CN105201002A - 一种地下结构渗排水***及其施工方法 - Google Patents

一种地下结构渗排水***及其施工方法 Download PDF

Info

Publication number
CN105201002A
CN105201002A CN201510692184.7A CN201510692184A CN105201002A CN 105201002 A CN105201002 A CN 105201002A CN 201510692184 A CN201510692184 A CN 201510692184A CN 105201002 A CN105201002 A CN 105201002A
Authority
CN
China
Prior art keywords
collecting well
header
base plate
drainage system
metal tube
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510692184.7A
Other languages
English (en)
Other versions
CN105201002B (zh
Inventor
钱刚新
邵金华
张艳雷
胡慧群
吕红明
周文良
杨伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JINPAN GROUP Co Ltd
Original Assignee
JINPAN GROUP Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JINPAN GROUP Co Ltd filed Critical JINPAN GROUP Co Ltd
Priority to CN201510692184.7A priority Critical patent/CN105201002B/zh
Publication of CN105201002A publication Critical patent/CN105201002A/zh
Application granted granted Critical
Publication of CN105201002B publication Critical patent/CN105201002B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

一种地下结构渗排水***及其施工方法,属于建筑施工技术领域。它包括渗排水沟、集水井、穿底板泄水点,渗排水沟与集水井通过四通接头相通,渗排水沟和集水井均由土工布过滤网、碎石过滤层和水平设置的集水管构成,穿底板泄水点设置在工程结构底板与集水井顶部连接处,穿底板泄水点通过金属管与集水井内的集水管连接,集水管上设有开孔。本发明通过设置该渗排水***,在施工期间,能及时排出地下渗水,有效避免施工期间因地下水水浮力引起的地下室上浮,避免底板结构裂缝;通过对地下水泄压,合理开发二次利用地下降水,达到节约用水的目的,渗排水***对地质环境影响小,施工不受周边环境影响;其施工工艺简单,可操作性强,适用推广应用。

Description

一种地下结构渗排水***及其施工方法
技术领域
本发明属于建筑施工技术领域,具体涉及一种设置在工程结构底板以下的地下结构渗排水***及其施工方法,可有效减小施工阶段结构底板所受的水浮力,相比抗浮锚杆、抗拔桩具有节约工程造价,减少工序,降低成本,加快工程进度,工艺简单可控性高的优点。
背景技术
地下室工程结构多采用抗浮锚杆、抗拔桩以抗为主的抗浮措施,而疏导排水措施应用相对较少,不利于节约造价;其施工阶段需依靠降水来避免水浮力拉裂结构底板,降水费用高,对周围环境影响大。
发明内容
针对现有技术中存在的上述问题,本发明的目的在于提供一种地下结构渗排水***及其施工方法,将工程结构底板范围内的地下水汇集、流径,通过基坑周边集水井、穿结构底板的泄水点排出,可有效减少施工阶段降水费用,对周边环境影响小,避免因地下水水浮力引起的地下室上浮和底板裂缝,具有较好的经济效益和社会效益。
所述的一种地下室底板抗浮渗排水***,包括渗排水沟、集水井、穿底板泄水点,其特征在于所述渗排水沟与集水井通过四通接头相通,所述渗排水沟水平设置在工程结构底板下面,所述集水井竖直暗设在结构底板下,所述渗排水沟由土工布过滤网、碎石过滤层和水平设置的集水管构成,集水井由土工布过滤网、碎石过滤层和竖直设置的集水管构成,所述穿底板泄水点设置在工程结构底板与集水井顶部连接处,所述穿底板泄水点通过金属管与集水井内的集水管连接,集水管上设有开孔,地下水渗入渗排水沟的集水管后,通过四通接头导入集水井的集水管中,由金属管通过穿底板泄水点排走。
所述的一种地下室底板抗浮渗排水***,其特征在于所述渗排水沟的沟槽截面为梯形,为下窄上宽梯形结构,该梯形上底位于沟槽底部,下底位于沟槽顶部。
所述的一种地下室底板抗浮渗排水***,其特征在于所述沟槽纵横向交错设置,其纵横向间隔为20-30m,沟槽下底边400mm,其高为300mm,沟槽开挖后先在沟内铺设土工布作为过滤网,土工布过滤网上铺有4-6cm的碎石过滤层,集水管水平铺设于碎石过滤层中间。
所述的一种地下室底板抗浮渗排水***,其特征在于所述渗排水沟和集水井的集水管管壁密布开孔的直径为3-6mm,优选为5mm。
所述的一种地下室底板抗浮渗排水***,其特征在于渗排水沟的集水管倾斜放置,集水管与四通接头连接的一端低于远离四通接头的另一端,两端之间的坡度为0.5%~1.0%。
所述的一种地下室底板抗浮渗排水***,其特征在于所述集水井尺寸为400×400×1000mm,相邻集水井间隔为20-30m,集水井开挖后先铺土工布作土工布过滤网,土工布过滤网上铺有4-6cm的碎石过滤层,集水管竖直***碎石过滤层内。
所述的一种地下室底板抗浮渗排水***,其特征在于所述的金属管上端穿出工程结构底板,下端置入集水井内的集水管中,金属管位于穿底板泄水点上方的设置焊接一圈止水环。
所述的一种地下室底板抗浮渗排水***,其特征在于施工工程完工后,所述穿底板泄水点由盖板与止水环焊接封堵,再由混凝土补填。
所述的一种地下室底板抗浮渗排水***,其特征在于施工工程完工后,所述穿底板泄水点由盖板上设有与金属管连通的镀锌水管,该镀锌水管伸出至工程结构底板外,该镀锌水管上安装水压调节阀,在水压力升高至预设值时开启阀门泄压,将水流导入就近的工程结构集水井中。
所述的一种地下室底板抗浮渗排水***的施工方法,其特征在于包括如下步骤:
1)基坑开挖;
2)地下渗排水沟槽、集水井开挖,沟槽下底为400mm,高为300mm,纵横向间隔20-30m布置;集水井400×400×1000mm,相邻集水井间隔20-30m布置;
3)渗排水沟槽内铺土工布,土工布内填入粒径4-6cm碎石;
4)沟槽内放入集水管,集水管端头位于集水井上,集水管由四通接头连接,集水管倾斜设置,其坡度0.5%~1.0%,集水管管壁开孔,包裹网格布,集水井内集水管竖向放置,并与四通接头连接;
5)沟槽、集水井内碎石回填,压实,得到碎石过滤层;
6)碎石过滤层上浇筑100mm厚的C15垫层,即混凝土垫层;
7)工程结构底板施工,集水井穿工程结构底板部位为穿底板泄水点,套入金属管,金属管管壁焊接止水环,金属管底部位于集水井处预留孔洞,与集水管相通,工程结构底板与穿底板泄水点之间的混凝土仅浇至止水环的高度;
8)结构施工期间,及时排出集水井内积水;
9)地下室顶板覆土压重完成后,根据需要,部分集水井可进行封堵,部分可留置后用;封堵部分用C30微膨胀混凝土灌入金属管内,随后金属管管口用8mm厚钢板焊接封闭,集水井处预留孔洞混凝土浇筑;留置部分的集水井先焊接盖板,盖板上设置外接的镀锌水管,镀锌水管高出工程结构底板后安装水压调节阀,当水压上升到预设值则自动开启阀门减压。
通过采用上述技术,与现有技术相比,本发明的有益效果如下:
1)本发明通过设置该渗排水***,在施工期间,能及时排出地下渗水,有效避免施工期间因地下水水浮力引起的地下室上浮,避免产生地下水水压力造成的底板结构裂缝;通过对地下水泄压,合理开发二次利用地下降水,达到节约用水的目的,通过渗排水***自然泄压降水,比采取井点降水等措施费用更省,而且渗排水***对地质环境影响小,施工不受周边环境影响;
2)本发明的渗排水***其施工工艺简单,可操作性强,适用推广应用。
附图说明
图1为本发明的排渗水***结构示意图;
图2为本发明排渗水沟横向剖面示意图;
图3为穿结构底板泄水点封堵部分结构示意图;
图4为穿结构底板泄水点留置部分结构示意图。
图中:1-工程结构底板,2-混凝土垫层,3-土工布过滤网,4-碎石过滤层,5-集水管,6-金属管,7-止水环,8-四通接头,9-盖板,10-镀锌水管,11-水压调节阀。
具体实施方式
以下结合说明书附图对本发明作进一步的描述,但本发明的保护范围并不仅限于此:
如图1-2所示,本发明的一种地下室底板抗浮渗排水***,包括渗排水沟、集水井、穿底板泄水点,所述渗排水沟与集水井通过四通接头相通,所述渗排水沟水平设置在工程结构底板1下面,所述集水井竖直暗设在结构底板下,所述渗排水沟由土工布过滤网3、碎石过滤层4和水平设置的集水管5构成,集水井由土工布过滤网3、碎石过滤层4和竖直设置的集水管5构成,所述穿底板泄水点设置在工程结构底板1与集水井顶部连接处,所述穿底板泄水点通过金属管6与集水井内的集水管5连接,集水管5上设有开孔,地下水渗入渗排水沟的集水管5后,通过四通接头8导入集水井的集水管5中,由金属管6通过穿底板泄水点排走。
如图所示,本发明实施例中的渗排水沟的沟槽纵横向交错设置,沟槽截面为梯形,为下窄上宽梯形结构,该梯形上底位于沟槽底部,下底位于沟槽顶部,其纵横向间隔为20-30m,沟槽下底边400mm,其高为300mm,沟槽开挖后先在沟内铺设土工布作为过滤网3,土工布过滤网3上铺有4-6cm的碎石过滤层4,集水管5水平铺设于碎石过滤层4中间;为了便于流水,本发明实施例将渗排水沟的集水管5倾斜放置,集水管5与四通接头8连接的一端低于远离四通接头8的另一端,两端之间的坡度为0.5%~1.0%。
如图所示,本发明实施例中的集水井尺寸为400×400×1000mm,相邻集水井间隔为20-30m,集水井开挖后先铺土工布作土工布过滤网3,土工布过滤网3上铺有4-6cm的碎石过滤层4,集水管5竖直***碎石过滤层4内。
为了便于收集地下渗水,本发明将所述渗排水沟和集水井的集水管5管壁密布开孔,开孔的直径为3-6mm,优选为5mm。
如图3和图4所示,所述穿底板泄水点通过金属管6连接集水管5,金属管6上端穿出工程结构底板1,下端置入集水井内的集水管5中,金属管6位于穿底板泄水点上方的设置焊接一圈止水环7,施工工程完工后,所述穿底板泄水点部分进行封堵,部分留置,该封堵部分穿底板泄水点由盖板9与止水环7焊接封堵,再由混凝土补填;留置部分穿底板泄水点由盖板9上设有与金属管6连通的镀锌水管10,该镀锌水管10伸出至工程结构底板1外,该镀锌水管10上安装水压调节阀11,在水压力升高至预设值时开启阀门泄压,将水流导入就近的工程结构集水井中。
本发明的地下室底板抗浮渗排水***的施工方法如下:
1)基坑开挖;
2)地下渗排水沟槽、集水井开挖,沟槽可以为梯形结构,也可以为方形结构,梯形结构沟槽的下底为400mm,高为300mm,方形沟槽的大小为300×300mm,纵横向间隔20-30m布置;集水井400×400×1000mm,相邻集水井间隔20-30m布置;
3)渗排水沟槽内铺土工布,土工布内填入粒径4-6cm碎石;
4)沟槽内放入集水管5,集水管端头位于集水井上,集水管由四通接头8连接,集水管5倾斜设置,其坡度0.5%~1.0%,集水管5管壁开孔,包裹网格布,集水井内集水管5竖向放置,并与四通接头8连接;
5)沟槽、集水井内碎石回填,压实,得到碎石过滤层4;
6)碎石过滤层上浇筑100mm厚的C15垫层,即混凝土垫层2;
7)工程结构底板施工,集水井穿工程结构底板部位为穿底板泄水点,套入金属管6,金属管6管壁焊接止水环7,金属管6底部位于集水井处预留孔洞,与集水管5相通,工程结构底板1与穿底板泄水点之间的混凝土仅浇至止水环7的高度;
8)结构施工期间,及时排出集水井内积水;
9)地下室顶板覆土压重完成后,根据需要,部分集水井可进行封堵,部分可留置后用;封堵部分用C30微膨胀混凝土灌入金属管6内,随后金属管6管口用盖板9焊接封闭,盖板9为8mm厚钢板,集水井处预留孔洞混凝土浇筑;留置部分的集水井先焊接盖板9,盖板9上设置外接的镀锌水管10,镀锌水管10高出工程结构底板后安装水压调节阀11,当水压上升到预设值则自动开启阀门减压。

