CN204097976U - A kind of absorption basin - Google Patents

A kind of absorption basin Download PDF

Info

Publication number
CN204097976U
CN204097976U CN201420514888.6U CN201420514888U CN204097976U CN 204097976 U CN204097976 U CN 204097976U CN 201420514888 U CN201420514888 U CN 201420514888U CN 204097976 U CN204097976 U CN 204097976U
Authority
CN
China
Prior art keywords
absorption basin
tail bank
bank
tail
utility
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201420514888.6U
Other languages
Chinese (zh)
Inventor
李红英
喻建清
罗永钦
展辰辉
张绍春
栗国忱
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina Kunming Engineering Corp Ltd
Original Assignee
PowerChina Kunming Engineering Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PowerChina Kunming Engineering Corp Ltd filed Critical PowerChina Kunming Engineering Corp Ltd
Priority to CN201420514888.6U priority Critical patent/CN204097976U/en
Application granted granted Critical
Publication of CN204097976U publication Critical patent/CN204097976U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

The utility model discloses a kind of absorption basin, aim to provide a kind of effect of energy dissipation good, the absorption basin that construction costs is low.It comprises tail bank, and the middle part of described tail bank arranges breach, makes tail bank form concave shape; The length of described breach is 1/2 ~ 2/3 of tail bank length, and the height of described indentations bottom is 0 ~ 1/2 of tail bank height.The dispersion of the utility model to flow has comparatively significant effect, and can adapt to the change of flow in a big way, can save engineering quantity, be a kind of novel energy dissipater's build.

