CN203742611U - 一种在初期支护条件下隧道侧墙开马头门的加强支护结构 - Google Patents
一种在初期支护条件下隧道侧墙开马头门的加强支护结构 Download PDFInfo
- Publication number
- CN203742611U CN203742611U CN201320402418.6U CN201320402418U CN203742611U CN 203742611 U CN203742611 U CN 203742611U CN 201320402418 U CN201320402418 U CN 201320402418U CN 203742611 U CN203742611 U CN 203742611U
- Authority
- CN
- China
- Prior art keywords
- tunnel
- ingate
- adherent
- supporting
- strengthening
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Lining And Supports For Tunnels (AREA)
Abstract
本实用新型涉及一种在初期支护条件下隧道侧墙开马头门的加强支护结构,包括在马头门部位前后沿隧道环向设置的贴壁框架梁和沿马头门部位、侧向隧道拱部、底部或全断面设置的贴壁纵向加强梁,贴壁环梁和贴壁纵强梁共同形成空间框架结构体系,用于承担初期支护破除后的受力转换。此种“贴壁空间框架”形成的封闭、稳定的结构受力体系,有效承担了竖井马头门初支破除后的受力转换,对围岩的稳定起到了约束作用,成功地实现了初期支护的受力转换及暗挖隧道初期支护结构的进洞,极大地提高了施工工效、降低了暗挖进洞难度和风险。
Description
技术领域
本实用新型涉及地下建筑工程技术领域,尤其涉及一种初期支护条件下的隧道侧墙开马头门进洞施工侧向隧道时,开口部位的加强环支护结构。
背景技术
在暗挖隧道的侧墙开马头门修建侧向隧道是地下工程中不可避免的一项工作,由于侧墙开口部位的结构将受到削弱,且开口部位的结构体系受力复杂,为确保安全,以往通常要求在完成隧道完成二次衬砌、并预留好二衬马头门结构后,才能破除初期支护、进洞开挖侧向隧道。这种做法的施工工期较长,对于建设周期紧张的项目、对提高工作效率有一定的影响。
在初期支护条件下直接开口施工侧向隧道虽然能够节省一定的时间,但在施工安全方面没有保证。
为解决隧道侧墙开马头门时在工期和安全方面的矛盾,提出了一种利用初期支护作为基本承载结构,在开口部位进行纵向和环向加固的结构加强方式,有效解决了在初期支护条件下侧墙开口的问题,能有效减小施工难度、控制施工风险,大大提高施工作业效率。
实用新型内容
本实用新型的目的在于提供在初期支护条件下,隧道侧墙开马头门的一种新的结构受力体系替代传统的二次衬砌马头门结构的开口做法。
由于隧道的初期支护均为环向封闭的、一榀一榀钢拱架排列组成的临时支护结构,在不施作二次衬砌就破除初期支护的情况下,隧道承载体系和整体稳定性遭受破坏,以此初支破坏后所释放的内力及变形,必须通过建立一种新的 结构体系达到平衡,本实用新型通过建立一种复杂的空间结构形成新的平衡体系,即利用紧贴初期支护的纵向和横向空间加强环梁作为在初期支护条件下开口的加强结构,从而实现快速、安全进洞施工侧向隧道的目的。
本实用新型的技术方案为:
一种在隧道初期支护侧墙开马头门部位的临时空间支撑结构,包括在马头门部位前后沿隧道环向设置的贴壁框架梁和沿马头门部位、侧向隧道拱部、底部或全断面设置的贴壁纵向加强梁,贴壁环梁和贴壁纵强梁共同形成空间框架结构体系,用于承担初期支护破除后的受力转换。
上述临时支撑结构的具体实施步序为:隧道在采用暗挖CRD法开挖、初支施工完成后,根据侧向进洞隧道的开挖轮廓,沿侧向隧道开口的两侧及侧向隧道拱部、底部或全断面设置的贴壁的纵、环向空间环梁,形成封闭、稳定的空间框架受力体系,此体系形成后,再破除隧道初支结构进行侧向隧道的开挖。
本实用新型的有益效果是:“贴壁空间框架”形成的封闭、稳定的空间框架受力体系,具有足够的强度、刚度和稳定性,与隧道初支结构形成很好的整体性,有效承担了隧道马头门初支破除后的转换受力,对围岩的稳定起到了约束作用,极大地提高了施工工效、降低了暗挖进洞难度和风险。实践证明,这种在初期支护条件下直接开口施工侧向隧道方式的成功实施,不仅安全、可靠,而且比传统的二次衬砌马头门进洞方式,工期能节约20%以上,效益显著,有较好的应用价值和推广意义。
本技术适用于隧道在初期支护条件下开各种大小、各种型式、采用不同施工工法进洞的马头门结构,包括侧向进洞开挖单层单洞、多层多跨隧道的各种开挖大小的隧道,侧向进洞开挖的隧道,其施工工法可以是目前暗挖土层隧道所采用的所有施工工法,包括全断面开挖法、中隔壁法、交叉中隔壁法、双侧 壁导坑法、中洞法、侧洞法、柱洞法、洞桩逆作法、洞柱逆作法、一次扣拱法等。
附图说明
图1是暗挖隧道侧向开挖单层单洞隧道(全断面开挖法)初支进洞示意图;
图2是暗挖隧道侧向开挖单层单洞隧道(全断面开挖法)初支进洞侧视图;
图3是暗挖隧道侧向开挖单层双洞隧道(双侧壁导坑法、全断面开挖法)初支进洞示意图;
图4是暗挖隧道侧向开挖单层双洞隧道(双侧壁导坑法、全断面开挖法)初支进洞侧视图;
图5是暗挖隧道侧向开挖多层多跨隧道(洞桩逆作法)初支进洞示意图;
图6是暗挖隧道侧向开挖多层多跨隧道(洞桩逆作法)初支进洞侧视图;
图7是贴壁环梁、贴壁纵梁与暗挖隧道侧壁连接节点(节点①)示意图;
图8是贴壁环梁与暗挖隧道临时仰拱相交节点(节点②)示意图;
图9是暗挖隧道初期支护与侧向隧道初期支护连接节点(节点③)示意图。
附图标记说明:
1.暗挖隧道初期支护;2.暗挖隧道临时仰拱;3.暗挖隧道中隔壁;4.贴壁环梁;5.贴壁纵梁;6.暗挖隧道端墙;7.侧向隧道初期支护;8.贴壁环梁、贴壁纵梁主筋;9.贴壁环梁、贴壁纵梁箍筋;10.预埋连接筋;11.暗挖隧道格栅主筋;12.暗梁;13.暗梁箍筋;14.侧向隧道格栅纵向连接筋。
具体实施方式
下面将结合附图,对本实用新型做进一步说明。
贴壁环梁4和贴壁纵梁5在马头门开洞过程中,对暗挖隧道结构的稳定和 环境变形控制等起到了重要作用。如何采取措施保证贴壁环梁4和纵梁5自身的稳定性,以及与暗挖隧道结构的整体稳定性,保证体系转换过程中传力可靠,是工程成功的关键。
(1)贴壁环梁4和贴壁纵梁5的设置:沿侧向隧道导洞的轮廓周圈贴壁设置,形成空间框架体系,使之与暗挖隧道原支护结构形成整体,共同受力;同时应兼顾施工方便与快捷。
(2)贴壁环梁4、贴壁纵梁5与暗挖隧道初期支护1的连接(节点①):暗挖隧道初期支护1施工时,须在格栅内预埋连接钢筋9,或与暗挖隧道格栅钢筋焊接牢固。
(3)贴壁环梁4与暗挖隧道临时仰拱2相交处节点处理(节点②):在贴壁环梁4与暗挖隧道临时仰拱2相交处,环梁4的钢筋须贯通,可采用以下两种措施实现:一是暗挖隧道施工时,在临时仰拱2相应位置预留贴壁环梁主筋8,后做的加强梁主筋与其焊接;二是暗挖隧道临时仰拱2与贴壁环梁4相交部位后喷射混凝土,环梁主筋后插,相交部位混凝土与贴壁环梁4混凝土一同喷射。
(4)暗挖隧道初期支护1与侧向隧道初期支护7的连接(节点③):为提高侧向隧道初期支护7的纵向稳定性,保证与暗挖隧道初期支护1可靠连接。暗挖隧道初期支护1破除后,保留足够长度的格栅主筋11,沿马头门四周施作暗梁12,预留格栅主筋11与暗梁箍筋13焊接牢固。暗梁12施作时,预埋侧向隧道格栅纵向连接筋14,连接筋14与暗梁箍筋13焊接牢固。
Claims (1)
1.一种在初期支护条件下隧道侧墙开马头门的加强支护结构,所述加强支护结构包括贴壁框架梁和贴壁纵向加强梁,所述贴壁框架梁在马头门前后部位沿隧道环向设置,所述贴壁纵向加强梁沿马头门部位、侧向隧道拱部、底部或全断面设置。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201320402418.6U CN203742611U (zh) | 2013-07-08 | 2013-07-08 | 一种在初期支护条件下隧道侧墙开马头门的加强支护结构 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201320402418.6U CN203742611U (zh) | 2013-07-08 | 2013-07-08 | 一种在初期支护条件下隧道侧墙开马头门的加强支护结构 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203742611U true CN203742611U (zh) | 2014-07-30 |
Family
ID=51342428
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201320402418.6U Expired - Fee Related CN203742611U (zh) | 2013-07-08 | 2013-07-08 | 一种在初期支护条件下隧道侧墙开马头门的加强支护结构 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203742611U (zh) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108331587A (zh) * | 2018-03-05 | 2018-07-27 | 北京市政建设集团有限责任公司 | 一种横通道马头门破除施工及破除方法 |
CN110080780A (zh) * | 2019-04-26 | 2019-08-02 | 中铁二十三局集团第六工程有限公司 | 一种用于城市地下空间的快速施工方法 |
CN110566237A (zh) * | 2019-09-16 | 2019-12-13 | 北京市市政四建设工程有限责任公司 | 一种地铁区间停车线大断面暗挖施工初支进洞加固结构 |
