CN203768926U - 一种地下室深井封堵装置 - Google Patents

一种地下室深井封堵装置 Download PDF

Info

Publication number
CN203768926U
CN203768926U CN201420164785.1U CN201420164785U CN203768926U CN 203768926 U CN203768926 U CN 203768926U CN 201420164785 U CN201420164785 U CN 201420164785U CN 203768926 U CN203768926 U CN 203768926U
Authority
CN
China
Prior art keywords
steel
steel pipe
pipe
well casing
plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420164785.1U
Other languages
English (en)
Inventor
姜忠
钱俊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Yangzhou Jiangong Construction Group Co Ltd
Original Assignee
Jiangsu Yangzhou Jiangong Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Yangzhou Jiangong Construction Group Co Ltd filed Critical Jiangsu Yangzhou Jiangong Construction Group Co Ltd
Priority to CN201420164785.1U priority Critical patent/CN203768926U/zh
Application granted granted Critical
Publication of CN203768926U publication Critical patent/CN203768926U/zh
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

一种地下室深井封堵装置,涉及建筑领域,包括井管,井管的上方设置第一钢套筒,第一钢套筒的下端焊接第一止水环,第一钢套筒的上端焊接第二止水环,第二止水环的上方焊接第二钢套筒;在井管内穿置钢管,钢管的下端四周径向设置渗水孔,钢管的进水端和渗水孔处包裹过滤网,在钢管与井管之间设置卵石填充层;在钢管上穿置第一钢盖板和第二钢盖板,在钢管上连接高压阀门;在第一钢套管与钢管之间设置第一纤维微膨胀混凝土层,在第二钢套管与钢管之间设置第二纤维微膨胀混凝土层;封堵装置还包括基础垫层、涂料防水层、防水保护层和基础底板。本实用新型操作简单、方便,封堵效率高、防渗效果好,并且可避免井管中的潜水泵亦无法取出的现象。

Description

一种地下室深井封堵装置
技术领域
本实用新型涉及建筑领域,尤其涉及地下室深井的封堵方法。
背景技术
大型基坑在底板施工结束后,必须要对降水井管进行封堵,以确保地下水不渗入地下室。常规做法是采用钢盖板焊接封堵法。即在封堵降水井管之前将所有的水泵停掉,派专人核实每一口井水位上涨的准确速度(即可用的焊接时间),并做好对应记录,计划好焊机台数和操作工人数。一般焊接一口井管一个人需要13分钟,可以根据现场水位上涨速度的实际情况,从水量大的井管先开始钢盖板焊接封堵,到最后留4-6口井管同时封堵。一口井管可以两个人同时焊接,最快6-7分钟焊接完成。钢盖板焊接封堵是指在止水钢套筒里直接焊接钢盖板,然后再在钢板上浇筑抗渗加微膨剂的高一个等级强度的混凝土。这种方法要求地下水位上涨的时间至少大于7分钟,而且要求两名熟练的焊工相互配合同时施工,因而有一定的局限性。
如果最后预留的4-6口井管水位上涨速度小于7分钟,则考虑采用钢板带短丝堵头或阀门封堵相结合的方法进行。即在钢套筒封口盖板上增焊Ф100的短丝,短丝中可穿水管,在焊接带丝扣的盖板时可不停地抽水,待钢盖板焊接好后,可将水管从丝扣中剪断,立刻将堵头封闭,然后浇筑抗渗加微膨剂高一个等级强度的混凝土,这样就可以解决水位快速上涨问题,但要求丝扣的密封性一定要好,同时井管中的潜水泵亦无法取出。
发明内容
本实用新型的目的是为了克服现有技术的不足,提供一种封堵效果好、效率高的地下室深井封堵装置。
本实用新型的目的是这样实现的:一种地下室深井封堵装置,包括井管,所述井管的上方设置第一钢套筒,第一钢套筒的下端焊接第一止水环,第一钢套筒的上端焊接第二止水环,第二止水环的上方焊接第二钢套筒;在所述井管内穿置钢管,钢管的下端四周径向设置渗水孔,钢管的进水端和渗水孔处包裹过滤网,在钢管与井管之间设置卵石填充层;在钢管上穿置第一钢盖板和第二钢盖板,第一钢盖板与所述第一止水环相焊接,第一钢盖板设置在井管的上方,第二钢盖板与所述第二止水环相焊接,钢管的上端穿出第二钢套筒,在第二钢套筒内的钢管上连接高压阀门;在所述第一钢套管与钢管之间设置第一纤维微膨胀混凝土层,在所述第二钢套管与钢管之间设置第二纤维微膨胀混凝土层;所述封堵装置还包括铺设在地面上的基础垫层,基础垫层设置在井管上端的外周,在基础垫层的上方设置涂料防水层,在涂料防水层的上方设置防水保护层,防水保护层设置在第一钢套筒的外周,在防水保护层的上方设置基础底板,基础底板设置在第一钢套筒和第二钢套筒的外周。
本实用新型制作方法是:1、钢套筒制作:钢套筒由厚6mm钢板制作,其内径为600mm,高度为基础底板厚度加40mm;在钢套筒的中间部位以及底部内外侧焊接一道厚度为6mm,外径为632mm、内径为580mm的止水环。
2、钢套筒的预埋:在基础底板混凝土垫层施工后防水层施工前在井管上方安装钢套筒,并用40mm保护层混凝土将钢套筒预埋。
3、井管封堵:井管封堵顺序为先封堵低标高处井管再封堵高标高处井管,从基坑四周向中心聚拢。井管封堵前,先将钢管四周开洞外包过滤网,将直径50mm钢管放置于井管之中并用卵石进行回填至钢套筒底部,然后将直径50mm钢管穿过钢盖板(厚度为6mm,直径为590mm)中心部位并与止水环四周焊接牢固。钢管的出水口与自吸泵对接。
4、在钢套筒中浇筑纤维微膨胀混凝土至中间止水环下,安装第二道钢盖板(厚度为6mm,直径为590mm),并与止水环四周焊接牢。
5、关闭1.5寸高压阀门,在钢套筒中浇筑纤维微膨胀混凝土至基础底板上表面,切除上部多余钢管,维微膨胀混凝土可加强防渗功能。
本实用新型通过以上设计,操作简单、方便,封堵效率高、防渗效果好,并且可避免井管中的潜水泵亦无法取出的现象。
附图说明
图1为本实用新型的一种结构示意图。
图2为图1中A部放大图。
图中,1井管,2钢管,3卵石填充层,4第一钢盖板,5第一止水环,6第一纤维微膨胀混凝土层,7第一钢套筒,8基础垫层,9涂料防水层,10防水保护层,11基础底板,12第二钢盖板,13高压阀门,14第二纤维微膨胀混凝土层,15第二钢套筒,16第二止水环,17渗水孔,18过滤网。
具体实施方式
如图1所示,为地下室深井封堵装置,包括井管1,井管1的上方设置第一钢套筒7,第一钢套筒7的下端焊接第一止水环5,第一钢套筒7的上端焊接第二止水环16,第二止水环16的上方焊接第二钢套筒15。在井管1内穿置钢管2,钢管2的下端四周径向设置渗水孔17,钢管2的进水端和渗水孔17处包裹过滤网18(如图2所示),在钢管2与井管1之间设置卵石填充层3。在钢管2上穿置第一钢盖板4和第二钢盖板12,第一钢盖板4与第一止水环5相焊接,第一钢盖板4设置在井管1的上方,第二钢盖板12与所述第二止水环16相焊接,钢管2的上端穿出第二钢套筒15后连接自吸泵,在第二钢套筒15内的钢管2上连接高压阀门13。
在第一钢套管7与钢管2之间设置第一纤维微膨胀混凝土层6,在第二钢套管15与钢管2之间设置第二纤维微膨胀混凝土层14。封堵装置还包括铺设在地面上的基础垫层8,基础垫层8设置在井管1上端的外周,在基础垫层8的上方设置涂料防水层9,在涂料防水层9的上方设置防水保护层10,防水保护层10设置在第一钢套筒7的外周,在防水保护层10的上方设置基础底板11,基础底板11设置在第一钢套筒7和第二钢套筒15的外周。

