CN203947490U - Combination moving type concrete premade tower crane foundation - Google Patents

Combination moving type concrete premade tower crane foundation Download PDF

Info

Publication number
CN203947490U
CN203947490U CN201420394968.2U CN201420394968U CN203947490U CN 203947490 U CN203947490 U CN 203947490U CN 201420394968 U CN201420394968 U CN 201420394968U CN 203947490 U CN203947490 U CN 203947490U
Authority
CN
China
Prior art keywords
extremity piece
piece
central part
tower crane
tower
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420394968.2U
Other languages
Chinese (zh)
Inventor
陈义彦
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201420394968.2U priority Critical patent/CN203947490U/en
Application granted granted Critical
Publication of CN203947490U publication Critical patent/CN203947490U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Foundations (AREA)

Abstract

The utility model belongs to building field, relates to a kind of combination moving type concrete premade tower crane foundation, and it comprises central part, transition piece, extremity piece and balancing weight, and extremity piece is divided into extremity piece fixed station and the upper and lower two parts of extremity piece holder; Central part, transition piece and extremity piece run through connected by steel strand, and central part is cross, and transition piece connects respectively four spiders of central part, and extremity piece is connected with four transition pieces respectively, and the two ends of counterweight are positioned on two adjacent extremity piece holders; Transition piece is provided with three anchor (bolt) holes; Extremity piece is provided with six anchor (bolt) holes.Combination moving type concrete premade tower crane foundation of the present utility model finds the bolt hole on corresponding basis according to the bolt hole position difference of the tower machine of different model, by bolton, a kind of basis just can be suitable for the advantage of three kinds of model tower machines (315 types, 40 types and 50 types), has saved material, has saved again hoisting transportation, install, that casts is loaded down with trivial details, and saving of labor is laborsaving, simply, convenient.

Description

Combination moving type concrete premade tower crane foundation
Technical field
The utility model belongs to building field, relates to a kind of foundation for tower crane, particularly a kind of combination moving type concrete premade tower crane foundation.
Background technology
In construction work, tower machine is mainly divided into 315 type tower machines, 40 type tower machines according to the difference of nominal lifting power moment, 50 type tower machines, 63 type tower machines and 80 type tower machines, also corresponding 315 type foundation for tower crane, 40 type foundation for tower crane, 50 type foundation for tower crane, 63 type foundation for tower crane and 80 type foundation for tower crane of having just.
The basis of fixed tower machine adopts the monolithic foundation for tower crane of Cast-in-place concrete conventionally, and long construction period can only once use, the basis of fixed tower machine can also adopt the precast combined foundation for tower crane of concrete, patent No. ZL 200620069053.X discloses a kind of plate shape assembling type concrete premade tower crane foundation, this foundation for tower crane comprises on polylith concrete prefabricated member establishes connection holes, bore a hole and connect the square combination foundation of polylith prefabricated component formation tower machine by flexible material, flexible material is crisscross connection concrete prefabricated member and is tightened to entirety, anchor (bolt) hole is distributed on the diagonal of square combination foundation of tower machine, anchor (bolt) hole is the bolt pore that is arranged on the bolt box in concrete prefabricated member, bolt box is bolt pipe and being connected of end box, in end box, be provided with stone bolt pad.
No matter the monolithic foundation for tower crane or the plate shape assembling type concrete premade tower crane foundation that are Cast-in-place concrete all have the following disadvantages: a kind of foundation for tower crane can only be applied to a kind of tower machine, increase and produced and used entreprise cost.
Utility model content
Goal of the invention: for solving the problems of the technologies described above, the utility model discloses a kind of combination moving type concrete premade tower crane foundation.According to the bolt hole position on different model and different brands tower machine lower margin, by foot bolt movably, make the bolt hole on the corresponding concrete premade tower crane foundation of bolt hole on different model and different brands tower machine lower margin, pass through bolton, on extremity piece holder, place the balancing weight matching, can realize same concrete premade tower crane foundation and can be suitable for 315 type tower machines, 40 type tower machines and 50 type tower machines simultaneously.
Technical scheme: a kind of combination moving type concrete premade tower crane foundation, comprise central part, transition piece, extremity piece and balancing weight, wherein:
Described extremity piece is divided into extremity piece fixed station and the upper and lower two parts of extremity piece holder;
Described central part, described transition piece and described extremity piece run through connected by steel strand, described central part is cross, described transition piece connects respectively four spiders of described central part, described extremity piece is connected with four described transition pieces respectively, and the two ends of described counterweight are positioned on two adjacent extremity piece holders;
Described transition piece is provided with three anchor (bolt) holes;
Described extremity piece is provided with six anchor (bolt) holes.
Further, described central part, described transition piece and described extremity piece are equipped with prestress hole, and the position of the prestress hole of described central part is corresponding with the position of the position of described transition piece prestress hole, described extremity piece prestress hole respectively.Steel strand form entirety by described prestress hole by described central part, described transition piece and described extremity piece.
Further, also comprise stone bolt box, stone bolt, described transition piece and tower machine lower margin are affixed by described stone bolt box and described stone bolt.
Further, also comprise stone bolt box, stone bolt, described extremity piece and tower machine lower margin are affixed by described stone bolt box and described stone bolt.
The utility model combination moving type concrete premade tower crane foundation saves one group of octal by optimum organization former design and becomes three holes, and two groups, joint is become to six holes from four holes, saves one group and suitably strengthens with the length and width of two groups, joint, has increased basic safety and stability.
Beneficial effect: the disclosed moving concrete premade tower crane foundation that closes of the utility model has the following advantages: find corresponding bolt hole according to the anchor (bolt) hole of different brands and different model tower machine on transition piece and extremity piece, by mobile bolt, fastening with basis tower motor spindle, according to different model increase and decrease counterweight.Same stylobate plinth just can be suitable for three kinds of model tower machines (315 types, 40 types and 50 types), has saved material, has saved again hoisting transportation, install, and casting loaded down with trivial details, saving of labor, laborsaving, simple, convenient.
Brief description of the drawings
Fig. 1 is the structural scheme of mechanism of combination moving type concrete premade tower crane foundation of the present utility model
Fig. 2 is the sectional view of AA ' face in Fig. 1
The top view of part centered by Fig. 3
The lateral view of part centered by Fig. 4
Fig. 5 is the top view of transition piece
Fig. 6 is the lateral view of transition piece
Fig. 7 is the top view of extremity piece
Fig. 8 is the lateral view of extremity piece
Fig. 9 is the top view of balancing weight
Figure 10 is the lateral view of balancing weight
Wherein:
1-central part 2-transition piece
3-extremity piece 4-balancing weight
5-anchor (bolt) hole 6-prestress hole
7-hole for hoist 8-locates shear connector
9-stone bolt box
Detailed description of the invention:
In order to make those skilled in the art more be familiar with technical scheme of the present invention, further set forth below in conjunction with accompanying drawing.
As shown in Fig. 1~10, a kind of combination moving type concrete premade tower crane foundation, comprises central part, transition piece, extremity piece and balancing weight, wherein:
Extremity piece is divided into extremity piece fixed station and the upper and lower two parts of extremity piece holder;
Central part, transition piece and extremity piece run through connected by steel strand, and central part is cross, and transition piece connects respectively four spiders of central part, and extremity piece is connected with four transition pieces respectively, and the two ends of counterweight are positioned on two adjacent extremity piece holders;
Transition piece is provided with three anchor (bolt) holes;
Extremity piece is provided with six anchor (bolt) holes.
Central part, transition piece and extremity piece are equipped with prestress hole, and the position of the prestress hole of central part is corresponding with the position of the position of transition piece prestress hole, extremity piece prestress hole respectively.Steel strand are overall by fastening to central part, transition piece and extremity piece formation by prestress hole.
Combination moving type concrete premade tower crane foundation also comprises stone bolt box, stone bolt, and transition piece and tower machine lower margin are affixed by stone bolt box and stone bolt; Extremity piece and tower machine lower margin are affixed by stone bolt box and stone bolt.
No matter be 315 type tower machines or 40 type tower machines or 50 type tower machines, after the disclosed combination moving type concrete of the utility model premade tower crane foundation is installed, at all lower margins place of the tower machine of different model (315 types, 40 types and 50 types), combination moving type concrete premade tower crane foundation has corresponding anchor (bolt) hole in contrast should.For the tower machine of different model, only need foot bolt movably, make the bolt hole on the corresponding concrete premade tower crane foundation of bolt hole on tower machine lower margin, and then pass through bolton, on extremity piece holder, place the balancing weight matching, can realize the applicable 315 type tower machines of same concrete premade tower crane foundation, 40 type tower machines and 50 type tower machines.
By reference to the accompanying drawings embodiment of the present utility model is described in detail above.But the utility model is not limited to above-mentioned embodiment, in the ken possessing at affiliated technical field those of ordinary skill, can also or else departs under the prerequisite of the utility model aim and make a variety of changes.

