CN203847129U - Supporting device used for tunnel construction in weak, fractured and uneven stratum - Google Patents

Supporting device used for tunnel construction in weak, fractured and uneven stratum Download PDF

Info

Publication number
CN203847129U
CN203847129U CN201420283535.XU CN201420283535U CN203847129U CN 203847129 U CN203847129 U CN 203847129U CN 201420283535 U CN201420283535 U CN 201420283535U CN 203847129 U CN203847129 U CN 203847129U
Authority
CN
China
Prior art keywords
tubule
tunnel
suspension device
steel pipe
constructing tunnel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420283535.XU
Other languages
Chinese (zh)
Inventor
武科
赵闯
马明月
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong University
Original Assignee
Shandong University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong University filed Critical Shandong University
Priority to CN201420283535.XU priority Critical patent/CN203847129U/en
Application granted granted Critical
Publication of CN203847129U publication Critical patent/CN203847129U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

The utility model discloses a supporting device used for tunnel construction in a weak, fractured and uneven stratum. The supporting device comprises an arch-shaped support, a small pipe shed and small leading ducts are arranged within the 150-degree range of the circumferential direction of the top of the arch-shaped support, the small leading ducts are divided into an upper layer and a lower layer, and the upper layer of small leading ducts and the lower layer of small leading ducts are arranged in a staggered mode according to the form of quincuncial piles. The arch-shaped support is set up through seamless steel pipes with the outer diameter being 70 mm and the length being 10 m, the longitudinal distance between every two connected seamless steel pipes is 7 m and the lap joint length is 3 m. The supporting device has the advantages of being capable of effectively reducing tunnel surrounding rock deformation, improving the tunnel self-stabilization capacity and the seepage-proofing capacity enduringly, forming a multifunctional surrounding rock reinforcing region and guaranteeing safety of tunnel construction workers and equipment.

