CN109505310A CN201910046076.0A CN201910046076A CN109505310A CN 109505310 A CN109505310 A CN 109505310A CN 201910046076 A CN201910046076 A CN 201910046076A CN 109505310 A CN109505310 A CN 109505310A
Authority
CN
China
Prior art keywords
prefabricated
wallboard
pipe gallery
cast
auxiliary
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910046076.0A
Other languages
Chinese (zh)
Inventor
李新华
邱令乾
马海英
刘亚东
马思瑶
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANGHAI JOHNSON ARCHITECTURAL & ENGINEERING DESIGN CONSULTANTS Ltd
Original Assignee
SHANGHAI JOHNSON ARCHITECTURAL & ENGINEERING DESIGN CONSULTANTS Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANGHAI JOHNSON ARCHITECTURAL & ENGINEERING DESIGN CONSULTANTS Ltd filed Critical SHANGHAI JOHNSON ARCHITECTURAL & ENGINEERING DESIGN CONSULTANTS Ltd
Priority to CN201910046076.0A priority Critical patent/CN109505310A/en
Publication of CN109505310A publication Critical patent/CN109505310A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/10Tunnels or galleries specially adapted to house conduits, e.g. oil pipe-lines, sewer pipes ; Making conduits in situ, e.g. of concrete ; Casings, i.e. manhole shafts, access or inspection chambers or coverings of boreholes or narrow wells
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/16Arrangement or construction of joints in foundation structures
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D31/00Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution
    • E02D31/02Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution against ground humidity or ground water

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • General Engineering & Computer Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Oil, Petroleum & Natural Gas (AREA)
  • Chemical & Material Sciences (AREA)
  • Hydrology & Water Resources (AREA)
  • Panels For Use In Building Construction (AREA)

Abstract

The invention discloses a kind of environment-friendly type fabricated assembly overall pipe gallery and its assembly methods, environment-friendly type fabricated assembly overall pipe gallery includes: the piping lane unit that multiple length directions along pipe gallery are sequentially arranged, each piping lane unit includes prefabricated top plate, prefabricated panel, cast-in-place wallboard, prefabricated point of storehouse plate and two prefabricated c-type Side fascias;Two prefabricated c-type Side fascias are oppositely arranged and are arranged symmetrically along the left and right directions of pipe gallery;Prefabricated c-type Side fascia includes the main body wallboard to extend along the short transverse of pipe gallery, and is relatively arranged on two auxiliary wallboards at the both ends of main body wallboard respectively;Auxiliary wallboard is embedded with the anchor bar for protruding into cast-in-place wallboard;Point storehouse plate is by piping lane channel every setting out several mutually independent sub- piping lane channels.The each pre-constructed unit sectional area of the present invention is small, light-weight, simple structure, overall cost are low, structural strength and shear behavior are superior, and site operation pollution is small.

