CN205577106U - Well roof beam is directly shelved in capital formula beam column articulation node - Google Patents

Well roof beam is directly shelved in capital formula beam column articulation node Download PDF

Info

Publication number
CN205577106U
CN205577106U CN201620177978.XU CN201620177978U CN205577106U CN 205577106 U CN205577106 U CN 205577106U CN 201620177978 U CN201620177978 U CN 201620177978U CN 205577106 U CN205577106 U CN 205577106U
Authority
CN
China
Prior art keywords
precast concrete
column
utility
dowel
model
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620177978.XU
Other languages
Chinese (zh)
Inventor
金林飞
费烜
赵向前
李雪峰
徐春燕
米文杰
胡韦楠
张坚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Changzhou Planning And Design Institute
Original Assignee
Changzhou Planning And Design Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Changzhou Planning And Design Institute filed Critical Changzhou Planning And Design Institute
Application granted granted Critical
Publication of CN205577106U publication Critical patent/CN205577106U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

The utility model relates to a well roof beam is directly shelved in capital formula beam column articulation node, beam column articulation node include precast concrete post and precast concrete roof beam, and the top of precast concrete post is provided with the dowel, pre -buried among the precast concrete beam have a PVC tube hole, and PVC tube hole suit is on the dowel. This beam column articulation node has characteristics such as the atress is clear and definite, the commonality is strong, the cost is lower, the construction is simple convenient, can improve structure assembly rate greatly, shorten assembly construction period, embodies advantages such as the energy -conservation of prefabricated assembly type structure, environmental protection, high efficiency better.

Description

Central sill is directly held on the beam-column hinged node of capital formula
Technical field
This utility model belongs to prefabricated construction design and construction field, is directly held on the beam-column hinged node of capital formula in particular to a kind of prefabrication central sill.
Background technology
In some small precast assembled architectures, it is little that prefabricated components have size, and the feature that bean column node stress is less, for this practical situation, designs a kind of beam-column hinged node.This beam-column hinged node should have stress clearly, versatility compared with strong, cost is relatively low, the feature such as simple and easy of constructing, Standard rate can be greatly improved, shorten the assembling construction period, preferably embody prefabrication energy-saving and environmental protection, the advantage such as efficiently.
Utility model content
This utility model is for the deficiencies in the prior art, it is provided that one have stress clearly, versatility compared with strong, cost is relatively low, the feature such as simple and easy of constructing, Standard rate can be greatly improved, shorten the beam-column hinged node of assembling construction period.
For achieving the above object, this utility model adopts the following technical scheme that central sill is directly held on the beam-column hinged node of capital formula, and including precast concrete column and precast concrete beam, wherein, the top of described precast concrete column is provided with dowel;Being embedded with pvc pipe hole in described precast concrete beam, described pvc pipe borehole jack is contained on described dowel.
Further, described pvc pipe hole is perfused with slurry, for spacing to precast concrete beam.
Further, the gap perfusion slurry between described precast concrete column and precast concrete beam.
Further, the grouting material of described grouting uses the slightly expanded concrete being not less than precast concrete beam column strength grade of concrete.
The beneficial effects of the utility model:
Precast concrete beam is directly held on precast concrete capital, reserves dowel by capital spacing to precast beam, and whole load is directly transmitted to precast concrete column by beam.
This beam-column hinged node have stress clearly, versatility compared with strong, cost is relatively low, the feature such as simple and easy of constructing, and can be greatly improved Standard rate, shorten the assembling construction period, preferably embodies prefabrication energy-saving and environmental protection, the advantage such as efficiently.
Accompanying drawing explanation
Fig. 1 is the structural representation that central sill of the present utility model is directly held on the beam-column hinged node of capital formula;
Fig. 2 is the top view of Fig. 1;
Fig. 3 is 1-1 direction sectional view in Fig. 1.
In figure, 1 is precast concrete column, and 2 is precast concrete beam, and 3 is dowel, and 4 is pvc pipe hole, and 5 indulge muscle for beam.
Detailed description of the invention
Purpose and technical scheme for making this utility model embodiment are clearer, below in conjunction with the accompanying drawing of this utility model embodiment, are clearly and completely described the technical scheme of this utility model embodiment.Obviously, described embodiment is a part of embodiment of the present utility model rather than whole embodiments.Based on described embodiment of the present utility model, the every other embodiment that those of ordinary skill in the art are obtained on the premise of without creative work, broadly fall into the scope of this utility model protection.
Those skilled in the art of the present technique are appreciated that unless otherwise defined, all terms used herein (including technical term and scientific terminology) have with the those of ordinary skill in this utility model art be commonly understood by identical meaning.Should also be understood that those terms defined in such as general dictionary should be understood that have the meaning consistent with the meaning in the context of prior art, and unless defined as here, will not explain by idealization or the most formal implication.
The implication of the "and/or" described in this utility model refers to respective individualism or both simultaneous situations are included in interior.
The implication of " inside and outside " described in this utility model refers to relative to equipment itself, and the direction within sensing equipment is interior, otherwise is outward, rather than the specific restriction to equipment mechanism of the present utility model.
When the implication of " left and right " described in this utility model refers to reader just to accompanying drawing, the left side of reader is a left side, and the right of reader is the right side, rather than the specific restriction to equipment mechanism of the present utility model.
The implication of " connection " described in this utility model can be being directly connected between parts can also be by being indirectly connected with of other parts between parts.
Central sill of the present utility model is directly held on the construction method of the beam-column hinged node of capital formula, comprises the following steps:
Step one: in the prefabrication process of precast concrete column 1, reserves dowel 3 on the top of precast concrete column 1;
Step 2: in the prefabrication process of precast concrete beam 2, pre-buried PVC casing pipe hole forming in precast concrete beam 2;
Step 4: after precast concrete column 1 having been lifted, is held on precast concrete beam 2 in precast concrete column 1, and ensures that pvc pipe hole 4 pre-buried in precast concrete beam 2 is sleeved on the dowel 3 on precast concrete column 1 top;
Step 5: be in the milk in the reserved pvc pipe hole 4 in precast concrete beam 2;It is in the milk to the gap between precast concrete column 1 and precast concrete beam 2.
As in preferred mode, the grouting material of grouting uses the slightly expanded concrete being not less than precast concrete beam 2 post strength grade of concrete.
As Figure 1-3, this utility model additionally provides central sill and is directly held on the beam-column hinged node of capital formula, and including precast concrete column 1 and precast concrete beam 2, wherein, the top of precast concrete column 1 is provided with dowel 3;Being embedded with pvc pipe hole 4 in precast concrete beam 2, pvc pipe hole 4 is sleeved on dowel 3.
In order to carry out spacing to precast concrete beam 2, typically slurry can be perfused with in pvc pipe hole 4.
Gap perfusion slurry in order to will interfix between precast concrete column 1 and precast concrete beam 2, between precast concrete column 1 and precast concrete beam 2.
As in preferred mode, the grouting material of grouting uses the slightly expanded concrete being not less than precast concrete beam 2 post strength grade of concrete.
In order to improve the intensity of precast concrete beam 2, typically can arrange that in precast concrete beam 2 beam indulges muscle 5.
These are only embodiment of the present utility model, it describes more concrete and detailed, but therefore can not be interpreted as the restriction to this utility model the scope of the claims.It should be pointed out that, for the person of ordinary skill of the art, without departing from the concept of the premise utility, it is also possible to make some deformation and improvement, these belong to protection domain of the present utility model.

Claims (4)

1. central sill is directly held on the beam-column hinged node of capital formula, it is characterised in that including precast concrete column and precast concrete beam, wherein, the top of described precast concrete column is provided with dowel;Being embedded with pvc pipe hole in described precast concrete beam, described pvc pipe borehole jack is contained on described dowel.
Central sill the most according to claim 1 is directly held on the beam-column hinged node of capital formula, it is characterised in that described pvc pipe hole is perfused with slurry, for spacing to precast concrete beam.
Central sill the most according to claim 1 is directly held on the beam-column hinged node of capital formula, it is characterised in that the gap perfusion slurry between described precast concrete column and precast concrete beam.
4. directly it is held on the beam-column hinged node of capital formula according to the central sill described in Claims 2 or 3, it is characterised in that the slurry of described grouting uses the slightly expanded concrete being not less than precast concrete beam column strength grade of concrete.
CN201620177978.XU 2015-05-27 2016-03-09 Well roof beam is directly shelved in capital formula beam column articulation node Active CN205577106U (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN201520349856 2015-05-27
CN201520349856X 2015-05-27

Publications (1)

Publication Number Publication Date
CN205577106U true CN205577106U (en) 2016-09-14

Family

ID=56867637

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620177978.XU Active CN205577106U (en) 2015-05-27 2016-03-09 Well roof beam is directly shelved in capital formula beam column articulation node

Country Status (1)

Country Link
CN (1) CN205577106U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104895190A (en) * 2015-05-27 2015-09-09 常州市规划设计院 Beam column hinge node enabling middle beam to be directly arranged at top of column and construction method thereof
CN112627545A (en) * 2020-12-17 2021-04-09 李伯明 Building frame installation process for box type building

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104895190A (en) * 2015-05-27 2015-09-09 常州市规划设计院 Beam column hinge node enabling middle beam to be directly arranged at top of column and construction method thereof
CN112627545A (en) * 2020-12-17 2021-04-09 李伯明 Building frame installation process for box type building

Similar Documents

Publication Publication Date Title
CN205577106U (en) Well roof beam is directly shelved in capital formula beam column articulation node
CN205171690U (en) Roof beam and capital articulation node among prefabricated assembly type structure
CN104895190A (en) Beam column hinge node enabling middle beam to be directly arranged at top of column and construction method thereof
CN206457955U (en) A kind of oblique close rib composite wall board structure
CN204475529U (en) The syndeton of a kind of assembling type outer wall and beam
CN204401881U (en) A kind of steel concrete-profile steel concrete column combined special-shaped column
CN203296203U (en) Reinforced-concrete-fitted seismic isolation node and fitted seismic isolation structure with reinforced-concrete-fitted seismic isolation node
CN206219974U (en) The assembled attachment structure of prefabricated bent cap and prefabricated stand column
CN103741961A (en) Aseismic strengthening method for adding pin key and hidden beam for prefabricated round hole plate of existing building
CN204491826U (en) Can restore funcitons tube structure system
CN205116400U (en) Steel construction beam column mosaic structure
CN104895196A (en) Hidden steel corbel type beam column hinged node and construction method thereof
CN207646996U (en) A kind of square set
CN205712504U (en) Hide the beam-column hinged node of steel corbel formula
CN106013421B (en) A kind of method of construction of the compound assembled fiber concrete building of steel wood
CN204125931U (en) Foundation pile structure
CN212001632U (en) Assembled square steel pipe column-H shaped steel roof beam connected node
CN211690319U (en) Combined pile foundation structure
CN203742021U (en) Novel frame wall structure with door opening or window opening
CN204282796U (en) Collapsible hanging basket
CN203514918U (en) Concrete pole tower with ladder stand device
CN102912934A (en) Steel-pipe column with holes
CN205063035U (en) Node structure is fixed to gatepost fossil fragments
CN203308289U (en) Special door
CN205804999U (en) The attachment structure of prefabrication tower crane

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant