CN203924113U CN201420338022.4U CN201420338022U CN203924113U CN 203924113 U CN203924113 U CN 203924113U CN 201420338022 U CN201420338022 U CN 201420338022U CN 203924113 U CN203924113 U CN 203924113U
Authority
CN
China
Prior art keywords
structural member
reinforcing steel
prefabricated
steel structural
side plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420338022.4U
Other languages
Chinese (zh)
Inventor
刘小沙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201420338022.4U priority Critical patent/CN203924113U/en
Application granted granted Critical
Publication of CN203924113U publication Critical patent/CN203924113U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

The utility model discloses a kind of prefabricated pipe gallery, by some prefabricated tube couplings, be assembled, each prefabricated tube coupling is surrounded by top board, biside plate and base plate, and wherein top board and side plate are prefabricated, base plate is prefabricated or cast-in-place, and adjacent each prefabricated tube coupling splicing seams place is provided with water blocking tape.Between described top board and side plate, between side plate and base plate, the concrete cast-in-situ band by pre-buried separately reinforcing steel structural member and corresponding reinforcing steel structural member place forms rigid unitary respectively, between the top board of adjacent described prefabricated tube coupling, be provided with between side plate drawing fastening assembly.Pre-buried reinforcing steel structural member and concrete cast-in-situ band make prefabricated tube coupling form rigid unitary, have guaranteed water-tight performance that each prefabricated tube coupling top and bottom are good and the high strength monolithic of prefabricated tube coupling.To drawing arranging of fastening assembly to improve the resistance to compression shear behavior of whole piping lane, water blocking tape the water resistance that has improved piping lane is set, thereby guaranteed safety of structure and the durability of whole piping lane.