Description

A kind of environment-friendly type fabricated assembly overall pipe gallery and its assembly method
Technical field
The present invention relates to pipe gallery technical field, espespecially a kind of environment-friendly type fabricated assembly overall pipe gallery and its dress Method of completing the square.
Background technique
Pipe gallery is to be built in Urban Underground to accommodate two classes and the above municipal pipeline in the box culvert tunnel of one.It can will give The municipal engineering pipeline such as water, natural gas, heating power, electric power, communication is included, realizes that planning, construction and management three are unified, is Ensure the important infrastructure and " lifeline " of city operations.Traditional City Buried Pipeline is done things in his own way the shallow of road that be laid in In sheaf space, caused by pipeline increase-volume dilatation not only the phenomenon that " zipper road ", and leads to pipeline Frequent Accidents, cause road surface It repeatedly excavates, not only increases maintenance cost, and greatly affected the safe operation in city.
Pipe gallery is widely applied as a kind of Municipal Infrastructure, and especially country is big over the past two years It pushes extensively, various regions construction is like a raging fire.Currently, built or positive construction parts underground pipe gallery, the overwhelming majority is using cast-in-place It formula and using centrifugation or vibrates to pour and builds up an entirety and be transported to construction site in factory.Both methods all exists very big Insufficient: cast in situs box culvert construct period length, large labor intensity, low efficiency are influenced by weather, field condition, to ring around The huge pollution of border generation, construction quality are also unstable, at high cost, while polluting to soil;The entirety of the factorial production Box culvert, piping lane molding time is long, and processing step is cumbersome, and construction cost is high, and transport, lifting are difficult, especially large-scale box culvert, raw It produces equipment and hanging device investment is huge, and the box culvert difficulty of super large-scale has production equipment that can not also manufacture.
Summary of the invention
The object of the present invention is to provide a kind of environment-friendly type fabricated assembly overall pipe gallery and its assembly method, this synthesis The each pre-constructed unit of piping lane (prefabricated top plate, prefabricated panel, prefabricated point of storehouse plate and prefabricated c-type Side fascia) can individually be added Work, transport are lifted and are built, and the lighter in weight of each pre-constructed unit, and in-site installation is convenient, and micro-adjustment is easily achieved, thus The bonding strength of globality and adjacent piping lane unit after improving pipe gallery assembly;Each pre-constructed unit sectional area is small, Light-weight, simple structure, transport and lifting be conveniently easily achieved and site operation small to the pollution of soil (prefabricated components are without existing Pour molding, scene is built), prefabrication processing step is simple, produces, structural strength low with hoisting cost and shear behavior It is superior.
Technical solution provided by the invention is as follows:
A kind of environment-friendly type fabricated assembly overall pipe gallery, comprising:
The piping lane unit that multiple length directions along pipe gallery are sequentially arranged, each described piping lane unit includes prefabricated Top plate, prefabricated panel, cast-in-place wallboard, prefabricated point of storehouse plate and two prefabricated c-type Side fascias;
Two prefabricated c-type Side fascias are oppositely arranged and are arranged symmetrically along the left and right directions of pipe gallery;Two institutes Stating prefabricated c-type Side fascia is to form the prefabricated c-type Side fascia in a left side of the left side wall of the pipe gallery and form the pipe gallery Right side wall the prefabricated c-type Side fascia in the right side;
The prefabricated c-type Side fascia includes the main body wallboard to extend along the short transverse of the pipe gallery, and respectively It is relatively arranged on two auxiliary wallboards at the both ends of the main body wallboard;Two auxiliary wallboards are the first auxiliary wallboard and the Two auxiliary wallboards, the first auxiliary wallboard and the second auxiliary wallboard are sequentially arranged along short transverse, so that the main body Wallboard and two C-shaped arrangements of the auxiliary wallboard;The auxiliary wallboard is embedded with the anchoring for protruding into the cast-in-place wallboard Reinforcing bar;
The prefabricated top plate is set to the first auxiliary wallboard and the prefabricated c-type exterior wall in the right side of the prefabricated c-type Side fascia in the left side Between first auxiliary wallboard of plate, so that two the first auxiliary wallboards, two cast-in-place wallboards and the prefabricated top plate Constitute the upper side wall of the pipe gallery;
The prefabricated panel is set to the second auxiliary wallboard and the prefabricated c-type exterior wall in the right side of the prefabricated c-type Side fascia in the left side Between second auxiliary wallboard of plate, so that two the second auxiliary wallboards, two cast-in-place wallboards and the prefabricated panel Constitute the lower wall of the pipe gallery;
The left side wall, the upper side wall, the right side wall and the lower wall, which are enclosed, to be set to form piping lane channel, described prefabricated Point storehouse plate is by the piping lane channel every setting out several mutually independent sub- piping lane channels.
In the technical program, by prefabricated and cast-in-place combination, so that it is completely prefabricated caused to eliminate pipe gallery simultaneously Problem (piping lane molding time is long, and processing step is cumbersome, and construction cost is high, and transport, lifting are difficult, especially large-scale box culvert, Production equipment and hanging device investment are huge, and the box culvert difficulty of super large-scale has production equipment that can not also manufacture) and integrated pipe (long construction period, large labor intensity, low efficiency are influenced problem caused by corridor cast in situs by weather, field condition, right The huge pollution of ambient enviroment generation, construction quality are also unstable, at high cost, while polluting to soil).And by prefabricated Point storehouse plate by piping lane channel every being set as each functional area, so that it is logical to realize that different utilities pipelines is arranged in different sub- piping lanes In road, convenient for the wiring of different utilities pipelines, later maintenance and maintenance greatly reduce the workload of later maintenance.It is adjacent Two pipe galleries realize effectively connection by cast-in-place wallboard, improve the globality and structural strength of entire pipe gallery.By It can be independent in each pre-constructed unit of this pipe gallery (prefabricated top plate, prefabricated panel, prefabricated point of storehouse plate and prefabricated c-type Side fascia) It processed, transported, lifted and is built, and the lighter in weight of each pre-constructed unit, in-site installation is convenient and site operation is to soil The pollution of earth is small (prefabricated components are not necessarily to cast-in-place molding, and scene is built), and micro-adjustment is easily achieved, to improve integrated pipe The bonding strength of globality and adjacent piping lane unit after corridor assembly;Each pre-constructed unit sectional area is small, light-weight, construction is simple List, transport are conveniently easily achieved with lifting, prefabrication processing step is simple, are produced, structural strength low with hoisting cost and resisted Cut superior performance.
It is further preferred that the auxiliary wallboard is embedded with close to the cast-in-place wallboard side for protruding into the cast-in-place wall The steel plate for sealing water of plate;And/or the prefabricated top plate is embedded with close to the cast-in-place wallboard side for protruding into the cast-in-place wallboard Steel plate for sealing water;And/or the prefabricated panel is embedded with close to the cast-in-place wallboard side for protruding into the cast-in-place wallboard Steel plate for sealing water.
In the technical program, the setting of steel plate for sealing water improves the waterproofness of the junction of cast-in-place wallboard and pre-constructed unit Can, it avoids the structure of this pipe gallery from the bad phenomenons such as seep water, is permeable, avoids occurring in piping lane channel structure infiltration and ponding Bad phenomenon, and then improve the structural strength and service life of this pipe gallery;It also ensures simultaneously and is located in piping lane channel The normal service life of interior utilities pipeline;More preferably, the setting of steel plate for sealing water improves cast-in-place wallboard and connect with pre-constructed unit Connectivity robustness, stability and the shear behavior at place.
It is further preferred that the steel plate for sealing water is groove-like structure, the opening of the steel plate for sealing water is logical away from the piping lane Road setting.
