged the first U-shaped groove 11 face is horizontally arranged with for retraining through pipeline, the both sides of described first U-shaped groove 11 are vertically provided with and described first bolt 3, second bolt 4, the second U-shaped groove 12 that 3rd bolt 5 and the 4th bolt 6 adapt and the 3rd U-shaped groove 13.
Wherein, in this embodiment, the size of above-mentioned first group of snubber block 7, second group of snubber block 8 and the 3rd group of snubber block 9 can be different, effect such as shown in figure, first group of snubber block 7 is identical with the 3rd group of snubber block 9 size, second group of snubber block 8 relatively less, space is there is between this three, be convenient to the adjustment adapted with the trend of pipeline, do not repeat them here, but not in order to limit the utility model.
Further, the damping fritter 10 comprised in above-mentioned first group of snubber block 7, second group of snubber block 8 and the 3rd group of snubber block 9, its size can be identical with structure, also can according to actual conditions, be arranged to the effect shown in figure, i.e. the arranging of groove and size, does not repeat them here, but not in order to limit the utility model.
In the utility model, as shown in Figures 3 to 6, first U-shaped groove 11 of two damping fritters 10 is oppositely arranged, form the space of constraint and fixing tube, the second vertical on its bi-side in addition U-shaped groove 12 and the 3rd U-shaped groove 13 gang up passage in order to what form the first bolt 3, second bolt 4, the 3rd bolt 5 and the 4th bolt 6 respectively, do not repeat them here.
In the utility model, first clamping plate 1 and the second clamping plate 2 are respectively equipped with the anti-shedding mechanism preventing described damping fritter 10 from coming off, namely, when dismantling pipe clamp of pipeline, the damping fritter 10 be oppositely arranged up and down is easily scattered, and makes troubles to dismantlement work, this anti-shedding mechanism is set for this reason, wherein, this anti-shedding mechanism can set according to actual conditions, such as, can be realized by spacing, package parts accordingly, followingly provide a kind of mode, when not in order to limit the utility model:
Shown in composition graphs 2 and Fig. 3 to Fig. 6, the extension removal stop section 15 that anti-shedding mechanism is arranged on the slide way mechanism 14 on described first clamping plate 1 and the second clamping plate 2 and is arranged on described damping fritter 10, described extension removal stop section 15 matches with described slide way mechanism 14;
Particularly, slide way mechanism 14 comprises the bending vertical edge 141 and limited part 142 that are extended to form by the ing jaw body of the first clamping plate 1 or the second clamping plate 2, and described ing jaw body, bending vertical edge 141 enclose with described limited part 142 chute forming described extension removal stop section 15;
Now, damping fritter 10 can be implemented in the chute laterally slip that slide way mechanism 14 is formed, and the existence of limited part 142, extension removal stop section 15 is constrained in this chute, prevents from coming off.
In the utility model, the first bolt 3, second bolt 4, the 3rd bolt 5 and arrange spring washer 17 respectively between the 4th bolt 6 and described first clamping plate 1, do not repeat them here.
In the utility model, pipe clamp of pipeline comprises the first clamping plate, second clamping plate, first group of snubber block, second group of snubber block, the first bolt is fixed in 3rd group of snubber block and a constraint, second bolt, 3rd bolt and the 4th bolt, the first clamping plate and the second clamping plate are arranged and the first bolt respectively, second bolt, 3rd bolt and the first bolt hole corresponding to the 4th bolt and the second bolt hole, in order to complete the first clamping plate and the second clamping plate to first group of snubber block, second group of snubber block, 3rd group of snubber block is fixed, meanwhile, and difference the first U-shaped groove on damping fritter, second U-shaped groove and the 3rd U-shaped groove, wherein, upper and lower two the first U-type groove are oppositely arranged, and for passing and restrained line, the second U-shaped groove and the 3rd U-shaped groove are in order to realize and the first bolt, second bolt, adapting of 3rd bolt and the 4th bolt, three independent first group of snubber blocks arranged, second group of snubber block and the 3rd group of snubber block can adjust according to wanting the position of restrained line, realize the fixed installation to pipeline, avoid the problem occurring when fixing tube fixing difficulty and cannot fixing.
The foregoing is only preferred embodiment of the present utility model; not in order to limit the utility model; all do within spirit of the present utility model and principle any amendment, equivalent to replace and improvement etc., all should be included within protection domain of the present utility model.

Claims (5)

