CN203891439U - Building construction beam frame - Google Patents

Building construction beam frame Download PDF

Info

Publication number
CN203891439U
CN203891439U CN201420198728.5U CN201420198728U CN203891439U CN 203891439 U CN203891439 U CN 203891439U CN 201420198728 U CN201420198728 U CN 201420198728U CN 203891439 U CN203891439 U CN 203891439U
Authority
CN
China
Prior art keywords
bracing frame
supporting frame
frame
supplemental support
support pin
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420198728.5U
Other languages
Chinese (zh)
Inventor
梁少文
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sichuan Hongchang Construction Co Ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201420198728.5U priority Critical patent/CN203891439U/en
Application granted granted Critical
Publication of CN203891439U publication Critical patent/CN203891439U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Load-Bearing And Curtain Walls (AREA)

Abstract

The utility model discloses a building construction beam frame which comprises a first supporting frame and a second supporting frame. The first supporting frame and the second supporting frame are of a structure shaped like a Chinese character men, the opposite surfaces of the first supporting frame and the second supporting frame are provided with connecting holes respectively, the first supporting frame is connected with the second supporting frame through a connecting block, the left end and the right end of the connecting block are provided with insertion rods respectively, the insertion rods at the two ends of the connecting block are installed in the connecting holes of the first supporting frame and the second supporting frame respectively, the bottom of the first supporting frame and the bottom of the second supporting frame are provided with four supporting feet, two sides of an inner wall of the first supporting frame are provided with grooves, auxiliary supporting feet are movably installed in the grooves, and a pressing plate for treading is installed on the upper end face of the second supporting frame. When the building construction beam frame is in construction, the stability can be improved by utilizing the middle auxiliary supporting feet according to the appropriate length needing to be chosen, and the building construction beam frame is wide in applied range, simple in structure, high in utility ratio and better in economic benefit.

Description

Building operations roof beam structure
Technical field
The utility model relates to a kind of building operations roof beam structure.
Background technology
During building operations, due to higher apart from ground, conventionally can use roof beam structure; so that touch enough height, and roof beam structure of the prior art, structure is too simple; and very single; for how everybody uses simultaneously, condition restriction is too many, can not many people operate simultaneously; and only have single use to waste resource; less stable, easily topples over, and safety is lower.
Summary of the invention
Technical problem to be solved in the utility model is to provide a kind ofly can select suitable length as required, and the supplemental support pin in the middle of utilizing increases stability, and applied widely, simple in structure, utility ratio is high, the better building operations roof beam structure of economic benefit.
The utility model is achieved through the following technical solutions: a kind of building operations roof beam structure, comprise the first bracing frame and the second bracing frame, described the first bracing frame and the second bracing frame are " door " character form structure, described the first bracing frame and the second bracing frame opposite face are respectively provided with connecting hole, between described the first bracing frame and the second bracing frame, by contiguous block, realize and being connected, two ends, described contiguous block left and right are respectively provided with inserted link, the two ends inserted link of contiguous block is arranged on respectively in the connecting hole of the first bracing frame and the second bracing frame, the bottom of described the first bracing frame and the second bracing frame is provided with four feets, the inwall both sides of described the first bracing frame offer groove, in described groove, be movably installed with supplemental support pin, the upper surface of described the second bracing frame is provided with the pressing plate for trampling.
As preferably, described supplemental support pin comprises support bar, the two ends that are positioned at this support bar are respectively provided with bearing pin, the diameter of described bearing pin is less than the diameter of support bar, described bearing pin is set with sleeve outward, described supplemental support pin is fixedly connected with sleeve, and described supplemental support pin is placed in the groove of the first bracing frame inwall.
As preferably, the length of described bearing pin is greater than the length of sleeve, and described sleeve is placed in the groove of the first bracing frame inwall.
As preferably, described the first bracing frame, the second bracing frame, contiguous block, supplemental support pin and feet are made by steel structure material.
The beneficial effects of the utility model are: the utility model, when construction, can be selected suitable length as required, and utilize middle supplemental support pin to increase stability, and applied widely, simple in structure, utility ratio is high, and economic benefit is better.
Accompanying drawing explanation
Fig. 1 is overall structure schematic diagram of the present utility model;
Fig. 2 is the structural representation of supplemental support pin in the utility model.
Coding in figure is respectively: 1 is the first bracing frame, and 2 is feet, and 4 is support bar, and 5 is the second bracing frame, and 6 is contiguous block, and 7 is groove, and 8 is inserted link, and 9 is pressing plate, and 10 is sleeve, and 11 is bearing pin, and 12 is supplemental support pin.
The specific embodiment
As depicted in figs. 1 and 2, this building operations roof beam structure, comprise the first bracing frame 1 and the second bracing frame 5, described the first bracing frame 1 and the second bracing frame 5 are " door " character form structure, described the first bracing frame 1 and the second bracing frame 5 opposite faces are respectively provided with connecting hole, between described the first bracing frame 1 and the second bracing frame 5, by contiguous block 6, realize and being connected, described contiguous block 6 two ends, left and right are respectively provided with inserted link 8, the two ends inserted link 8 of contiguous block 6 is arranged on respectively in the connecting hole of the first bracing frame 1 and the second bracing frame 5, the bottom of described the first bracing frame 1 and the second bracing frame 5 is provided with four feets 2, the inwall both sides of described the first bracing frame 1 offer groove 7, in described groove 7, be movably installed with supplemental support pin 12, the upper surface of described the second bracing frame 5 is provided with the pressing plate 9 for trampling.
As depicted in figs. 1 and 2, described supplemental support pin 12 comprises support bar 4, the two ends that are positioned at this support bar 4 are respectively provided with bearing pin 11, the diameter of described bearing pin 11 is less than the diameter of support bar 4, the outer sleeve 10 that is set with of described bearing pin 11, described supplemental support pin 12 is fixedly connected with sleeve 10, described supplemental support pin 12 is placed in the groove 7 of the first bracing frame 1 inwall, when the length of whole roof beam structure is not enough, can pull open the first bracing frame and the second bracing frame, make it increase entire length, the supplemental support pin 12 in the middle of then utilizing increases stability.
As depicted in figs. 1 and 2, the length of described bearing pin 11 is greater than the length of sleeve 10, described sleeve 10 is placed in the groove 7 of the first bracing frame 1 inwall, when needs are used supplemental support pin, sleeve can be slided to the inside, then whole supplemental support pin is just parallel to each other with the first feet and the second feet, realizes and supporting.
As depicted in figs. 1 and 2, described the first bracing frame 1, the second bracing frame 5, contiguous block 6, supplemental support pin 12 and feet 2 are made by steel structure material.
The beneficial effects of the utility model are: the utility model, when construction, can be selected suitable length as required, and utilize middle supplemental support pin to increase stability, and applied widely, simple in structure, utility ratio is high, and economic benefit is better.

Claims (4)

1. a building operations roof beam structure, it is characterized in that: comprise the first bracing frame (1) and the second bracing frame (5), described the first bracing frame (1) and the second bracing frame (5) are " door " character form structure, described the first bracing frame (1) and the second bracing frame (5) opposite face are respectively provided with connecting hole, between described the first bracing frame (1) and the second bracing frame (5), by contiguous block (6), realize and being connected, described contiguous block (6) two ends, left and right are respectively provided with inserted link (8), the two ends inserted link (8) of described contiguous block (6) is arranged on respectively in the connecting hole of the first bracing frame (1) and the second bracing frame (5), the bottom of described the first bracing frame (1) and the second bracing frame (5) is provided with four feets (2), the inwall both sides of described the first bracing frame (1) offer groove (7), in described groove (7), be movably installed with supplemental support pin (12), the upper surface of described the second bracing frame (5) is provided with the pressing plate (9) for trampling.
2. building operations roof beam structure according to claim 1, it is characterized in that: described supplemental support pin (12) comprises support bar (4), the two ends that are positioned at this support bar (4) are respectively provided with bearing pin (11), the diameter of described bearing pin (11) is less than the diameter of support bar (4), the outer sleeve (10) that is set with of described bearing pin (11), described supplemental support pin (12) is fixedly connected with sleeve (10), and described supplemental support pin (12) is placed in the groove (7) of the first bracing frame (1) inwall.
3. building operations roof beam structure according to claim 2, is characterized in that: the length of described bearing pin (11) is greater than the length of sleeve (10), and described sleeve (10) is placed in the groove (7) of the first bracing frame (1) inwall.
4. building operations roof beam structure according to claim 2, is characterized in that: described the first bracing frame (1), the second bracing frame (5), contiguous block (6), supplemental support pin (12) and feet (2) are made by steel structure material.
CN201420198728.5U 2014-04-13 2014-04-13 Building construction beam frame Expired - Fee Related CN203891439U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420198728.5U CN203891439U (en) 2014-04-13 2014-04-13 Building construction beam frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420198728.5U CN203891439U (en) 2014-04-13 2014-04-13 Building construction beam frame

Publications (1)

Publication Number Publication Date
CN203891439U true CN203891439U (en) 2014-10-22

Family

ID=51717855

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420198728.5U Expired - Fee Related CN203891439U (en) 2014-04-13 2014-04-13 Building construction beam frame

Country Status (1)

Country Link
CN (1) CN203891439U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111140021A (en) * 2020-01-06 2020-05-12 刘梓峻 Double-door type building construction beam bearing frame

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111140021A (en) * 2020-01-06 2020-05-12 刘梓峻 Double-door type building construction beam bearing frame

Similar Documents

Publication Publication Date Title
CN203021899U (en) Quick-assembling template device for concrete ground construction
CN203201146U (en) Spacers for column template reinforcement
CN203891439U (en) Building construction beam frame
CN204435677U (en) High strength steel structural column
CN204040515U (en) Cat ladder
CN204009336U (en) A kind of hard ball curtain
CN204703381U (en) Steel structure column
CN205577106U (en) Well roof beam is directly shelved in capital formula beam column articulation node
CN205153137U (en) Articulated support of connecting of one -way slip type of respiration
CN204199535U (en) Can the log cabin trusses of effective load-bearing
CN204023898U (en) Steel bar horse-shaped bench can be had enough to meet the need
CN207177339U (en) A kind of easy-disassembling-assembling Construction of Civil Engineering Support bracket
CN203359805U (en) Rail double-door interlocking device for building hoist
CN206458115U (en) A kind of construction site builder's temporary shed support meanss
CN205875785U (en) Consolidate bow member device of loess cave dwelling
CN204456805U (en) Indoor moving frame for building
CN204225514U (en) A kind of jacking of good stability
CN203462700U (en) Keel for outdoor floor
CN203977603U (en) The multi-functional connecting rod of a kind of double card button
CN204001369U (en) Aerated bricks
CN204266500U (en) The board-like quakeproof stair of steel concrete
CN203294988U (en) Lift support for construction
CN205713209U (en) Construct the inner supporting structure of reverse V-shaped concrete column inner support post
CN203802029U (en) Table capable of being converted into chair
CN203553621U (en) Power transformation framework lattice beam sliding support

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: ZHOU DECHENG

Free format text: FORMER OWNER: LIANG SHAOWEN

Effective date: 20150127

Owner name: ZHOU XIAOQIANG

Effective date: 20150127

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 362400 QUANZHOU, FUJIAN PROVINCE TO: 610200 CHENGDU, SICHUAN PROVINCE

TR01 Transfer of patent right

Effective date of registration: 20150127

Address after: 610200 Sichuan Province, Shuangliu County Dongsheng Changzhi Road section of No. 78 Building 9 No. 99

Patentee after: Zhou Decheng

Patentee after: Zhou Xiaoqiang

Address before: 362400 Fujian County, Anxi County, Chengxiang town cents after the Village Court House No. 1

Patentee before: Liang Shaowen

ASS Succession or assignment of patent right

Owner name: SICHUAN HONGCHANG CONSTRUCTION CO., LTD.

Free format text: FORMER OWNER: ZHOU DECHENG

Effective date: 20150216

Free format text: FORMER OWNER: ZHOU XIAOQIANG

Effective date: 20150216

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20150216

Address after: 610200 middle Yangtze Road, Southwest Airlines Development Zone, Chengdu, Sichuan

Patentee after: Sichuan Hongchang Construction Co. Ltd.

Address before: 610200 Sichuan Province, Shuangliu County Dongsheng Changzhi Road section of No. 78 Building 9 No. 99

Patentee before: Zhou Decheng

Patentee before: Zhou Xiaoqiang

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20141022

Termination date: 20150413

EXPY Termination of patent right or utility model