In the technical program, the setting of the groove-like structure of steel plate for sealing water improves intercept water area and connecing in concrete Contacting surface product, ensure that the fastness connected between cast-in-place wallboard and pre-constructed unit and stability and shear behavior.
It is further preferred that the prefabricated point of storehouse plate along the pipe gallery short transverse by the piping lane channel every setting Left sub- piping lane channel and right sub- piping lane channel out.
It is further preferred that one end of the prefabricated point of storehouse plate is connect with the prefabricated top plate, the prefabricated point of storehouse plate The other end is connect with the prefabricated panel;The prefabricated top plate is equipped with the first joint bar towards the prefabricated point of storehouse plate, described prefabricated The position for dividing storehouse plate to correspond to first joint bar is equipped with the first grout sleeve;First grout sleeve is sheathed on described first and inserts The outside of muscle, and first grout sleeve is equipped with cast-in-place concrete;The prefabricated panel is equipped with towards the prefabricated point of storehouse plate Second joint bar, the position that the prefabricated point of storehouse plate corresponds to first joint bar are equipped with the second grout sleeve;The second grouting set Cylinder is sheathed on the outside of second joint bar, and second grout sleeve is equipped with cast-in-place concrete.
In the technical program, prefabricated point of storehouse plate, prefabricated panel and pre- are improved by the mating connection of joint bar and grout sleeve The fastness and tightness of mechanical coupling strength, connection between top plate processed.
It is further preferred that the main body wallboard is embedded with several deformed bars, the extension side of the deformed bar To parallel with short transverse.
In the technical program, the setting of deformed bar subtracts so that the structural strength of main body wallboard and shear behavior increase The thickness (i.e. area of section) of main body wallboard is lacked, while having realized the lighting of this prefabricated c-type Side fascia, has been readily transported and hangs Dress;Since the structural strength of main body wallboard is high, shear behavior is superior, main body wallboard eliminates the anti-of main body wallboard without tensile stress The setting of water construction, and reduce earth excavation and backfill amount.
It is further preferred that the two sidewalls of length direction of the prefabricated c-type Side fascia along the pipe gallery are set respectively Have to preformed hole is drawn, so that two prefabricated c-type Side fascias being disposed adjacent of length direction along the pipe gallery pass through Connection is bolted;One end and one of them in two prefabricated c-type Side fascias being disposed adjacent of the connection bolt The prefabricated c-type Side fascia to preformed hole connection is drawn, the other end of the connection bolt is described pre- be disposed adjacent two Another prefabricated c-type Side fascia in c-type Side fascia processed to drawing preformed hole connection.
In the technical program, two piping lane units being disposed adjacent are attached by connection bolt and are carried out at grouting Reason, to further increase the mechanical coupling strength of two piping lane units, guarantees the alignment of pipe gallery, improves two pipes The fastness and tightness of corridor unit connection.
It is further preferred that along two prefabricated c-type Side fascias being disposed adjacent of length direction of the pipe gallery Between the splicing seams that are formed filled with waterproof layer.
In the technical program, the setting of waterproof layer improves the waterproof performance of pipe gallery, effectively avoids the water of external environment The service life for influencing utilities pipeline is penetrated into piping lane channel, utilities pipeline is protected.
The present invention also provides a kind of assembly methods of environment-friendly type fabricated assembly overall pipe gallery, comprising steps of
It is arranged outside prefabricated top plate, prefabricated panel, prefabricated point of storehouse plate and two prefabricated c-types according to the design requirement of pipe gallery The position of wallboard, so that two prefabricated c-type Side fascias are respectively formed the left side wall and right side wall of the pipe gallery, it is described Prefabricated point of storehouse plate is by the piping lane channel of the pipe gallery every setting out several mutually independent sub- piping lane channels;Wherein, described Prefabricated c-type Side fascia includes the main body wallboard to extend along the short transverse of the pipe gallery, and is relatively arranged on institute respectively State two auxiliary wallboards at the both ends of main body wallboard;Two auxiliary wallboards are that the first auxiliary wallboard and second assist wallboard, The first auxiliary wallboard and the second auxiliary wallboard are sequentially arranged along short transverse, so that the main body wallboard and two institutes State the auxiliary C-shaped arrangement of wallboard;The auxiliary wallboard is embedded with the anchor bar for protruding into cast-in-place wallboard;
Casting concrete forms the cast-in-place wallboard at the anchor bar so that the anchor bar be embedded in it is described Cast-in-place wallboard.
In the technical program, by prefabricated and cast-in-place combination, so that it is completely prefabricated caused to eliminate pipe gallery simultaneously Problem (piping lane molding time is long, and processing step is cumbersome, and construction cost is high, and transport, lifting are difficult, especially large-scale box culvert, Production equipment and hanging device investment are huge, and the box culvert difficulty of super large-scale has production equipment that can not also manufacture) and integrated pipe (long construction period, large labor intensity, low efficiency are influenced problem caused by corridor cast in situs by weather, field condition, right The huge pollution of ambient enviroment generation, construction quality are also unstable, at high cost, while polluting to soil).And by prefabricated Point storehouse plate by piping lane channel every being set as each functional area, so that it is logical to realize that different utilities pipelines is arranged in different sub- piping lanes In road, convenient for the wiring of different utilities pipelines, later maintenance and maintenance greatly reduce the workload of later maintenance.It is adjacent Two pipe galleries realize effectively connection by cast-in-place wallboard, improve the globality and structural strength of entire pipe gallery.By It can be independent in each pre-constructed unit of this pipe gallery (prefabricated top plate, prefabricated panel, prefabricated point of storehouse plate and prefabricated c-type Side fascia) It processed, transported, lifted and is built, and the lighter in weight of each pre-constructed unit, in-site installation is convenient and site operation is to soil The pollution of earth is small (prefabricated components are not necessarily to cast-in-place molding, and scene is built), and micro-adjustment is easily achieved, to improve integrated pipe The bonding strength of globality and adjacent piping lane unit after corridor assembly;Each pre-constructed unit sectional area is small, light-weight, construction is simple List, transport are conveniently easily achieved with lifting, prefabrication processing step is simple, are produced, structural strength low with hoisting cost and resisted Cut superior performance.
It is further preferred that further comprising the steps of:
By connecting bolt for two be disposed adjacent along the length direction of the pipe gallery prefabricated c-type Side fascias Connection,
The spelling formed between two prefabricated c-type Side fascias being disposed adjacent along the length direction of the pipe gallery Seam is filled with waterproof layer.
In the technical program, two piping lane units being disposed adjacent are attached by connection bolt and are carried out at grouting Reason, to further increase the mechanical coupling strength of two piping lane units, guarantees the alignment of pipe gallery, improves two pipes The fastness and tightness of corridor unit connection.More preferably, the setting of waterproof layer improves the waterproof performance of pipe gallery, effectively keeps away The water for exempting from external environment penetrates into piping lane channel the service life for influencing utilities pipeline, protects utilities pipeline.
A kind of environment-friendly type fabricated assembly overall pipe gallery provided by the invention and its assembly method, can bring following It is at least one the utility model has the advantages that
1, in the present invention, by prefabricated with cast-in-place combination, thus eliminate simultaneously pipe gallery it is completely prefabricated caused by Problem caused by problem and pipe gallery cast in situs.And by prefabricated point of storehouse plate by piping lane channel every being set as each function Region, to realize that different utilities pipelines is arranged in different sub- piping lane channels, convenient for the wiring of different utilities pipelines, Later maintenance and maintenance greatly reduce the workload of later maintenance.Two neighboring pipe gallery has by the realization of cast-in-place wallboard Effect connection, improves the globality and structural strength of entire pipe gallery.Due to each pre-constructed unit of this pipe gallery (prefabricated top Plate, prefabricated panel, prefabricated point of storehouse plate and prefabricated c-type Side fascia) it can individually be processed, transported, lifted and be built, and it is each The lighter in weight of pre-constructed unit, in-site installation is convenient and site operation is small to the pollution of soil (prefabricated components are not necessarily to cast-in-place molding, Build at scene), micro-adjustment is easily achieved, to improve the globality after pipe gallery assembly and adjacent piping lane unit Bonding strength;Each pre-constructed unit sectional area is small, light-weight, simple structure, transport and lifting are conveniently easily achieved, factory is pre- Processing step processed is simple, produce, structural strength low with hoisting cost and shear behavior is superior.