Claims (10)

1.一种地下室底板抗浮渗排水***,包括渗排水沟、集水井、穿底板泄水点,其特征在于所述渗排水沟与集水井通过四通接头相通,所述渗排水沟水平设置在工程结构底板(1)下面,所述集水井竖直暗设在结构底板下,所述渗排水沟由土工布过滤网(3)、碎石过滤层(4)和水平设置的集水管(5)构成,集水井由土工布过滤网(3)、碎石过滤层(4)和竖直设置的集水管(5)构成,所述穿底板泄水点设置在工程结构底板(1)与集水井顶部连接处,所述穿底板泄水点通过金属管(6)与集水井内的集水管(5)连接,集水管(5)上设有开孔,地下水渗入渗排水沟的集水管(5)后,通过四通接头(8)导入集水井的集水管(5)中,由金属管(6)通过穿底板泄水点排走。
2.根据权利要求1所述的一种地下室底板抗浮渗排水***,其特征在于所述渗排水沟的沟槽截面为梯形,为下窄上宽梯形结构,该梯形上底位于沟槽底部,下底位于沟槽顶部。
3.根据权利要求2所述的一种地下室底板抗浮渗排水***,其特征在于所述沟槽纵横向交错设置,其纵横向间隔为20-30m,沟槽下底边400mm,其高为300mm,沟槽开挖后先在沟内铺设土工布作为过滤网(3),土工布过滤网(3)上铺有4-6cm的碎石过滤层(4),集水管(5)水平铺设于碎石过滤层(4)中间。
4.根据权利要求1所述的一种地下室底板抗浮渗排水***,其特征在于所述渗排水沟和集水井的集水管(5)管壁密布开孔的直径为3-6mm,优选为5mm。
5.根据权利要求1所述的一种地下室底板抗浮渗排水***,其特征在于渗排水沟的集水管(5)倾斜放置,集水管(5)与四通接头(8)连接的一端低于远离四通接头(8)的另一端,两端之间的坡度为0.5%~1.0%。
6.根据权利要求1所述的一种地下室底板抗浮渗排水***,其特征在于所述集水井尺寸为400×400×1000mm,相邻集水井间隔为20-30m,集水井开挖后先铺土工布作土工布过滤网(3),土工布过滤网(3)上铺有4-6cm的碎石过滤层(4),集水管(5)竖直***碎石过滤层(4)内。
7.根据权利要求1所述的一种地下室底板抗浮渗排水***,其特征在于所述的金属管(6)上端穿出工程结构底板(1),下端置入集水井内的集水管(5)中,金属管(6)位于穿底板泄水点上方的设置焊接一圈止水环(7)。
8.根据权利要求7所述的一种地下室底板抗浮渗排水***,其特征在于施工工程完工后,所述穿底板泄水点由盖板(9)与止水环(7)焊接封堵,再由混凝土补填。
9.根据权利要求7所述的一种地下室底板抗浮渗排水***,其特征在于施工工程完工后,所述穿底板泄水点由盖板(9)上设有与金属管(6)连通的镀锌水管(10),该镀锌水管(10)伸出至工程结构底板(1)外,该镀锌水管(10)上安装水压调节阀(11),在水压力升高至预设值时开启阀门泄压,将水流导入就近的工程结构集水井中。
10.一种根据权利要求1所述的一种地下室底板抗浮渗排水***的施工方法,其特征在于包括如下步骤:
1)基坑开挖;
2)地下渗排水沟槽、集水井开挖,沟槽下底为400mm,高为300mm,纵横向间隔20-30m布置;集水井400×400×1000mm,相邻集水井间隔20-30m布置;
3)渗排水沟槽内铺土工布,土工布内填入粒径4-6cm碎石;
4)沟槽内放入集水管(5),集水管(5)端头位于集水井上,集水管(5)由四通接头(8)连接,集水管(5)倾斜设置,其坡度0.5%~1.0%,集水管(5)管壁开孔,包裹网格布,集水井内集水管(5)竖向放置,并与四通接头(8)连接;
5)沟槽、集水井内碎石回填,压实,得到碎石过滤层(4);
6)碎石过滤层(4)上浇筑100mm厚的C15垫层,即混凝土垫层(2);
7)工程结构底板(1)施工,集水井穿工程结构底板(1)部位为穿底板泄水点,套入金属管(6),金属管(6)管壁焊接止水环(7),金属管(6)底部位于集水井处预留孔洞,与集水管(5)相通,工程结构底板(1)与穿底板泄水点之间的混凝土仅浇至止水环(7)的高度;
8)结构施工期间,及时排出集水井内积水;
9)地下室顶板覆土压重完成后,根据需要,部分集水井可进行封堵,部分可留置后用;封堵部分用C30微膨胀混凝土灌入金属管(6)内,随后金属管(6)管口用8mm厚钢板焊接封闭,集水井处预留孔洞混凝土浇筑;留置部分的集水井先焊接盖板(9),盖板(9)上设置外接的镀锌水管(10),镀锌水管(10)高出工程结构底板(1)后安装水压调节阀(11),当水压上升到预设值则自动开启阀门减压。
CN201510692184.7A 2015-10-23 2015-10-23 一种地下结构渗排水***及其施工方法 Active CN105201002B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510692184.7A CN105201002B (zh) 2015-10-23 2015-10-23 一种地下结构渗排水***及其施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510692184.7A CN105201002B (zh) 2015-10-23 2015-10-23 一种地下结构渗排水***及其施工方法

Publications (2)

Publication Number Publication Date
CN105201002A true CN105201002A (zh) 2015-12-30
CN105201002B CN105201002B (zh) 2017-08-25

Family

ID=54948935

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510692184.7A Active CN105201002B (zh) 2015-10-23 2015-10-23 一种地下结构渗排水***及其施工方法

Country Status (1)

Country Link
CN (1) CN105201002B (zh)

Cited By (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106013265A (zh) * 2016-07-15 2016-10-12 宁波建工工程集团有限公司 地下室应急抗浮结构及其施工方法
CN106968712A (zh) * 2017-05-12 2017-07-21 西南交通大学 富水地层隧底排水结构及其施工方法
CN108396787A (zh) * 2018-05-21 2018-08-14 中建四局第六建筑工程有限公司 一种地下室底板抗浮泄压装置及其使用方法
CN108868185A (zh) * 2018-06-30 2018-11-23 厦门防水博士建筑工程有限公司 一种楼地面窜水渗漏修缮***
CN108914944A (zh) * 2018-07-27 2018-11-30 中国冶集团有限公司 沙洲高水位管道基坑开挖支护降水体系及施工方法
CN109168528A (zh) * 2018-08-31 2019-01-11 靖西海越农业有限公司 一种水肥智慧施灌***
CN109372033A (zh) * 2018-11-13 2019-02-22 湖北天利建筑技术有限责任公司 用于地下建筑抗浮的泄水装置及其施工方法
CN109440775A (zh) * 2018-12-27 2019-03-08 云南省建设投资控股集团有限公司 一种下沉式基坑降排水***、施工方法及使用方法
CN110805052A (zh) * 2019-10-31 2020-02-18 中国二十二冶集团有限公司 超深基坑突涌综合处理方法
CN111809704A (zh) * 2020-07-29 2020-10-23 青岛时代建筑设计有限公司 一种降低抗浮设防水位的排水***
CN112411631A (zh) * 2020-11-11 2021-02-26 浙江中垚建设有限公司 一种地下室防水卷材施工方法及防水结构
CN112921999A (zh) * 2021-01-26 2021-06-08 中建四局第一建筑工程有限公司 一种高水位地下室底板下层疏水带雨水再利用一体化循环***的结构及其施工方法
CN113585790A (zh) * 2021-07-23 2021-11-02 中国建筑西南勘察设计研究院有限公司 一种既有建筑的引孔卸压施工方法
CN113638453A (zh) * 2021-08-18 2021-11-12 贵州大学 一种地下室抗浮降压***及其施工方法
CN113700050A (zh) * 2021-09-07 2021-11-26 通号建设集团有限公司 一种地下建筑抗浮结构体系及其施工方法
CN113718808A (zh) * 2021-07-23 2021-11-30 新城控股集团实业发展有限公司 一种防止地下结构上浮的降水结构及其施工方法
CN114855846A (zh) * 2022-06-08 2022-08-05 贵州建工兴印建筑工程有限公司 一种地下防渗减压抗浮盲管结构及其施工方法

