CN203827815U - Wind-brace structure in arbor planting bed - Google Patents
Wind-brace structure in arbor planting bed Download PDFInfo
- Publication number
- CN203827815U CN203827815U CN201420221406.8U CN201420221406U CN203827815U CN 203827815 U CN203827815 U CN 203827815U CN 201420221406 U CN201420221406 U CN 201420221406U CN 203827815 U CN203827815 U CN 203827815U
- Authority
- CN
- China
- Prior art keywords
- planting bed
- anchor ear
- arbor
- built
- wind
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Transplanting Machines (AREA)
Abstract
The utility model relates to a wind-brace structure in an arbor planting bed. The structure comprises a hoop provided an inner liner, a supporting rod and a planting bed embedded part, wherein the trunk of an arbor is hooped by the hoop, the planting bed embedded part is arranged in the planting bed, the supporting rod is arranged between the hoop provided with the inner liner and the planting bed embedded part, the hoop is provided with a fastening screw, and a movable hoop plate connected with the fastening screw is arranged on the inner side of the hoop provided with the inner liner. According to the wind-brace structure in the arbor planting bed, the defect that an embedded pile is unstable during supporting is avoided by arranging the embedded part on the lower portion of the supporting rod, the damage to bark caused by the hoop is avoided by arranging the rubber liner in the hoop, secondary fastening can be achieved after installation by arranging the movable hoop plate in the hoop, and stability is more reliable. All installation parts can be made into standard parts, installation and detachment are convenient, the frameworks obtained after installation are uniform, and the appearance is elegant.
Description
Technical field
The utility model relates to a kind of arbor planting bed wind-brace structure.
Background technology
In order to realize the target of the fast rapid-result scape of garden landscape, landscape planting is heeled in seedling by the arbor species complete crowns that use large specification more, and complete crown heel in seedling need to newly plant plot at least normal growth more than 1~2 year could newly grow effective root system and go deep into planting soil, therefore during 1~2 year of the newborn root system of strong point not, the fixation of root system can not effectively be brought into play, especially in typhoon, very easily lodge running into strong wind weather, bring loss to engineering construction, therefore, plant and support in time the construction technology that becomes one indispensability after arbor species.Use at present maximum on-the-spot bamboo and wood rod triangle or well types used that be supported for to support, the firm trunk of rope colligation; Also there is scene to be welded the method for triangle or well shape steel tube support.The invasion and attack that are difficult to resist strong wind weather or typhoon that bamboo waddy supports, scene is welded steelframe structure and supports, and construction work amount is large, and simultaneously inconvenient for the arbor species installation welding in planting bed, buried stake steadiness is also difficult to ensure.Arbor in large area greenery patches is supported and expands the increase rated wind velocity that support angle can be to a certain degree by increasing, but the arbor in road edge or the limited planting bed of green coverage can not meet steric requirements if supporting and space is very little according to conventional bearing height and support angle at all.
Utility model content
Be difficult to meet the technical problem of wind-brace when solving arbor planting bed limited space, of the present utility modelly provide a kind of arbor planting bed wind-brace structure, concrete scheme of the present utility model is as follows for achieving the above object:
A kind of arbor planting bed wind-brace structure, comprises anchor ear, support bar, planting bed built-in fitting with inner liner;
Described anchor ear is waled the trunk of arbor, and described planting bed built-in fitting is located in planting bed, between described anchor ear with inner liner and described planting bed built-in fitting, is provided with described support bar;
Described anchor ear is provided with trip bolt, and is provided with in the described anchor ear inner side with inner liner the movable hoop plate being connected with described trip bolt.
Preferably, described anchor ear wale arbor trunk height 1/3rd to 2/3rds between.
Preferably, described anchor ear outside is uniformly distributed and is provided with four supporting bar connectors, and described anchor ear is connected with described support bar respectively by described supporting bar connector.
Preferably, described planting bed built-in fitting is provided with four built-in connections, and described planting bed built-in fitting is connected with described support bar respectively by described built-in connection.
Preferably, described inner liner is that elastomeric material is made.
Preferably, described planting bed built-in fitting comprises embedded bar, and described embedded bar is implanted in concrete.