2, in the present invention, the setting of steel plate for sealing water improves the waterproof performance of the junction of cast-in-place wallboard and pre-constructed unit, It avoids the structure of this pipe gallery from the bad phenomenons such as seeping water, is permeable, avoids occurring structure infiltration and ponding in piping lane channel not Good phenomenon, and then improve the structural strength and service life of this pipe gallery;It also ensures and is located in piping lane channel simultaneously Utilities pipeline normal service life;More preferably, the setting of steel plate for sealing water improves cast-in-place wallboard and pre-constructed unit junction Connectivity robustness, stability and shear behavior.
3, in the present invention, the setting of deformed bar is reduced so that the structural strength of main body wallboard and shear behavior increase The thickness (i.e. area of section) of main body wallboard, while the lighting of this prefabricated c-type Side fascia is realized, it is readily transported and hangs Dress;Since the structural strength of main body wallboard is high, shear behavior is superior, main body wallboard eliminates the anti-of main body wallboard without tensile stress The setting of water construction, and reduce earth excavation and backfill amount.
Detailed description of the invention
Below by clearly understandable mode, preferred embodiment is described with reference to the drawings, it is whole to environment-friendly type prefabrication and assembly construction Formula pipe gallery and its above-mentioned characteristic, technical characteristic, advantage and its implementation of assembly method are further described.
Fig. 1 is a kind of example structure schematic diagram of environment-friendly type fabricated assembly overall pipe gallery of the invention;
Fig. 2 is the B-B the schematic diagram of the section structure of Fig. 1;
Fig. 3 is enlarged drawing at the A of Fig. 1;
Fig. 4 is a kind of example structure schematic diagram of prefabricated c-type Side fascia of the invention;
Fig. 5 is another example structure schematic diagram of prefabricated c-type Side fascia of the invention;
Fig. 6 is a kind of example structure schematic diagram of prefabricated point of storehouse plate of the invention;
Fig. 7 is a kind of example structure schematic diagram of prefabricated top plate of the invention;
Fig. 8 is a kind of example structure schematic diagram of prefabricated panel of the invention.
Drawing reference numeral explanation:
1. prefabricated c-type Side fascia, 111. main body wallboards, 112. auxiliary wallboards, 2. prefabricated top plates, 3. prefabricated points of storehouse plates, 4. Prefabricated panel, 5. cast-in-place wallboards, 6. steel plate for sealing water, 7. deformed bars, 8. anchor bars, 81. straightways, 82. crotch sections, 91. the first joint bar, 92. second joint bars, 101. first grout sleeves, 102. second grout sleeves, 11. waterproof layers, 12. pairs of drawings are pre- It boxes out, 13. connection bolts, 141. left sub- piping lane channels, 142. right sub- piping lane channels.
Specific embodiment
In order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, Detailed description of the invention will be compareed below A specific embodiment of the invention.It should be evident that drawings in the following description are only some embodiments of the invention, for For those of ordinary skill in the art, without creative efforts, it can also be obtained according to these attached drawings other Attached drawing, and obtain other embodiments.
To make simplified form, part related to the present invention is only schematically shown in each figure, their not generations Its practical structures as product of table.In addition, there is identical structure or function in some figures so that simplified form is easy to understand Component, only symbolically depict one of those, or only marked one of those.Herein, "one" not only table Show " only this ", can also indicate the situation of " more than one ".Herein, it should be noted that unless otherwise specific Regulation and restriction, term " installation ", " connected ", " connection " shall be understood in a broad sense, for example, it may be being fixedly connected, be also possible to It is detachably connected, or is integrally connected;It can be mechanical connection, be also possible to be electrically connected;It can be directly connected, can also lead to It crosses intermediary to be indirectly connected, can be the connection inside two elements.It for the ordinary skill in the art, can be with Concrete condition understands the concrete meaning of above-mentioned term in the present invention.
In example 1, as shown in figures 1-8, a kind of environment-friendly type fabricated assembly overall pipe gallery, comprising: Duo Geyan The piping lane unit that the length direction of pipe gallery is sequentially arranged, each piping lane unit include prefabricated top plate 2, prefabricated panel 4, show Pour wallboard 5, prefabricated point of storehouse plate 3 and two prefabricated c-type Side fascias 1;Two prefabricated c-type Side fascias 1 are along the right and left of pipe gallery To being oppositely arranged and be arranged symmetrically;Two prefabricated c-type Side fascias 1 are outside the prefabricated c-type in a left side for formed the left side wall of pipe gallery The prefabricated c-type Side fascia in the right side of the right side wall of wallboard and formation pipe gallery;Prefabricated c-type Side fascia 1 includes the height along pipe gallery The main body wallboard 111 that direction is extended is spent, and is relatively arranged on two auxiliary wallboards 112 at the both ends of main body wallboard 111 respectively; Two auxiliary wallboards 112 are the first auxiliary wallboard and the second auxiliary wallboard, and the first auxiliary wallboard and the second auxiliary wallboard are along height Direction is sequentially arranged, so that main body wallboard 111 and two C-shaped arrangements of auxiliary wallboard 112;Auxiliary wallboard 112, which is embedded with, to be used for Protrude into the anchor bar 8 of cast-in-place wallboard 5;Prefabricated top plate 2 is set to the first auxiliary wallboard and right prefabricated C of left prefabricated c-type Side fascia Between first auxiliary wallboard of type Side fascia, so that two first auxiliary wallboards, two cast-in-place wallboards 5 and prefabricated top plate 2 are constituted The upper side wall of pipe gallery;Prefabricated panel 4 is set to the second auxiliary wallboard and right prefabricated c-type Side fascia of left prefabricated c-type Side fascia Second auxiliary wallboard between so that two second auxiliary wallboards, two cast-in-place wallboards 5 and prefabricated panel 4 composition pipe gallery Lower wall;Left side wall, upper side wall, right side wall and lower wall, which are enclosed, to be set to form piping lane channel, prefabricated point of storehouse plate 3 by piping lane channel every Set out several mutually independent sub- piping lane channels.
In example 2, as shown in figures 1-8, on the basis of example 1, auxiliary wallboard 112 is close to cast-in-place wallboard 5 Side is embedded with the steel plate for sealing water 6 for protruding into cast-in-place wallboard 5;Prefabricated top plate 2 is embedded with close to cast-in-place 5 side of wallboard for stretching Enter the steel plate for sealing water 6 of cast-in-place wallboard 5;Prefabricated panel 4 is embedded with close to cast-in-place 5 side of wallboard for protruding into stopping for cast-in-place wallboard 5 Water steel plate 6.Preferably, steel plate for sealing water 6 is groove-like structure, and the opening of steel plate for sealing water 6 is arranged away from piping lane channel;Such as steel plate for sealing water 6 be c-type steel plate for sealing water 6 or drum steel.Preferably, prefabricated point of storehouse plate 3 is along the short transverse of pipe gallery by piping lane channel Every setting out left sub- piping lane channel 141 and right sub- piping lane channel 142.It is further preferred that one end of prefabricated point of storehouse plate 3 and prefabricated top Plate 2 connects, and the other end of prefabricated point of storehouse plate 3 is connect with prefabricated panel 4;Prefabricated top plate 2 is equipped with first towards prefabricated point of storehouse plate 3 and inserts The position of muscle 91, corresponding first joint bar 91 of prefabricated point of storehouse plate 3 is equipped with the first grout sleeve 101;First grout sleeve 101 is sheathed on The outside of first joint bar 91, and the first grout sleeve 101 is equipped with cast-in-place concrete;Prefabricated panel 4 is equipped with towards prefabricated point of storehouse plate 3 The position of second joint bar 92, corresponding first joint bar 91 of prefabricated point of storehouse plate 3 is equipped with the second grout sleeve 102;Second grout sleeve 102 It is sheathed on the outside of the second joint bar 92, and the second grout sleeve 102 is equipped with cast-in-place concrete.It is worth noting that prefabricated point of storehouse Plate 3 can also be in the horizontal direction by piping lane channel every being set as upper sub- piping lane channel and lower sub- piping lane channel, and prefabricated point of storehouse plate 3 can be Cross, X font or rice font etc. can be by piping lane channels every being set as more than two sub- piping lane channels, and each sub- piping lane channel Size may be the same or different, in this way, in practical applications, different utilities pipelines can be included into different sub- piping lane channels It is interior, convenient for the independent maintenance in later period.Since 3 need of prefabricated point of storehouse plate play the left and right of function division, prefabricated point of storehouse plate 3 Can along the length direction and pipe gallery unit of pipe gallery length dimension it is identical or different.