CN111188631A (zh) * | 2020-02-18 | 2020-05-22 | 中建八局轨道交通建设有限公司 | 马头门双初支进洞结构及其施工方法 |
CN112096425A (zh) * | 2020-11-20 | 2020-12-18 | 北京城建道桥建设集团有限公司 | 一种马头门位置的横通道支护***及其施工方法 |
CN112253137A (zh) * | 2020-11-03 | 2021-01-22 | 中铁隆工程集团有限公司 | 马头门破除加固关键技术的施工方法 |
-
2013
- 2013-07-08 CN CN201320402418.6U patent/CN203742611U/zh not_active Expired - Fee Related
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108331587A (zh) * | 2018-03-05 | 2018-07-27 | 北京市政建设集团有限责任公司 | 一种横通道马头门破除施工及破除方法 |
CN110080780A (zh) * | 2019-04-26 | 2019-08-02 | 中铁二十三局集团第六工程有限公司 | 一种用于城市地下空间的快速施工方法 |
CN110566237A (zh) * | 2019-09-16 | 2019-12-13 | 北京市市政四建设工程有限责任公司 | 一种地铁区间停车线大断面暗挖施工初支进洞加固结构 |
CN111188631A (zh) * | 2020-02-18 | 2020-05-22 | 中建八局轨道交通建设有限公司 | 马头门双初支进洞结构及其施工方法 |
CN112253137A (zh) * | 2020-11-03 | 2021-01-22 | 中铁隆工程集团有限公司 | 马头门破除加固关键技术的施工方法 |
CN112096425A (zh) * | 2020-11-20 | 2020-12-18 | 北京城建道桥建设集团有限公司 | 一种马头门位置的横通道支护***及其施工方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203742611U (zh) | 一种在初期支护条件下隧道侧墙开马头门的加强支护结构 | |
CN102733827B (zh) | 隧道换拱施工方法及用于隧道换拱施工中的施工结构 | |
CN203559904U (zh) | 一种倒挂井壁竖井侧墙开马头门的加强支护结构 | |
CN101963060B (zh) | 基于钢管拱肋支护结构的隧道施工方法 | |
CN109184700B (zh) | 一种软弱围岩小净距隧道稳定中夹岩的施工方法 | |
CN104405411B (zh) | 超大变断面隧道支护结构 | |
CN104653197A (zh) | 超大变断面隧道施工方法 | |
CN204729099U (zh) | 岩质地层暗挖三层地铁车站伞盖结构 | |
CN104329095B (zh) | 一种既有隧道拓宽施工方法 | |
CN101338678A (zh) | 一次扣拱暗挖逆作施工方法 | |
CN102704939A (zh) | 特大断面隧道组合型钢临时支撑开挖法 | |
CN104295301B (zh) | 一种浅埋暗挖碎裂岩体地铁隧道交叉点的施工方法 | |
CN108868834B (zh) | 隧道拱墙初期支护侵限换拱施工临时支护装置 | |
CN104294769B (zh) | 一种补桩与增大台帽组合加固已建桥台结构的施工方法 | |
CN102650212A (zh) | 一种利用中导洞临时支护保护连拱隧道中隔墙的施工方法 | |
CN105822329B (zh) | 一种支护架、支护结构及支护结构的施工方法 | |
CN104481546A (zh) | 一种软岩隧道斜井进入正洞的双曲拱的施工方法 | |
CN104929649A (zh) | 隧道横洞进主洞挑顶工法及挑顶结构 | |
CN103061779B (zh) | 矿山隧道新型支护结构的施工方法 | |
CN204716248U (zh) | 隧道横洞进主洞挑顶结构 | |
CN104632228B (zh) | 横通道进入正线施工方法及横通道 | |
CN109854276A (zh) | 一种小间距多线隧道洞口支撑结构 | |
CN202991054U (zh) | 矿山隧道新型支护结构 | |
CN105134247A (zh) | 水平层状ⅲ类围岩中的隧道支护结构和施工方法 | |
CN205117354U (zh) | 具有拱脚临时加强装置的钢筋格栅群 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20140730 Termination date: 20210708 |
|
CF01 | Termination of patent right due to non-payment of annual fee |