Preferably, described anchor ear comprises two semicircle anchor ear plates, and two described semicircle anchor ear plates connect by locking member.
The unstable disadvantage of buried stake when the arbor planting bed wind-brace structure that the utility model provides has been avoided support by built-in fitting being set in support bar bottom, rubber packing is set in anchor ear has avoided anchor ear to damage bark, movable hoop plate is set in anchor ear, and can to realize secondary after installation fastening, and stability is more reliable.All installed parts can be made standard component, and installation and removal are convenient, and after installing, framework is uniform, outward appearance grace.
Brief description of the drawings
Accompanying drawing described herein is used to provide further understanding of the present utility model, forms the application's a part, does not form to improper restriction of the present utility model, in the accompanying drawings:
Fig. 1 is that the utility model embodiment installs profile;
Fig. 2 is the utility model embodiment anchor ear top view;
Fig. 3 is the local enlarged diagram of the utility model embodiment anchor ear;
Fig. 4 is the utility model embodiment anchor ear and locking member structural representation thereof;
Fig. 5 is the utility model embodiment planting bed embedded part structure schematic diagram;
Fig. 6 is the utility model embodiment planting bed built-in fitting preferred version structural representation.
Embodiment
Describe the utility model in detail below in conjunction with accompanying drawing and specific embodiment, be used for explaining the utility model in this illustrative examples of the present utility model and explanation, but not as to restriction of the present utility model.
Embodiment
As shown in FIG. 1 to 3, a kind of arbor planting bed wind-brace structure, comprises anchor ear 200, support bar 300, planting bed built-in fitting 400; Described anchor ear 200 inwalls are provided with the inner liner 204 that soft material is made, inner liner 204 has avoided anchor ear 200 to damage bark, anchor ear 200 is for waling the trunk 100 of arbor, described planting bed built-in fitting 400 is located in planting bed, between described anchor ear 200 and described planting bed built-in fitting 400, is provided with described support bar 300; Described anchor ear 200 is provided with trip bolt 202, and be provided with in described anchor ear 200 inner sides the movable hoop plate 203 being connected with described trip bolt 202, movable hoop plate 203 is curved, in the time that the diameter of anchor ear 200 is greater than the diameter of trunk 100, tighten trip bolt 202, make movable hoop plate 203 hold out against trunk 100, can ensure anchor ear 200 banding trunks 100.
As shown in Figure 4, as the preferred version of above-described embodiment scheme, described anchor ear 200 comprises two semicircle anchor ear plates, and two described semicircle anchor ear plates connect by locking member 205.
As the preferred version of above-described embodiment scheme, described anchor ear 200 wale arbor trunk 100 height 1/3rd to 2/3rds between, make supporting construction more stable, increase wind resistance grade.
As the preferred version of above-described embodiment scheme, described anchor ear 200 outsides are uniformly distributed and are provided with four supporting bar connectors 201, corresponding support bar 300 is also four, and described anchor ear 200 is connected with described support bar 300 respectively by described supporting bar connector 201.
As shown in Figures 1 and 5, as the preferred version of above-described embodiment scheme, described planting bed built-in fitting 400 is provided with four built-in connections 401, and described planting bed built-in fitting 400 is connected with described support bar 300 respectively by described built-in connection 401.
It is circular or square that pre-buried pond is generally, therefore adopt the supporting construction of four planting bed built-in fittings 400 and four support bars 300 to be convenient to design and construction, and too many planting bed built-in fitting 400, the support bar 300 of quantity increased basic cost, quantity planting bed built-in fitting 400 very little, the requirement that support bar 300 can not reach again wind resistance grade.
As the preferred version of above-described embodiment scheme, described inner liner 204 is made for elastomeric material.
As shown in Figure 6, as the preferred version of above-described embodiment scheme, described planting bed built-in fitting 400 comprises embedded bar 402, and described embedded bar 402 is implanted in concrete, and 401 outsides of built-in connection are exposed and are connected with support bar 300.