Description

A kind of suspension device for weak broken uneven strata constructing tunnel
Technical field
The utility model relates to Geotechnical Engineering field, especially a kind of suspension device of weak broken uneven strata constructing tunnel.
Background technology
In weak broken uneven strata, carry out constructing tunnel, very easily cause tunnel wall rock deformation excessive, even falling rocks, the geological disaster such as cave in occur, thereby jeopardize constructor's life security and damage production equipment.The suspension device of weak broken uneven strata constructing tunnel is mainly a kind of by the suspension device of little pipe shed support and the combination of staggered floor advanced tubule pre-reinforcement.But, although reduce the soil pressure covered on tunnel tunnel face, reduce vault and ground settlement and improve self by little pipe shed support, exist stagnant water effect general and because longitudinal lap joint arranges the deficiencies such as the second comb canopy difficulty is large; Meanwhile, although advanced tubule pre-reinforcement can realize the object of tunnel surrounding pre-reinforcement, antiseepage, leak stopping, but its reinforcing scope is relatively little, action time is shorter, it is general to improve tunnel surrounding self-stable ability effect limited, that control ground settlement, slip casting effect is inhomogeneous, just can not effectively form reinforcing scope, thereby reliability reduces.
Utility model content
The utility model is in order to address the above problem, a kind of suspension device for weak broken uneven strata constructing tunnel has been proposed, the method can effectively reduce tunnel wall rock deformation, enduringly improve tunnel from steady with seepage capability, form multi-functional surrounding rock consolidation region, the advantage of guarantee constructing tunnel personal security and equipment.
To achieve these goals, the utility model adopts following technical scheme:
A kind of suspension device for weak broken uneven strata constructing tunnel, comprise an arch support, within the scope of 150 ° of the hoops at the top of described arch support, lay tubule canopy and advanced tubule, described advanced tubule comprises upper and lower two-layer, and upper and lower two-layer advanced tubule is laid according to quincuncial pile pattern staggered floor.
Arch support adopts external diameter 70mm, and the seamless steel pipe of long 10m is built, and the longitudinal pitch of connected seamless steel pipe is 7m, and lap length is 3m.
Spacing when tubule canopy is laid between boring is 30cm, 3 °~5 ° of outer limbs.
The long 7.0m of described advanced tubule, upper and lower two-layer employing quincuncial pile is laid, and spacing when advanced tubule is laid between boring is 0.3m, and outer limb is 3 °~10 °, 30, every ring.
The steel pipe construction error of described tubule canopy is controlled at and is radially not more than 20cm, is not more than 10cm along adjacent steel pipe direction;
The long * of described tubule canopy service depot (working space) is wide is: 0.3m*1.4m.
Operating principle of the present utility model is:
By little pipe shed support, improve enduringly tunnel from steady, effectively reduce tunnel wall rock deformation; Meanwhile, staggered floor ductule pre-reinforcement can form zigzag anti-seepage reinforcing body, improves antiseepage and leak stopping capability, forms multi-functional country rock anti-seepage reinforcing region.
The beneficial effects of the utility model are:
The method is that advanced tubule is laid according to quincuncial pile pattern staggered floor, and combines with little pipe shed support, for reducing difficulty of construction and cost, improves tunnel self-stable ability and all plays an important role.(1) Analyses of Tunnel Wall Rock Stability aspect: not only can reduce weak broken uneven strata tunnel wall rock deformation, improve tunnel surrounding self-stable ability, and make its tunnel top form zigzag anti-seepage reinforcing non-individual body by staggered floor advanced tubule pre-reinforcement, play an important role for tunnel surrounding pre-reinforcement, antiseepage, leak stopping, finally form multi-functional country rock anti-seepage reinforcing region.(2) construction aspect: adopt little pipe shed support, compare large pipe shed support and save cost, reduced difficulty of construction, and construction speed is easy to grasp; And adopt staggered floor advanced tubule pre-reinforcement, and be to lay pattern in the technical innovation of existing advanced tubule pre-reinforcement, its work progress is simple.
In sum, advanced tubule is laid to the tunnel surrounding suspension device combining with little pipe shed support according to quincuncial pile pattern staggered floor, aspect tunnel surrounding stabilization and reinforcement, not only can reduce the soil pressure covered on tunnel tunnel face, reduce vault and ground settlement and improve self, and can realize the object of tunnel surrounding pre-reinforcement, antiseepage, leak stopping, the final multi-functional country rock anti-seepage reinforcing region that forms, reduce the generation of Propagation in Tunnel Disaster, ensure the safety of constructor and production equipment; Meanwhile, the method has not only reduced construction cost and difficulty, and construction technology is simply easy to constructor operation, has improved operating efficiency, supporting effect excellence.
Brief description of the drawings
Fig. 1 is elevation of the present utility model;
Fig. 2 is skiagraph of the present utility model.
Wherein, 1, tunnel lining; 2, steel pipe; 3, advanced tubule; 4, steel arch frame.
Detailed description of the invention
Below in conjunction with accompanying drawing and embodiment, the utility model is described in further detail.