In the third embodiment, as shown in figures 1-8, on the basis of embodiment one or two, main body wallboard 111 is embedded with several The extension direction of deformed bar 7, deformed bar 7 is parallel with short transverse.Preferably, multiple deformed bars 7 are along synthesis The length direction equidistant placement of piping lane.Certainly, multiple deformed bars 7 are arranged along the length direction Unequal distance of pipe gallery.It is excellent Selection of land, spacing of the main body wallboard 111 between the deformed bar 7 of two side positions of the length direction of pipe gallery are less than main body Spacing of the wallboard 111 between the deformed bar 7 in the middle position of the length direction of pipe gallery.And it is located at main body wallboard The arrangement of the deformed bar 7 in 111 middle positions can be equidistant or Unequal distance arrangement.Preferably, deformed bar 7 is along height Direction extends into the lower end surface of main body wallboard 111 in the upper surface of main body wallboard 111, but not through upper surface and lower end surface.
In example IV, as shown in figures 1-8, on the basis of embodiment one, two or three, anchor bar 8 is along height side To being laid with several rows.Preferably, at least one anchor bar 8 is crotch structure, including straightway 81 and crotch section 82, crotch The end direction auxiliary wallboard 112 of section 82.Certainly, anchor bar 8 can also be linear structure and/or linear structure close to cast-in-place wall 5 side of plate be equipped with anchor plate, the extension direction of anchor plate can be parallel with short transverse, or simultaneously with short transverse and anchor steel The length direction of muscle 8 is vertical.Even, anchor bar 8 can for crotch structure, linear structure, one of be provided with anchor plate or Two kinds of even three kinds of situations.Preferably, the end of the crotch section 82 for two anchor bars 8 being disposed adjacent along short transverse It is disposed adjacent.Preferably, at least one anchor bar 8 is linear structure.Preferably, length of the main body wallboard 111 along pipe gallery The two sidewalls in degree direction are respectively equipped with to drawing preformed hole 12.Preferably, length direction of the prefabricated c-type Side fascia 1 along pipe gallery Two sidewalls be respectively equipped with to preformed hole 12 is drawn, so that outside two prefabricated c-types being disposed adjacent of length direction of pipe gallery Wallboard 1 is connected by connection bolt 13;Connect one end of bolt 13 and its in two prefabricated c-type Side fascias 1 being disposed adjacent In prefabricated c-type Side fascia 1 to drawing preformed hole 12 to connect, it is prefabricated be disposed adjacent two to connect the other end of bolt 13 Another prefabricated c-type Side fascia 1 in c-type Side fascia 1 to drawing preformed hole 12 to connect.Preferably, connection bolt 13 is preferably C Type connects bolt 13, and the opening for connecting bolt 13 is arranged towards piping lane channel side.Preferably, along the length side of pipe gallery Waterproof layer 11 is filled with to the splicing seams formed between two prefabricated c-type Side fascias 1 being disposed adjacent.
In practical applications, one end of connection bolt 13 is across the one of main body wallboard 111 being disposed adjacent to drawing Preformed hole 12 is simultaneously fixed by nut, and the other end of connection bolt 13 passes through another main body wallboard 111 being disposed adjacent Preformed hole 12 and be fixed by nut to drawing;To realize that two prefabricated c-type Side fascias 1 being disposed adjacent connect.Two A prefabricated c-type Side fascia 1 is oppositely arranged, so that main body wallboard 111 forms the left side wall or right side wall of pipe gallery, and in opposite Cast in situs is carried out at the anchor bar 8 of setting to form cast-in-place wallboard 5, so that two cast-in-place wallboards 5,2 and of prefabricated top plate Two first auxiliary wallboards form the upper side wall of pipe gallery, two cast-in-place wallboards 5, prefabricated panel 4 and two the second relieving walls Plate forms the lower wall of pipe gallery, very easy and be easily achieved.Preferably, to the drawing setting auxiliary wallboard of preformed hole 12 112 and main body wallboard 111 junction, in prefabricated c-type Side fascia 1, main body wallboard 111 and auxiliary wallboard 112 be one Body pours to be formed, and anchor bar 8 is preferably extended by the reinforcing bar of the skeleton reinforcing steel bar in auxiliary wallboard 112 and formed.That is main body wallboard 111 are made of with auxiliary wallboard 112 skeleton reinforcing steel bar of itself and the concrete of wrapping frame reinforcing bar.Certainly, main body wallboard 111 It can also be only made of concrete with auxiliary wallboard 112, and anchor bar 8 is embedded in relieving wall plate 112 in advance and extends into cast-in-place wallboard 5 Place.
In embodiment five, as shown in figures 1-8, on the basis of embodiment one, two, three or four, prefabricated top plate 2 includes top Plate ontology, the left and right ends of top plate ontology are respectively equipped with the anchor bar 8 for protruding into cast-in-place wallboard 5, and anchor bar 8 is preferably several Setting, and multiple anchor bars 8 are arranged in array, be embedded in the anchor bar 8 on top plate ontology structure and prefabricated c-type exterior wall 8 structure of anchor bar of plate 1 is identical or different;Likewise, prefabricated panel 4 includes top plate bottom body, the left and right of bottom plate ontology Both ends are respectively equipped with the anchor bar 8 for protruding into cast-in-place wallboard 5, the preferably several settings of anchor bar 8, and multiple anchor bars 8 It is arranged in array, is embedded in the structure of the anchor bar 8 on bottom plate ontology and the 8 structure phase of anchor bar of prefabricated c-type Side fascia 1 It is same or different;It is worth noting that when the size of pipe gallery is smaller, then the anchor bar 8 of prefabricated c-type Side fascia 1 It is preferably shifted to install with the anchor bar 8 of prefabricated top plate 2, prefabricated panel 4, to reduce the ruler of cast-in-place wallboard 5 in left-right direction It is very little, and then reduce the side-to-side dimensions of pipe gallery;Certainly, when the size of pipe gallery is larger, then prefabricated c-type Side fascia 1 The anchor bar 8 of anchor bar 8 and prefabricated top plate 2, prefabricated panel 4 is preferably oppositely arranged, thus improve cast-in-place wallboard 5 along a left side The size of right direction.Certainly, the anchor bar 8 and prefabricated top plate 2, prefabricated shifted to install in prefabricated c-type Side fascia 1 can also be extended The length of the anchor bar 8 of bottom plate 4.
In embodiment six, a kind of assembly method of environment-friendly type fabricated assembly overall pipe gallery, comprising steps of
It is arranged outside prefabricated top plate, prefabricated panel, prefabricated point of storehouse plate and two prefabricated c-types according to the design requirement of pipe gallery The position of wallboard, so that two prefabricated c-type Side fascias are respectively formed the left side wall and right side wall of the pipe gallery, it is described Prefabricated point of storehouse plate is by the piping lane channel of the pipe gallery every setting out several mutually independent sub- piping lane channels;Wherein, described Prefabricated c-type Side fascia includes the main body wallboard to extend along the short transverse of the pipe gallery, and is relatively arranged on institute respectively State two auxiliary wallboards at the both ends of main body wallboard;Two auxiliary wallboards are that the first auxiliary wallboard and second assist wallboard, The first auxiliary wallboard and the second auxiliary wallboard are sequentially arranged along short transverse, so that the main body wallboard and two institutes State the auxiliary C-shaped arrangement of wallboard;The auxiliary wallboard is embedded with the anchor bar for protruding into cast-in-place wallboard;
Casting concrete forms the cast-in-place wallboard at the anchor bar so that the anchor bar be embedded in it is described Cast-in-place wallboard.
In the present embodiment, prefabricated top plate 2, prefabricated panel 4, prefabricated point of storehouse plate 3 and prefabricated c-type Side fascia 1 are respectively above-mentioned Prefabricated top plate 2, prefabricated panel 4 described in embodiment any one, prefabricated point of storehouse plate 3 and prefabricated c-type Side fascia 1;Actually answering In, these pre-constructed units (prefabricated top plate 2, prefabricated panel 4, prefabricated point of storehouse plate 3 and prefabricated c-type Side fascia 1) need to only be transported To scene, and prefabricated c-type Side fascia 1 is oppositely arranged to and is formed the left side wall and right side wall of pipe gallery, prefabricated panel 4 is put It is placed in the centre of two prefabricated c-type Side fascias 1, so that prefabricated panel 4, which is set between two anchor bars 8, forms pipe gallery Lower wall, installation prefabricated point of storehouse plate 3 be mounted in piping lane channel, prefabricated top plate 2 is placed in two prefabricated c-type Side fascias 1 Centre so that prefabricated top plate 2 be set between two anchor bars 8 formed pipe gallery upper side wall, then anchor steel again Be arranged that template forms cast-in-place wallboard 5 at muscle 8 pours chamber, and then casting concrete forms cast-in-place wallboard 5, and then forms integrated pipe Corridor.It is worth noting that the template for pouring chamber for being used to form cast-in-place wallboard 5 can be non-dismantling formwork or movable die plate, and cast-in-place After the pouring of wallboard 5 can arrange for all prefabricated components of pipe gallery, poured carrying out cast-in-place wallboard 5, so that Two piping lane units being disposed adjacent can by and meanwhile the cast-in-place wallboard 5 that pours realize connection, improve the entirety of pipe gallery Property and structural strength.
In embodiment seven, a kind of assembly method of environment-friendly type fabricated assembly overall pipe gallery, in embodiment six On the basis of, it further comprises the steps of:
By connecting bolt for two be disposed adjacent along the length direction of the pipe gallery prefabricated c-type Side fascias Connection,
The spelling formed between two prefabricated c-type Side fascias being disposed adjacent along the length direction of the pipe gallery Seam is filled with waterproof layer.
In the present embodiment, when carrying out the arrangement of prefabricated components, two prefabricated c-types being adjacently positioned along piping lane length direction Side fascia 1 is mechanically connected by connecting the cooperation of bolt 13 and nut, and with connecting screw far from piping lane channel side Waterproof layer 11 is filled in splicing seams to improve the waterproof performance of pipe gallery, guarantees the drying ring in the piping lane channel of pipe gallery Border.
In embodiment eight, a kind of assembly method of environment-friendly type fabricated assembly overall pipe gallery, in embodiment six or On the basis of seven, auxiliary wallboard 112 is embedded with the steel plate for sealing water 6 for protruding into cast-in-place wallboard 5 close to cast-in-place 5 side of wallboard;In advance Top plate 2 processed is embedded with the steel plate for sealing water 6 for protruding into cast-in-place wallboard 5 close to cast-in-place 5 side of wallboard;Prefabricated panel 4 is close to cast-in-place 5 side of wallboard is embedded with the steel plate for sealing water 6 for protruding into cast-in-place wallboard 5.Preferably, steel plate for sealing water 6 is groove-like structure, water-stopping steel The opening of plate 6 is arranged away from piping lane channel;If steel plate for sealing water 6 is c-type steel plate for sealing water 6 or drum steel.
Preferably, prefabricated point of storehouse plate 3 along pipe gallery short transverse by piping lane channel every setting out left sub- piping lane channel 141 With right sub- piping lane channel 142.It is further preferred that one end of prefabricated point of storehouse plate 3 is connect with prefabricated top plate 2, prefabricated point of storehouse plate 3 The other end is connect with prefabricated panel 4;Prefabricated top plate 2 is equipped with the first joint bar 91 towards prefabricated point of storehouse plate 3, and prefabricated point of storehouse plate 3 is corresponding The position of first joint bar 91 is equipped with the first grout sleeve 101;First grout sleeve 101 is sheathed on the outside of the first joint bar 91, and First grout sleeve 101 is equipped with cast-in-place concrete;Prefabricated panel 4 is equipped with the second joint bar 92, prefabricated point of storehouse towards prefabricated point of storehouse plate 3 The position of corresponding first joint bar 91 of plate 3 is equipped with the second grout sleeve 102;Second grout sleeve 102 is sheathed on the second joint bar 92 Outside, and the second grout sleeve 102 is equipped with cast-in-place concrete.It is worth noting that prefabricated point of storehouse plate 3 can also in the horizontal direction by Piping lane channel is every being set as upper sub- piping lane channel and lower sub- piping lane channel, and prefabricated point of storehouse plate 3 can be cross, X font or rice word Type etc. can be by piping lane channel every being set as more than two sub- piping lane channels, and the size in each sub- piping lane channel can be identical or not Together, in this way, in practical applications, different utilities pipelines can be included into different sub- piping lane channels, convenient for the independence in later period Maintenance.Since 3 need of prefabricated point of storehouse plate play the left and right of function division, prefabricated point of storehouse plate 3 can be along the length of pipe gallery Direction and the length dimension of pipe gallery unit are identical or different.
Preferably, main body wallboard 111 is embedded with several deformed bars 7, the extension direction and height side of deformed bar 7 To parallel.Preferably, length direction equidistant placement of multiple deformed bars 7 along pipe gallery.Certainly, multiple deformed bars 7 along pipe gallery length direction Unequal distance arrange.Preferably, main body wallboard 111 is along the two sides of the length direction of pipe gallery Spacing between the deformed bar 7 of position is less than main body wallboard 111 along the pre- of the middle position of the length direction of pipe gallery Spacing between stress reinforcing bar 7.And the arrangement for being located at the deformed bar 7 in 111 middle position of main body wallboard can be it is equidistant or Unequal distance arrangement.Preferably, deformed bar 7 extends into main body wallboard 111 in the upper surface of main body wallboard 111 along short transverse Lower end surface, but not through upper surface and lower end surface.Anchor bar 8 is laid with several rows along short transverse.Preferably, at least A piece anchor bar 8 is crotch structure, including straightway 81 and crotch section 82, the end direction auxiliary wallboard 112 of crotch section 82. Certainly, anchor bar 8 can also be equipped with anchor plate close to cast-in-place 5 side of wallboard for linear structure and/or linear structure, anchor plate Extension direction can be parallel with short transverse, or vertical with the length direction of short transverse and anchor bar 8 simultaneously.Even, anchor Gu reinforcing bar 8 can be crotch structure, linear structure, the even three kinds of situations that one or both of are provided with anchor plate.It is preferred that The end on ground, the crotch section 82 for two anchor bars 8 being disposed adjacent along short transverse is disposed adjacent.
Preferably, prefabricated top plate 2 includes top plate ontology, and the left and right ends of top plate ontology, which are respectively equipped with, protrudes into cast-in-place wallboard 5 Anchor bar 8, preferably several settings of anchor bar 8, and multiple anchor bars 8 are arranged in array, and are embedded in top plate ontology On anchor bar 8 structure and prefabricated c-type Side fascia 18 structure of anchor bar it is identical or different;Likewise, prefabricated Bottom plate 4 includes top plate bottom body, and the left and right ends of bottom plate ontology are respectively equipped with the anchor bar 8 for protruding into cast-in-place wallboard 5, anchor bar 8 preferably several settings, and multiple anchor bars 8 are arranged in array, be embedded in the structure of the anchor bar 8 on bottom plate ontology with 8 structure of anchor bar of prefabricated c-type Side fascia 1 is identical or different;It is worth noting that the size when pipe gallery is smaller When, then the anchor bar 8 of the anchor bar 8 of prefabricated c-type Side fascia 1 and prefabricated top plate 2, prefabricated panel 4 preferably shifts to install, from And the size of cast-in-place wallboard 5 in left-right direction is reduced, and then reduce the side-to-side dimensions of pipe gallery;Certainly, when pipe gallery When size is larger, then the preferred phase of anchor bar 8 of the anchor bar 8 of prefabricated c-type Side fascia 1 and prefabricated top plate 2, prefabricated panel 4 To setting, to improve the size in left-right direction of cast-in-place wallboard 5.Certainly, it can also extend and shift to install in prefabricated c-type exterior wall The length of the anchor bar 8 and prefabricated top plate 2 of plate 1, the anchor bar 8 of prefabricated panel 4.
It should be noted that above-described embodiment can be freely combined as needed.The above is only of the invention preferred Embodiment, it is noted that for those skilled in the art, in the premise for not departing from the principle of the invention Under, several improvements and modifications can also be made, these modifications and embellishments should also be considered as the scope of protection of the present invention.

