CN204000796U - Power station in river channel's structure - Google Patents

Power station in river channel's structure Download PDF

Info

Publication number
CN204000796U
CN204000796U CN201420467349.1U CN201420467349U CN204000796U CN 204000796 U CN204000796 U CN 204000796U CN 201420467349 U CN201420467349 U CN 201420467349U CN 204000796 U CN204000796 U CN 204000796U
Authority
CN
China
Prior art keywords
abutment wall
factory building
lock
clipping room
ship lock
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201420467349.1U
Other languages
Chinese (zh)
Inventor
张勇
李永红
肖平西
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina Chengdu Engineering Co Ltd
Original Assignee
PowerChina Chengdu Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PowerChina Chengdu Engineering Co Ltd filed Critical PowerChina Chengdu Engineering Co Ltd
Priority to CN201420467349.1U priority Critical patent/CN204000796U/en
Application granted granted Critical
Publication of CN204000796U publication Critical patent/CN204000796U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A10/00TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE at coastal zones; at river basins
    • Y02A10/30Flood prevention; Flood or storm water management, e.g. using flood barriers
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/20Hydro energy

Landscapes

  • Revetment (AREA)

Abstract

The utility model discloses a kind of power station in river channel structure, relate to Hydraulic and Hydro-Power Engineering technical field, provide a kind of and can save power station in river channel's structure that riverbed width is beneficial to the layout of flood releasing structure.Power station in river channel's structure comprises ship lock and the factory building clipping room of adjacent setting, and ship lock comprises spaced twice ship lock abutment wall, and ship lock abutment wall comprises upper approach channel abutment wall, head bay abutment wall and the lock chamber abutment wall setting gradually along river flow direction; A monolith three of the head bay abutment wall of close factory building clipping room side, part lock chamber abutment wall, factory building clipping room makes and is integrally formed co-ordinative construction; Or, making, a monolith of the lock chamber abutment wall of part, part approach channel abutment wall, factory building clipping room is integrally formed co-ordinative construction near the head bay abutment wall of factory building clipping room side.The utility model has obviously reduced shared riverbed overall width than the technical scheme of arranging separately factory building clipping room and ship lock, is conducive to the layout of hinge flood releasing structure and reduces inundation loss of reservoir.

Description

Power station in river channel's structure
Technical field
The utility model relates to Hydraulic and Hydro-Power Engineering technical field, relates in particular to a kind of power station in river channel structure.
Background technology
Big-and-middle-sized river often have flood discharge large, have features such as navigation requirement.While developing its hydraulic power potentials, in the situation that power station utilized head is high, (conventionally below 40m), does not adopt power house in river channel mostly, as Navigation & Hydropower Junction Engineering engineerings such as the new policies of being built on Jia Lingjiang River, Jinxi, Sha Xi, careless streets.Take Jia Lingjiang River as example, its flood has the advantages that peak height amount greatly, suddenly rises and suddenly falls, and multi-purpose project dam site section is often in Canyon Area, and river course is wide not, outlet structure escape works discharge capacity be need to increase as much as possible, upstream, dam flood control object pressure of flood and submerge loss alleviated.
Because Power Plant, ship lock, sluice, scouring sluice etc. all need to occupy river course, the width in riverbed becomes extremely limited resource, need to reduce the shared riverbed of the non-flood releasing structure width such as block power plant factory building, ship lock as far as possible, and hinge flood discharge building is arranged on main stem to guarantee that hinge has enough flood carrying capacities as far as possible.In addition, for ease of the operational management of Navigation & Hydropower Junction Engineering, ship lock and factory building adopt with bank arrangement more.
Addressing the above problem at present implementation is: reduce the thickness of the structures self such as power house in river channel, ship lock, sluice, scouring sluice as far as possible, or dig riverbank, both sides, or the flood discharge efficiency of raising flood releasing structure etc.
Use functional requirement due to powerhouse of hydropower station, ship lock, sluice, scouring sluice etc., himself structure is comparatively complicated, the structural thickness that can reduce is limited, the poor effect that often causes structure optimization, if and structural thickness reduces too much, can cause again the increase of structural reinforcement amount, Structural Endurance Problem, economic effect is not obvious.And dig riverbank, both sides, and when excavation and support engineering amount increase considerably, also can bring stability of high slope problem, claim for eot and project occupation of land increase problem, be unfavorable for performance and the environmental protection of engineering safety, economic benefit.
The terminological interpretation of the utility model part is as follows
Ship lock: utilize in the navigation channel that has gate to control to two ends and fill with, sluice, with lifting water level, make boats and ships can overcome the shape navigation structure, railway carriage or compartment of the concentrated height of water on navigation channel, claim again by " railway carriage or compartment ship lock ".By lock chamber, lock head, gate, approach channel and relevant device, formed.When ship is up, first lock chamber is sluiced, treat that indoor water level flushes with the level of tail water, open lower gate, allow ship enter lock chamber, close immediately lower gate, to lock chamber, pour water, when the lock chamber water surface and upper pond level flush, open upstream gate, ship rolls lock chamber away from, enters Upstream Navigation Waterway.Contrary when descending.
Power station in river channel's factory building: powerhouse of hydropower station is arranged in riverbed, itself also plays dash effect, as Gezhou Dam powerhouse of hydropower station.
Utility model content
The technical problems to be solved in the utility model is: provides a kind of and can save the layout that riverbed width is beneficial to flood releasing structure, and power station in river channel's structure of implementing of good economy performance, constructability.
For addressing the above problem the technical scheme of employing, be: power station in river channel's structure comprises ship lock and the factory building clipping room of adjacent setting, ship lock comprises spaced twice ship lock abutment wall, and ship lock abutment wall comprises upper approach channel abutment wall, head bay abutment wall and the lock chamber abutment wall setting gradually along river flow direction; Between twice ship lock abutment wall, form lock chamber, lock chamber bottom is lock floor; A monolith three of the head bay abutment wall of close factory building clipping room side, part lock chamber abutment wall, factory building clipping room makes and is integrally formed co-ordinative construction; Or, making, a monolith of the lock chamber abutment wall of part, part approach channel abutment wall, factory building clipping room is integrally formed co-ordinative construction near the head bay abutment wall of factory building clipping room side.
Further: co-ordinative construction and have neither part nor lot between the upper approach channel abutment wall that forms co-ordinative construction and be provided with structural joint, co-ordinative construction and have neither part nor lot between the lock chamber abutment wall that forms co-ordinative construction and be provided with structural joint, is provided with structural joint between co-ordinative construction and lock floor.
Further: co-ordinative construction bottom is provided with chamfering.
Further: near side slope and the basis of ship lock and factory building clipping room side, all (vertical: gradient excavation level) by 1:0~1:0.1.
Further: ship lock axis and factory building clipping room longitudinal axis intersect.
Further: ship lock axis is vertical with factory building clipping room longitudinal axis.
The beneficial effects of the utility model are: a monolith of (1), ship lock part abutment wall and factory building clipping room is made and is integrally formed co-ordinative construction, and this co-ordinative construction realizes the function of ship lock and factory building clipping room simultaneously, and can realize dam crest communication function.Than the technical scheme of arranging separately factory building clipping room and ship lock, obviously reduced shared riverbed overall width, be conducive to the layout of hinge flood releasing structure and reduce inundation loss of reservoir.
(2), a monolith of ship lock part abutment wall and factory building clipping room makes and is integrally formed co-ordinative construction, more easily meets structural strength, antiskid, anti-ly inclines, the requirement such as anti-floating, can significantly save excavated volume and concrete amount.
Accompanying drawing explanation
Tu1Shi power station in river channel structure top view;
Fig. 2 is the A-A sectional view of Fig. 1;
In figure, be labeled as: upper approach channel abutment wall 1, head bay abutment wall 2, lock chamber abutment wall 3, lock chamber 4, structural joint 5, factory building clipping room 6, co-ordinative construction 7, lock floor 8.
The specific embodiment
Below in conjunction with the drawings and specific embodiments, the utility model is further illustrated.
Power station in river channel's structure, comprises ship lock and the factory building clipping room 6 of adjacent setting, and ship lock comprises spaced twice ship lock abutment wall, and ship lock abutment wall comprises upper approach channel abutment wall 1, head bay abutment wall 2 and the lock chamber abutment wall 3 setting gradually along river flow direction; Between twice ship lock abutment wall, form lock chamber 4, lock chamber 4 bottoms are lock floor 8; A monolith three of the head bay abutment wall 2 of close factory building clipping room 6 sides, part lock chamber abutment wall 3, factory building clipping room 6 makes and is integrally formed co-ordinative construction 7; Or, making, a monolith of the lock chamber abutment wall 3 of part, part approach channel abutment wall 1, factory building clipping room 6 is integrally formed co-ordinative construction 7 near the head bay abutment wall 4 of factory building clipping room 6 sides.Ship lock axis can intersect with factory building clipping room 6 longitudinal axis or be vertical.
A monolith of ship lock part abutment wall and factory building clipping room 6 is made and is integrally formed co-ordinative construction 7, and this co-ordinative construction 7 realizes the function of ship lock and factory building clipping room 6 simultaneously, and can realize dam crest communication function.Than the technical scheme of arranging separately factory building clipping room 6 and ship lock, obviously reduced shared riverbed overall width, be conducive to the layout of hinge flood releasing structure and reduce inundation loss of reservoir.A monolith of ship lock part abutment wall and factory building clipping room 6 is made and is integrally formed co-ordinative construction, more easily meets structural strength, antiskid, anti-ly inclines, the requirement such as anti-floating, can significantly save excavated volume and concrete amount.
Take certain engineering as example explanation: in conjunction with front, it is 68.00m (containing 8.00m webbing wall) that clipping room takies riverbed width (along axis of dam direction, as follows), and ship lock takies riverbed width 62.94m, and the two takies riverbed overall width is 130.94m; In conjunction with after, it is 60.00m that clipping room takies riverbed width, ship lock takies riverbed width 62.94m, the two takies riverbed overall width is 122.28m, than in conjunction with front few axis of dam length 8.66m that accounts for, concrete work amount has reduced 50174m simultaneously 3.Press concrete unit by 400 yuan/m 3meter, on cost saving, more than 2,000 ten thousand yuan, its economic benefit is significant.
Upper approach channel abutment wall 1, head bay abutment wall 2, lock chamber abutment wall 3, head bay abutment wall 4, factory building clipping room 6 and co-ordinative construction 7 are made by concrete.For fear of occurring expanding with heat and contract with cold, produce the destruction causing compared with imperial palace stress, co-ordinative construction 7 and have neither part nor lot between the upper approach channel abutment wall 1 that forms co-ordinative construction 7 and be provided with structural joint 5, co-ordinative construction 7 and have neither part nor lot between the lock chamber abutment wall 3 that forms co-ordinative construction 7 and be provided with structural joint 5, is provided with structural joint 5 between co-ordinative construction 7 and lock floor 8.Structural joint 5 is variations in temperature etc. provides deformation space, avoids each parts to produce crack.
Further, co-ordinative construction 7 bottoms are provided with chamfering.Co-ordinative construction 7 bottoms are provided with chamfering can improve stress raisers.
Further, near side slope and the basis of ship lock and factory building clipping room 6 sides, all (vertical: gradient excavation level) by 1:0~1:0.1.Can reduce excavated volume and fill concrete amount so simultaneously.

Claims (6)

1. power station in river channel's structure, the ship lock and the factory building clipping room (6) that comprise adjacent setting, ship lock comprises spaced twice ship lock abutment wall, and ship lock abutment wall comprises upper approach channel abutment wall (1), head bay abutment wall (2) and the lock chamber abutment wall (3) setting gradually along river flow direction; Between twice ship lock abutment wall, form lock chamber (4), lock chamber (4) bottom is lock floor (8); It is characterized in that: a monolith three of the head bay abutment wall (2) of close factory building clipping room (6) side, part lock chamber abutment wall (3), factory building clipping room (6) makes and is integrally formed co-ordinative construction (7); Or, making, a monolith of the lock chamber abutment wall (3) of part, part approach channel abutment wall (1), factory building clipping room (6) is integrally formed co-ordinative construction (7) near the head bay abutment wall (4) of factory building clipping room (6) side.
2. power station in river channel according to claim 1 structure, it is characterized in that: co-ordinative construction (7) and have neither part nor lot between the upper approach channel abutment wall (1) that forms co-ordinative construction (7) and be provided with structural joint (5), co-ordinative construction (7) and have neither part nor lot between the lock chamber abutment wall (3) that forms co-ordinative construction (7) and be provided with structural joint (5), is provided with structural joint (5) between co-ordinative construction (7) and lock floor (8).
3. power station in river channel according to claim 2 structure, is characterized in that: co-ordinative construction (7) bottom is provided with chamfering.
4. power station in river channel according to claim 3 structure, is characterized in that: all excavate by the gradient of 1:0~1:0.1 on side slope and basis near ship lock and factory building clipping room (6) side.
5. power station in river channel according to claim 4 structure, is characterized in that: ship lock axis and factory building clipping room (6) longitudinal axis intersect.
6. power station in river channel according to claim 5 structure, is characterized in that: ship lock axis is vertical with factory building clipping room (6) longitudinal axis.
CN201420467349.1U 2014-08-18 2014-08-18 Power station in river channel's structure Withdrawn - After Issue CN204000796U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420467349.1U CN204000796U (en) 2014-08-18 2014-08-18 Power station in river channel's structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420467349.1U CN204000796U (en) 2014-08-18 2014-08-18 Power station in river channel's structure

Publications (1)

Publication Number Publication Date
CN204000796U true CN204000796U (en) 2014-12-10

Family

ID=52040822

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420467349.1U Withdrawn - After Issue CN204000796U (en) 2014-08-18 2014-08-18 Power station in river channel's structure

Country Status (1)

Country Link
CN (1) CN204000796U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104153338A (en) * 2014-08-18 2014-11-19 中国电建集团成都勘测设计研究院有限公司 Ship lock and riverbed type hydropower house combined structure
CN111379245A (en) * 2020-04-24 2020-07-07 中国电建集团成都勘测设计研究院有限公司 Riverbed type anti-skid workshop for hydraulic and hydroelectric engineering

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104153338A (en) * 2014-08-18 2014-11-19 中国电建集团成都勘测设计研究院有限公司 Ship lock and riverbed type hydropower house combined structure
CN111379245A (en) * 2020-04-24 2020-07-07 中国电建集团成都勘测设计研究院有限公司 Riverbed type anti-skid workshop for hydraulic and hydroelectric engineering

Similar Documents

Publication Publication Date Title
CN104294803A (en) Winding type fishway
CN209053164U (en) Diversion tunnel water inlet layered water drawing structure
CN203256706U (en) Underflow energy dissipation structure of broken slope in hydraulic and hydroelectric projects
CN202323895U (en) Tail water channel structure for stepped hydro-junction
CN207685797U (en) A kind of bottom-shaft type flap lock
CN104452666A (en) Lifting submerged dam
CN105386426A (en) Construction for transforming diversion tunnel into ecological drainage tunnel controlled by radial gate and method for construction
CN204000796U (en) Power station in river channel's structure
CN202626947U (en) Picking flow type flaring pier of overflow dam
CN204370370U (en) A kind of liftable ground sills
CN211571646U (en) Air supply ridge structure for drainage energy dissipation hole
CN103526732A (en) Dam drainage structure
CN203113359U (en) Earth rock cofferdam structure
CN203795388U (en) Mixed earth dam and gravity dam arrangement structure
CN109778802A (en) Narrow Valleys, deep tail water, super large discharge per unit width curve gravity dam flood-discharge energy-dissipating structure
CN202718071U (en) Barrage structure capable of lowering silt of reservoir area
CN104153338B (en) Ship lock and power station in river channel's factory building co-ordinative construction
CN210262966U (en) Reconstruction ecological water drainage hole structure combined with permanent plug
CN204080761U (en) For the absorption basin structure of high-velocity flow
CN204385701U (en) Be applicable to surface current underflow combined energy dissipater and the water-control project of wide shallow river course porous gate dam
CN103938585A (en) Arrangement structure of mixed dam composed of earth dams and gravity dam
CN203808019U (en) Layout structure of high-water head multi-functional dam on deep soft foundation
CN211948311U (en) Combined impact energy dissipation box structure
CN110080182B (en) Diversion tunnel plug energy dissipation structure and arrangement method thereof
CN210262967U (en) Energy dissipation structure of diversion tunnel plug

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20141210

Effective date of abandoning: 20160518

C25 Abandonment of patent right or utility model to avoid double patenting