CN202707066U - Manual hole digging pile wall-protecting integral template - Google Patents

Manual hole digging pile wall-protecting integral template Download PDF

Info

Publication number
CN202707066U
CN202707066U CN 201220385211 CN201220385211U CN202707066U CN 202707066 U CN202707066 U CN 202707066U CN 201220385211 CN201220385211 CN 201220385211 CN 201220385211 U CN201220385211 U CN 201220385211U CN 202707066 U CN202707066 U CN 202707066U
Authority
CN
China
Prior art keywords
stupefied
template
digging pile
man
arc
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201220385211
Other languages
Chinese (zh)
Inventor
宋功业
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Institute of Architectural Technology
Original Assignee
Jiangsu Institute of Architectural Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Institute of Architectural Technology filed Critical Jiangsu Institute of Architectural Technology
Priority to CN 201220385211 priority Critical patent/CN202707066U/en
Application granted granted Critical
Publication of CN202707066U publication Critical patent/CN202707066U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model relates to a manual hole digging pile wall-protecting integral template, and belongs to the construction template field. The template comprises a plurality of main templates, main template supports, lengthened rods, a slinging frame and a plurality of lengthened templates. The main templates are arch-shaped templates and symmetrically distributed with one another, and one lengthened template is connected between every two adjacent main templates to form a round whole template. The slinging frame is arranged at the center of the round whole template and connected with the main templates through crosses, the lengthened rods and the main template supports connected with the lengthened rods. During operation, the aim of supporting can be achieved by placing the crosses of the slinging frame and the lengthened rods on a horizontal plane. When the template is disassembled, buckle pieces of the main templates and the lengthened templates are loosened, the slinging frame is slung, and the template is disconnected with manual hole digging pile wall-protecting inner barrel concrete. The template has the advantages of being convenient to install and disassemble, simple to operate, convenient and fast to construct, economical, practical, and capable of being used repeatedly.

Description

Man-made digging pile mould-pipe monolithic template
Technical field
The utility model relates to a kind of man-made digging pile mould-pipe monolithic masterplate, and mainly the construction for man-made digging pile mould-pipe designs.Belong to building circulation material field.
Background technology
In the construction of man-made digging pile mould-pipe template, mostly adopt wooden form or combined steel template, construct more loaded down with trivial details, holding time is long, need material working tool a lot, workman's amount of labour is large, and transport of materials is stacked and inconvenience, and material consumption is also larger, not economical rationality, and when construction safety of workers also be difficult to ensure, sometimes also can affect the duration.
Summary of the invention
For addressing the above problem, the utility model provides a kind of man-made digging pile mould-pipe monolithic template.
The utility model is realized with following technical scheme: a kind of man-made digging pile mould-pipe monolithic template.It comprises a plurality of master modules, master module support, extension bar, upending frame and a plurality of lengthening template; Described master module is Arc moulding board, and a plurality of master modules are arranged symmetrically, connect the lengthening template and form a circular integral mold plate between every adjacent two master modules; Home position at circular integral mold plate is installed upending frame, and described upending frame is installed in upper and lower two crosses at center pillar two ends by center pillar, level and the suspension ring that are installed on the upper cross form; Upending frame is connected with each master module by its cross, extension bar and each master module support of being connected with extension bar.
Know-why of the present utility model is: utilize rod member to be articulated and connected to rotate easily principle, can adjusting template and the distance of retaining wall face, and directly be lifted to the man-made digging pile mould-pipe working face with tower crane (or other Lifting implementses).During operation, as long as cross and the extension bar of upending frame placed the purpose that just can reach formwork on the horizontal plane.When needing adjustment elevator shaft inner core to touch size, just can achieve the goal as long as adjust the turnbuckle of extension bar.Increase the lengthening template and can regulate the man-made digging pile mould-pipe diameter dimension.
During form removal, as long as unclamp master module and the fastener that lengthens template, with tower crane (or other Lifting implementses) upending frame is sling, template and man-made digging pile mould-pipe inner core concrete will be thrown off.
The beneficial effects of the utility model are: make things convenient for the installation and removal of man-made digging pile mould-pipe template, and simple to operate, be convenient to rapid construction, economical and practical, and can be repeatedly used remarkable in economical benefits.
Description of drawings
Fig. 1 is man-made digging pile mould-pipe monolithic masterplate working state schematic representation;
Fig. 2 is the master module structural representation;
Fig. 3 is the upending frame structural representation.
Among the figure: the 1-master module; 1.1-panel; 1.2-top rail is stupefied; 1.3-the limit is perpendicular stupefied; 1.4-in perpendicular stupefied; 1.5-crosspiece; 1.6-bottom rail is stupefied; The 2-master module supports; The 3-extension bar; The 4-upending frame; 4.1-suspension ring; 4.2-cross; 4.3-center pillar; 5-lengthens template.
The specific embodiment
Below in conjunction with drawings and Examples the utility model is further specified.
As shown in figures 1 and 3, man-made digging pile mould-pipe monolithic template comprises 4 master modules 1, master module support 2, extension bar 3, upending frame 4 and 4 lengthening templates 5; Described master module 1 is Arc moulding board, and 4 master modules are arranged symmetrically, connect lengthening template 5 and form a circular integral mold plate between every adjacent two master modules, and master module 1 adopts fastener to be connected with lengthening template 5; Home position at circular integral mold plate is installed upending frame 4, and described upending frame 4 is installed in upper and lower two crosses 4.2 at center pillar two ends by center pillar 4.3, level and the suspension ring 4.1 that are installed on the upper cross form; Upending frame 4 is connected with each master module 1 by its cross 4.2, extension bar 3 and each master module support 2 of being connected with extension bar 3.
As shown in Figure 2, master module 1 is comprised of curved panel 1.1 and the steel frame that is installed on curved panel 1.1 intrados; Described steel frame is stupefied 1.2 by the arc top rail, stupefied 1.6, two limits of arc bottom rail perpendicular stupefied 1.3, one be arranged in the middle of two limits perpendicular stupefied 1.3 with limit perpendicular stupefied parallel perpendicular stupefied 1.4 and two ends be connected to two limits erect on stupefied 1.3 with top rail stupefied with stupefied parallel a plurality of arc crosspieces 1.5 frameworks that cooperate with curved panel 1.1 that form of bottom rail.Long 1 meter of master module, wide 0.6 meter.
Above-mentioned curved panel 1.1 is made by 1-1.5 millimeters thick steel plate, and employing is welded to connect between the steel frame; Or local with self-tapping screw or rivet connection.
Described arc top rail stupefied 1.2 and arc bottom rail stupefied 1.6 and limit perpendicular stupefied 1,3, in adopt between perpendicular stupefied 1.4 and be welded to connect; Arc top rail stupefied 1.2 is to bend with square steel pipe to form with arc bottom rail stupefied 1.6, and the limit perpendicular stupefied 1.3, in adopts between perpendicular stupefied 1.4 and is welded to connect, and adopt between the template and be welded to connect, or with self-tapping screw or rivet connection.The present embodiment is that the square steel pipe with 0,6 meter of the length of side 30 millimeters long bends and forms.
The perpendicular stupefied 1.3 usefulness steel plate bars in described limit are made, and centre, 100 millimeters places and 250-300 millimeter place, interval are useful on the circular hole that fastener connects usefulness at the distance both ends.Long 1 meter of steel plate bar, wide 40 millimeters, thickness 3-6 millimeter, 12 millimeters of Circularhole diameters.
Perpendicular stupefied 1.4 is to make with square steel pipe in described, and upper arc is stupefied 1.2, adopt between the arc lower horizontal stupefied 1.6 and be welded to connect; The present embodiment is to make with the square steel pipe of 0.6 meter of the length of side 30 millimeters long.
The spacing 400-500 millimeter that the arc crosspiece is 1.5, and the limit perpendicular stupefied, in perpendicular the employing between stupefied be welded to connect, when conflict with stupefied upper fastener connecting hole position, limit in the horizontal stupefied position of arc, the position of adjustment arc crosspiece;
It is the triangular support that are made by square steel pipe that described master module supports 2, and, arc bottom rail stupefied 1.6 stupefied 1.2 with the arc top rail is welded into integral body, and the arc top rail is stupefied 1.2, the angle between the arc bottom rail stupefied 1.6 is between 30 °-45 °; Master module support 2 and extension bar between for being articulated and connected.The square steel pipe length of side is 30 millimeters,
Extension bar 3 usefulness turnbuckles are made, and master module support 2 and upending frame 4 between adopt and be articulated and connected.
As shown in Figure 3, upending frame is comprised of suspension ring 4.1, cross 4.2, center pillar 4.3; Suspension ring 4.1 are the annulus that are connected into steel bar welding, and internal radius is not less than 200 millimeters; Cross is to be welded with two long channel-section steels of 300 millimeters; 30 millimeters of bar diameters, channel-section steel are No. 6 channel-section steels.Top cross top center and suspension ring 4.1 are welded to connect; The center pillar that welding is made by No. 6 channel-section steels between the cross up and down.
Lengthen template and be the measure of the lengthening template of taking for the size that meets design requirement, lengthen template and served as by combined steel formwork, length is 1 meter.It is several that width is respectively 100 millimeters, 150 millimeters, 200 millimeters, 300 millimeters, selects as required during use.
When the every cutting depth of hand excavated pile surpasses 1 meter, just need to carry out the retaining wall reinforced concrete construction.At this moment the retaining wall reinforcement installation is put in place, formwork hoisting puts in place, just can build breast wall concrete.
During work, place the horizontal level master module to strut upending frame and extension bar, the length of regulating extension bar just can realize the interior cylinder size of man-made digging pile mould-pipe of designing requirement.During man-made digging pile mould-pipe template formwork, because the hand excavated pile diameter dimension is had nothing in common with each other, between master module, be provided with the lengthening template.Concrete curing during form removal, will lengthen first formwork with fastener-style and unclamp, takes out after the enough intensity, with lifting appliance suspension ring be sling, because it all is hinged that extension bar and upending frame and master module support, during lifting, master module will leave concrete surface, and template is moved on just can be as required.

Claims (10)

1. man-made digging pile mould-pipe monolithic template is characterized in that: it comprises that a plurality of master modules (1), master module support (2), extension bar (3), upending frame (4) and a plurality of lengthening template (5); Described master module (1) is Arc moulding board, and a plurality of master modules are arranged symmetrically, connect lengthening template (5) and form a circular integral mold plate between every adjacent two master modules; At the home position of circular integral mold plate upending frame (4) is installed, described upending frame (4) is installed in upper and lower two crosses (4.2) at center pillar two ends by center pillar (4.3), level and the suspension ring (4.1) that are installed on the upper cross form; Upending frame (4) is connected with each master module (1) by its cross (4.2), extension bar (3) and each master module support (2) of being connected with extension bar (3).
2. man-made digging pile mould-pipe monolithic template according to claim 1 is characterized in that: described master module (1) is comprised of curved panel (1.1) and the steel frame that is installed on curved panel (1.1) intrados; Described steel frame by arc top rail stupefied (1.2), arc bottom rail stupefied (1.6), two limits perpendicular stupefied (1.3), one be arranged in the middle of two limits perpendicular stupefied (1.3) with limit perpendicular stupefied parallel perpendicular stupefied (1.4) and two ends be connected to two limits erect stupefied (1.3) upward with the stupefied framework that cooperates with curved panel (1.1) that forms with the stupefied parallel a plurality of arc crosspieces (1.5) of bottom rail of top rail.
3. man-made digging pile mould-pipe monolithic template according to claim 2, it is characterized in that: described curved panel (1.1) is made by 1-1.5 millimeters thick steel plate, and adopts between the steel frame and be welded to connect; Or local with self-tapping screw or rivet connection.
4. man-made digging pile mould-pipe monolithic template according to claim 1 is characterized in that: described master module (1) with lengthen template (5) and adopt fastener to be connected.
5. man-made digging pile mould-pipe monolithic template according to claim 2 is characterized in that: described arc top rail stupefied (1.2) and arc bottom rail stupefied (1.6) and limit perpendicular stupefied (1,3), in adopt between perpendicular stupefied (1.4) and be welded to connect; Described arc top rail stupefied (1.2) and arc bottom rail stupefied (1.6) are to bend with square steel pipe to form, with limit perpendicular stupefied (1,3), in adopts between perpendicular stupefied (1.4) and is welded to connect, and adopt between the template and be welded to connect, or with self-tapping screw or rivet connection.
6. man-made digging pile mould-pipe monolithic template according to claim 2, it is characterized in that: described limit perpendicular stupefied (1.3) are made with the steel plate bar, and centre, 100 millimeters places and 250-300 millimeter place, interval are useful on the circular hole that fastener connects usefulness at the distance both ends.
7. man-made digging pile mould-pipe monolithic template according to claim 2 is characterized in that: perpendicular stupefied (1.4) are to make with square steel pipe in described, and adopt between the upper arc stupefied (1.2), arc lower horizontal stroke stupefied (1.6) and be welded to connect;
8. man-made digging pile mould-pipe monolithic template according to claim 1, it is characterized in that: it is the triangular support that is made by square steel pipe that described master module supports (2), be welded into integral body with arc top rail stupefied (1.2), arc bottom rail stupefied (1.6), and the angle between the arc top rail stupefied (1.2), arc bottom rail stupefied (1.6) is between 30 °-45 °; Master module supports between (2) and the extension bar as being articulated and connected.
9. man-made digging pile mould-pipe monolithic template according to claim 1, it is characterized in that: described extension bar (3) is made with turnbuckle, and master module supports to adopt between (2) and the upending frame (4) and is articulated and connected.
10. man-made digging pile mould-pipe monolithic template according to claim 9, it is characterized in that: described suspension ring (4.1) are the annulus that is connected into steel bar welding, internal radius is not less than 200 millimeters; Cross is to be welded with two long channel-section steels of 300 millimeters.
CN 201220385211 2012-08-05 2012-08-05 Manual hole digging pile wall-protecting integral template Expired - Fee Related CN202707066U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220385211 CN202707066U (en) 2012-08-05 2012-08-05 Manual hole digging pile wall-protecting integral template

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220385211 CN202707066U (en) 2012-08-05 2012-08-05 Manual hole digging pile wall-protecting integral template

Publications (1)

Publication Number Publication Date
CN202707066U true CN202707066U (en) 2013-01-30

Family

ID=47587375

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220385211 Expired - Fee Related CN202707066U (en) 2012-08-05 2012-08-05 Manual hole digging pile wall-protecting integral template

Country Status (1)

Country Link
CN (1) CN202707066U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105386438A (en) * 2015-10-19 2016-03-09 中铁城建集团第三工程有限公司 Manual hole digging pile arm guard suspension construction formwork system and construction method thereof
CN111172983A (en) * 2020-02-17 2020-05-19 中冶建工集团有限公司 Foldable manual hole digging pile dado template
CN111350187A (en) * 2018-12-20 2020-06-30 中铁建设集团有限公司 Template system suitable for large-diameter manual hole digging annular foundation pile and construction method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105386438A (en) * 2015-10-19 2016-03-09 中铁城建集团第三工程有限公司 Manual hole digging pile arm guard suspension construction formwork system and construction method thereof
CN111350187A (en) * 2018-12-20 2020-06-30 中铁建设集团有限公司 Template system suitable for large-diameter manual hole digging annular foundation pile and construction method
CN111172983A (en) * 2020-02-17 2020-05-19 中冶建工集团有限公司 Foldable manual hole digging pile dado template

Similar Documents

Publication Publication Date Title
CN202627493U (en) Combined template for constructing elevator shaft
CN203499229U (en) Operating platform for construction of elevator shaft
CN202707066U (en) Manual hole digging pile wall-protecting integral template
CN204001416U (en) For the assemble type truss of the factory building of constructing
CN204687050U (en) A kind of mould of precast concrete rectangular beam
CN203891442U (en) High-rise elevator shaft template supporting platform
CN203050106U (en) Integral hoisting balcony mould
CN201730316U (en) Floor slab template for buildings
CN204848024U (en) Girder steel hoist device for construction
CN203905423U (en) Novel door frame beam supporting system
CN202925883U (en) Large size wooden formwork surrounding purlin device
CN107700854B (en) Steel plate wall sliding installation device and installation method for super high-rise core tube
CN202081639U (en) Steel truss tool type supporting structure for concrete framework industrial building templates
CN201771112U (en) Multipurpose reinforcement mat frame
CN205077503U (en) Prefabricated basis of building
CN203271122U (en) Attached template lifting frame
CN201151954Y (en) Steel column and concrete column connection structure
CN202299407U (en) Supporting device for floor slab template
CN104652833A (en) Manufacturing method for fixing device for pulleys for installation and lifting of purlines of steel structure factory building
CN203961239U (en) High-altitude overhanging awning construction operation platform
CN205224579U (en) Steel framework template and self -supporting truss board combination concrete quick detach system
CN218563047U (en) Building floor is fast-assembling quick detach device for template
CN201635419U (en) Formwork support for steel deposit concrete
CN215519871U (en) Combined elevator shaft operating frame
CN103993729A (en) High rise elevator shaft formwork erecting platform

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130130

Termination date: 20150805