Description

Prefabricated pipe gallery
Technical field
The utility model relates to a kind of prefabricated piping lane, is specifically related to a kind of prefabricated pipe gallery.
Background technology
Urban Underground city planting ductwork is the important component part of urban public utilities.Communal facilities belongs to the public service facility in city, and have is the double properties of social production and social life service simultaneously.As can be seen here, urban public utilities are to maintain the basis that city produces and life normally moves, and are also therefore called as " lifeline " in city as the Municipal pipe network of its important component part.Municipal Infrastructure comprises the facilities such as the transmission & distribution pipelines such as feedwater, sewage, rainwater, electric power, communication, combustion gas, heating power and plant stand.
Urban Underground pipe gallery refers to that below urban road, building a municipal administration shares tunnel, the multiple municipal pipelines such as electric power, communication, water supply, combustion gas are concentrated on to one, carry out " same planning, unified construction, unified management ", to accomplish the comprehensive utilization of the underground space and sharing of resource, so just, can avoid user along the line without the underground space of abusing of planning, various underground utilities are concentrated in the underground comprehensive gallery that is laid in.
Utility model content
The purpose of this utility model is to provide that a kind of reliable in quality, bulk strength are high, long service life, short construction period, prefabricated pipe gallery that operation side is little.
The disclosed this prefabricated pipe gallery of the utility model, by some prefabricated tube couplings, be assembled, each prefabricated tube coupling is surrounded by top board, biside plate and base plate, and wherein top board and side plate are prefabricated, base plate is prefabricated or cast-in-place, and adjacent each prefabricated tube coupling splicing seams place is provided with water blocking tape.Between described top board and side plate, between side plate and base plate, the concrete cast-in-situ band by pre-buried separately reinforcing steel structural member and corresponding reinforcing steel structural member place forms rigid unitary respectively.
Between the top board of adjacent described prefabricated tube coupling, between side plate, be provided with drawing fastening assembly, to drawing fastening assembly to comprise bolt or studs, screw mandrel and corresponding nut, packing ring, each part is galvanized part.
Described top board is rectangular flat, the dual-side of its length direction is embedded with the overhanging reinforcing steel structural member of horizontal symmetrical, and inner side, its width two ends is useful on the connecting hole that described bolt or studs, screw mandrel pass and the technology groove of being convenient to assembling nut, packing ring.
There is recess along its length the top margin inner side of described side plate, described reinforcing steel structural member protrudes upward, from the base of side plate, stretches out downwards from the bottom surface of recess respectively, and inner side, its short transverse two ends is useful on the connecting hole that described bolt or studs, screw mandrel pass and the technology groove of being convenient to assembling nut, packing ring; The reinforcing steel structural member of described top board both sides stretches into respectively in the recess of the corresponding side in described side plate upper end, and top board is consistent with quantity with reinforcing steel structural member position pre-buried on side plate.
Between reinforcing steel structural member on described top board and side plate, be welded to each other or along the length direction of described prefabricated tube coupling, perforated rebar be set, each reinforcing steel structural member and the welding of perforated rebar intersection.
Described base plate is elongated plates, the bilateral symmetry of its upper surface length direction is provided with elongated lower narrow wide trapezoidal groove, the base of described reinforcing steel structural member from trapezoidal groove protrudes upward, or described base plate is rectangular flat, the described reinforcing steel structural member from it bilateral symmetry of length surface direction protrudes upward, consistent with on described side plate of pre-buried reinforcing steel structural member position and quantity on base plate, on side plate, pre-buried reinforcing steel structural member bottom is positioned at base plate top, colligation overlap joint or welding between the corresponding reinforcing steel structural member on base plate and side plate.Described base plate is elongated plates, the bilateral symmetry of its upper surface length direction is provided with elongated lower narrow wide trapezoidal groove, the base of described reinforcing steel structural member from trapezoidal groove protrudes upward, or described base plate is rectangular flat, the described reinforcing steel structural member from it bilateral symmetry of length surface direction protrudes upward, consistent with on described side plate of pre-buried reinforcing steel structural member position and quantity on base plate, colligation overlap joint or welding between the corresponding reinforcing steel structural member on base plate and side plate; Or described base plate is rectangular flat, the described reinforcing steel structural member from it bilateral symmetry of length surface direction protrudes upward, and position is consistent with the reinforcing steel structural member on described side plate with quantity; Colligation overlap joint or welding between corresponding reinforcing steel structural member on base plate and side plate.