1. a pipe clamp of pipeline, it is characterized in that, described pipe clamp of pipeline comprises the first clamping plate (1) and the second clamping plate (2), described first clamping plate (1) are provided with the first bolt hole extending to the other end from one end, described second clamping plate (2) are provided with second bolt hole corresponding with described first bolt hole, corresponding between described first bolt hole with described second bolt hole the first bolt (3) is set, second bolt (4), 3rd bolt (5) and the 4th bolt (6), described first bolt (3), second bolt (4), the end of the 3rd bolt (5) and the 4th bolt (6) respectively correspondence arranges tightening nut,
First group of snubber block (7) is set between described first clamping plate (1) and described second clamping plate (2) respectively, second group of snubber block (8) and the 3rd group of snubber block (9), described first group of snubber block (7), the damping fritter (10) that second group of snubber block (8) and the 3rd group of snubber block (9) are oppositely arranged by upper and lower two respectively forms, described damping fritter (10) is oppositely arranged the first U-shaped groove (11) face is horizontally arranged with for retraining through pipeline up and down, the both sides of described first U-shaped groove (11) are vertically provided with and described first bolt (3), second bolt (4), the second U-shaped groove (12) that 3rd bolt (5) and the 4th bolt (6) adapt and the 3rd U-shaped groove (13).
2. pipe clamp of pipeline according to claim 1, is characterized in that, described first clamping plate (1) and the second clamping plate (2) are respectively equipped with the anti-shedding mechanism preventing described damping fritter (10) from coming off.
3. pipe clamp of pipeline according to claim 2, it is characterized in that, described anti-shedding mechanism comprises the slide way mechanism (14) be arranged on described first clamping plate (1) and the second clamping plate (2) and the extension removal stop section (15) be arranged on described damping fritter (10), and described extension removal stop section (15) and described slide way mechanism (14) match.
4. pipe clamp of pipeline according to claim 3, it is characterized in that, described slide way mechanism (14) comprises the bending vertical edge (141) and limited part (142) that are extended to form by the ing jaw body of the first clamping plate (1) or the second clamping plate (2), and described ing jaw body, bending vertical edge (141) enclose with described limited part (142) chute forming described extension removal stop section (15).
5. pipe clamp of pipeline according to claim 1, it is characterized in that, described first bolt (3), the second bolt (4), the 3rd bolt (5) and between the 4th bolt (6) and described first clamping plate (1), spring washer (17) is set respectively.
CN201420462927.2U 2014-08-15 2014-08-15 A kind of pipe clamp of pipeline Active CN204141067U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420462927.2U CN204141067U (en) 2014-08-15 2014-08-15 A kind of pipe clamp of pipeline

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420462927.2U CN204141067U (en) 2014-08-15 2014-08-15 A kind of pipe clamp of pipeline

Publications (1)

Publication Number Publication Date
CN204141067U true CN204141067U (en) 2015-02-04

Family

ID=52417751

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420462927.2U Active CN204141067U (en) 2014-08-15 2014-08-15 A kind of pipe clamp of pipeline

Country Status (1)

Country Link
CN (1) CN204141067U (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105351628A (en) * 2015-12-04 2016-02-24 四川海搏液压机械有限公司 Clamping assembly for hydraulic pipes
CN105402496A (en) * 2015-12-04 2016-03-16 四川海搏液压机械有限公司 Fastening structure of hydraulic pipe
CN105822842A (en) * 2016-05-26 2016-08-03 中网电力科技有限公司 Lightweight three-core cable fixing frame
CN106224655A (en) * 2016-08-22 2016-12-14 常州市海盈五金科技有限公司 Two-tube pipe clamp
CN109556191A (en) * 2018-10-19 2019-04-02 青岛海尔空调电子有限公司 A kind of copper pipe fixing device and the air-conditioner outdoor unit with it
CN114809178A (en) * 2022-04-19 2022-07-29 三一重机有限公司 Arm support, method for fixing hydraulic pipe on arm support and operation machine
CN115999804A (en) * 2022-12-20 2023-04-25 广东电网有限责任公司江门供电局 Unmanned aerial vehicle sprays paint

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105351628A (en) * 2015-12-04 2016-02-24 四川海搏液压机械有限公司 Clamping assembly for hydraulic pipes
CN105402496A (en) * 2015-12-04 2016-03-16 四川海搏液压机械有限公司 Fastening structure of hydraulic pipe
CN105822842A (en) * 2016-05-26 2016-08-03 中网电力科技有限公司 Lightweight three-core cable fixing frame
CN106224655A (en) * 2016-08-22 2016-12-14 常州市海盈五金科技有限公司 Two-tube pipe clamp
CN109556191A (en) * 2018-10-19 2019-04-02 青岛海尔空调电子有限公司 A kind of copper pipe fixing device and the air-conditioner outdoor unit with it
CN109556191B (en) * 2018-10-19 2021-05-28 青岛海尔空调电子有限公司 Copper pipe fixing device and air conditioner outdoor unit with same
CN114809178A (en) * 2022-04-19 2022-07-29 三一重机有限公司 Arm support, method for fixing hydraulic pipe on arm support and operation machine
CN115999804A (en) * 2022-12-20 2023-04-25 广东电网有限责任公司江门供电局 Unmanned aerial vehicle sprays paint

Similar Documents

Publication Publication Date Title
CN204141067U (en) A kind of pipe clamp of pipeline
CN203979038U (en) A kind of clip
CN204290844U (en) The two glass assembly pressing block type erecting device of a kind of solar energy
CN204592579U (en) Combined type tunable medium delivery line support
CN204785083U (en) Quick -release formula pipeline fixing device
CN104609287A (en) Fixing mode of escalator outer decorating plate
CN202691302U (en) Vibration-proof high-pressure oil pipe system
CN203273014U (en) Communication base station angle steel tower vent pipe fastening device
CN204534048U (en) Meter erection fixture
CN204529056U (en) A kind of fixed form of escalator balustrade exterior panelling
CN104061367A (en) Combined-type pipeline support device
CN102963243A (en) Connecting structure for engine suspension and bracket of engine suspension
CN205544134U (en) Anti stockbridge damper of trembling of multi -angle
CN203497312U (en) Transportation frame for air conditioner
CN207314185U (en) A kind of town road deceleration strip
CN207584183U (en) A kind of anticorrosive high-pressure oil pipe outside support
CN204835418U (en) Bus duct connector
CN209650431U (en) Motorcycle headlamp backboard mounting structure system
CN204703645U (en) A kind of framework steel ball Positioning hinge
CN203130194U (en) Supercharger oil inlet pipe assembly
CN205089562U (en) Vacuum pump base
CN204116763U (en) The fixed sturcture of LCD screen backlight module
CN203383517U (en) Accurate steel column axis positioning regulator
CN203131219U (en) Combined pipeline support device
CN203362366U (en) Fixing bracket for high-pressure oil track of diesel engine

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant