CN203113359U - Earth rock cofferdam structure - Google Patents

Earth rock cofferdam structure Download PDF

Info

Publication number
CN203113359U
CN203113359U CN 201320121707 CN201320121707U CN203113359U CN 203113359 U CN203113359 U CN 203113359U CN 201320121707 CN201320121707 CN 201320121707 CN 201320121707 U CN201320121707 U CN 201320121707U CN 203113359 U CN203113359 U CN 203113359U
Authority
CN
China
Prior art keywords
cofferdam
seepage
filling body
vertical
horizontal part
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN 201320121707
Other languages
Chinese (zh)
Inventor
王仁坤
郑家祥
黎昀
唐朝阳
冯菊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina Chengdu Engineering Co Ltd
Original Assignee
Chengdu Hydroelectric Investigation and Design Institute of China Hydropower Engineering Consulting Group
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chengdu Hydroelectric Investigation and Design Institute of China Hydropower Engineering Consulting Group filed Critical Chengdu Hydroelectric Investigation and Design Institute of China Hydropower Engineering Consulting Group
Priority to CN 201320121707 priority Critical patent/CN203113359U/en
Application granted granted Critical
Publication of CN203113359U publication Critical patent/CN203113359U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Revetment (AREA)

Abstract

The utility model discloses an earth rock cofferdam structure which is beneficial to shortening a construction period and reducing engineering cost. The earth rock cofferdam structure comprises a cofferdam filling body, an anti-seepage body and a vertical anti-seepage wall are arranged inside the cofferdam filling body, the anti-seepage body comprises an inclined part and a horizontal part, one end of the horizontal part is connected with the low end of the inclined part, the vertical anti-seepage wall is close to an upstream side of the cofferdam filling body, the top end of the vertical anti-seepage wall is connected with the other end of the horizontal part of the anti-seepage body, an anti-seepage structure is formed by the anti-seepage body and the vertical anti-seepage wall, and the anti-seepage structure is used for preventing water from permeating to a downstream side from the upstream side of the cofferdam filling body. The structure is beneficial to quick construction of an earth rock cofferdam, meanwhile, for the construction of hydraulic and hydroelectric engineering of a large flow watercourse with deep covering layer of a narrow river valley, an earth rock cofferdam with higher height can be used, the scale of a river diversion and water release structure can be reduced, and engineering investment is saved.

Description

Earth-rock cofferdam structure
Technical field
The utility model relates to a kind of cofferdam structure, relates in particular to a kind of earth-rock cofferdam structure.
Background technology
In Hydraulic and Hydro-Power Engineering is built, the cofferdam often need be set in the river course ensure the dry work of dam foundation ditch with dash.River course for some narrow river valley deep covering layers generally adopts earth rock cofferdam.Existing earth-rock cofferdam structure comprises the cofferdam filling body, and filling body inside, cofferdam is provided with antiseepage body and vertical impervious wall, and the antiseepage body is vertically to arrange, and vertical impervious wall links to each other with the antiseepage body and forms leakage preventing structure.Because conventional antiseepage body and impervious wall all are vertically to arrange, therefore when construction, again cofferdam filling body and inner antiseepage body are constructed after needing earlier impervious wall construction to be finished, again because this earth rock cofferdam covering layer is deep, the foundation treatment engineering amount is big, therefore in a dry season, be difficult to finish, often need to finish by stages.If for the reduction of erection time just need reduce the cofferdam height.But the cofferdam height is more low, and the water level that can keep out is also just more low, and water conservancy diversion outlet structure escape works scale is just more big, and its economy is more low.
The utility model content
The technical problem that the utility model solves provides a kind of earth-rock cofferdam structure that is conducive to the reduction of erection time.
The technical scheme that its technical problem that solves the utility model adopts is: earth-rock cofferdam structure, comprise the cofferdam filling body, filling body inside, cofferdam is provided with antiseepage body and vertical impervious wall, described antiseepage body comprises rake and horizontal part, one end of described horizontal part links to each other with the lower end of rake, described vertical impervious wall links to each other with the other end of the horizontal part of antiseepage body near the top of meet water side and the vertical impervious wall of cofferdam filling body, and described antiseepage body is formed for anti-sealing by the leakage preventing structure of the side direction land side infiltration that meets water of cofferdam filling body jointly with vertical impervious wall.
Further be: the rake of described antiseepage body comprises the tilting section that links to each other with horizontal part and vertical section of linking to each other with the top of tilting section, and described vertical section top extends to the top of cofferdam filling body.
The beneficial effects of the utility model are: be conducive to the earth rock cofferdam rapid construction, construct for the big flow of deep covering layer river course, narrow river valley Hydraulic and Hydro-Power Engineering simultaneously, can adopt highly higher earth rock cofferdam, dwindle water conservancy diversion outlet structure escape works scale, save construction investment.
Description of drawings
Fig. 1 is the cross sectional representation of earth-rock cofferdam structure of the present utility model;
Fig. 2 is the build mode schematic diagram of earth-rock cofferdam structure of the present utility model;
Be labeled as among the figure: cofferdam filling body 1, horizontal part 2, tilting section 3, vertical section 4, vertical impervious wall 5, A district 6, B district 7, C district 8, antiseepage body 9, the side 10 that meets water, land side 11, rake 12.
The specific embodiment
Below in conjunction with the drawings and specific embodiments the utility model is further specified.
As depicted in figs. 1 and 2, earth-rock cofferdam structure of the present utility model, comprise cofferdam filling body 1, filling body 1 inside in cofferdam is provided with antiseepage body 9 and vertical impervious wall 5, described antiseepage body 9 comprises rake 12 and horizontal part 2, one end of described horizontal part 2 links to each other with the lower end of rake 12, described vertical impervious wall 5 links to each other with the other end of the horizontal part 2 of antiseepage body 9 near the top of meet water side 10 and the vertical impervious wall 5 of cofferdam filling body 1, and described antiseepage body 9 is formed for anti-sealing by the leakage preventing structure of side 10 to land side 11 infiltrations that meet water of cofferdam filling body jointly with vertical impervious wall 5.During construction, as shown in Figure 2, can build A district 6 earlier, form vertical impervious wall 5 operation platforms, because vertically impervious wall 5 is arranged on the side 10 that meets water of cofferdam filling body, so can when A district 6 builds vertical impervious wall 5, build B district 7, so significantly reduction of erection time.Build C district 8 at last, finish the build of earth rock cofferdam.
On the basis of the above, in order to reduce the volume of cofferdam filling body, be conducive to the further reduction of erection time, the rake 12 of described antiseepage body 9 comprises the tilting section 3 that links to each other with horizontal part 2 and vertical section 4 of linking to each other with the top of tilting section 3, and described vertical section 4 top extends to the top of cofferdam filling body 1.Adopt said structure, owing to comprise vertical section 4, therefore under the situation that guarantees cofferdam filling body height, can reduce the width of the cross section of cofferdam filling body, and then be conducive to the further reduction of erection time, save engineering cost.

Claims (2)

1. earth-rock cofferdam structure, comprise cofferdam filling body (1), cofferdam filling body (1) inside is provided with antiseepage body (9) and vertical impervious wall (5), it is characterized in that: described antiseepage body (9) comprises rake (12) and horizontal part (2), one end of described horizontal part (2) links to each other with the lower end of rake (12), the side that meets water (10) of the close cofferdam filling body (1) of described vertical impervious wall (5) and the top of vertical impervious wall (5) link to each other with the other end of the horizontal part (2) of antiseepage body (9), and described antiseepage body (9) is formed for the leakage preventing structure that anti-sealing is permeated to land side (11) by the side that meets water (10) of cofferdam filling body jointly with vertical impervious wall (5).
2. earth-rock cofferdam structure as claimed in claim 1, it is characterized in that: the rake (12) of described antiseepage body (9) comprises the tilting section (3) that links to each other with horizontal part (2) and vertical period (4) that link to each other with the top of tilting section (3), and the top of described vertical section (4) extends to the top of cofferdam filling body (1).
CN 201320121707 2013-03-18 2013-03-18 Earth rock cofferdam structure Expired - Lifetime CN203113359U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201320121707 CN203113359U (en) 2013-03-18 2013-03-18 Earth rock cofferdam structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201320121707 CN203113359U (en) 2013-03-18 2013-03-18 Earth rock cofferdam structure

Publications (1)

Publication Number Publication Date
CN203113359U true CN203113359U (en) 2013-08-07

Family

ID=48893722

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201320121707 Expired - Lifetime CN203113359U (en) 2013-03-18 2013-03-18 Earth rock cofferdam structure

Country Status (1)

Country Link
CN (1) CN203113359U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104314089A (en) * 2014-11-10 2015-01-28 中国水利水电第十四工程局有限公司 Method for composite geo-membrane sloping core cofferdam
CN105839653A (en) * 2016-05-18 2016-08-10 中铁隧道集团二处有限公司 Construction method for reconstructing cofferdam anti-seepage system in immersed tube tunnel
CN106836035A (en) * 2017-04-07 2017-06-13 中国矿业大学 A kind of cofferdam dam filling construction for being applicable existing culvert under spoil embankment

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104314089A (en) * 2014-11-10 2015-01-28 中国水利水电第十四工程局有限公司 Method for composite geo-membrane sloping core cofferdam
CN105839653A (en) * 2016-05-18 2016-08-10 中铁隧道集团二处有限公司 Construction method for reconstructing cofferdam anti-seepage system in immersed tube tunnel
CN105839653B (en) * 2016-05-18 2018-06-08 中铁隧道集团二处有限公司 A kind of immersed tube tunnel rebuilds the construction method of seepage prevention of cofferdam system
CN106836035A (en) * 2017-04-07 2017-06-13 中国矿业大学 A kind of cofferdam dam filling construction for being applicable existing culvert under spoil embankment

Similar Documents

Publication Publication Date Title
CN205012359U (en) Barrel -shaped basis in branch storehouse of direction is passed through to adjustable sinking
CN204023501U (en) A remove dangerous and consolidate prevention of seepage processing structure for earth and rockfill dam
CN204370373U (en) Seepage proof curtain structure closed by a kind of reservoir
CN203113359U (en) Earth rock cofferdam structure
CN203429606U (en) Sediment retaining bank reconstructed from temporary cofferdam
CN109267549A (en) Diversion tunnel structure
CN105386426A (en) Construction for transforming diversion tunnel into ecological drainage tunnel controlled by radial gate and method for construction
CN203393682U (en) Retaining dam for water resources and hydropower engineering
CN204370370U (en) A kind of liftable ground sills
CN203307776U (en) Concrete face rock fill dam toe board structure
CN203213078U (en) Dam combining gravity dam with rock-fill dam
CN104164858B (en) Realize the diversion tunnel point sequence method for blocking that induced joint retaining phase downstream continues to flow
CN203795388U (en) Mixed earth dam and gravity dam arrangement structure
CN107893406B (en) Diversion tunnel group lower brake plugging program
CN204163057U (en) A kind of for the blocking dam in mud-rock flow
CN203144967U (en) Connecting structure of high earth rock cofferdam anti-seepage earth material and concrete anti-seepage wall
CN204000796U (en) Power station in river channel's structure
CN203096696U (en) High and low composite backwater weir
CN103938585A (en) Arrangement structure of mixed dam composed of earth dams and gravity dam
CN210262966U (en) Reconstruction ecological water drainage hole structure combined with permanent plug
CN203729280U (en) Water retaining structure of lower sluice gate for blocking lower water head flow-guiding hole
CN204282384U (en) Processing structure for high-water-head karst cave crossing dam impervious curtain
CN207919510U (en) Diversion tunnel blocks arrangement using lock under permanent plug first section joint gate
CN204753536U (en) Diversion tunnel structure with traffic function
CN209194485U (en) Diversion tunnel structure

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: CHENGDU HYDROELECTRIC INVESTIGATION + DESIGN INSTI

Free format text: FORMER NAME: CHENGDU HYDROELECTRIC INVESTIGATION + DESIGN INSTITUTE OF CHINA HYDROPOWER CONSU

CP01 Change in the name or title of a patent holder

Address after: The North Qingyang District of Chengdu City, Sichuan Province, No. 610072

Patentee after: HYDROCHINA CHENGDU ENGINEERING Corp.

Address before: The North Qingyang District of Chengdu City, Sichuan Province, No. 610072

Patentee before: POWERCHINA Chengdu Engineering Corporation Limited

C56 Change in the name or address of the patentee

Owner name: CHINA POWER GROUP CHENGDU INVESTIGATION DESIGN + R

Free format text: FORMER NAME: CHENGDU HYDROELECTRIC INVESTIGATION + DESIGN INSTITUTE OF SPC

CP01 Change in the name or title of a patent holder

Address after: The North Qingyang District of Chengdu City, Sichuan Province, No. 610072

Patentee after: POWERCHINA Chengdu Engineering Co.,Ltd.

Address before: The North Qingyang District of Chengdu City, Sichuan Province, No. 610072

Patentee before: HYDROCHINA CHENGDU ENGINEERING Corp.

CX01 Expiry of patent term

Granted publication date: 20130807

CX01 Expiry of patent term