Claims (10)

1. a kind of environment-friendly type fabricated assembly overall pipe gallery characterized by comprising
The piping lane unit that multiple length directions along pipe gallery are sequentially arranged, each described piping lane unit includes prefabricated top Plate, prefabricated panel, cast-in-place wallboard, prefabricated point of storehouse plate and two prefabricated c-type Side fascias;
Two prefabricated c-type Side fascias are oppositely arranged and are arranged symmetrically along the left and right directions of pipe gallery;Two described pre- C-type Side fascia processed is the prefabricated c-type Side fascia in a left side to form the left side wall of the pipe gallery and the right side for forming the pipe gallery The prefabricated c-type Side fascia in the right side of side wall;
The prefabricated c-type Side fascia includes the main body wallboard to extend along the short transverse of the pipe gallery, and opposite respectively It is set to two auxiliary wallboards at the both ends of the main body wallboard;Two auxiliary wallboards are that the first auxiliary wallboard and second are auxiliary Wallboard is helped, the first auxiliary wallboard and the second auxiliary wallboard are sequentially arranged along short transverse, so that the main body wallboard With two C-shaped arrangements of the auxiliary wallboard;The auxiliary wallboard is embedded with the anchor bar for protruding into the cast-in-place wallboard;
What the prefabricated top plate was set to the prefabricated c-type Side fascia in left side first assists wallboard and the prefabricated c-type Side fascia in the right side Between first auxiliary wallboard, so that described two first auxiliary wallboards, two cast-in-place wallboards and the prefabricated top plate are constituted The upper side wall of the pipe gallery;
What the prefabricated panel was set to the prefabricated c-type Side fascia in left side second assists wallboard and the prefabricated c-type Side fascia in the right side Between second auxiliary wallboard, so that two the second auxiliary wallboards, two cast-in-place wallboards and the prefabricated panel are constituted The lower wall of the pipe gallery;
The left side wall, the upper side wall, the right side wall and the lower wall, which are enclosed, to be set to form piping lane channel, the prefabricated point of storehouse Plate is by the piping lane channel every setting out several mutually independent sub- piping lane channels.
2. environment-friendly type fabricated assembly overall pipe gallery according to claim 1, it is characterised in that: the auxiliary wallboard The steel plate for sealing water for protruding into the cast-in-place wallboard is embedded with close to the cast-in-place wallboard side;And/or
The prefabricated top plate is embedded with the steel plate for sealing water for protruding into the cast-in-place wallboard close to the cast-in-place wallboard side;With/ Or,
The prefabricated panel is embedded with the steel plate for sealing water for protruding into the cast-in-place wallboard close to the cast-in-place wallboard side.
3. environment-friendly type fabricated assembly overall pipe gallery according to claim 2, it is characterised in that: the steel plate for sealing water Opening for groove-like structure, the steel plate for sealing water is arranged away from the piping lane channel.
4. environment-friendly type fabricated assembly overall pipe gallery according to claim 1, it is characterised in that: the prefabricated point of storehouse Plate along the pipe gallery short transverse by the piping lane channel every setting out left sub- piping lane channel and right sub- piping lane channel.
5. environment-friendly type fabricated assembly overall pipe gallery according to claim 4, it is characterised in that: the prefabricated point of storehouse One end of plate is connect with the prefabricated top plate, and the other end of the prefabricated point of storehouse plate is connect with the prefabricated panel;
The prefabricated top plate is equipped with the first joint bar towards the prefabricated point of storehouse plate, and the prefabricated point of storehouse plate corresponds to first joint bar Position be equipped with the first grout sleeve;First grout sleeve is sheathed on the outside of first joint bar, and described first fills It starches sleeve and is equipped with cast-in-place concrete;
The prefabricated panel is equipped with the second joint bar towards the prefabricated point of storehouse plate, and the prefabricated point of storehouse plate corresponds to first joint bar Position be equipped with the second grout sleeve;Second grout sleeve is sheathed on the outside of second joint bar, and described second fills It starches sleeve and is equipped with cast-in-place concrete.
6. environment-friendly type fabricated assembly overall pipe gallery described in -5 any one according to claim 1, it is characterised in that:
The main body wallboard is embedded with several deformed bars, and the extension direction of the deformed bar is parallel with short transverse.
7. environment-friendly type fabricated assembly overall pipe gallery described in -5 any one according to claim 1, it is characterised in that:
The two sidewalls of length direction of the prefabricated c-type Side fascia along the pipe gallery are respectively equipped with to drawing preformed hole, so that Two prefabricated c-type Side fascias being disposed adjacent along the length direction of the pipe gallery are bolted by connection;It is described Connect one end and one of them described prefabricated c-type Side fascia in two prefabricated c-type Side fascias being disposed adjacent of bolt To draw preformed hole connection, it is described connection bolt the other end with it is another in two prefabricated c-type Side fascias being disposed adjacent One prefabricated c-type Side fascia to drawing preformed hole connection.
8. environment-friendly type fabricated assembly overall pipe gallery described in -5 any one according to claim 1, it is characterised in that:
The splicing seams formed between two prefabricated c-type Side fascias that the length direction of the pipe gallery is disposed adjacent are filled out Filled with waterproof layer.
9. a kind of assembly method of environment-friendly type fabricated assembly overall pipe gallery, which is characterized in that comprising steps of
Prefabricated top plate, prefabricated panel, prefabricated point of storehouse plate and two prefabricated c-type Side fascias are arranged according to the design requirement of pipe gallery Position it is described prefabricated so that two prefabricated c-type Side fascias are respectively formed the left side wall and right side wall of the pipe gallery Point storehouse plate is by the piping lane channel of the pipe gallery every setting out several mutually independent sub- piping lane channels;Wherein, the prefabricated C Type Side fascia includes the main body wallboard to extend along the short transverse of the pipe gallery, and is relatively arranged on the main body respectively Two auxiliary wallboards at the both ends of wallboard;Two auxiliary wallboards are the first auxiliary wallboard and the second auxiliary wallboard, described the One auxiliary wallboard and the second auxiliary wallboard are sequentially arranged along short transverse, so that the main body wallboard and two auxiliary The C-shaped arrangement of wallboard;The auxiliary wallboard is embedded with the anchor bar for protruding into cast-in-place wallboard;
Casting concrete forms the cast-in-place wallboard at the anchor bar so that the anchor bar be embedded in it is described cast-in-place Wallboard.
10. the assembly method of environment-friendly type fabricated assembly overall pipe gallery according to claim 9, which is characterized in that It further comprises the steps of:
Two be disposed adjacent along the length direction of the pipe gallery prefabricated c-type Side fascias are connected by connection bolt It connects,
The splicing seams formed between two prefabricated c-type Side fascias being disposed adjacent along the length direction of the pipe gallery Filled with waterproof layer.
CN201910046076.0A 2019-01-16 2019-01-16 A kind of environment-friendly type fabricated assembly overall pipe gallery and its assembly method Pending CN109505310A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910046076.0A CN109505310A (en) 2019-01-16 2019-01-16 A kind of environment-friendly type fabricated assembly overall pipe gallery and its assembly method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910046076.0A CN109505310A (en) 2019-01-16 2019-01-16 A kind of environment-friendly type fabricated assembly overall pipe gallery and its assembly method