When installation, select according to diameter of a cross-section of a tree trunk 1.3 meters above the ground size and the height of tree of arbor the anchor ear 200 and the support bar 300 that match with it, first overlap support bar 300 and planting bed built-in fitting 400, built-in connection 401 is fastening with support bar 300 use General purpose screws, then anchor ear 200 is installed, fastening to support bar 300 and supporting bar connector 201 use General purpose screws, tentatively tighten anchor ear 200 with tight latch fitting, after installing, adjust movable hoop plate 203 with trip bolt 202, the firm anchor ear 200 of final installation, after above step completes, can complete installation of the present utility model.According to above method, arbor is installed and supports, avoided Site Welding and cutting, have again and can meet wind resistance and uniform effect, convenient to use.
The technical scheme above the utility model embodiment being provided is described in detail, applied principle and the embodiment of specific case to the utility model embodiment herein and set forth, the explanation of above embodiment is only applicable to help to understand the principle of the utility model embodiment; , for one of ordinary skill in the art, according to the utility model embodiment, in embodiment and range of application, all will change, in sum, this description should not be construed as restriction of the present utility model meanwhile.
Claims (7)
1. an arbor planting bed wind-brace structure, is characterized in that:
Comprise anchor ear, support bar, planting bed built-in fitting with inner liner;
Described anchor ear is waled the trunk of arbor, and described planting bed built-in fitting is located in planting bed, between described anchor ear with inner liner and described planting bed built-in fitting, is provided with described support bar;
Described anchor ear is provided with trip bolt, and is provided with in the described anchor ear inner side with inner liner the movable hoop plate being connected with described trip bolt.
2. arbor planting bed wind-brace structure as claimed in claim 1, is characterized in that:
Described anchor ear wale arbor trunk height 1/3rd to 2/3rds between.
3. arbor planting bed wind-brace structure as claimed in claim 1, is characterized in that:
Described anchor ear outside is uniformly distributed and is provided with four supporting bar connectors, and described anchor ear is connected with described support bar respectively by described supporting bar connector.
4. arbor planting bed wind-brace structure as claimed in claim 3, is characterized in that:
Described planting bed built-in fitting is provided with four built-in connections, and described planting bed built-in fitting is connected with described support bar respectively by described built-in connection.
5. arbor planting bed wind-brace structure as claimed in claim 1, is characterized in that:
Described inner liner is that elastomeric material is made.
6. arbor planting bed wind-brace structure as claimed in claim 1, is characterized in that:
Described planting bed built-in fitting comprises embedded bar, and described embedded bar is implanted in concrete.
7. arbor planting bed wind-brace structure as claimed in claim 1, is characterized in that:
Described anchor ear comprises two semicircle anchor ear plates, and two described semicircle anchor ear plates connect by locking member.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420221406.8U CN203827815U (en) | 2014-04-30 | 2014-04-30 | Wind-brace structure in arbor planting bed |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420221406.8U CN203827815U (en) | 2014-04-30 | 2014-04-30 | Wind-brace structure in arbor planting bed |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203827815U true CN203827815U (en) | 2014-09-17 |
Family
ID=51505720
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201420221406.8U Expired - Fee Related CN203827815U (en) | 2014-04-30 | 2014-04-30 | Wind-brace structure in arbor planting bed |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203827815U (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104584969A (en) * | 2014-12-26 | 2015-05-06 | 上海聚隆绿化发展有限公司 | Wind-preventing root-strengthening method for roof greening arbor plantation |
CN104847159A (en) * | 2015-05-19 | 2015-08-19 | 国网河南许昌县供电公司 | Special safety belt pendant for annular concrete pole |
CN105284525A (en) * | 2015-10-21 | 2016-02-03 | 中国农业科学院郑州果树研究所 | Angle fixator for fruit tree branches |
CN107512747A (en) * | 2017-09-26 | 2017-12-26 | 天津宝舟科技有限公司 | A kind of Novel sewage handles bacteria filter device |
CN111972208A (en) * | 2020-08-31 | 2020-11-24 | 中国二十二冶集团有限公司 | Wind-resistant arbor supporting device and mounting method |
CN115486343A (en) * | 2022-09-26 | 2022-12-20 | 扬州雅典娜园艺科技开发有限公司 | High-survival-rate garden seedling planting method |
-
2014
- 2014-04-30 CN CN201420221406.8U patent/CN203827815U/en not_active Expired - Fee Related
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104584969A (en) * | 2014-12-26 | 2015-05-06 | 上海聚隆绿化发展有限公司 | Wind-preventing root-strengthening method for roof greening arbor plantation |
CN104847159A (en) * | 2015-05-19 | 2015-08-19 | 国网河南许昌县供电公司 | Special safety belt pendant for annular concrete pole |
CN105284525A (en) * | 2015-10-21 | 2016-02-03 | 中国农业科学院郑州果树研究所 | Angle fixator for fruit tree branches |
CN105284525B (en) * | 2015-10-21 | 2018-07-20 | 中国农业科学院郑州果树研究所 | A kind of angle fixer of fruit tree |
CN107512747A (en) * | 2017-09-26 | 2017-12-26 | 天津宝舟科技有限公司 | A kind of Novel sewage handles bacteria filter device |
CN111972208A (en) * | 2020-08-31 | 2020-11-24 | 中国二十二冶集团有限公司 | Wind-resistant arbor supporting device and mounting method |
CN111972208B (en) * | 2020-08-31 | 2022-07-19 | 中国二十二冶集团有限公司 | Wind-resistant arbor supporting device and installation method |
CN115486343A (en) * | 2022-09-26 | 2022-12-20 | 扬州雅典娜园艺科技开发有限公司 | High-survival-rate garden seedling planting method |
CN115486343B (en) * | 2022-09-26 | 2024-04-05 | 扬州雅典娜园艺科技开发有限公司 | Planting method for garden seedlings with high survival rate |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203827815U (en) | Wind-brace structure in arbor planting bed | |
US20140305041A1 (en) | Modular planting system | |
CN109168942A (en) | The support of assembled roof greening plant | |
CN205329713U (en) | Green retaining wall building block | |
CN109837916B (en) | Ecological restoration method for side slope of split wooden sash | |
KR101049249B1 (en) | Tree underground strut installation method | |
CN204069979U (en) | A kind of lodging-prevention nursery support system | |
CN204466458U (en) | A kind of landscape engineering is with holding up wooden bracing or strutting arrangement | |
CN208227897U (en) | It is a kind of to have both beautiful tree anti-tilting bracket for garden seedling tree | |
CN206283997U (en) | Tree grafting growth supporting construction is used in a kind of garden landscape construction | |
KR101800234B1 (en) | Solar module installation unit for sloping hills | |
CN215122678U (en) | Tree fixing system of aerial ecological courtyard | |
CN204608803U (en) | A kind of bolt support high gradient slope is with planting raw groove structure | |
CN209964808U (en) | Reliable type fastening strutting arrangement | |
KR100442995B1 (en) | Afforestation method of bedrock and building | |
CN112544335A (en) | Tree fixing system for aerial ecological courtyard | |
CN202559492U (en) | Natural drainage system for step of side slope | |
KR101015636B1 (en) | Laying type device for supporting tree | |
CN204634564U (en) | A kind of forestry trees apparatus for correcting | |
CN203105230U (en) | Supporting device for tree transplanting | |
CN204132086U (en) | A kind of dismountable viticulture frame type | |
CN205071830U (en) | Polywater pipe | |
KR20130036032A (en) | Below ground tree supporting systems and other supplements | |
CN203846516U (en) | Building structure for green plants planting on rock mountain | |
CN201400888Y (en) | Combined movable sand stabilization cup |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C56 | Change in the name or address of the patentee | ||
CP03 | Change of name, title or address |
Address after: 510000 Guangdong, Guangzhou, Zhongshan, No. 1, Yuexiu District Road, No. 34, No. 3 Patentee after: HUAYUAN LANDSCAPE ARCHITECTURE CO., LTD. Address before: 510000, Guangzhou, Guangdong, Zhongshan Yuexiu District Road, No. 51 extension building, front seat, 7 floor Patentee before: Guangzhou Huayuan Landscaping Co.,Ltd. |
|
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20140917 Termination date: 20210430 |
|
CF01 | Termination of patent right due to non-payment of annual fee |