Description

A kind of absorption basin
Technical field
The utility model relates to Hydraulic and Hydro-Power Engineering technical field, especially relates to a kind of New Type Energy Dissipator build absorption basin of discharge construction.
Background technology
Absorption basin is the energy-dissipating installation of stream in downstream generation underflow type hydraulic jump that sluice under impelling outlet structure escape works.By hydraulic jump, the torrent released by outlet structure escape works changes unhurried current into, to eliminate the Energy Dissipation Modes of kinetic energy.Generally the kinetic energy of the lower stream that sluices can be eliminated 40% ~ 70%, and can shorten protection-apron length, be a kind of effectively energy-dissipating installation of economy.It has fluid stable, and effect of energy dissipation is better, to geological conditions and tail water luffing strong adaptability, and the advantages such as tail water fluctuation is little.But there is earthwork evacuation amount in the construction of existing absorption basin and concrete square amount is comparatively large, the deficiency that construction costs is higher.In addition, upper pond level is large to the drop of the first section that jumps, therefore this place's flow velocity is high, and when Froude number Fr is lower, the kinetic energy of dissipation is few, and complementary energy is many, and complementary energy is exactly mainly the potential energy that water depth after jump is expressed.Therefore, how the energy dissipating load transfer plan in absorption basin is reduced washing away left and right bank slope to downstream river course, to the problem solving water depth after jump that complementary energy brings larger, there is important theory value and and engineering significance while reduce native stone excavated volume, reduce construction costs.
Utility model content
The utility model overcomes shortcoming of the prior art, provides a kind of effect of energy dissipation good, the absorption basin that construction costs is low.
In order to solve the problems of the technologies described above, the utility model is achieved through the following technical solutions: a kind of absorption basin, comprises tail bank, and the middle part of described tail bank arranges breach, makes tail bank form concave shape; The length of described breach is 1/2 ~ 2/3 of tail bank length, and the height of described indentations bottom is 0 ~ 1/2 of tail bank height.
Preferably, the length of described breach is 1/2 of tail bank length, and the height of described indentations bottom is 0 ~ 1/3 of tail bank height.
Preferably, described breach is positioned at side to the right in the middle part of tail bank.
Preferably, the cross section of described indentation, there is trapezoidal.
Preferably, the wall thickness of described indentation, there is less than the wall thickness of tail bank.
Compared with prior art, the utility model tool has the following advantages:
The utility model absorption basin only arranges the absorption basin tail bank of suitably height in absorption basin afterbody arranged on left and right sides, the mid portion at absorption basin afterbody main flow place does not establish tail bank, only arranges the little bank of suitably height.Its hydraulics feature is: make the best use of the situation to going out pond current; main flow is allowed directly to go out pond; main flow is washed away in the middle part of underwater bed; what formed rushes the length that hole adds absorption basin virtually; make down to let out water energy to disappear in absorption basin and downstream river course punching hole and stop; current are chosen to surface by the tail bank of the left and right sides simultaneously, make two sides side slope obtain good protection like this.The main flow that the little bank of the mid portion setting at absorption basin afterbody main flow place makes this position go out bottom the current of pond is provoked, and reduces and determines washing away of position, boundary to dynamic, enhance the stability after absorption basin tail bank, saved construction investment.
The present invention has following beneficial effect:
1, versatility is stronger, is substantially applicable to all power stations being provided with absorption basin type that the level of tail water is high.
2, reduce concrete engineering quantity, saved construction investment, make two sides, left and right bank slope obtain good protection.
3, make the best use of the situation to going out pond current, allow main flow directly go out pond, main flow carries out lumped scour in the middle part of underwater bed, formation rush the length that hole adds absorption basin virtually, make down to let out water energy at absorption basin and punching hole, downstream inner dissipation.
4, give underwater bed by the energy dissipating load sharing originally wanting absorption basin to bear, make absorption basin, the safety of dam obtains further guarantee.By contrast, be middle bank absorption basin, fall the energy dissipater such as ridge underflow stilling basin or flaring gate pier build and all do not reach this effect of energy dissipation.
5, the main flow that the little bank that the mid portion at absorption basin afterbody main flow place arranges breach formation makes this position go out bottom the main flow of pond is provoked, and reduces and determines washing away of position, boundary to dynamic, strengthens the stability after absorption basin tail bank.
6, the dispersion of absorption basin to flow that tail bank offers breach has comparatively significant effect, and can adapt to the change of flow in a big way, can save engineering quantity, be a kind of novel energy dissipater's build.Itself and flaring gate pier have different energy dissipatings to conceive, and the latter improves the dose rate that disappears in absorption basin, and the former is transfer and dispersion absorption basin energy dissipating load, and it is to reducing costs tool significance.
Accompanying drawing explanation
In order to be illustrated more clearly in the utility model embodiment or technical scheme of the prior art, be briefly described to the accompanying drawing used required in embodiment or description of the prior art below, apparently, accompanying drawing in the following describes is only embodiments more of the present utility model, for those of ordinary skill in the art, under the prerequisite not paying creative work, other accompanying drawing can also be obtained according to these accompanying drawings.
Fig. 1 is top view of the present utility model.
Fig. 2 is stereogram of the present utility model.
Detailed description of the invention
Below in conjunction with the accompanying drawing in the utility model embodiment, be clearly and completely described the technical scheme in the utility model embodiment, obviously, described embodiment is only the utility model part embodiment, instead of whole embodiments.Based on the embodiment in the utility model, those of ordinary skill in the art are not paying the every other embodiment obtained under creative work prerequisite, all belong to the scope of the utility model protection.
Absorption basin shown in Fig. 1 and Fig. 2, comprises tail bank 1, and the middle part of described tail bank 1 arranges breach 2, makes tail bank 1 form concave shape; The length of described breach 2 is 1/2 ~ 2/3 of tail bank 1 length, and the height bottom described breach 2 is 0 ~ 1/2 of tail bank 1 height, and as preferably, the length of described breach 2 is 1/2 of tail bank 1 length, and the height bottom described breach 2 is 1/3 of tail bank 1 height.
Wherein, described breach 2 is preferably positioned at side to the right in the middle part of tail bank, so that the main flow used bottom pond protects slope, left bank while provoking.The cross section at described breach 2 place is trapezoidal, and the wall thickness at described breach 2 place is less than the wall thickness of tail bank 1.
Absorption basin on certain test power station arranges the tail bank of this structure: this power station force reduction pool bottom is 61m to the dam crest discrepancy in elevation, the dark 8m of absorption basin, the long 80m in pond, and force reduction pool bottom and outlet protection-apron elevation are 292m.Arrange the absorption basin tail bank of high 8m on the left and right both sides of absorption basin afterbody, the mid portion at absorption basin afterbody main flow place forms breach, notch length b=36.5m, indentations bottom height 2m.
Model testing shows that gap type absorption basin tail bank substantially reduces absorption basin load, and water depth after jump (punching hole) obviously reduces, dynamic determine position, boundary wash away obvious reduction, produce a desired effect.Originally the energy dissipating load sharing wanting absorption basin to bear is given underwater bed by the utility model, makes absorption basin, the safety of dam obtains further guarantee.It can effectively reduce concrete engineering quantity, saves construction investment, makes two sides, left and right bank slope obtain good protection.
The foregoing is only preferred embodiment of the present utility model; not in order to limit the utility model; all within spirit of the present utility model and principle, any amendment done, equivalent replacement, improvement etc., all should be included within protection domain of the present utility model.