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20020000318A (ko) * 2000-06-23 2002-01-05 오시덕 연약지반 개량구역의 간극수 처리용 수평 배수공법
CN201172828Y (zh) * 2008-03-19 2008-12-31 山西第六建筑有限公司 降水井封井装置
WO2009100529A1 (en) * 2008-02-11 2009-08-20 Marc-Antoine Pelletier Gas and liquid extraction system and method
CN202450536U (zh) * 2011-12-29 2012-09-26 青岛新华友建工集团股份有限公司 一种基坑内浅降水与封堵施工装置
CN103114605A (zh) * 2013-03-12 2013-05-22 中国建筑第八工程局有限公司 防渗疏水层结构及施工方法
CN203049630U (zh) * 2012-12-21 2013-07-10 曹琪喆 建筑物基础底板防水***
CN203768926U (zh) * 2014-04-08 2014-08-13 江苏扬州建工建设集团有限公司 一种地下室深井封堵装置
CN104060620A (zh) * 2013-03-20 2014-09-24 中国二十冶集团有限公司 深基坑岩溶裂隙水控制方法
CN204174631U (zh) * 2014-08-29 2015-02-25 上海建工七建集团有限公司 一种基坑落深区域的疏排水结构
CN104712000A (zh) * 2015-03-24 2015-06-17 中船第九设计研究院工程有限公司 一种超深地下空间结构底板下减压排水***
CN205152970U (zh) * 2015-10-23 2016-04-13 金磐集团有限公司 一种地下结构渗排水***

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20020000318A (ko) * 2000-06-23 2002-01-05 오시덕 연약지반 개량구역의 간극수 처리용 수평 배수공법
WO2009100529A1 (en) * 2008-02-11 2009-08-20 Marc-Antoine Pelletier Gas and liquid extraction system and method
CN201172828Y (zh) * 2008-03-19 2008-12-31 山西第六建筑有限公司 降水井封井装置
CN202450536U (zh) * 2011-12-29 2012-09-26 青岛新华友建工集团股份有限公司 一种基坑内浅降水与封堵施工装置
CN203049630U (zh) * 2012-12-21 2013-07-10 曹琪喆 建筑物基础底板防水***
CN103114605A (zh) * 2013-03-12 2013-05-22 中国建筑第八工程局有限公司 防渗疏水层结构及施工方法
CN104060620A (zh) * 2013-03-20 2014-09-24 中国二十冶集团有限公司 深基坑岩溶裂隙水控制方法
CN203768926U (zh) * 2014-04-08 2014-08-13 江苏扬州建工建设集团有限公司 一种地下室深井封堵装置
CN204174631U (zh) * 2014-08-29 2015-02-25 上海建工七建集团有限公司 一种基坑落深区域的疏排水结构
CN104712000A (zh) * 2015-03-24 2015-06-17 中船第九设计研究院工程有限公司 一种超深地下空间结构底板下减压排水***
CN205152970U (zh) * 2015-10-23 2016-04-13 金磐集团有限公司 一种地下结构渗排水***