Claims (1)

1.一种地下室深井封堵装置,包括井管,其特征在于:所述井管的上方设置第一钢套筒,第一钢套筒的下端焊接第一止水环,第一钢套筒的上端焊接第二止水环,第二止水环的上方焊接第二钢套筒;在所述井管内穿置钢管,钢管的下端四周径向设置渗水孔,钢管的进水端和渗水孔处包裹过滤网,在钢管与井管之间设置卵石填充层;在钢管上穿置第一钢盖板和第二钢盖板,第一钢盖板与所述第一止水环相焊接,第一钢盖板设置在井管的上方,第二钢盖板与所述第二止水环相焊接,钢管的上端穿出第二钢套筒,在第二钢套筒内的钢管上连接高压阀门;在所述第一钢套管与钢管之间设置第一纤维微膨胀混凝土层,在所述第二钢套管与钢管之间设置第二纤维微膨胀混凝土层;所述封堵装置还包括铺设在地面上的基础垫层,基础垫层设置在井管上端的外周,在基础垫层的上方设置涂料防水层,在涂料防水层的上方设置防水保护层,防水保护层设置在第一钢套筒的外周,在防水保护层的上方设置基础底板,基础底板设置在第一钢套筒和第二钢套筒的外周。
CN201420164785.1U 2014-04-08 2014-04-08 一种地下室深井封堵装置 Expired - Fee Related CN203768926U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420164785.1U CN203768926U (zh) 2014-04-08 2014-04-08 一种地下室深井封堵装置

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420164785.1U CN203768926U (zh) 2014-04-08 2014-04-08 一种地下室深井封堵装置

Publications (1)

Publication Number Publication Date
CN203768926U true CN203768926U (zh) 2014-08-13

Family

ID=51286133

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420164785.1U Expired - Fee Related CN203768926U (zh) 2014-04-08 2014-04-08 一种地下室深井封堵装置

Country Status (1)