Claims (5)

1. an absorption basin, comprises tail bank (1), it is characterized in that: the middle part of described tail bank (1) arranges breach (2), makes tail bank (1) form concave shape; The length of described breach (2) is 1/2 ~ 2/3 of tail bank (1) length, and the height of described breach (2) bottom is 0 ~ 1/2 of tail bank (1) height.
2. absorption basin according to claim 1, is characterized in that: the length of described breach (2) is 1/2 of tail bank (1) length, and the height of described breach (2) bottom is 0 ~ 1/3 of tail bank (1) height.
3. absorption basin according to claim 1, is characterized in that: described breach (2) is positioned at side to the right in the middle part of tail bank.
4. absorption basin according to claim 1, is characterized in that: the cross section at described breach (2) place is trapezoidal.
5. absorption basin according to claim 1, is characterized in that: the wall thickness at described breach (2) place is less than the wall thickness of tail bank (1).
CN201420514888.6U 2014-09-10 2014-09-10 A kind of absorption basin Active CN204097976U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420514888.6U CN204097976U (en) 2014-09-10 2014-09-10 A kind of absorption basin

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420514888.6U CN204097976U (en) 2014-09-10 2014-09-10 A kind of absorption basin

Publications (1)

Publication Number Publication Date
CN204097976U true CN204097976U (en) 2015-01-14

Family

ID=52266419

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420514888.6U Active CN204097976U (en) 2014-09-10 2014-09-10 A kind of absorption basin

Country Status (1)

Country Link
CN (1) CN204097976U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104179158A (en) * 2014-09-10 2014-12-03 中国电建集团昆明勘测设计研究院有限公司 Stilling pool

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104179158A (en) * 2014-09-10 2014-12-03 中国电建集团昆明勘测设计研究院有限公司 Stilling pool
CN104179158B (en) * 2014-09-10 2016-08-24 中国电建集团昆明勘测设计研究院有限公司 A kind of stiling basin

Similar Documents

Publication Publication Date Title
CN103266583B (en) Bent slope underflow energy dissipation structure of water conservancy and hydropower engineering
CN103498452B (en) The slit structure of high steep Narrow Valleys outlet structure escape works
CN204662380U (en) A kind of bench spillway
CN103215916B (en) Disappear unrestrained cavity
CN104863098A (en) Danger-elimination refitting method for stilling pool downstream energy dissipater
CN107022987A (en) High dam spillwag chute jet vectoring structure
CN204982814U (en) Power that disappears structure in low water head dam low reaches riverbed
CN114108575B (en) Stepped grading spillway with energy dissipation effect
CN104480911A (en) Flexible foundation energy dissipater structure
CN109098152B (en) Anti-cavitation facility of ladder overflow dam
CN204370370U (en) A kind of liftable ground sills
CN204097976U (en) A kind of absorption basin
CN102828490B (en) Separated wharf wave dissipation wall
CN204728280U (en) A kind of full lined debris flow drainage groove of flow-disturbing energy dissipating
CN103821112A (en) Lateral on-way outflow shore spillway
CN109778802A (en) Narrow Valleys, deep tail water, super large discharge per unit width curve gravity dam flood-discharge energy-dissipating structure
CN105421305A (en) Pile plate plane and vertical face intersecting combination auxiliary energy dissipater
CN203821300U (en) Generating type breakwater
CN104179158B (en) A kind of stiling basin
CN203878546U (en) Culvert with energy dissipation function
CN204456015U (en) Short protection-apron type power station absorption basin structure
CN203808025U (en) Intercepting ditch structure for steeper terrain
CN204000796U (en) Power station in river channel's structure
CN203846463U (en) Sudden-drop and sudden-expansion structure in free-flow spillway tunnel reconstruction
CN209779578U (en) Flood discharge and energy dissipation structure of gravity dam with narrow river valley, deep tail water and super-large single-wide flow curve

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant