CN203938196U - A kind of device for transporting equipment of semi-underground powerhouse - Google Patents
A kind of device for transporting equipment of semi-underground powerhouse Download PDFInfo
- Publication number
- CN203938196U CN203938196U CN201420343657.3U CN201420343657U CN203938196U CN 203938196 U CN203938196 U CN 203938196U CN 201420343657 U CN201420343657 U CN 201420343657U CN 203938196 U CN203938196 U CN 203938196U
- Authority
- CN
- China
- Prior art keywords
- erecting bed
- equipment
- guide wheel
- suspension hook
- conveying chamber
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 239000000725 suspension Substances 0.000 claims abstract description 20
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims abstract description 16
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 12
- 239000010959 steel Substances 0.000 claims abstract description 12
- 238000010276 construction Methods 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 238000012423 maintenance Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000006073 displacement reaction Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000005286 illumination Methods 0.000 description 1
- 238000009423 ventilation Methods 0.000 description 1
Landscapes
- Carriers, Traveling Bodies, And Overhead Traveling Cranes (AREA)
Abstract
The utility model relates to a kind of device for transporting equipment of semi-underground powerhouse.The purpose of this utility model is the device for transporting equipment that proposes a kind of semi-underground powerhouse, as the permanent transport channel of semi-underground powerhouse.The technical solution of the utility model is: have erecting bed and be arranged at the other equipment conveying chamber of erecting bed, erecting bed top is provided with crane in bridge type, on this crane in bridge type, suspension hook is set, the draft tube deck at top, equipment conveying chamber is provided with tail water door machine, on tail water door machine, suspension hook is set, erecting bed and bottom, equipment conveying chamber are communicated with, on described erecting bed and equipment conveying room floor, be equipped with guide wheel device, between two guide wheel devices, be provided with trailer, this trailer connects the suspension hook on crane in bridge type or after steel rope is walked around the guide wheel device that is fixed on equipment conveying room floor, connects the suspension hook on tail water door machine after steel rope is walked around the guide wheel device that is fixed on erecting bed ground.
Description
Technical field
The utility model relates to a kind of device for transporting equipment of semi-underground powerhouse.Be applicable to be provided with the power station of semi-underground powerhouse.
Background technology
Power station is different according to factory building pattern, is generally divided into ground factory building, underground power house and semi-underground powerhouse.The bottom section of semi-underground powerhouse is generally arranged in the deep trouth of massif open cut.
At present, be generally provided with the power station of semi-underground power house, external access tunnel need be set conventionally as the main transport channel of power station electromechanical appliance, electromechanical appliance is transported on the erecting bed ground between main frame by external access tunnel from factory.Yet, adopt this transport channel to mainly contain following shortcoming: first, due to the factors such as depth displacement on ground outside geologic condition and erecting bed and factory, externally access tunnel length is generally longer, and equipment conveying route is longer; Secondly, externally access tunnel difficulty of construction is larger, and the construction period is longer, invests higher; Finally, externally access tunnel domestic demand is supporting arranges the permanent measure such as ventilation, illumination, draining, and repair and maintenance amount is large.
Summary of the invention
The technical problems to be solved in the utility model is: for the problem of above-mentioned existence, in conjunction with the existing permanent electromechanical appliance in power station, a kind of device for transporting equipment of simple, the economic failure-free semi-underground powerhouse of constructing is proposed, as the permanent transport channel of semi-underground powerhouse.
The technical scheme that the utility model adopts is: a kind of device for transporting equipment of semi-underground powerhouse, there is erecting bed and be arranged at the other equipment conveying chamber of erecting bed, erecting bed top is provided with crane in bridge type, on this crane in bridge type, suspension hook is set, the draft tube deck at top, equipment conveying chamber is provided with tail water door machine, on tail water door machine, suspension hook is set, erecting bed and bottom, equipment conveying chamber are communicated with, it is characterized in that: on described erecting bed and equipment conveying room floor, be equipped with guide wheel device, between two guide wheel devices, be provided with trailer, this trailer connects the suspension hook on crane in bridge type or after steel rope is walked around the guide wheel device that is fixed on equipment conveying room floor, connects the suspension hook on tail water door machine after steel rope is walked around the guide wheel device that is fixed on erecting bed ground.
Between the guide wheel device of the guide wheel device of described erecting bed and equipment conveying chamber, on ground, lay i-beam track, described trailer is placed on i-beam track.
The beneficial effects of the utility model are: the utility model can make full use of the existing crane facility in power station, only need to arrange the equipment such as trailer, i-beam track and guide wheel device, thereby saved the external access tunnel of whole piece, saved the maintenance workload after power station investment, duration and operation.
Accompanying drawing explanation
Fig. 1 be in the utility model equipment by the schematic diagram being transported to outside factory in factory.
Fig. 2 be in the utility model equipment by the schematic diagram being transported in factory outside factory.
The specific embodiment
The present embodiment is a kind of device for transporting equipment of semi-underground powerhouse, has the erecting bed 1 in semi-underground power house and is arranged at the other equipment conveying chamber 8 of erecting bed, and the top of erecting bed 1 is provided with crane in bridge type 2, and suspension hook 3 is set on crane in bridge type; On the draft tube deck at 8 tops, equipment conveying chamber, arrange a tail water door machine 10, on tail water door machine 10, be provided with suspension hook 3.Erecting bed 1 is communicated with 8 bottoms, equipment conveying chamber, across erecting bed 1 and equipment conveying chamber 8, i-beam track 7 is set, on the ground that this i-beam track is laid between erecting bed 1 and equipment conveying chamber 8, at i-beam track 7 two ends, guide wheel device 5 is all set, is individually fixed on erecting bed 1 and 8 ground, equipment conveying chamber.Trailer 6 is set on i-beam track 7, and this trailer 6 can be along i-beam track 7 operations.
The transportation resources of the device for transporting equipment of the present embodiment is as follows:
1, outside factory, be transported in factory: first, equipment by suspension hook 3 handlings of tail water door machine 10 to the ground trailer 6 in equipment conveying chamber 8; Then, trailer 6 towards erecting bed one end fixing steel rope 4, the other end of steel rope 4 is walked around the guide wheel device 5 that is positioned at erecting bed 1 ground, is connected on the suspension hook 3 of top crane in bridge type 2 between main frame; Finally, the suspension hook 3 of crane in bridge type 2, up to draw at a slow speed steel rope 4, is pulled into trailer 6 and equipment in the lifting range of operation of crane in bridge type 2, and finishing equipment is by the work (seeing Fig. 1) being transported to outside factory in factory.
2, in factory, be transported to outside factory: first, equipment by suspension hook 3 handlings of crane in bridge type 2 to the ground trailer 6 of clipping room 1; Then, trailer 6 towards 8 one end, equipment conveying chamber fixing steel rope 4, the other end of steel rope 4 is walked around the guide wheel device 5 that is fixed on 8 ground, equipment conveying chamber, is connected on the suspension hook 3 of tail water door machine 10 at 8 tops, equipment conveying chamber; Finally, the suspension hook 3 of tail water door machine 10 is up to draw at a slow speed steel rope 4, trailer 6 and equipment are pulled in the lifting scope of tail water door machine 10, then equipment is hung out to factory by tail water door machine 10, finishing equipment is by the work (seeing Fig. 2) being transported in factory outside factory.
Certainly, above-mentioned explanation is not limitation of the utility model, and the utility model is also not limited to above-mentioned giving an example; those skilled in the art; in scope of the present utility model, the variation of making, change and add or replace, all should belong to protection domain of the present utility model.
Claims (2)
1. the device for transporting equipment of a semi-underground powerhouse, there is erecting bed (1) and be arranged at the other equipment conveying chamber (8) of erecting bed, erecting bed (1) top is provided with crane in bridge type (2), suspension hook (3) is set on this crane in bridge type, the draft tube deck at top, equipment conveying chamber (8) is provided with tail water door machine (10), suspension hook (3) is set on tail water door machine, erecting bed (1) and equipment conveying chamber (8) bottom are communicated with, it is characterized in that: on described erecting bed (1) and ground, equipment conveying chamber (8), be equipped with guide wheel device (5), between two guide wheel devices (5), be provided with trailer (6), this trailer connects the suspension hook (3) on crane in bridge type (2) or after steel rope (4) is walked around the guide wheel device (5) that is fixed on ground, equipment conveying chamber (8), connects the suspension hook (3) on tail water door machine (10) after steel rope (4) is walked around the guide wheel device (5) that is fixed on erecting bed (1) ground.
2. the device for transporting equipment of semi-underground powerhouse according to claim 1, it is characterized in that: between the guide wheel device (5) of described erecting bed (1) and the guide wheel device (5) of equipment conveying chamber (8), on ground, lay i-beam track (7), described trailer (6) is placed on i-beam track (7).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420343657.3U CN203938196U (en) | 2014-06-25 | 2014-06-25 | A kind of device for transporting equipment of semi-underground powerhouse |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420343657.3U CN203938196U (en) | 2014-06-25 | 2014-06-25 | A kind of device for transporting equipment of semi-underground powerhouse |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203938196U true CN203938196U (en) | 2014-11-12 |
Family
ID=51857532
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201420343657.3U Expired - Fee Related CN203938196U (en) | 2014-06-25 | 2014-06-25 | A kind of device for transporting equipment of semi-underground powerhouse |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203938196U (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106628909A (en) * | 2016-12-29 | 2017-05-10 | 浙江海洋大学 | Workshop weight carrying system |
CN109371933A (en) * | 2018-11-23 | 2019-02-22 | 中国电建集团成都勘测设计研究院有限公司 | Underground workshop ventilating system |
CN111498672A (en) * | 2020-04-08 | 2020-08-07 | 中国电建集团华东勘测设计研究院有限公司 | Hoisting system and construction method for large bridge crane heavy workpiece |
CN114348891A (en) * | 2022-01-07 | 2022-04-15 | 中国电建集团华东勘测设计研究院有限公司 | Hoisting equipment for disassembling and assembling bridge crane of underground workshop and bridge crane disassembling and assembling construction method |
-
2014
- 2014-06-25 CN CN201420343657.3U patent/CN203938196U/en not_active Expired - Fee Related
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106628909A (en) * | 2016-12-29 | 2017-05-10 | 浙江海洋大学 | Workshop weight carrying system |
CN109371933A (en) * | 2018-11-23 | 2019-02-22 | 中国电建集团成都勘测设计研究院有限公司 | Underground workshop ventilating system |
CN109371933B (en) * | 2018-11-23 | 2024-02-27 | 中国电建集团成都勘测设计研究院有限公司 | Underground powerhouse ventilation system of hydropower station |
CN111498672A (en) * | 2020-04-08 | 2020-08-07 | 中国电建集团华东勘测设计研究院有限公司 | Hoisting system and construction method for large bridge crane heavy workpiece |
CN114348891A (en) * | 2022-01-07 | 2022-04-15 | 中国电建集团华东勘测设计研究院有限公司 | Hoisting equipment for disassembling and assembling bridge crane of underground workshop and bridge crane disassembling and assembling construction method |
CN114348891B (en) * | 2022-01-07 | 2024-05-24 | 中国电建集团华东勘测设计研究院有限公司 | Hoisting equipment for disassembling and assembling bridge crane of underground factory building and bridge crane disassembling and assembling construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203938196U (en) | A kind of device for transporting equipment of semi-underground powerhouse | |
CN201864516U (en) | Lifting appliance special for overhauling isolating switch | |
CN202813997U (en) | Leech drying rack | |
CN207651996U (en) | Well head modular cable lays guiding trestle | |
CN204606919U (en) | A kind of gap bridge connecting device of hangar system | |
CN203874318U (en) | Novel climbing-assisting device | |
CN202039851U (en) | Lifting device of shaft sleeve inner wall construction assembling template | |
CN204212180U (en) | A kind of reinforcing cage for basement plugging dewatering well | |
CN204590782U (en) | A kind of industrialization Prefabricated enclosure wall | |
CN203895865U (en) | Cable laying device | |
CN203624937U (en) | Curtain board installing machine | |
CN205118440U (en) | Draw installation device in large diameter pipe hydraulic pressure | |
CN205724669U (en) | Frock is laid in cable layering beam splitting | |
CN205688820U (en) | A kind of installation system of high-rise building large area cell cube curtain wall block | |
CN204030460U (en) | A kind of supporter for LWD transmission line and stringing system | |
CN205207213U (en) | Colliery sump automatic drainage system | |
CN104545680A (en) | Electric basket for vertical shafts | |
CN104249963A (en) | Electric lifting basket for large-size lock drainage shaft | |
CN201794060U (en) | Suspended down-the-hole steel gate | |
CN204848097U (en) | Lift shallow for building | |
CN207234231U (en) | A kind of buried electricity box of overhead type | |
CN204677234U (en) | A kind of mine blow dryer erecting by overhang | |
CN204552757U (en) | A kind of energy-saving tunnel and Double pilot tunnel | |
CN205668869U (en) | A kind of boom hoisting for dredge pump maintenance | |
CN205231630U (en) | A special bracket for cable cloth is put |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20141112 |
|
CF01 | Termination of patent right due to non-payment of annual fee |