As shown in Figure 1 and Figure 2, a kind of suspension device for weak broken uneven strata constructing tunnel, be included in steel arch frame 4, steel pipe 2, advanced tubule 3 that tunnel lining 1 arranges, within the scope of 150 ° of the hoops at the top of described arch support, lay tubule canopy and advanced tubule, described advanced tubule comprises upper and lower two-layer, and upper and lower two-layer advanced tubule is laid according to quincuncial pile pattern staggered floor.
Arch support adopts external diameter 70mm, and the seamless steel pipe of long 10m is built, and the longitudinal pitch of connected seamless steel pipe is 7m, and lap length is 3m.
The circumferential distance (referring to the spacing between boring when tubule canopy is laid) of tubule canopy is 30cm, 3 °~5 ° of outer limbs.
The long 7.0m of described advanced tubule, upper and lower two-layer employing quincuncial pile is laid, circumferential distance (referring to the spacing between boring when advanced tubule is laid) 0.3m; 21 dozen of Pin, outer limb is 3 °~10 °, 30, every ring.
The steel pipe construction error of described tubule canopy is controlled at and is radially not more than 20cm, is not more than 10cm along adjacent steel pipe direction;
Described tubule canopy service depot size (being the working space of little pipe roof construction) 0.3m*1.4m.
Tunnel surrounding supporting step is as follows:
(1) little pipe shed support
Adopt external diameter 70mm, the seamless steel pipe of long 10m, longitudinal pitch 7m, lap length 3m, tubule canopy sets in 150 ° of scopes of vault, and circumferential distance is 30cm, 3 °~5 ° of outer limbs; Steel pipe construction error is controlled at and is radially not more than 20cm, is not more than 10cm along adjacent steel pipe direction; The size 0.3m*1.4m of tubule canopy service depot.
Before boring, positioned by measurement, adopt red paint to identify.Guarantee that position, hole meets design requirement.The inspection of whole hole all will be carried out in every hole, and the deviation of position, hole, the deviant of whole nose end are not more than 10cm, and mustn't invade excavation periphery, heavily bores after should filling for bending, overmigration hole.Adopt and jump position boring method boring, and bore a hole and install a hole, with avalanche prevention hole.
Slip casting (to carrying out grouting and reinforcing in little pipe shed support steel pipe used) in pipe, must install stack, and make final pressure value reach 1.0MPa, and stable 5min.Slurries preparations must strict measurement, and grouting serous fluid adopts the cement paste of water/binder ratio 0.5:1~1:1.
(2) staggered floor advanced tubule pre-reinforcement
In performing little pipe shed support, adopt Ф 42 advanced tubules to carry out leading consolidation process to umbrella arch, the long 7.0m of advanced tubule, upper and lower two-layer employing quincuncial pile is laid, circumferential distance 0.3m, 1 dozen of vertical two 2 Pin (press Pin unit and calculate by steel arch frame, after establishing two Pin, on tubule canopy, perform advanced tubule) 1 hole, 3 °~10 ° of outer limbs (being exactly the angle between advanced tubule and tubule canopy), 30, every ring, grouting pressure is 0.5~1MPa.
Ductule front end is processed into cone-shaped, and on tube wall, slurry outlet position and size are processed by designing requirement.In excavation face, accurately draw the position of the ductule that this circulation need establish according to designing requirement.Adopt air drill to hole, the outer limb of advanced tubule applies in strict accordance with designing requirement, and afterbody and steelframe weld together, advanced tubule and line midline direction almost parallel.Steel pipe is entered by the Special top crown, and jacking boring length is not less than 90% of pipe range, when steel pipe jacking, notes the not impaired distortion of the protection mouth of pipe, to be connected with grouting pipeline; Slip casting dummy pipe aperture first checks whether reach airtight standard, with mortar leakage prevention; Steel pipe tail end exposes sufficient length, and together with steel supporting welding.Adopt slurry filling machine pressure grouting, slurries are prepared according to designing requirement, and grouting pressure is 0.5~1.0MPa, reaches designing requirement grouting amount as ending standard by single tube, after slip casting finishes, by mouth of pipe shutoff, in case outside slurries refluence pipe.
(3) tunnel excavation
Tunnel excavation adopts benching tunnelling method excavation, and country rock explosion adopts smooth blasting, and excavation drilling depth is pressed 0.5m and controlled.In digging process, accomplish " digging a Pin, a Pin, spray one Pin ".
(4) preliminary bracing
After tunnel excavation, preliminary bracing construction is carried out in every circulation in time.Section preliminary bracing adopts I18 or I22 i iron bow member, longitudinal pitch 0.5m; Full section arranges Ф 8@20cmX20cm double steel bar nets; Spray C25, P6 concrete, thick 30cm.
(5) inverted arch excavation and two lining constructions
After tunnel trunk excavation supporting completes, carry out in time inverted arch construction, and seal into ring; Thereafter two linings follow-up in time, the every construction technology of lining cutting and technical indicator must meet design or code requirement.
By reference to the accompanying drawings detailed description of the invention of the present utility model is described although above-mentioned; but the not restriction to the utility model protection domain; one of ordinary skill in the art should be understood that; on the basis of the technical solution of the utility model, those skilled in the art do not need to pay various amendments that creative work can make or distortion still in protection domain of the present utility model.

Claims (6)

1. the suspension device for weak broken uneven strata constructing tunnel, it is characterized in that: comprise an arch support, within the scope of 150 ° of the hoops at the top of described arch support, be laid with tubule canopy and advanced tubule, described advanced tubule comprises upper and lower two-layer, and upper and lower two-layer advanced tubule is laid according to quincuncial pile pattern staggered floor.
2. the suspension device for weak broken uneven strata constructing tunnel as claimed in claim 1, is characterized in that: arch support adopts external diameter 70mm, and the seamless steel pipe of long 10m is built, and the longitudinal pitch of connected seamless steel pipe is 7m, and lap length is 3m.
3. the suspension device for weak broken uneven strata constructing tunnel as claimed in claim 1, is characterized in that: spacing when described tubule canopy is laid between boring is 30cm, 3 °~5 ° of outer limbs.
4. the suspension device for weak broken uneven strata constructing tunnel as claimed in claim 1, is characterized in that: the long 7.0m of described advanced tubule, and spacing when advanced tubule is laid between boring is 0.3m; Outer limb is 3 °~10 °, 30, every ring.
5. the suspension device for weak broken uneven strata constructing tunnel as claimed in claim 1, is characterized in that: the steel pipe construction error of described tubule canopy is controlled at and is radially not more than 20cm, is not more than 10cm along adjacent steel pipe direction.
6. the suspension device for weak broken uneven strata constructing tunnel as claimed in claim 1, is characterized in that: the long * of described tubule canopy service depot is wide is: 0.3m*1.4m.
CN201420283535.XU 2014-05-29 2014-05-29 Supporting device used for tunnel construction in weak, fractured and uneven stratum Expired - Fee Related CN203847129U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420283535.XU CN203847129U (en) 2014-05-29 2014-05-29 Supporting device used for tunnel construction in weak, fractured and uneven stratum

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420283535.XU CN203847129U (en) 2014-05-29 2014-05-29 Supporting device used for tunnel construction in weak, fractured and uneven stratum

Publications (1)

Publication Number Publication Date
CN203847129U true CN203847129U (en) 2014-09-24

Family

ID=51560163

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420283535.XU Expired - Fee Related CN203847129U (en) 2014-05-29 2014-05-29 Supporting device used for tunnel construction in weak, fractured and uneven stratum

Country Status (1)

Country Link
CN (1) CN203847129U (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106437750A (en) * 2016-09-21 2017-02-22 福州大学 Method for forming and supporting crushed zone large-cross-section inclined shaft adit entrance at a time
CN106499423A (en) * 2016-11-23 2017-03-15 中铁十八局集团有限公司 A kind of reverse daguanpeng construction method in tunnel construction
CN107816358A (en) * 2017-09-12 2018-03-20 高军 A kind of Railway Tunnel construction reinforcing method and conduit
CN111396102A (en) * 2018-05-23 2020-07-10 向开秀 Supporting device for tunnel construction and using method
CN111648823A (en) * 2020-05-22 2020-09-11 中交二航局第二工程有限公司 Collapse treatment method suitable for fault fracture zone tunnel
CN112253143A (en) * 2020-11-27 2021-01-22 中交路桥建设有限公司 Structure for rapidly entering hole by adjusting position of tunnel and construction method