Publications (1)

Publication Number Publication Date
CN109505310A true CN109505310A (en) 2019-03-22

Family

ID=65758090

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910046076.0A Pending CN109505310A (en) 2019-01-16 2019-01-16 A kind of environment-friendly type fabricated assembly overall pipe gallery and its assembly method

Country Status (1)

Country Link
CN (1) CN109505310A (en)

Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN203924113U (en) * 2014-06-24 2014-11-05 刘小沙 Prefabricated pipe gallery
CN203924112U (en) * 2014-06-24 2014-11-05 刘小沙 Prefabricated pipe gallery
CN104805866A (en) * 2015-04-30 2015-07-29 黑龙江宇辉新型建筑材料有限公司 Prefabricated comprehensive pipe gallery and construction method
CN105040732A (en) * 2015-08-18 2015-11-11 湖南东方红建设集团有限公司 Prefabricated type reinforced concrete underground comprehensive pipe gallery and production mold thereof
CN105421489A (en) * 2015-11-11 2016-03-23 东南大学 Mortise type prefabricated comprehensive pipe gallery longitudinal connector
CN105672355A (en) * 2016-03-17 2016-06-15 上海同预建筑科技有限公司 Plate type prefabricated concrete comprehensive pipe gallery
CN105756088A (en) * 2016-03-17 2016-07-13 上海同预建筑科技有限公司 Combined prefabricated assembled multi-cabin comprehensive pipe rack
CN206189455U (en) * 2016-11-02 2017-05-24 中民筑友科技投资有限公司 Piping lane
CN106869166A (en) * 2017-02-28 2017-06-20 中国十七冶集团有限公司 A kind of fabricated construction method for pipe gallery
JP2017166229A (en) * 2016-03-16 2017-09-21 ジオスター株式会社 Box culvert
WO2018076499A1 (en) * 2016-10-31 2018-05-03 浙江鑫宙竹基复合材料科技有限公司 Pipe segment connecting component suitable for comprehensive bamboo composite pipe gallery
CN210134455U (en) * 2019-01-16 2020-03-10 上海中森建筑与工程设计顾问有限公司 Integral utility tunnel of environment-friendly prefabricated assembly

Patent Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN203924113U (en) * 2014-06-24 2014-11-05 刘小沙 Prefabricated pipe gallery
CN203924112U (en) * 2014-06-24 2014-11-05 刘小沙 Prefabricated pipe gallery
CN104805866A (en) * 2015-04-30 2015-07-29 黑龙江宇辉新型建筑材料有限公司 Prefabricated comprehensive pipe gallery and construction method
CN105040732A (en) * 2015-08-18 2015-11-11 湖南东方红建设集团有限公司 Prefabricated type reinforced concrete underground comprehensive pipe gallery and production mold thereof
CN105421489A (en) * 2015-11-11 2016-03-23 东南大学 Mortise type prefabricated comprehensive pipe gallery longitudinal connector
JP2017166229A (en) * 2016-03-16 2017-09-21 ジオスター株式会社 Box culvert
CN105672355A (en) * 2016-03-17 2016-06-15 上海同预建筑科技有限公司 Plate type prefabricated concrete comprehensive pipe gallery
CN105756088A (en) * 2016-03-17 2016-07-13 上海同预建筑科技有限公司 Combined prefabricated assembled multi-cabin comprehensive pipe rack
WO2018076499A1 (en) * 2016-10-31 2018-05-03 浙江鑫宙竹基复合材料科技有限公司 Pipe segment connecting component suitable for comprehensive bamboo composite pipe gallery
CN206189455U (en) * 2016-11-02 2017-05-24 中民筑友科技投资有限公司 Piping lane
CN106869166A (en) * 2017-02-28 2017-06-20 中国十七冶集团有限公司 A kind of fabricated construction method for pipe gallery
CN210134455U (en) * 2019-01-16 2020-03-10 上海中森建筑与工程设计顾问有限公司 Integral utility tunnel of environment-friendly prefabricated assembly

Similar Documents

Publication Publication Date Title
CN106854873A (en) A kind of engineering method and garage parking in precast spliced sinking type garage parking
CN101117805A (en) Underground engineering one-pile multi-use semi reverse construction method
CN106555408A (en) The structure and construction method of underground pipe gallery
CN206545215U (en) A kind of precast spliced sinking type garage parking
CN109914644A (en) A kind of assembled heat insulation masonry wall and preparation method thereof
CN205297593U (en) Prefabricated cable tunnel module of combined type
CN208293597U (en) A kind of super plane size well foundation structure
CN206571248U (en) A kind of Assembled enclosing wall
CN106088758B (en) A kind of bilayer assembled underground granary
CN203530958U (en) Thin-wall prefabricated overlapped concrete underground diaphragm wall
CN109469103A (en) A kind of environment-friendly type fabricated assembly overall pipe gallery and its assembly method
CN208009473U (en) The integrated concrete pipe gallery in braced wall corridor
CN115961647A (en) Basement roof post-cast strip advanced sealing structure, construction structure and construction method
CN106088762B (en) A kind of prefabricated assembled round underground granary of insertion slot type encased steel plate
CN109505310A (en) A kind of environment-friendly type fabricated assembly overall pipe gallery and its assembly method
CN212452765U (en) Two-in-one underground pipe gallery structure
CN209875164U (en) Box-type top plate structure of urban tunnel branch
CN210134453U (en) Integral utility tunnel of environment-friendly prefabricated assembly
CN210002441U (en) Box-type top plate structure for large-span urban tunnel
CN209686448U (en) A kind of prefabricated assembled pipe gallery of sheet hydrant and its piping lane unit
CN208782449U (en) A kind of cable duct bank
CN205364171U (en) Forming die of prefabricated net roof beam
CN206376251U (en) Steel plate concrete prefabricated parts and face forever and descend retaining design in combination
CN106088764B (en) A kind of stepped prefabricated assembled circular underground granary of encased steel plate
CN106088759B (en) The equal stepped prefabricated assembled circular underground granary of steel plated inside and outside one kind

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information

Inventor after: Li Xinhua

Inventor after: Qiu Lingqian

Inventor after: Ma Haiying

Inventor after: Liu Yadong

Inventor after: Ma Siyao

Inventor before: Li Xinhua

Inventor before: Qiu Lingqian

Inventor before: Ma Haiying

Inventor before: Liu Yadong

Inventor before: Ma Siyao

CB03 Change of inventor or designer information