Described water blocking tape lays respectively at the upstream face of contiguous prefabricated tube coupling splicing seams, comprises successively asphalt rubber waterproofing unction layer, EPDM waterproof adhesive tape layer, Bituminous hemp fiber layer.
On described bolt or studs, screw mandrel, corresponding described water blocking tape place is connected with waterproof rubber gasket.
There is anticracking grout layer the inner side of adjacent described prefabricated tube coupling splicing seams.
Described reinforcing steel structural member is double dowel or anchor ring.
Reinforcing steel structural member and concrete cast-in-situ band excessively pre-buried between the top board and side plate of the prefabricated tube coupling of the utility model, between side plate and base plate make prefabricated tube coupling form rigid unitary, have guaranteed water-tight performance that each prefabricated tube coupling top and bottom are good and the high strength monolithic of prefabricated tube coupling.Between the top board of contiguous prefabricated tube coupling and between side plate, be provided with drawing fastening assembly and water blocking tape, to drawing arranging of fastening assembly, improved the resistance to compression shear behavior of whole piping lane, water blocking tape the water resistance that has improved piping lane is set, thereby guaranteed safety of structure and the durability of whole piping lane.
The anticracking grout layer of contiguous prefabricated tube coupling splicing seams inside forms by high-pressure slip-casting.When the water blocking tape at certain splicing seams place lost efficacy, can be by this splicing seams place tension firmware be unloaded, will be again fastening good to tension firmware after carrying out waterproof reparation by slip casing by pressure.
Accompanying drawing explanation
Fig. 1 is that the master of the utility model embodiment mono-looks schematic diagram.
Fig. 2 is the schematic top plan view of Fig. 1.
Fig. 3 is the main TV structure schematic diagram of prefabricated tube coupling top board.
Fig. 4 is the schematic top plan view of Fig. 3.
Fig. 5 is the A-A schematic diagram in Fig. 4.
Fig. 6 is the main TV structure schematic diagram of prefabricated tube coupling side plate.
Fig. 7 is the B-B schematic diagram in Fig. 6.
Fig. 8 is the C-C schematic diagram in Fig. 6.
Fig. 9 is the main TV structure schematic diagram of prefabricated tube coupling base plate.
Figure 10 is the top board of prefabricated tube coupling and the assembling cross section enlarged diagram between side plate.
Figure 11 is the side plate of prefabricated tube coupling and the assembling cross section enlarged diagram between base plate.
Figure 12 is cross section, the splicing seams place structure for amplifying schematic diagram between contiguous prefabricated tube coupling top board.
Figure 13 is cross section, the splicing seams place structure for amplifying schematic diagram between contiguous prefabricated tube coupling side plate.
Figure 14 is the main TV structure schematic diagram of base plate in the utility model embodiment bis-.
Figure 15 is the main TV structure schematic diagram of base plate and side plate in the utility model embodiment bis-.
Figure 16 is the main TV structure schematic diagram of base plate in the utility model embodiment tri-.
The specific embodiment
Embodiment mono-, as shown in figure 1 to figure 13, the disclosed this prefabricated pipe gallery of the utility model, by some prefabricated tube couplings 1, be assembled, each prefabricated tube coupling 1 is by top board 11, biside plate 12 and base plate 13 surround, wherein top board 11 and side plate 12 are prefabricated, base plate 13 is prefabricated or cast-in-place, between top board 11 and side plate 12, between side plate 12 and base plate 13, the concrete cast-in-situ band 15 by pre-buried separately reinforcing steel structural member 14 and corresponding reinforcing steel structural member place 14 forms rigid unitary respectively, between the top board 11 of contiguous prefabricated tube coupling 1, between side plate 12, be provided with drawing fastening assembly 2.The upstream face of contiguous prefabricated tube coupling 1 splicing seams is provided with water blocking tape 3, there is anticracking grout layer 4 inner side.
To drawing fastening assembly 2 for bolt or studs, screw mandrel and corresponding nut, packing ring, each part is galvanized part, be bolt and nut, packing ring accordingly shown in Fig. 8.
Top board 11 is rectangular flat, the dual-side of its length direction is embedded with the overhanging reinforcing steel structural member of horizontal symmetrical 14, and inner side, its width two ends is useful on the connecting hole 16 that bolt or studs, screw mandrel pass and the technology groove 17 of being convenient to assembling nut, packing ring.
There is recess 18 along its length the top margin inner side of side plate 12.14 reinforcing steel structural members protrude upward, from the base of side plate 12, stretch out downwards from the bottom surface of recess 18 respectively.Side plate 12 short transverse two ends inner sides are useful on the connecting hole 16 that bolt or studs, screw mandrel pass and the technology groove 17 of being convenient to assembling nut, packing ring.The reinforcing steel structural member 14 of top board 11 both sides stretches into respectively in the recess 18 of the side plate 12 corresponding sides in upper end, and top board 11 is consistent with quantity with reinforcing steel structural member 14 positions pre-buried on side plate 12.
Base plate 13 is elongated plates, and the bilateral symmetry of its upper surface length direction is provided with outstanding installation positioning strip 131, and the width center position that positioning strip 131 is installed has elongated lower narrow wide trapezoidal groove 132.The base of reinforcing steel structural member 14 from trapezoidal groove 132 protrudes upward, consistent with on side plate 12 of pre-buried reinforcing steel structural member 14 positions and quantity on base plate 13, reinforcing steel structural member 14 bottoms pre-buried on side plate 12 are positioned at base plate 13 tops, colligation overlap joint or welding between the corresponding reinforcing steel structural member on base plate 13 and side plate 12.
In the present embodiment, the pre-buried reinforcing steel structural member 14 in top board 11 and side plate 12 upper ends adopts anchor ring, and reinforcing steel structural member 14 pre-buried on side plate 12 lower ends and base plate 13 adopts double dowel.
Top board 11 and the side plate 12 of each prefabricated tube coupling 1 are prefabricated in the factory, base plate 13 can be prefabricated also can be cast-in-place, prefabricated component is transported to job site by the vehicles.For the ease of handling, when each plate is prefabricated, all arranges and hang nail or suspension ring on it.
The prefabricated tube coupling Assembling step prefabricated for base plate 13 is as follows: 1, ground is dug to respective design absolute altitude, after building one deck concrete cushion, handling base plate 13 is to precalculated position, by side plate 12 handlings to the corresponding position on base plate 13, and with bracing element fixed side 12, each dowel difference spot welding that base plate is pre-buried with side plate junction is connected, corresponding anchor ring place concreting is cast-in-place is again with 15 to make to form rigid unitary between base plate 13 and side plate 12, finally the both sides of trapezoidal groove is built.2, the upper end to biside plate 12 by top board 11 handlings, the anchor ring of top board 12 both sides is stretched in the recess 18 of side plate 12 inner sides, upper end, adjust the position of top board 11 until the anchor ring position correspondence on top board 11 and side plate 12 is good, length direction along prefabricated tube coupling 1 inserts perforated rebar or cable wire 6, between perforated rebar or cable wire 6 and anchor ring, concreting is cast-in-place again after fixing is with 15 in spot welding, makes top board 11 and side plate 12 form rigid unitary.So far, a rigidly connected integral prefabricated tube coupling construction is complete.
After adjacent prefabricated tube coupling 1 is good according to above-mentioned steps assembling construction, it is next the construction at contiguous prefabricated tube coupling 1 splicing seams place.First by fastening to drawing fastening assembly 2 respectively adjacent top board 11 to be connected with side plate 12, to drawing corresponding splicing seams place on the bolt of fastening assembly 2 or studs, screw mandrel to be connected with waterproof rubber gasket 5, then carry out the construction of water blocking tape 3.Water blocking tape 3 lays respectively at the upstream face of adjacent top board 11 and side plate 12, comprises successively asphalt rubber waterproofing unction layer 31, EPDM waterproof adhesive tape layer 32, Bituminous hemp fiber layer 33.Water blocking tape 3 carries out slip casing by pressure construction at each splicing seams place of piping lane inner side after having constructed, and forms anticracking grout layer 4 seal in the inner side of each splicing seams.
Piping lane carries out corresponding municipal engineering pipe installation installation work again after having assembled.
When base plate 13 is cast-in-place, before side plate 12 and base plate 11 assemblings, ground is dug to respective design absolute altitude, after building one deck concrete cushion, base plate 13 is built in case designing requirement thereon, until base plate 13 is standing while reaching requirement, starts to assemble successively by above-mentioned steps side plate 12 and the top board 11 of prefabricated tube coupling 1.
After the prefabricated tube coupling of some assembles, in the inside of piping lane, splicing seams place carries out slip casing by pressure operation, forms anticracking grout layer at each splicing seams place, so that carry out waterproof reparation while having water blocking tape to lose efficacy.
Embodiment bis-, and as shown in Figure 14 and Figure 15, the difference of the present embodiment and embodiment mono-is: base plate 13 is rectangular flat, and pre-buried double dowel protrudes upward from the bilateral symmetry of plate upper surface length direction; Colligation overlap joint between corresponding dowel on side plate and base plate.Other structure of the present embodiment is with embodiment mono-.
Embodiment tri-, as shown in figure 16, the difference of the present embodiment and embodiment mono-, embodiment bis-is: upper surface length direction one side of base plate 13 is provided with outstanding installation positioning strip 131, the width center position that positioning strip 131 is installed has elongated lower narrow wide trapezoidal groove 132, the base of reinforcing steel structural member 14 from trapezoidal groove 132 protrudes upward, and the reinforcing steel structural member 14 of opposite side directly stretches out from the upper surface of base plate 13.When side plate 12 and base plate 13 are assembled certainly, carry out according to the corresponding operating of above-mentioned two embodiment respectively both sides.Other structure of the present embodiment is with embodiment mono-.
Reinforcing steel structural member pre-buried on each plate of prefabricated tube coupling also can adopt anchor ring.If pipeline is more, be convenient to the layer-built cables installation of pipeline, can be when side plate be prefabricated, sidewall arranges bracket within it, prefabricated middle plate is set on bracket and piping lane is divided into two-layer up and down.For the very high piping lane of waterproof requirement, the water blocking tape between side plate meet water layer can add one deck waterproof roll.

Claims (10)

1. a prefabricated pipe gallery, by some prefabricated tube couplings, be assembled, each prefabricated tube coupling is surrounded by top board, biside plate and base plate, wherein top board and side plate are prefabricated, base plate is prefabricated or cast-in-place, adjacent each prefabricated tube coupling splicing seams place is provided with water blocking tape, it is characterized in that: between described top board and side plate, between side plate and base plate, the concrete cast-in-situ band by pre-buried separately reinforcing steel structural member and corresponding reinforcing steel structural member place forms rigid unitary respectively, between the top board of adjacent described prefabricated tube coupling, be provided with between side plate drawing fastening assembly.
2. prefabricated pipe gallery as claimed in claim 1, is characterized in that: described to drawing fastening assembly to comprise bolt or studs, screw mandrel and corresponding nut, packing ring, each part is galvanized part.
3. prefabricated pipe gallery as claimed in claim 2, it is characterized in that: described top board is rectangular flat, the dual-side of its length direction is embedded with the overhanging reinforcing steel structural member of horizontal symmetrical, and inner side, its width two ends is useful on the connecting hole that described bolt or studs, screw mandrel pass and the technology groove of being convenient to assembling nut, packing ring.
4. prefabricated pipe gallery as claimed in claim 3, it is characterized in that: there is recess along its length the top margin inner side of described side plate, described reinforcing steel structural member protrudes upward, from the base of side plate, stretches out downwards from the bottom surface of recess respectively, and inner side, its short transverse two ends is useful on the connecting hole that described bolt or studs, screw mandrel pass and the technology groove of being convenient to assembling nut, packing ring; The reinforcing steel structural member of described top board both sides stretches into respectively in the recess of the corresponding side in described side plate upper end, and top board is consistent with quantity with reinforcing steel structural member position pre-buried on side plate.
5. prefabricated pipe gallery as claimed in claim 1, it is characterized in that: between the reinforcing steel structural member on described top board and side plate, be welded to each other or along the length direction of described prefabricated tube coupling, perforated rebar be set, each reinforcing steel structural member and the welding of perforated rebar intersection.
6. prefabricated pipe gallery as claimed in claim 1, it is characterized in that: described base plate is elongated plates, the bilateral symmetry of its upper surface length direction is provided with elongated lower narrow wide trapezoidal groove, the base of described reinforcing steel structural member from trapezoidal groove protrudes upward, or described base plate is rectangular flat, the described reinforcing steel structural member from it bilateral symmetry of length surface direction protrudes upward, consistent with on described side plate of pre-buried reinforcing steel structural member position and quantity on base plate, colligation overlap joint or welding between the corresponding reinforcing steel structural member on base plate and side plate; Or described base plate is rectangular flat, the described reinforcing steel structural member from it bilateral symmetry of length surface direction protrudes upward, and position is consistent with the reinforcing steel structural member on described side plate with quantity; Colligation overlap joint or welding between corresponding reinforcing steel structural member on base plate and side plate.
7. prefabricated pipe gallery as claimed in claim 1, is characterized in that: described water blocking tape lays respectively at the upstream face of contiguous prefabricated tube coupling splicing seams, comprises successively asphalt rubber waterproofing unction layer, EPDM waterproof adhesive tape layer, Bituminous hemp fiber layer.
8. prefabricated pipe gallery as claimed in claim 2, is characterized in that: on described bolt or studs, screw mandrel, corresponding described water blocking tape place is connected with waterproof rubber gasket.
9. prefabricated pipe gallery as claimed in claim 1, is characterized in that: there is anticracking grout layer the inner side of adjacent described prefabricated tube coupling splicing seams.
10. the prefabricated pipe gallery as described in any one in claim 1,4,5,6, is characterized in that: described reinforcing steel structural member is anchor ring or double dowel.
CN201420338022.4U 2014-06-24 2014-06-24 Prefabricated pipe gallery Expired - Fee Related CN203924113U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420338022.4U CN203924113U (en) 2014-06-24 2014-06-24 Prefabricated pipe gallery

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420338022.4U CN203924113U (en) 2014-06-24 2014-06-24 Prefabricated pipe gallery

Publications (1)

Publication Number Publication Date
CN203924113U true CN203924113U (en) 2014-11-05

Family

ID=51819967

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420338022.4U Expired - Fee Related CN203924113U (en) 2014-06-24 2014-06-24 Prefabricated pipe gallery

Country Status (1)

Country Link
CN (1) CN203924113U (en)

Cited By (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104805866A (en) * 2015-04-30 2015-07-29 黑龙江宇辉新型建筑材料有限公司 Prefabricated comprehensive pipe gallery and construction method
CN105672355A (en) * 2016-03-17 2016-06-15 上海同预建筑科技有限公司 Plate type prefabricated concrete comprehensive pipe gallery
CN105951877A (en) * 2016-06-10 2016-09-21 周瑞华 Totally-prefabricated comprehensive pipe rack
CN106193689A (en) * 2016-08-31 2016-12-07 中国矿业大学(北京) A kind of assembled cooling tower cylinder and construction method
CN106906845A (en) * 2017-04-27 2017-06-30 福州大学 Transverse joint precast assembly pipe gallery and construction method
CN107059917A (en) * 2016-12-30 2017-08-18 中建五局第三建设有限公司 One kind splits element precast formula pipe gallery and its construction method
CN107119725A (en) * 2017-06-07 2017-09-01 安徽省建筑科学研究设计院 A kind of prefabricated box culvert structure containing glass fiber-reinforced polymer
CN107152036A (en) * 2017-06-07 2017-09-12 扬州工业职业技术学院 A kind of pipe gallery and its construction method
CN107653900A (en) * 2017-08-25 2018-02-02 中建科技有限公司深圳分公司 A kind of preparation method of Prefabricated pipe gallery
CN109083251A (en) * 2018-07-26 2018-12-25 广州坚磊建设有限公司 The no mould construction cast-in-place drainage ditch structure of top plate
CN109505310A (en) * 2019-01-16 2019-03-22 上海中森建筑与工程设计顾问有限公司 A kind of environment-friendly type fabricated assembly overall pipe gallery and its assembly method
CN109898551A (en) * 2019-03-15 2019-06-18 上海市政工程设计研究总院(集团)有限公司 A kind of prefabricated assembled cantilever retaining wall using bolt block connection type
CN109898550A (en) * 2019-03-15 2019-06-18 上海市政工程设计研究总院(集团)有限公司 A kind of prefabricated assembled cantilever retaining wall being connected by screw bolts mode
CN110821256A (en) * 2019-11-21 2020-02-21 中建三局绿色产业投资有限公司 Prefabricated assembled biochemical pool of sewage plant and installation method thereof
CN111305874A (en) * 2020-02-28 2020-06-19 东北大学 Construction method of assembled box culvert
CN112963717A (en) * 2021-01-27 2021-06-15 沈位 Green environment-friendly plate and preparation process thereof
CN114457845A (en) * 2020-11-10 2022-05-10 内蒙古中朵远大建筑工业有限公司 Prefabricated part, assembly socket type square pipe culvert and construction method thereof

Cited By (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104805866A (en) * 2015-04-30 2015-07-29 黑龙江宇辉新型建筑材料有限公司 Prefabricated comprehensive pipe gallery and construction method
CN105672355A (en) * 2016-03-17 2016-06-15 上海同预建筑科技有限公司 Plate type prefabricated concrete comprehensive pipe gallery
CN105951877A (en) * 2016-06-10 2016-09-21 周瑞华 Totally-prefabricated comprehensive pipe rack
CN106193689A (en) * 2016-08-31 2016-12-07 中国矿业大学(北京) A kind of assembled cooling tower cylinder and construction method
CN107059917B (en) * 2016-12-30 2020-02-04 中建五局第三建设有限公司 Split component prefabricated comprehensive pipe gallery and construction method thereof
CN107059917A (en) * 2016-12-30 2017-08-18 中建五局第三建设有限公司 One kind splits element precast formula pipe gallery and its construction method
CN106906845A (en) * 2017-04-27 2017-06-30 福州大学 Transverse joint precast assembly pipe gallery and construction method
CN107119725A (en) * 2017-06-07 2017-09-01 安徽省建筑科学研究设计院 A kind of prefabricated box culvert structure containing glass fiber-reinforced polymer
CN107152036A (en) * 2017-06-07 2017-09-12 扬州工业职业技术学院 A kind of pipe gallery and its construction method
CN107653900A (en) * 2017-08-25 2018-02-02 中建科技有限公司深圳分公司 A kind of preparation method of Prefabricated pipe gallery
CN109083251A (en) * 2018-07-26 2018-12-25 广州坚磊建设有限公司 The no mould construction cast-in-place drainage ditch structure of top plate
CN109505310A (en) * 2019-01-16 2019-03-22 上海中森建筑与工程设计顾问有限公司 A kind of environment-friendly type fabricated assembly overall pipe gallery and its assembly method
CN109898551A (en) * 2019-03-15 2019-06-18 上海市政工程设计研究总院(集团)有限公司 A kind of prefabricated assembled cantilever retaining wall using bolt block connection type
CN109898550A (en) * 2019-03-15 2019-06-18 上海市政工程设计研究总院(集团)有限公司 A kind of prefabricated assembled cantilever retaining wall being connected by screw bolts mode
CN110821256A (en) * 2019-11-21 2020-02-21 中建三局绿色产业投资有限公司 Prefabricated assembled biochemical pool of sewage plant and installation method thereof
CN111305874A (en) * 2020-02-28 2020-06-19 东北大学 Construction method of assembled box culvert
CN111305874B (en) * 2020-02-28 2021-07-02 中铁七局集团第三工程有限公司 Construction method of assembled box culvert
CN114457845A (en) * 2020-11-10 2022-05-10 内蒙古中朵远大建筑工业有限公司 Prefabricated part, assembly socket type square pipe culvert and construction method thereof
CN112963717A (en) * 2021-01-27 2021-06-15 沈位 Green environment-friendly plate and preparation process thereof

Similar Documents

Publication Publication Date Title
CN203924113U (en) Prefabricated pipe gallery
CN203924112U (en) Prefabricated pipe gallery
CN203924114U (en) Prefabricated pipe gallery
CN205276316U (en) Modular prefabricated piping lane
CN107313455B (en) Cast-in-place and prefabricated combined single-bin comprehensive pipe gallery node and construction method
CN106049551B (en) Pipe gallery boss sealing structure
CN105672355A (en) Plate type prefabricated concrete comprehensive pipe gallery
CN105525632A (en) Waterproof structure for bellmouths and sockets of fabricated prefabricated composite pipe gallery
CN105401593A (en) Assembly type square underground pipe gallery
CN205617425U (en) Prefabricated structure of assembling of utility tunnel
CN105735353A (en) Prefabricated comprehensive pipe gallery
CN110552378A (en) Underground space roof subsides post-cast strip and seals structure in advance
CN205894103U (en) Prefabricated parabola type utility tunnel
CN110629792B (en) Splicing construction method for corrugated steel pipe gallery
CN110685234B (en) Construction method of corrugated steel pipe culvert
CN209817336U (en) Floor heating pipeline and domestic water pipeline mounting structure
CN208136954U (en) Precast splice type Pipe rack
CN203284814U (en) Transformer substation prefabricated concrete water-scattering device
CN105971016A (en) Connection structure between joints of comprehensive pipe rack
CN211285692U (en) Corrugated steel pipe gallery based on prestressed tendons
CN103603376A (en) Concrete box culvert deformation joint waterproof structure and manufacturing technology thereof
CN208088343U (en) A kind of assembled piping lane component and piping lane
CN203834522U (en) Waterproof structure for concrete box culvert deformation joint
CN204040061U (en) Prefabricated pipe gallery
CN203383160U (en) Reinforced concrete round pipe culvert

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20141105

Termination date: 20170624

CF01 Termination of patent right due to non-payment of annual fee