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106437750A (en) * 2016-09-21 2017-02-22 福州大学 Method for forming and supporting crushed zone large-cross-section inclined shaft adit entrance at a time
CN106437750B (en) * 2016-09-21 2019-05-10 福州大学 A kind of crushed zone slope of large section cave mouth one-pass molding method for protecting support
CN106499423A (en) * 2016-11-23 2017-03-15 中铁十八局集团有限公司 A kind of reverse daguanpeng construction method in tunnel construction
CN107816358A (en) * 2017-09-12 2018-03-20 高军 A kind of Railway Tunnel construction reinforcing method and conduit
CN111396102A (en) * 2018-05-23 2020-07-10 向开秀 Supporting device for tunnel construction and using method
CN111396102B (en) * 2018-05-23 2021-06-08 南京溧水高新产业股权投资有限公司 Supporting device for tunnel construction and using method
CN111648823A (en) * 2020-05-22 2020-09-11 中交二航局第二工程有限公司 Collapse treatment method suitable for fault fracture zone tunnel
CN111648823B (en) * 2020-05-22 2021-08-03 中交二航局第二工程有限公司 Collapse treatment method suitable for fault fracture zone tunnel
CN112253143A (en) * 2020-11-27 2021-01-22 中交路桥建设有限公司 Structure for rapidly entering hole by adjusting position of tunnel and construction method

Similar Documents

Publication Publication Date Title
CN103993892B (en) A kind of supporting method for weak broken uneven strata constructing tunnel
CN203847129U (en) Supporting device used for tunnel construction in weak, fractured and uneven stratum
CN102493822B (en) Method for performing curtain grouting construction on tunnel by water rich fault influence zone
CN102562099B (en) Method for carrying out rapid face excavation construction of loess tunnel by double rows of small conduits
CN103628885A (en) Tunnel exit cover-excavation construction method of Ultra-shadow buried tunnel
CN101408106B (en) Small tube shed pre-grouting method
CN102606167B (en) Settlement control construction method for transverse grouting guide pipe of shallow underground excavation tunnel
CN103835729A (en) Ground pre-grouting strengthening technology for deep long-distance roadway surrounding rock
CN104481540A (en) Method for controlling multiple coal mining hazards by high level borehole grouting
CN110735653A (en) deep-hole retreating type grouting water plugging construction method for igneous rock water-rich fault
CN102678126A (en) Method for excavating mountain tunnels in weak surrounding rock-fractured zones or shallow covered slope sections
CN103835723A (en) Comprehensive pretreatment method for shaft penetration in mined-out area stratum
CN103899351A (en) Filling and reinforcing method for processing complicated goafs
CN109763483A (en) A kind of thick 4th is buried excavation collapse broken formation upstriker segmenting slip casting technique
CN102966359A (en) Working face ventilation oxidization zone roof control method
CN102400694A (en) Reinforcement method for combined part of shield tunnel and mining-method tunnel
CN103742158A (en) Fore support and excavating method of inclined tunnel
CN106223897A (en) A kind of fully-mechanized mining working crushes coal petrography deep hole segmenting slip casting method
CN107237638A (en) Both wired concealed tunneling structure and its construction method are worn under a kind of
CN104612714B (en) Tunneling by mining method construction method and structure under the conditions of the poor geology of country rock is passed through
CN204140092U (en) The inclined shaft deep hole grouting structure of a kind of effective reinforce adjoining rock and shutoff underground water burst
CN101358529A (en) Short tube and short tube sand consolidation agent strengthening construction process
CN103775102B (en) Hidden hole drilling is stablized free face with pipe pore-forming backfill concrete and is processed landslide construction method
CN203769804U (en) Advanced support of inclined tunnel
CN102606173A (en) Construction method for treating tunnel deformation segment and accelerating tunneling

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140924

Termination date: 20170529

CF01 Termination of patent right due to non-payment of annual fee