Country Link
CN (1) CN203768926U (zh)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104762983A (zh) * 2015-04-28 2015-07-08 北京城建建设工程有限公司 双环止水引流管及采用双环止水引流管的引流降水工法
CN104947700A (zh) * 2015-07-01 2015-09-30 中国建筑一局(集团)有限公司 一种用于降水井的封井套管、降水井及降水井封井方法
CN105201002A (zh) * 2015-10-23 2015-12-30 金磐集团有限公司 一种地下结构渗排水***及其施工方法
CN105672336A (zh) * 2015-03-13 2016-06-15 陈卓杰 一种井点降水用的可变形过滤组件
CN109537611A (zh) * 2018-12-06 2019-03-29 安徽省人防建筑设计研究院 一种人防工程管井封堵构造
CN109869116A (zh) * 2019-03-07 2019-06-11 东北大学 一种降水井封堵结构及其施工方法
CN109882113A (zh) * 2019-03-07 2019-06-14 东北大学 一种降水井封堵结构及其施工方法
CN110117961A (zh) * 2019-05-13 2019-08-13 安徽四建基础建设工程有限公司 一种底板降水井泄压式预埋装置及实现方法
CN111424694A (zh) * 2020-04-17 2020-07-17 广东省水利水电第三工程局有限公司 一种用于基础结构集水井的封井装置和封井方法
CN113174985A (zh) * 2021-04-25 2021-07-27 中国十九冶集团有限公司 用于超深地下结构底板的管井防渗及封井处理方法

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105672336A (zh) * 2015-03-13 2016-06-15 陈卓杰 一种井点降水用的可变形过滤组件
CN105672336B (zh) * 2015-03-13 2017-11-17 宁波恒进自动化技术有限公司 一种井点降水用的可变形过滤组件
CN104762983A (zh) * 2015-04-28 2015-07-08 北京城建建设工程有限公司 双环止水引流管及采用双环止水引流管的引流降水工法
CN104947700A (zh) * 2015-07-01 2015-09-30 中国建筑一局(集团)有限公司 一种用于降水井的封井套管、降水井及降水井封井方法
CN105201002A (zh) * 2015-10-23 2015-12-30 金磐集团有限公司 一种地下结构渗排水***及其施工方法
CN109537611A (zh) * 2018-12-06 2019-03-29 安徽省人防建筑设计研究院 一种人防工程管井封堵构造
CN109869116A (zh) * 2019-03-07 2019-06-11 东北大学 一种降水井封堵结构及其施工方法
CN109882113A (zh) * 2019-03-07 2019-06-14 东北大学 一种降水井封堵结构及其施工方法
CN109882113B (zh) * 2019-03-07 2020-12-01 东北大学 一种降水井封堵结构的施工方法
CN110117961A (zh) * 2019-05-13 2019-08-13 安徽四建基础建设工程有限公司 一种底板降水井泄压式预埋装置及实现方法
CN111424694A (zh) * 2020-04-17 2020-07-17 广东省水利水电第三工程局有限公司 一种用于基础结构集水井的封井装置和封井方法
CN113174985A (zh) * 2021-04-25 2021-07-27 中国十九冶集团有限公司 用于超深地下结构底板的管井防渗及封井处理方法

Similar Documents

Publication Publication Date Title
CN203768926U (zh) 一种地下室深井封堵装置
CN103075128A (zh) 一种瓦斯抽采钻孔的封孔方法
CN108868875B (zh) 一种二次注浆带压瓦斯封孔装置及其施工方法
CN206128099U (zh) 一种新型降水井封井装置
CN204012618U (zh) 电缆密封装置及地下连续墙施工机械
CN104563164A (zh) 一种地连墙接缝渗漏检测及注浆堵漏方法
CN103924577B (zh) 一种软基处理中监测管与真空膜连接结构及连接施工方法
CN103643690A (zh) 一种深基坑勘探孔涌水处理方法
CN109137948A (zh) 一种桩间后注浆咬合止水方法及设备
CN103161171B (zh) 减压降水井的带泵封井方法
CN107191218B (zh) 一种悬渣水封***增透与抽采瓦斯的方法
CN105780792A (zh) 一种基坑高水头减压降水井封井方法及封井结构
CN209444310U (zh) 一种降水井封堵结构
CN203890978U (zh) 一种埋藏式压力钢管接触灌浆结构
CN205387711U (zh) 基坑降水备用兼观测井
CN203891001U (zh) 一种软基处理中监测管与真空膜的连接结构
CN204551551U (zh) 一种地连墙接缝渗漏检测及注浆堵漏装置
CN203284787U (zh) 复合式管井降水***
CN209026313U (zh) 钢顶管管节中继间
CN203795442U (zh) 地下深井封堵盖板***
CN104018475B (zh) 一种埋藏式压力钢管回填灌浆结构及其灌浆工艺
CN207159985U (zh) 一种真空预压注气增压管
CN207213171U (zh) 一种顶管机进出洞用密封装置
CN205404039U (zh) 连接管道密封性测试仪
CN220581004U (zh) 一种高低压耦合带压封孔装置

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140813

Termination date: 20160408