Claims (4)

1. a combination moving type concrete premade tower crane foundation, is characterized in that, comprises central part, transition piece, extremity piece and balancing weight, wherein:
Described extremity piece is divided into extremity piece fixed station and the upper and lower two parts of extremity piece holder;
Described central part, described transition piece and described extremity piece run through connected by steel strand, described central part is cross, described transition piece connects respectively four spiders of described central part, described extremity piece is connected with four described transition pieces respectively, and the two ends of described counterweight are positioned on two adjacent extremity piece holders;
Described transition piece is provided with three anchor (bolt) holes;
Described extremity piece is provided with six anchor (bolt) holes.
2. a kind of combination moving type concrete premade tower crane foundation as claimed in claim 1, it is characterized in that, described central part, described transition piece and described extremity piece are equipped with prestress hole, and the position of the prestress hole of described central part is corresponding with the position of the position of described transition piece prestress hole, described extremity piece prestress hole respectively.
3. a kind of combination moving type concrete premade tower crane foundation as claimed in claim 1 or 2, is characterized in that, also comprises stone bolt box, stone bolt, and described transition piece and tower machine lower margin are affixed by described stone bolt box and described stone bolt.
4. a kind of combination moving type concrete premade tower crane foundation as claimed in claim 1 or 2, is characterized in that, also comprises stone bolt box, stone bolt, and described extremity piece and tower machine lower margin are affixed by described stone bolt box and described stone bolt.
CN201420394968.2U 2014-07-09 2014-07-09 Combination moving type concrete premade tower crane foundation Expired - Fee Related CN203947490U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420394968.2U CN203947490U (en) 2014-07-09 2014-07-09 Combination moving type concrete premade tower crane foundation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420394968.2U CN203947490U (en) 2014-07-09 2014-07-09 Combination moving type concrete premade tower crane foundation

Publications (1)

Publication Number Publication Date
CN203947490U true CN203947490U (en) 2014-11-19

Family

ID=51889537

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420394968.2U Expired - Fee Related CN203947490U (en) 2014-07-09 2014-07-09 Combination moving type concrete premade tower crane foundation

Country Status (1)

Country Link
CN (1) CN203947490U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
USD811208S1 (en) 2016-12-21 2018-02-27 John Rene Spronken Crane base fastener
US10139037B2 (en) 2016-12-21 2018-11-27 John Rene Spronken Prefabricated reusable concrete pedestal element
USD835878S1 (en) 2016-12-21 2018-12-11 John Rene Spronken Crane base
US10202734B2 (en) 2016-12-21 2019-02-12 John Rene Spronken Prefabricated resuable concrete pedestal element

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
USD811208S1 (en) 2016-12-21 2018-02-27 John Rene Spronken Crane base fastener
US10139037B2 (en) 2016-12-21 2018-11-27 John Rene Spronken Prefabricated reusable concrete pedestal element
USD835878S1 (en) 2016-12-21 2018-12-11 John Rene Spronken Crane base
US10202734B2 (en) 2016-12-21 2019-02-12 John Rene Spronken Prefabricated resuable concrete pedestal element
US10422465B2 (en) 2016-12-21 2019-09-24 John Rene Spronken Prefabricated reusable concrete pedestal element

Similar Documents

Publication Publication Date Title
CN203947490U (en) Combination moving type concrete premade tower crane foundation
CN102328881B (en) One-time hoisting device and method for ultra-large reinforcement cage
CN102070071A (en) Steel reinforcement cage hoisting method
CN206624553U (en) Lifting component system
CN202099742U (en) Sling structure of bridge erecting machine
CN202882376U (en) Elevator shaft template support platform
CN205669313U (en) A kind of Universal adjustable hangs template system
CN201843325U (en) Stopping structure of attached lifting scaffold
CN100560918C (en) Large steel girder member bar turning device and member bar turning method thereof
CN203050106U (en) Integral hoisting balcony mould
CN203847334U (en) Built-in fitting
CN202707066U (en) Manual hole digging pile wall-protecting integral template
CN104818809A (en) Construction method for combined plate staircase
CN103982380A (en) Precast concrete tower member, assembly thereof, stacking method thereof and embedded part
CN202017342U (en) Block traction drawing die for slope concrete pouring
CN204825655U (en) Arc case roof beam lifts by crane focus off -centre and installation leveling system that takes one's place
CN110606435B (en) Suspension type electric hoist suitable for reverse construction method soil taking port transferring materials
CN203807946U (en) Track beam erecting device
CN203740916U (en) Standard knot for tower crane
CN202945577U (en) Precast structure of concrete pouring moldboard striding temporary hole
CN202440851U (en) Structure for supporting construction elevator foundation on basement top plate
CN202000266U (en) Supporting structure of bridge coping template
CN202185973U (en) Device for assisting dismounting and installing T beam formwork
CN202575694U (en) Arc surface type equipment hoisting tool
CN101590979A (en) The hoisting crane constant-rear lifting and hoisting force short-delivery hoisting method

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20141119

Termination date: 20190709