Cited By (20)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106013265A (zh) * 2016-07-15 2016-10-12 宁波建工工程集团有限公司 地下室应急抗浮结构及其施工方法
CN106968712A (zh) * 2017-05-12 2017-07-21 西南交通大学 富水地层隧底排水结构及其施工方法
CN108396787A (zh) * 2018-05-21 2018-08-14 中建四局第六建筑工程有限公司 一种地下室底板抗浮泄压装置及其使用方法
CN108868185A (zh) * 2018-06-30 2018-11-23 厦门防水博士建筑工程有限公司 一种楼地面窜水渗漏修缮***
CN108914944A (zh) * 2018-07-27 2018-11-30 中国冶集团有限公司 沙洲高水位管道基坑开挖支护降水体系及施工方法
CN109168528A (zh) * 2018-08-31 2019-01-11 靖西海越农业有限公司 一种水肥智慧施灌***
CN109168528B (zh) * 2018-08-31 2021-01-15 靖西海越农业有限公司 一种水肥智慧施灌***
CN109372033A (zh) * 2018-11-13 2019-02-22 湖北天利建筑技术有限责任公司 用于地下建筑抗浮的泄水装置及其施工方法
CN109440775B (zh) * 2018-12-27 2020-11-24 云南省建设投资控股集团有限公司 一种下沉式基坑降排水***、施工方法及使用方法
CN109440775A (zh) * 2018-12-27 2019-03-08 云南省建设投资控股集团有限公司 一种下沉式基坑降排水***、施工方法及使用方法
CN110805052A (zh) * 2019-10-31 2020-02-18 中国二十二冶集团有限公司 超深基坑突涌综合处理方法
CN111809704A (zh) * 2020-07-29 2020-10-23 青岛时代建筑设计有限公司 一种降低抗浮设防水位的排水***
CN112411631A (zh) * 2020-11-11 2021-02-26 浙江中垚建设有限公司 一种地下室防水卷材施工方法及防水结构
CN112411631B (zh) * 2020-11-11 2021-12-21 浙江中垚建设有限公司 一种地下室防水卷材施工方法及防水结构
CN112921999A (zh) * 2021-01-26 2021-06-08 中建四局第一建筑工程有限公司 一种高水位地下室底板下层疏水带雨水再利用一体化循环***的结构及其施工方法
CN113585790A (zh) * 2021-07-23 2021-11-02 中国建筑西南勘察设计研究院有限公司 一种既有建筑的引孔卸压施工方法
CN113718808A (zh) * 2021-07-23 2021-11-30 新城控股集团实业发展有限公司 一种防止地下结构上浮的降水结构及其施工方法
CN113638453A (zh) * 2021-08-18 2021-11-12 贵州大学 一种地下室抗浮降压***及其施工方法
CN113700050A (zh) * 2021-09-07 2021-11-26 通号建设集团有限公司 一种地下建筑抗浮结构体系及其施工方法
CN114855846A (zh) * 2022-06-08 2022-08-05 贵州建工兴印建筑工程有限公司 一种地下防渗减压抗浮盲管结构及其施工方法

Also Published As

Publication number Publication date
CN105201002B (zh) 2017-08-25

Similar Documents

Publication Publication Date Title
CN105201002B (zh) 一种地下结构渗排水***及其施工方法
CN205152970U (zh) 一种地下结构渗排水***
CN101768976B (zh) 一种基坑降水节水装置及其施工方法
CN102418347B (zh) 一种深基坑内盲沟和集水井排水施工方法
CN110219313B (zh) 一种地下施工盲井排水***及施工方法
CN109371918B (zh) 具有永临结合多功能排水箱涵的大坝结构及其施工方法
CN203174616U (zh) 一种粘土地基降水节水***
CN109797769B (zh) 一种湿陷性黄土地区地下综合管廊地基结构及其施工方法
CN102433886A (zh) 一种集水井内增加降水井施工方法
LU500273B1 (en) New comprehensive dewatering and drainage method and drainage device for mudstone subway station
CN108677982A (zh) 复杂地质条件基坑基底开挖涌水处理方法
CN204174631U (zh) 一种基坑落深区域的疏排水结构
CN105484277A (zh) 一种电梯基坑或集水坑内管井降水施工用构件及施工方法
CN203320494U (zh) 一种高坝溢洪道地基排水***
CN103061351B (zh) 防止地下室底板***、渗水的装置
CN202440826U (zh) 一种高水位地下室底板防水***
CN104846837B (zh) 一种明排水基坑中超深井坑的施工方法
CN218148458U (zh) 一种裂隙发育岩层深水深基坑降排水***
CN216275788U (zh) 用于深基坑截水帷幕失效后的排水装置
CN104929081A (zh) 一种堆石混凝土透水坝及其施工方法
CN214245855U (zh) 隔水控压抗浮结构
CN112144425B (zh) 一种位于高水位且砂性土质环境的箱涵排水沟浇筑方法
CN113914342A (zh) 一种地下室外墙肥槽降排水施工方法
CN202081425U (zh) 建筑施工基坑水节水机构
CN104947630A (zh) 用于水利水电工程的过流集渣堰及其施工方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant